This Addendum No. 1 document issued by Howard County Public Schools Purchasing Department modifies the original bid solicitation (IFB No. 103.26.B4) for Mt. View Middle School Entrance Renovation, with proposals due November 10, 2026, at 10:00 A.M. The addendum addresses questions regarding project liquidity damages, existing roof warranty information, and incorporates substantive changes including replacement of furniture plan notes to clarify that storage pods are not required for existing furnishings, substitution of an illegible floor plan sheet with a corrected FP101 Floor Plan showing existing fire protection dated October 7, 2026, and addition of two new specification sections (Section 012100 Allowances and Section 012200 Unit Prices) along with a Preliminary Baseline Construction Schedule dated May 5, 2026. The project schedule establishes a 193-day construction timeline from March 17, 2027, through December 10, 2027, encompassing procurement, fabrication, delivery, demolition, rough-in work, finishes, and closeout activities, with substantial completion targeted for August 11, 2027.

The addendum establishes a General Allowance of $35,000 to be included in the base bid lump sum, which may be utilized for unforeseen conditions, code mandates, or owner revisions with verbal approval and written direction from the owner or construction manager. The document includes a comprehensive schedule of twenty-four unit prices for various work items, including masonry walls ($13.05 to $15.75 per square foot), metal stud wall assemblies ($8.50 per square foot), acoustical ceiling systems ($5.50 to $6.75 per item), sprinkler heads ($525 to $535 each), electrical devices and outlets ($135 to $530 each), and specialized labor services ($42.36 to $87.55 per hour). All bidders are required to acknowledge receipt of and full understanding of all addenda on the proper bid submittal form, with failure to obtain addenda not relieving bidders from obligations under their proposals. The existing Mt. View Middle School roof, installed in 2015, is a 4-ply BUR with capsheet manufactured by Firestone under a 20-year NDL warranty (issued November 17, 2015, Warranty No. RO 085440).

View the file

Other files

File Type Posted
2-Form of Proposal.pdf PDF
1-Mt. View MS Enterance Reno Bid 103.26.B4 fully Complete Doc..pdf PDF
2-Form of Proposal.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HOWARD COUNTY PUBLIC SCHOOLS

PURCHASING DEPARTMENT

10910 Clarksville Pike Ellicott City, MD 21042

(410) 313-6600 http://www.hcpss.org/about-us/purchasing/

ADDENDUM NO. 1

(Total Pages - 15)

October 9, 2026 Invitation for Bids No. 103.26.B4 Mt View MS – Entrance Renovation

Bid Due Date: November 10, 2026, Time: 10:00 A.M.

The following shall be incorporated into the captioned solicitation as though included in the original documents issued.

The Board of Education authorizes the following changes, clarification and/or attachments to the solicitation documents; however, such changes shall not relieve the firm of their responsibilities as otherwise required by the solicitation documents.

Questions

Item # Attachment

Enclosed Y/N

Question or Change Description Answer

1 NO

Are there liquidated damages for the project referenced above? I reviewed the bid documents and found the MBE liquidated damages but nothing specified for the actual project itself, thank you.

Yes. Refer to AIA A132, Section 4.5.1.

2 NO Is the existing roof under warranty and who is the original manufacturer?

MVMS roof was installed in 2015. It is a 4-ply BUR with capsheet and the manufacturer is Firestone, 20 year NDL warranty issued on

11/17/2015, #RO 085440.

Changes

Item # Attachment Enclosed Y/N

Question or Change Description Answer

3 NO

Replace language on A161 FURNTIURE PLANS, GENERAL NOTES, Note #3, A-H as follows:

3. STORAGE PODS ARE NOT REQUIRED

FOR EXISTING FURNISHINGS AND

STORAGE WILL BE AVAILABLE WITHIN

THE SCHOOL AT A LOCATION APPROVED

BY THE CONSTRUCTION MANAGER PRIOR

TO MOBILIZATION.

N/A http://www.hcpss.org/about-us/purchasing/

4 YES

Replace sheet between FP001 and FP400 with

FP101 FLOOR PLAN - EXISTING FIRE

PROTECTION, Dated 10/07/2026. Previous print was illegible.

N/A

5 YES

Add Specification Section 012100 Allowances and 012200 Unit Prices. Add Preliminary Baseline Construction Schedule, dated 05-Oct-26, to the end of Specification Section 013213

N/A

Note: It is the bidder’s sole responsibility to monitor the HCPSS Purchasing website to ensure that they download any additional addendums or clarifications prior to submitting their bid or proposal and duly acknowledge receipt of and full understanding of said addendums on the proper bid submittal form. Failure to do so may result in non-receipt of important information prior to the closing date and may render the bid or proposal non responsive and ineligible to award. It is highly recommended that the submitting bidder ascertain if they have received all the addendums posted prior to submitting their bid/proposal. Failure of any bidder to obtain any such addendum or interpretation shall not relieve the bidders company from any obligation under his/her proposal as submitted.

PRINCIPAL

PRINCIPAL TOILET

024T

DATA

PRINCIPAL SECRETARY

RECEPTION

ACCESSIBLE TOILET

023T

ASSISTANT PRINCIPAL

DATA CLERK

STORAGE

012C

STORAGE

014C

CORRIDOR

FLEX

CONFERENCE ROOM

VESTIBULE

CORRIDOR

LOBBY

EXISTING STORAGE

EXISTING WORKROOM

STAFF LOUNGE

CORRIDOR

STAFF TOILET

010T

ACCESSIBLE STAFF TOILET

011T

CORRIDOR

EX SP

EX SP

EX

S

P

EX

S P

EX SP

EX

S

P

EX

S

P

EX

S

P

EX

S

P

EX

S

P

EX

S

P

EX SP

EX SP

EX SP

S H E E T T I T L E

S H E E T N U M B E R

AFFIRMATION

S C A L E ã D E S I G N C O L L E C T I V E , I N C . A L L R I G H T S R E S E R V E D

CONSULTANT

SEAL

O W N E R / D E V E L O P E R

DC Project No.

P R O J E C T A D D R E S S

PSC No.

P R O J E C T N A M E

KEY PLAN

PROJECT SUBMISSION

REVISION# I S S U E D F O R D A T E

7/

/2

8:

:2

AM

24-P-0702

HOWARD COUNTY

PUBLIC SCHOOLS

L13F049

MOUNT VIEW MS

ENTRANCE RENOVATION

BID DOCUMENTS

12101 WOODFORD DR, MARRIOTSVILLE, MD

21104

100% DD 11/14/2025

Gipe Associates, Inc.

CONSULTING ENGINEERS

1220 East Joppa Road, Suite 102 Towson, Maryland 21286 Baltimore, Maryland Easton, Maryland www.gipe.net

410.832.2420 410.822.8688

W.O.# 25062

"THIS DRAWING AND THE DESIGN AND CONSTRUCTION FEATURES DISCLOSED ARE

PROPRIETARY TO GIPE ASSOCIATES, INC. AND SHALL NOT BE ALTERED OR REUSED IN

WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF GIPE

ASSOCIATES, INC. Copyright ã 2026"

SCALE: 1/4" = 1'-0"

0 4 8

M I

C H

A E L N O T A R A N

G E

NO. 35222

PROFESSIONAL CERTIFICATION:

I HEREBY CERTIFY THAT THESE DOCUMENTS WERE

PREPARED OR APPROVED BY ME, AND THAT I AM A

DULY LICENSED PROFESSIONAL ENGINEER UNDER

THE LAWS OF THE STATE OF MARYLAND, LICENSE

No. 35222, EXPIRATION DATE: 01/05/2028.

95% CD 2/26/2026

BID DOCUMENTS 5/1/2026

FLOOR PLAN - EXISTING

FIRE PROTECTION

FP101

GENERAL NOTES:

1. INFORMATION SHOWN ON THIS DRAWING PERTAINING TO

EXISTING CONDITIONS HAS BEEN OBTAINED FROM AVAILABLE

BUILDING AS-BUILTS AND/OR GENERAL FIELD OBSERVATIONS

AND MAY NOT INDICATE EXISTING CONDITIONS IN DETAIL.

DETERMINE EXISTING CONDITIONS PRIOR TO FABRICATION OR

PERFORMANCE OF ANY WORK.

FLOOR PLAN - EXISTING FIRE PROTECTION

SCALE: 1/4'' = 1'-0'' N1

FP101

1/4" = 1'-0"

EXISTING SPRINKLER ZONE

PIPING

ADDENDUM 10/7/2026

ADDENDUM 01

012100 - 1 Turner Townsend & Heery

MT VIEW MS-ENTRANCE RENOVATION

HOWARD COUNTY PUBLIC SCHOOL SYSTEM

SECTION 012100 - ALLOWANCES

PART 1 – GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements governing allowances.

B. Types of allowances include the following: Lump-sum allowances.

1.3 DEFINITIONS

A. Allowance: A quantity of work or dollar amount included in the Contract, established in lieu of additional requirements, used to defer selection of actual materials and equipment to a later date when direction will be provided to Contractor. If necessary, additional requirements will be issued by the Construction Manager.

1.4 SELECTION AND PURCHASE

A. At the earliest practical date after award of the Contract, advise Architect of the date when final selection, or purchase and delivery, of each product or system described by an allowance must be completed by the Owner to avoid delaying the Work.

B. At the Construction Manager’s request, obtain proposals for each allowance for use in making final selections. Include recommendations that are relevant to performing the Work.

C. Purchase products and systems selected by Architect from the designated supplier.

1.5 ACTION SUBMITTALS

A. Submit proposals for purchase of products or systems included in allowances in the form specified for Proposed Change Orders.

B. Coordinate and process submittals for allowance items in same manner as for other portions of the

Work, to include but not limited to, product data, shop drawings, coordination drawings, and as-builts.

1.6 LUMP-SUM ALLOWANCES

A. General

1. After associated allowances work has been completed and accepted, notify the Owner and

Construction Manager of any unused materials purchased under an allowance. Owner to provide direction if unused materials are to be returned to manufacturer or supplier for a credit or turned over to Owner for storage.

2. If requested by Owner or Construction Manager, retain and prepare unused material for storage by Owner. Deliver unused material to Owner’s storage space as directed.

3. Allowance shall include cost to Contractor of specific products and materials ordered by Owner or selected by Construction Manager/Architect under allowance and shall include taxes, insurance, bonds, overhead and profit, freight, and delivery to Project site.

4. The Owner has the right to utilize the encumbered dollars that remain in any Allowance line items in any Contractor’s Payment Application Schedule of Values. If approved by the Owner, any Allowance line item may be utilized to perform changes in the work in lieu of an executed change order, but only if verbally approved by the Owner and directed in writing by the Owner

012100 - 2 and Construction Manager, and only if the cost of the requested Work does not exceed the value of the Allowance line item dollar amount (or cumulatively the total dollar amount of all allowances if a Contractor has more than one allowance) that remains unused at the time the written direction is provided.

5. If for any reason the Owner does not require the use of any portion of any Allowance, the dollars not utilized will be credited back to the Owner via Change Order prior to Final Payment.

B. Lump Sum Allowance

1. The Contractor’s bid includes a Lump Sum Allowance as directed below, within SCHEDULE OF ALLOWANCES. Every bidder will be required to provide the cost of this Lump Sum Allowance as part of the Base Bid Lump Sum under the heading “Lump Sum Allowance in their Schedule of Values.

2. Allowances are intended to minimize the impacts to the work due to unforeseen conditions, code official mandates, or revisions/additions by the Owner.

3. The Allowance shall not be used without verbal approval and written direction from the Owner or Construction Manager.

4. Contractor shall provide daily work tickets to the Construction Manager for signature. No payment for work performed under the Lump Sum Allowance will be made without signed tickets.

5. Contractor to submit a Proposed Change Order as outlined in 01 2600 for approval as an allowance draw.

6. Change Orders are not created until an allowance has been exhausted.

7. Bond is not a permissible cost on allowance Work.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged or defective products to manufacturer for replacement.

3.2 PREPARATION

A. Coordinate materials and their installations to ensure that each allowance item is completely integrated and interfaced with related work.

3.3 SUBMITTALS FOR PAYMENT

A. Contractor shall submit “Allowance” items by submitting a Proposed Change Order (PCO) on HCPSS change order form in the bid documents, Exhibit A and as instructed on Exhibit B. Once a PCO is approved and fully executed the Contractor shall invoice through periodic applications for payment in the appropriate allowance line item in the schedule of values. Submit payment application with the appropriate dollar amount on the appropriate line item in the application for that allowance.

B. For Time and Material work (T&M) submit daily extra work ticket within twenty-four (24) hours, stating the allowance number under which the work was performed, indicate the time spent and

012100 - 3 material used. Daily extra work tickets must be signed by a Construction Manager representative and submitted as backup documentation with payment applications when billing for allowance funds.

C. Time & Materials work tickets shall be accompanied by actual material and equipment receipts, invoices, and number of man-hours for each type of worker, number of equipment hours, and all material quantities must be stated on the ticket presented for Construction Manager signature.

3.4 SCHEDULE OF ALLOWANCES

A. The Prime Contractor shall include cash amounts in the Base Bid Lump Sum for each of the following Schedules of Allowances,.

B. Lump Sum Schedule of Allowances:

1. General Allowance: $35,000

END OF SECTION

UNIT PRICES

012200 - 1

SECTION 012200

PART 1 GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for unit prices.

B. Related Requirements:

1. Section 01 2100 - ALLOWANCES, for procedures for using unit prices to adjust lump sum allowances.

2. Section 01 2900 – PAYMENT PROCEDURES, for procedures for submitting and handling Change Orders.

3. Section 01 2600 – CONTRACT MODIFICATION PROCEDURERS

1.3 DEFINITIONS

A. Unit price is an amount incorporated in the Agreement, applicable during the duration of the

Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

1.4 PROCEDURES

A. Unit prices include required labor, products, tools, equipment, plant and facilities, transportation, services, and incidentals; applicable taxes and insurance; overhead and profit and bond.

B. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contractor

C. List of Unit Prices: A schedule of unit prices is included in Part 3. Work referenced in the schedule shall be provided in accordance with requirements from applicable specification sections.

PART 2 PRODUCTS – NOT USED

012200 - 2

PART 3 EXECUTION

3.1 SCHEDULE OF UNIT PRICES

Unit Prices are for both extra Work and Credits. This list of prices will be submitted with the Bid and shall become a part of the Contract upon its award. Unit prices listed below are applicable to all Work in this project involving extra materials/services/labor/install/warranty/deliveries, etc. performed by the Contractor or his Subcontractors and/or credits to the Owner deleted from the Project. Unit Prices include all overhead and profit for the Subcontractor(s) and Contractor. Prices as stated shall remain in effect through the end of the Contract Warranty period. The undersigned acknowledges the unit price values as part of this bid proposal and agrees to add or delete items for the unit prices identified when directed to do so by the Owner. The Owner reserves the right to negotiate unit prices depending upon the quantities to which the unit prices become applicable. Contractor to submit costs as a Proposed Change Order ( in accordance with Section 01 2600) and use the unit rate only in the total line, as previously stated, no additional costs including overhead and profit shall be added for Contractor or Subcontractor(s). If paid for as an allowance draw, no additional bond permitted, and if allowances are exhausted and a Change Order is used, then additional bond cost is applicable.

Item No.

Description Unit Price

1 6" CMU wall** See item #3 Sq/ft $13.05

2 8" CMU wall** See item #3 Sq/ft $14.20

12” CMU Wall** **Unit masonry per sq/ft of wall surface includes mortar/joint reinforcement, bullnose corners, labor, scaffold, and all incidentals. This price does not include grout infill. CMU units to be regular hollow for purpose of unit price.

Sq/ft $15.75

Provide general laborer labor services as directed by Construction Manager / Owner.

Hour $42.36

Provide 3 5/8” 20-gauge metal stud wall assembly including 5/8” gypsum board on each side finished and ready for paint.

Sq/ft $8.50

Provide specified 2’ X 4’ acoustical panel ceiling system, including support system, grid, and tiles.

Sq/ft $5.50

Provide replacement of installed 2x4 APC acoustical ceiling tiles including all labor, material, and equipment.

Each $6.75

Provide Touch-up Point-up and painting of GWB walls and ceilings including all labor, material, and equipment.

Hour $73.80

Provide replacement of installed VCT floor tile including removal, floor prep and replacement, throughout building.

Sq/ft $8.75

012200 - 3

Add wet pipe FP pendant semi-recessed quick response sprinkler head, w/ up to 20lf of branch piping.

Each $525.00

Add wet pipe FP upright quick response sprinkler head and head guards w/ up to 20lf of branch piping.

Each $535.00

Provide HVAC mechanic, Plumber or TAB technician labor to assist Commissioning Agent with additional requested functional performance testing supplemental to base contract requirements.

Hour $87.55

Receptacle: Provide 120-volt, 20-Ampere receptacle and 100-ln/ft 2# and 12G in ¾" conduits, and other materials as needed for a complete receptacle addition.

Each $530.00

Fire Alarm Strobe: Provide 15, 30, 60, 75, or 110-CD ceiling or wall-mounted strobe and 50-ln/ft of 14 AWG THWN stranded fire alarm cabling in ¾" conduit minimum. Provide all programming and testing.

Each $425.00

Fire Alarm Horn or Speaker/Strobe Unit: Provide 15, 30, 60, 75, or 110-CD ceiling or wall-mounted fire alarm horns, horn/strobes, or speaker/strobes and 50-ln/ft of 14 AWG THWN stranded fire alarm cabling in ¾" conduit minimum. Provide all programming and testing.

Each $465.00

Data Outlet: Provide 300-Ln/ft of CAT-6 cabling and CAT-6 RJ-45 jack and faceplate and back box.

Provide all terminations, testing, and labeling.

Each $280.00

Exit Sign: Provide single or double faced exit light with wire guards and 50-ft of conduit and wire – Fixture Type X.

Each $459.00

Light Switch: Provide 1P, 20A toggle switch including box, cover plate, and 50-ft of conduit and wiring.

Each $280.00

Telephone Drop: Provide a CAT-5 E telephone jack complete with testing and termination. Include 300-ft of CAT-5 E plenum cable.

Each $240.00

Video Drop: Provide video jack and plates as specified complete with testing, termination, and labeling. Include 50-ft of RG-6/U coaxial plenum cable and video tape.

Each $135.00

Speaker: Provide PA system ceiling-mounted speaker including back box, 200-ft of cabling in ¾" conduit and programming.

Each $775.00

Fire Alarm Pull Station: Provide a manual fire alarm pull station complete with 50- ft of fire alarm wiring in ¾" conduit. Include all testing and programming of device.

Each $427.00

Provide Journeyman Electrician, Fire Alarm System or Lighting Control technician, labor to assist Commissioning Agent with additional requested performance testing supplemental to base contract requirements.

Hour $81.75

012200 - 4

END SECTION

Video Outlet: Unit costs shall include one (1) cable television video outlet with one (1) F-connector jack and 100-lf of RG-6 coaxial cable. Unit price shall be complete including all conduit, back-box, labeling and testing.

Each $250.00

Activity ID Activity Name Orig Dur

Start Finish Total Float

MounMount View Middle School - Preliminary Baseline Construction Schedule 193d 17-Mar-27 10-Dec-27 0d

ProcProcurement 100d 17-Mar-27 04-Aug-27 2d

SubmSubmittals 20d 17-Mar-27 13-Apr-27 47d SUB-000 ANTICIPATED NOTICE TO PROCEED 0d 17-Mar-27 0d SUB-050 SUBMIT GLAZING 10d 17-Mar-27 30-Mar-27 49d SUB-060 SUBMIT CERAMIC TILING 10d 17-Mar-27 30-Mar-27 42d SUB-070 SUBMIT ATC SYSTEM 10d 17-Mar-27 30-Mar-27 47d SUB-080 SUBMIT FLOORING 10d 17-Mar-27 30-Mar-27 42d SUB-110 SUBMIT ROLLER SHADES 10d 17-Mar-27 30-Mar-27 51d SUB-120 SUBMIT HM FRAMES & DOORS 10d 17-Mar-27 30-Mar-27 0d SUB-170 SUBMIT PLUMBING FIXTURES 10d 17-Mar-27 30-Mar-27 55d SUB-180 SUBMIT TOILET ACCESSORIES 10d 17-Mar-27 30-Mar-27 57d SUB-190 SUBMIT LIGHTING FIXTURES 10d 17-Mar-27 30-Mar-27 42d SUB-200 SUBMIT ELECTRICAL SENSORS, OUTLETS, CONTROLS, ETC. 10d 17-Mar-27 30-Mar-27 35d SUB-220 SUBMIT SECURITY / COMM LOW VOLTAGE 10d 17-Mar-27 30-Mar-27 35d SUB-230 SUBMIT SPRINKLER 10d 17-Mar-27 30-Mar-27 25d SUB-240 SUBMIT CAULKING & FIRESTOPPING 10d 17-Mar-27 30-Mar-27 34d SUB-250 SUBMIT ROOFING 10d 17-Mar-27 30-Mar-27 25d SUB-260 SUBMIT VISUAL DISPLAY UNITS, FE, & CLOSET SHELVING 10d 17-Mar-27 30-Mar-27 46d SUB-270 SUBMIT SIGNAGE 10d 17-Mar-27 30-Mar-27 47d SUB-010 SUBMIT PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS & HARDWARE 15d 17-Mar-27 06-Apr-27 30d SUB-020 SUBMIT CASEWORK 15d 17-Mar-27 06-Apr-27 30d SUB-090 SUBMIT SOLID SURFACE COUNTERTOP 15d 17-Mar-27 06-Apr-27 30d SUB-100 SUBMIT PLASTIC-LAMINATE-CLAD COUNTERTOPS 15d 17-Mar-27 06-Apr-27 30d SUB-130 SUBMIT HARDWARE & PERM CORES 15d 17-Mar-27 06-Apr-27 42d SUB-140 SUBMIT CABINET UNIT HEATER 15d 17-Mar-27 06-Apr-27 25d SUB-150 SUBMIT MECHANICAL VAVS, DUCT, ETC. 15d 17-Mar-27 06-Apr-27 28d SUB-160 SUBMIT DUCTLESS SPLIT SYSTEM 15d 17-Mar-27 06-Apr-27 15d SUB-210 SUBMIT FIRE ALARM 20d 17-Mar-27 13-Apr-27 27d

ReviewReview & Approval 20d 31-Mar-27 27-Apr-27 47d REV-050 REVIEW & APPROVE GLAZING 10d 31-Mar-27 13-Apr-27 49d REV-060 REVIEW & APPROVE CERAMIC TILING 10d 31-Mar-27 13-Apr-27 42d REV-070 REVIEW & APPROVE ATC SYSTEM 10d 31-Mar-27 13-Apr-27 47d REV-080 REVIEW & APPROVE FLOORING 10d 31-Mar-27 13-Apr-27 42d REV-110 REVIEW & APPROVE ROLLER SHADES 10d 31-Mar-27 13-Apr-27 51d REV-120 REVIEW & APPROVE HM FRAMES & DOORS 10d 31-Mar-27 13-Apr-27 0d REV-170 REVIEW & APPROVE PLUMBING FIXTURES 10d 31-Mar-27 13-Apr-27 55d REV-180 REVIEW & APPROVE TOILET ACCESSORIES 10d 31-Mar-27 13-Apr-27 57d REV-190 REVIEW & APPROVE LIGHTING FIXTURES 10d 31-Mar-27 13-Apr-27 42d REV-200 REVIEW & APPROVE ELECTRICAL SENSORS, OUTLETS, CONTROLS, ETC. 10d 31-Mar-27 13-Apr-27 35d REV-220 REVIEW & APPROVE SECURITY / COMM LOW VOLTAGE 10d 31-Mar-27 13-Apr-27 35d REV-230 REVIEW & APPROVE SPRINKLER 10d 31-Mar-27 13-Apr-27 25d REV-240 REVIEW & APPROVE CAULKING & FIRESTOPPING 10d 31-Mar-27 13-Apr-27 34d REV-250 REVIEW & APPROVE ROOFING 10d 31-Mar-27 13-Apr-27 25d

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 2027 2028

ANTICIPATED NOTICE TO PROCEED

SUBMIT GLAZING

SUBMIT CERAMIC TILING

SUBMIT ATC SYSTEM

SUBMIT FLOORING

SUBMIT ROLLER SHADES

SUBMIT HM FRAMES & DOORS

SUBMIT PLUMBING FIXTURES

SUBMIT TOILET ACCESSORIES

SUBMIT LIGHTING FIXTURES

SUBMIT ELECTRICAL SENSORS, OUTLETS, CONTROLS, ETC.

SUBMIT SECURITY / COMM LOW VOLTAGE

SUBMIT SPRINKLER

SUBMIT CAULKING & FIRESTOPPING

SUBMIT ROOFING

SUBMIT VISUAL DISPLAY UNITS, FE, & CLOSET SHELVING

SUBMIT SIGNAGE

SUBMIT PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS & HARDWARE

SUBMIT CASEWORK

SUBMIT SOLID SURFACE COUNTERTOP

SUBMIT PLASTIC-LAMINATE-CLAD COUNTERTOPS

SUBMIT HARDWARE & PERM CORES

SUBMIT CABINET UNIT HEATER

SUBMIT MECHANICAL VAVS, DUCT, ETC.

SUBMIT DUCTLESS SPLIT SYSTEM

SUBMIT FIRE ALARM

REVIEW & APPROVE GLAZING

REVIEW & APPROVE CERAMIC TILING

REVIEW & APPROVE ATC SYSTEM

REVIEW & APPROVE FLOORING

REVIEW & APPROVE ROLLER SHADES

REVIEW & APPROVE HM FRAMES & DOORS

REVIEW & APPROVE PLUMBING FIXTURES

REVIEW & APPROVE TOILET ACCESSORIES

REVIEW & APPROVE LIGHTING FIXTURES

REVIEW & APPROVE ELECTRICAL SENSORS, OUTLETS, CONTROLS, ETC.

REVIEW & APPROVE SECURITY / COMM LOW VOLTAGE

REVIEW & APPROVE SPRINKLER

REVIEW & APPROVE CAULKING & FIRESTOPPING

REVIEW & APPROVE ROOFING

Mount View Middle School Preliminary Baseline Construction Schedule Print Date: 05-Oct-26

Actual Work Remaining Work Critical Remaining Work Milestone

Start Finish Total Float

REV-260 REVIEW & APPROVE VISUAL DISPLAY UNITS, FE, & CLOSET SHELVING 10d 31-Mar-27 13-Apr-27 46d REV-270 REVIEW & APPROVE SIGNAGE 10d 31-Mar-27 13-Apr-27 47d REV-010 REVIEW & APPROVE PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS & HARDWARE 10d 07-Apr-27 20-Apr-27 30d REV-020 REVIEW & APPROVE CASEWORK 10d 07-Apr-27 20-Apr-27 30d REV-090 REVIEW & APPROVE SOLID SURFACE COUNTERTOP 10d 07-Apr-27 20-Apr-27 30d REV-100 REVIEW & APPROVE PLASTIC-LAMINATE-CLAD COUNTERTOPS 10d 07-Apr-27 20-Apr-27 30d REV-130 REVIEW & APPROVE HARDWARE & PERM CORES 10d 07-Apr-27 20-Apr-27 42d REV-140 REVIEW & APPROVE UNIT HEATER 10d 07-Apr-27 20-Apr-27 25d REV-150 REVIEW & APPROVE MECHANICAL VAVS, DUCT, ETC. 10d 07-Apr-27 20-Apr-27 28d REV-160 REVIEW & APPROVE DUCTLESS SPLIT SYSTEM 10d 07-Apr-27 20-Apr-27 15d REV-210 REVIEW & APPROVE FIRE ALARM 10d 14-Apr-27 27-Apr-27 27d

FabricFabrication & Delivery 80d 14-Apr-27 04-Aug-27 2d FAB-070 FABRICATE & DELIVER ATC SYSTEM 20d 14-Apr-27 11-May-27 47d FAB-120 FABRICATE & DELIVER HM FRAMES 20d 14-Apr-27 11-May-27 38d FAB-170 FABRICATE & DELIVER PLUMBING FIXTURES 20d 14-Apr-27 11-May-27 55d FAB-180 FABRICATE & DELIVER TOILET ACCESSORIES 20d 14-Apr-27 11-May-27 57d FAB-200 FABRICATE & DELIVER ELECTRICAL SENSORS, OUTLETS, CONTROLS, ETC. 20d 14-Apr-27 11-May-27 35d FAB-220 FABRICATE & DELIVER SECURITY / COMM LOW VOLTAGE 20d 14-Apr-27 11-May-27 35d FAB-240 FABRICATE & DELIVER CAULKING & FIRESTOPPING 20d 14-Apr-27 11-May-27 34d FAB-190 FABRICATE & DELIVER LIGHTING FIXTURES 25d 14-Apr-27 18-May-27 42d FAB-050 FABRICATE & DELIVER GLAZING 30d 14-Apr-27 25-May-27 49d FAB-060 FABRICATE & DELIVER CERAMIC TILING 30d 14-Apr-27 25-May-27 42d FAB-080 FABRICATE & DELIVER FLOORING 30d 14-Apr-27 25-May-27 42d FAB-110 FABRICATE & DELIVER ROLLER SHADES 30d 14-Apr-27 25-May-27 51d FAB-230 FABRICATE & DELIVER SPRINKLER 35d 14-Apr-27 01-Jun-27 25d FAB-250 FABRICATE & DELIVER ROOFING 35d 14-Apr-27 01-Jun-27 25d FAB-260 FABRICATE & DELIVER VISUAL DISPLAY UNITS, FE, & CLOSET SHELVING 35d 14-Apr-27 01-Jun-27 46d FAB-270 FABRICATE & DELIVER SIGNAGE 35d 14-Apr-27 01-Jun-27 47d FAB-030 FABRICATE & DELIVER GRAINTECH DOORS 80d 14-Apr-27 04-Aug-27 0d FAB-150 FABRICATE & DELIVER MECHANICAL VAVS, DUCT, ETC. 20d 21-Apr-27 18-May-27 28d FAB-130 FABRICATE & DELIVER DOOR HARDWARE & PERM CORES 30d 21-Apr-27 01-Jun-27 42d FAB-140 FABRICATE & DELIVER UNIT HEATER 30d 21-Apr-27 01-Jun-27 25d FAB-010 FABRICATE & DELIVER PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS & HARDWARE 40d 21-Apr-27 15-Jun-27 30d FAB-020 FABRICATE & DELIVER CASEWORK 40d 21-Apr-27 15-Jun-27 30d FAB-090 FABRICATE & DELIVER SOLID SURFACE COUNTERTOP 40d 21-Apr-27 15-Jun-27 30d FAB-100 FABRICATE & DELIVER PLASTIC-LAMINATE CLAD COUNTERTOPS 40d 21-Apr-27 15-Jun-27 30d FAB-160 FABRICATE & DELIVER DUCTLESS SPLIT SYSTEM 40d 21-Apr-27 15-Jun-27 15d FAB-210 FABRICATE & DELIVER FIRE ALARM 20d 28-Apr-27 25-May-27 27d

ConsConstruction 37d 16-Jun-27 08-Aug-27 0d

DemoDemolition 7d 16-Jun-27 24-Jun-27 0d NTP-1000 LAST DAY OF 2026 - 2027 SCHOOL YEAR 0d 16-Jun-27* 0d DEMO-010 MOBILIZATION 1d 17-Jun-27 17-Jun-27 4d DEMO-040 UTILITY SHUTDOWN / ISOLATION 1d 17-Jun-27 17-Jun-27 4d DEMO-000 PLACEMENT OF DUMPSTER & STORAGE PODS 1d 17-Jun-27 17-Jun-27 0d DEMO-020 MOVE OUT FURNISHINGS, MOSAIC, TACKBOARDS, COPIERS, ETC. 2d 17-Jun-27 18-Jun-27 3d

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 2027 2028

REVIEW & APPROVE VISUAL DISPLAY UNITS, FE, & CLOSET SHELVING

REVIEW & APPROVE SIGNAGE

REVIEW & APPROVE PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS & HARDWARE

REVIEW & APPROVE CASEWORK

REVIEW & APPROVE SOLID SURFACE COUNTERTOP

REVIEW & APPROVE PLASTIC-LAMINATE-CLAD COUNTERTOPS

REVIEW & APPROVE HARDWARE & PERM CORES

REVIEW & APPROVE UNIT HEATER

REVIEW & APPROVE MECHANICAL VAVS, DUCT, ETC.

REVIEW & APPROVE DUCTLESS SPLIT SYSTEM

REVIEW & APPROVE FIRE ALARM

FABRICATE & DELIVER ATC SYSTEM

FABRICATE & DELIVER HM FRAMES

FABRICATE & DELIVER PLUMBING FIXTURES

FABRICATE & DELIVER TOILET ACCESSORIES

FABRICATE & DELIVER ELECTRICAL SENSORS, OUTLETS, CONTROLS, ETC.

FABRICATE & DELIVER SECURITY / COMM LOW VOLTAGE

FABRICATE & DELIVER CAULKING & FIRESTOPPING

FABRICATE & DELIVER LIGHTING FIXTURES

FABRICATE & DELIVER GLAZING

FABRICATE & DELIVER CERAMIC TILING

FABRICATE & DELIVER FLOORING

FABRICATE & DELIVER ROLLER SHADES

FABRICATE & DELIVER SPRINKLER

FABRICATE & DELIVER ROOFING

FABRICATE & DELIVER VISUAL DISPLAY UNITS, FE, & CLOSET SHELVING

FABRICATE & DELIVER SIGNAGE

FABRICATE & DELIVER GRAINTECH DOORS

FABRICATE & DELIVER MECHANICAL VAVS, DUCT, ETC.

FABRICATE & DELIVER DOOR HARDWARE & PERM CORES

FABRICATE & DELIVER UNIT HEATER

FABRICATE & DELIVER PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS & HARDWARE

FABRICATE & DELIVER CASEWORK

FABRICATE & DELIVER SOLID SURFACE COUNTERTOP

FABRICATE & DELIVER PLASTIC-LAMINATE CLAD COUNTERTOPS

FABRICATE & DELIVER DUCTLESS SPLIT SYSTEM

FABRICATE & DELIVER FIRE ALARM

LAST DAY OF 2026 - 2027 SCHOOL YEAR

MOBILIZATION

UTILITY SHUTDOWN / ISOLATION

PLACEMENT OF DUMPSTER & STORAGE PODS

MOVE OUT FURNISHINGS, MOSAIC, TACKBOARDS, COPIERS, ETC.

Mount View Middle School Preliminary Baseline Construction Schedule Print Date: 05-Oct-26

Actual Work Remaining Work

Start Finish Total Float

DEMO-030 SALVAGE, CUT, CAP, & MAKE SAFE (GENERAL SALVAGE) 2d 17-Jun-27 18-Jun-27 3d DEMO-050 INSTALL TEMPORARY BARRIERS & PROTECT INTERIOR; WRAP / SEAL DUCT TO REMAIN 2d 17-Jun-27 18-Jun-27 3d DEMO-060 DEMO EXISTING MILLWORK 3d 17-Jun-27 19-Jun-27 2d DEMO-100 DEMO / SALVAGE VAVS & CUH (AS APPLICABLE); REMOVE, STORE, & RELO EX FPVAV & ASSOC. THERMOSTAT 3d 17-Jun-27 19-Jun-27 2d DEMO-110 DEMO / SALVAGE FIRE ALARM (AS APPLICABLE) 3d 17-Jun-27 19-Jun-27 2d DEMO-150 DEMO EXISTING DOORS & FRAMES / GLAZING (SALVAGE NOTED DOORS & HARDWARE) 3d 17-Jun-27 19-Jun-27 2d DEMO-170 DEMO & STORE EXISTING VISITORS ACCESS INTERFACE SYSTEM 3d 17-Jun-27 19-Jun-27 2d DEMO-130 DEMO PLUMBING FIXTURES & REMOVE EXISTING REFRIGERATORS 5d 17-Jun-27 22-Jun-27 2d DEMO-140 DEMO EXISTING RANGE & OVERHEAD EXHAUST HOOD 5d 17-Jun-27 22-Jun-27 2d DEMO-070 DEMO EXISTING FLOORING (AS APPLICABLE) 7d 17-Jun-27 24-Jun-27 0d DEMO-080 DEMO AP CEILINGS / PORTION OF GYPSUM BOARD CEILNGS & FIXTURES 7d 17-Jun-27 24-Jun-27 0d DEMO-090 DEMO DUCTWORK 7d 17-Jun-27 24-Jun-27 0d DEMO-120 DEMO ABOVE CEILNG & IN WALL PLUMBING / GAS PIPING 7d 17-Jun-27 24-Jun-27 0d DEMO-160 DEMO OVERHEAD ELECTRICAL 7d 17-Jun-27 24-Jun-27 0d DEMO-180 DEMO EXISTING PORTION OF CMU WALL FOR NEW DOOR & FRAME / WINDOW 7d 17-Jun-27 24-Jun-27 0d DEMO-190 DEMO EXISTING WALLS 7d 17-Jun-27 24-Jun-27 0d DEMO-200 LAYOUT NEW SOG PLUMBING 2d 23-Jun-27 24-Jun-27 0d DEMO-210 DEMO PORTION OF EXISTING SOG FOR PLUMBING 2d 23-Jun-27 24-Jun-27 0d

RoughRough-in 17d 25-Jun-27 16-Jul-27 0d RI-050 NEW SOG PLUMBING INSTALLATION 2d 25-Jun-27 26-Jun-27 0d RI-010 MASONRY OPENINGS IN EXISTING WALLS 3d 25-Jun-27 28-Jun-27 0d RI-090 CUT WALL PENETRATIONS & ROUGH-IN DUCTWORK 3d 25-Jun-27 28-Jun-27 1d RI-060 POUR & PATCH NEW SOG PLUMBING 1d 28-Jun-27 28-Jun-27 0d RI-070 NEW FRAMING / WALL LAYOUT 1d 29-Jun-27 29-Jun-27 0d RI-360 INSPECT NEW SOG PLUMBING 1d 29-Jun-27 29-Jun-27 0d RI-100 ROUGH-IN OVERHEAD PLUMBING 2d 29-Jun-27 30-Jun-27 1d RI-110 ROUGH-IN OH LOW VOLTAGE 2d 29-Jun-27 30-Jun-27 1d RI-120 ROUGH-IN OH ELECTRICAL 2d 29-Jun-27 30-Jun-27 1d RI-020 INSTALL LINTELS & INFILL MASONRY OPENINGS 3d 29-Jun-27 01-Jul-27 0d RI-030 INSTALL STEEL LINTEL FOR BRICK VENEER 3d 29-Jun-27 01-Jul-27 0d RI-040 GROUT MASONRY WALLS 2d 30-Jun-27 01-Jul-27 0d RI-130 INSTALL HM DOOR FRAMES 2d 30-Jun-27 01-Jul-27 3d RI-080 INSTALL METAL WALL FRAMING 2d 30-Jun-27 01-Jul-27 0d RI-140 ROUGH-IN OVERHEAD CONTROLS & SENSORS 3d 01-Jul-27 06-Jul-27 1d RI-150 ROUGH-IN IN-WALL PLUMBING: TMVS & COLD WATER CONNECTION BOX 3d 02-Jul-27 07-Jul-27 0d RI-160 ROUGH-IN IN-WALL LOW VOLTAGE 3d 02-Jul-27 07-Jul-27 0d RI-170 ROUGH-IN IN-WALL ELECTRICAL 3d 02-Jul-27 07-Jul-27 0d RI-180 ROUGH-IN IN-WALL CONTROLS & SENSORS 3d 02-Jul-27 07-Jul-27 0d RI-190 INSTALL WOOD BLOCKING 2d 06-Jul-27 07-Jul-27 0d RI-200 ELECTRICAL ROUGH-IN INSPECTION 1d 08-Jul-27 08-Jul-27 0d RI-210 LOW VOLTAGE ROUGH-IN INSPECTION 1d 08-Jul-27 08-Jul-27 0d RI-220 PLUMBING ROUGH-IN INSPECTION 1d 08-Jul-27 08-Jul-27 0d RI-260 ROUGH-IN OH FIRE ALARM 3d 08-Jul-27 10-Jul-27 0d RI-270 ROUGH-IN OH MECHANICAL PIPING 3d 08-Jul-27 10-Jul-27 0d RI-280 MODIFY EXISTING SPRINKLER PIPING & HEADS 4d 08-Jul-27 12-Jul-27 0d

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 2027 2028

SALVAGE, CUT, CAP, & MAKE SAFE (GENERAL SALVAGE)

INSTALL TEMPORARY BARRIERS & PROTECT INTERIOR; WRAP / SEAL DUCT TO REMAIN

DEMO EXISTING MILLWORK

DEMO / SALVAGE VAVS & CUH (AS APPLICABLE); REMOVE, STORE, & RELO EX FPVAV & ASSOC. THER

DEMO / SALVAGE FIRE ALARM (AS APPLICABLE)

DEMO EXISTING DOORS & FRAMES / GLAZING (SALVAGE NOTED DOORS & HARDWARE)

DEMO & STORE EXISTING VISITORS ACCESS INTERFACE SYSTEM

DEMO PLUMBING FIXTURES & REMOVE EXISTING REFRIGERATORS

DEMO EXISTING RANGE & OVERHEAD EXHAUST HOOD

DEMO EXISTING FLOORING (AS APPLICABLE)

DEMO AP CEILINGS / PORTION OF GYPSUM BOARD CEILNGS & FIXTURES

DEMO DUCTWORK

DEMO ABOVE CEILNG & IN WALL PLUMBING / GAS PIPING

DEMO OVERHEAD ELECTRICAL

DEMO EXISTING PORTION OF CMU WALL FOR NEW DOOR & FRAME / WINDOW

DEMO EXISTING WALLS

LAYOUT NEW SOG PLUMBING

DEMO PORTION OF EXISTING SOG FOR PLUMBING

NEW SOG PLUMBING INSTALLATION

MASONRY OPENINGS IN EXISTING WALLS

CUT WALL PENETRATIONS & ROUGH-IN DUCTWORK

POUR & PATCH NEW SOG PLUMBING

NEW FRAMING / WALL LAYOUT

INSPECT NEW SOG PLUMBING

ROUGH-IN OVERHEAD PLUMBING

ROUGH-IN OH LOW VOLTAGE

ROUGH-IN OH ELECTRICAL

INSTALL LINTELS & INFILL MASONRY OPENINGS

INSTALL STEEL LINTEL FOR BRICK VENEER

GROUT MASONRY WALLS

INSTALL HM DOOR FRAMES

INSTALL METAL WALL FRAMING

ROUGH-IN OVERHEAD CONTROLS & SENSORS

ROUGH-IN IN-WALL PLUMBING: TMVS & COLD WATER CONNECTION BOX

ROUGH-IN IN-WALL LOW VOLTAGE

ROUGH-IN IN-WALL ELECTRICAL

ROUGH-IN IN-WALL CONTROLS & SENSORS

INSTALL WOOD BLOCKING

ELECTRICAL ROUGH-IN INSPECTION

LOW VOLTAGE ROUGH-IN INSPECTION

PLUMBING ROUGH-IN INSPECTION

ROUGH-IN OH FIRE ALARM

ROUGH-IN OH MECHANICAL PIPING

MODIFY EXISTING SPRINKLER PIPING & HEADS

Mount View Middle School Preliminary Baseline Construction Schedule Print Date: 05-Oct-26

Actual Work Remaining Work

Start Finish Total Float

RI-290 ROOF PATCH / BLOCKING FOR NEW DSS OUTDOOR UNIT 4d 08-Jul-27 12-Jul-27 0d RI-230 WALL CLOSE-IN INSPECTIONS 1d 09-Jul-27 09-Jul-27 0d RI-240 WALL INSULATION INSTALLATION 2d 09-Jul-27 10-Jul-27 0d RI-300 FIRE ALARM ROUGH-IN INSPECTION 1d 12-Jul-27 12-Jul-27 0d RI-310 MECHANICAL ROUGH-IN INSPECTION 1d 12-Jul-27 12-Jul-27 0d RI-320 REINSTALL / INSTALL NEW RELOCATED VAVS 4d 13-Jul-27 16-Jul-27 0d RI-330 FINAL INSTALL OF NEW INDOOR & OUTDOOR DSS UNITS 4d 13-Jul-27 16-Jul-27 0d RI-340 INSULATE DUCT & PIPING 3d 14-Jul-27 16-Jul-27 0d RI-350 FINAL VAV / CUH INSTALLATION; FINISH INSTALL OF NEW FPVAV & ASSOCIATED THERMOSTAT 3d 14-Jul-27 16-Jul-27 0d

FinishFinishes 26d 02-Jul-27 08-Aug-27 0d FIN-470 HANG, TAPE, & FINISH GWB/BULKHEADS (ONE-SIDE) 3d 02-Jul-27 07-Jul-27 3d FIN-010 HANG, TAPE, & FINISH GWB/BULKHEADS (2ND SIDE) 3d 12-Jul-27 14-Jul-27 0d FIN-020 INSTALL FIRE EXTINGUISHER CABINET 1d 14-Jul-27 14-Jul-27 0d FIN-030 PRIME & PAINT 1ST COAT 2d 15-Jul-27 16-Jul-27 0d FIN-040 INSTALL CEILING GRID 1d 17-Jul-27 17-Jul-27 0d FIN-050 INSTALL FIRE ALARM DEVICES 2d 19-Jul-27 20-Jul-27 1d FIN-060 TIE-IN & PRE-TEST SECURITY SYSTEM DEVICES 2d 19-Jul-27 20-Jul-27 1d FIN-070 INSTALL OVERHEAD ELECTRICAL / LV DEVICES (SPEAKERS, SENSORS, POWER SUPPLIES, ETC.) 2d 19-Jul-27 20-Jul-27 1d FIN-075 INSTALL GRILLES, REGISTERS, & DIFFUSERS 2d 19-Jul-27 20-Jul-27 0d FIN-080 INSTALL LIGHT FIXTURES 3d 19-Jul-27 21-Jul-27 0d FIN-300 MECHANCIAL FINAL INSPECTION 1d 21-Jul-27 21-Jul-27 0d FIN-090 CEILING CLOSE-IN INSPECTIONS 1d 22-Jul-27 22-Jul-27 0d FIN-100 DROP CEILING TILE / CLOSE CEILINGS 1d 23-Jul-27 23-Jul-27 0d FIN-150 PREP FLOORING INSTALLATION 1d 24-Jul-27 24-Jul-27 0d FIN-120 RE-INSTALL SALVAGED DOORS & HARDWARE 2d 24-Jul-27 26-Jul-27 7d FIN-130 RE-INSTALL DOOR CONTROLS / AUTOMATIC DOOR OPERATOR 2d 24-Jul-27 26-Jul-27 7d FIN-140 INSTALL TEMPORARY CONSTRUCTION DOOR CORES 2d 24-Jul-27 26-Jul-27 7d FIN-160 INSTALLATION OF CARPET TILES 2d 26-Jul-27 27-Jul-27 0d FIN-170 INSTALLATION OF RESILIENT FLOORING 2d 26-Jul-27 27-Jul-27 0d FIN-180 INSTALLATION OF CERAMIC TILE FLOORING 2d 26-Jul-27 27-Jul-27 0d FIN-190 INSTALLATION OF MARBLE THRESHOLD 1d 27-Jul-27 27-Jul-27 0d FIN-200 INSTALL FLOORING BASE 1d 28-Jul-27 28-Jul-27 0d FIN-230 INSTALL GLAZING 2d 28-Jul-27 29-Jul-27 6d FIN-210 INSTALL RESTROOM PLUMBING FIXTURES 3d 28-Jul-27 30-Jul-27 1d FIN-250 INSTALL MILLWORK, CASEWORK, & COUNTERTOPS 3d 29-Jul-27 31-Jul-27 0d FIN-330 FIRE ALARM FINAL INSPECTION 1d 30-Jul-27 30-Jul-27 6d FIN-220 INSTALL TOILET ACCESSORIES & MIRRORS 2d 31-Jul-27 02-Aug-27 1d FIN-260 INSTALL BACKSPLASH 1d 02-Aug-27 02-Aug-27 1d FIN-310 ELECTRICAL FINAL INSPECTION 1d 02-Aug-27 02-Aug-27 5d FIN-270 INSTALL TEACHERS LOUNGE PLUMBING FIXTURES 2d 02-Aug-27 03-Aug-27 0d FIN-290 PLUMBING FINAL INSPECTION 1d 04-Aug-27 04-Aug-27 3d FIN-340 POINT-UP 1d 04-Aug-27 04-Aug-27 0d FIN-350 FINAL PAINTING 2d 04-Aug-27 05-Aug-27 0d FIN-450 INSTALL PERMANENT DOOR CORES 4d 04-Aug-27 07-Aug-27 0d FIN-460 INSTALL GRAINTECH DOORS 4d 04-Aug-27 07-Aug-27 0d

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 2027 2028

ROOF PATCH / BLOCKING FOR NEW DSS OUTDOOR UNIT

WALL CLOSE-IN INSPECTIONS

WALL INSULATION INSTALLATION

FIRE ALARM ROUGH-IN INSPECTION

MECHANICAL ROUGH-IN INSPECTION

REINSTALL / INSTALL NEW RELOCATED VAVS

FINAL INSTALL OF NEW INDOOR & OUTDOOR DSS UNITS

INSULATE DUCT & PIPING

FINAL VAV / CUH INSTALLATION; FINISH INSTALL OF NEW FPVAV & ASSOCIATED THERMOS

HANG, TAPE, & FINISH GWB/BULKHEADS (ONE-SIDE)

HANG, TAPE, & FINISH GWB/BULKHEADS (2ND SIDE)

INSTALL FIRE EXTINGUISHER CABINET

PRIME & PAINT 1ST COAT

INSTALL CEILING GRID

INSTALL FIRE ALARM DEVICES

TIE-IN & PRE-TEST SECURITY SYSTEM DEVICES

INSTALL OVERHEAD ELECTRICAL / LV DEVICES (SPEAKERS, SENSORS, POWER SUPPLIES

INSTALL GRILLES, REGISTERS, & DIFFUSERS

INSTALL LIGHT FIXTURES

MECHANCIAL FINAL INSPECTION

CEILING CLOSE-IN INSPECTIONS

DROP CEILING TILE / CLOSE CEILINGS

PREP FLOORING INSTALLATION

RE-INSTALL SALVAGED DOORS & HARDWARE

RE-INSTALL DOOR CONTROLS / AUTOMATIC DOOR OPERATOR

INSTALL TEMPORARY CONSTRUCTION DOOR CORES

INSTALLATION OF CARPET TILES

INSTALLATION OF RESILIENT FLOORING

INSTALLATION OF CERAMIC TILE FLOORING

INSTALLATION OF MARBLE THRESHOLD

INSTALL FLOORING BASE

INSTALL GLAZING

INSTALL RESTROOM PLUMBING FIXTURES

INSTALL MILLWORK, CASEWORK, & COUNTERTOPS

FIRE ALARM FINAL INSPECTION

INSTALL TOILET ACCESSORIES & MIRRORS

INSTALL BACKSPLASH

ELECTRICAL FINAL INSPECTION

INSTALL TEACHERS LOUNGE PLUMBING FIXTURES

PLUMBING FINAL INSPECTION

POINT-UP

FINAL PAINTING

INSTALL PERMANENT DOOR CORES

INSTALL GRAINTECH DOORS

Mount View Middle School Preliminary Baseline Construction Schedule Print Date: 05-Oct-26

Actual Work Remaining Work

Start Finish Total Float

FIN-480 TRIM & TEST CARD READERS & AI PHONE / SECURITY SYSTEM 4d 04-Aug-27 07-Aug-27 0d FIN-360 INSTALL SIGNAGE 1d 06-Aug-27 06-Aug-27 1d FIN-370 INSTALL TACKBOARDS 1d 06-Aug-27 06-Aug-27 1d FIN-380 INSTALL REFRIGERATOR 1d 06-Aug-27 06-Aug-27 1d FIN-390 INSTALL WATER COOLER 1d 06-Aug-27 06-Aug-27 1d FIN-400 INSTALL RELOCATED PROJECTOR 1d 06-Aug-27 06-Aug-27 0d FIN-410 INSTALL MICROWAVE 1d 06-Aug-27 06-Aug-27 1d FIN-420 REINSTALL MOSAIC 1d 06-Aug-27 06-Aug-27 1d FIN-240 INSTALL BLINDS & ROLLER SHADES 2d 06-Aug-27 07-Aug-27 0d FIN-320 LOW VOLTAGE FINAL INSPECTION 1d 07-Aug-27 07-Aug-27 0d FIN-430 STRIP & WAX FLOORS 1d 08-Aug-27 08-Aug-27 0d

CloseCloseout 90d 09-Aug-27 10-Dec-27 0d

CLS-060 INSTALL / MOVE-IN FURNISHINGS 2d 09-Aug-27 10-Aug-27 0d CLS-010 STARTUP & FINAL TEST EQUIPMENT & DEVICES 3d 09-Aug-27 11-Aug-27 0d CLS-020 TAB 3d 09-Aug-27 11-Aug-27 0d CLS-070 REMOVE STORAGE POD 1d 10-Aug-27 10-Aug-27 0d CLS-030 FINAL CLEANING 1d 11-Aug-27 11-Aug-27 0d CLS-040 REMOVE DUMPSTER 1d 11-Aug-27 11-Aug-27 0d CLS-050 BUILDING FINAL INSPECTION 1d 11-Aug-27 11-Aug-27 0d CLS-080 SUBSTANTIAL COMPLETOIN 0d 11-Aug-27 0d CLS-090 SCHOOL STAFF RETURNS FOR 2027 - 2028 SCHOOL YEAR 0d 12-Aug-27* 0d CLS-100 PUNCHLIST 9d 12-Aug-27 21-Aug-27 0d CLS-130 FINAL COMPLETION 0d 21-Aug-27 0d CLS-110 FIRST DAY OF 2027 - 2028 SCHOOL YEAR 0d 23-Aug-27* 0d CLS-120 POST SEASON COMMISSIONING 35d 01-Nov-27* 10-Dec-27 0d

Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 2027 2028

TRIM & TEST CARD READERS & AI PHONE / SECURITY SYSTEM

INSTALL SIGNAGE

INSTALL TACKBOARDS

INSTALL REFRIGERATOR

INSTALL WATER COOLER

INSTALL RELOCATED PROJECTOR

INSTALL MICROWAVE

REINSTALL MOSAIC

INSTALL BLINDS & ROLLER SHADES

LOW VOLTAGE FINAL INSPECTION

STRIP & WAX FLOORS

INSTALL / MOVE-IN FURNISHINGS

STARTUP & FINAL TEST EQUIPMENT & DEVICES

TAB

REMOVE STORAGE POD

FINAL CLEANING

REMOVE DUMPSTER

BUILDING FINAL INSPECTION

SUBSTANTIAL COMPLETOIN

SCHOOL STAFF RETURNS FOR 2027 - 2028 SCHOOL YEAR

PUNCHLIST

FINAL COMPLETION

FIRST DAY OF 2027 - 2028 SCHOOL YEAR

POST SEASON COMMISSIONING

Mount View Middle School Preliminary Baseline Construction Schedule Print Date: 05-Oct-26

Actual Work Remaining Work

04-Addendum 1-Mt View MS Bid 103.26.B4
HOWARD COUNTY PUBLIC SCHOOLS PURCHASING DEPARTMENT
ADDENDUM NO. 1
Invitation for Bids No. 103.26.B4
Mt View MS – Entrance Renovation
Bid Due Date: November 10, 2026, Time: 10:00 A.M.
04-Addendum 1-Mt View MS Bid 103.26.B4
Addendum 01-Mt View MS Bid 103.26.B4
FP101 - FLOOR PLAN - EXISTING FIRE PROTECTION
01 21 00-ALLOWANCES
01 22 00-UNIT PRICES
01 32 13-PROJECT SCHEDULES-ATTACHMENT

File details come from the government source that posted it. Updated .