This is Addendum No. 2 to the Request for Proposals issued by the Brentwood Stormwater Authority for the Laveton Avenue Storm Sewer Extension project located in the 200 block of Laveton Avenue in the Borough of Brentwood, Pennsylvania. The addendum modifies project specifications based on field observations. The primary change involves a reduction in HDPE pipe requirements under Item 1 of Article 5 (Basis of Bid) from 295 square feet to 255 square feet due to a relocation of the upstream catch basin location. The project map has been updated to reflect this modification. The mandatory pre-bid meeting is scheduled for September 24, 2026, at 2:00 PM EST, with sealed electronic bids due on October 5, 2026, at 2:00 PM EST via pennbid.bonfire.com.
The addendum clarifies that Article 5, Item 3 regarding catch basins includes the cost of repairing concrete road disturbance associated with catch basin installation. Bidders are required to acknowledge receipt of this addendum and provide signature, date, and title of the authorizing officer with their bid submission. The original project scope included installation of approximately 295 linear feet of 16-inch diameter HDPE pipe, two 8-inch diameter HDPE wye connections, two 10 square foot pre-cast concrete catch basins with covers, replacement of approximately 285 square feet of disturbed driveway apron with 6-inch thick concrete, and replacement of approximately 265 square feet of disturbed asphalt road surface. Project Engineer George Zboyovsky, PE, and Project Manager Eric Peccon serve as primary contacts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-LAVETON SEWER RFP.pdf | ||
| 2-Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Laveton Avenue Storm Sewer Extension
ADDENDUM NO. 2
REQUEST FOR PROPOSALS TO BE RECEIVED ON OCTOBER 5, 2026
ADDENDUM TEXT: Based upon the field view, the location of the upstream catch basin will be changed. This will reduce the amount of HDPE pipe listed under Item 1 in Article 5 (Basis of Bid) from 295 SF to 255 SF. The project map has been changed to reject this matter. Additionally, Article 5 will also be updated to clarify that the catch basins listed as Item 3 includes the cost repairing disturbance to the concrete road.
ACKNOWLEDGMENT
The Bidder hereby acknowledges receipt of the foregoing ADDENDUM NUMBER 1
(Name of Bidder) (Signature)
(date) (Title of Officer)
END OF DOCUMENT 002113