3-6564-26 Green Roof RFPBid Pack.pdf

PDF 105 KB Posted

Attached to
6564-26 Green Roof Feasibility Study, Plan, Design and Implementation
Solicitation number
US.253721
Issued by
Erie County, Pennsylvania

About this file

This Request for Proposals is issued by the City of Erie, Pennsylvania Department of Planning and Zoning for a Green Roof Feasibility Study, Design, and Implementation Plan for the Municipal Building located at 626 State Street, Erie, PA 16501. The City seeks qualified consulting firms with demonstrated experience in green infrastructure, architecture, engineering, and sustainable building design to develop a comprehensive feasibility study and conceptual design for potential green roof installation on the Municipal Building. The project scope includes an existing conditions assessment, feasibility study evaluating structural suitability and construction constraints, benefits analysis quantifying energy savings and stormwater management benefits, preparation of conceptual and buildable design drawings with technical specifications, cost estimation, a final implementation report, and a secondary component involving City Hall lobby assessment and conceptual redesign. The RFP was issued on September 16, 2026, with questions due by October 21, 2026, and proposals due by November 10, 2026 at 12:00 P.M. prevailing time via PennBid in PDF format only. Consultant selection is anticipated for November 18, 2026, with a Notice to Proceed on November 23, 2026, and project completion required within 120 days of Notice to Proceed. Site visits to the Municipal Building are included as part of the existing conditions assessment task.

The total contract amount shall not exceed $50,000, with proposals required to include a detailed fee schedule showing labor, reimbursable expenses, and total project cost. The project is funded through a Pennsylvania Historical & Museum Commission Keystone Planning grant. All proposed designs must comply with the Secretary of the Interior's Standards for the Treatment of Historic Properties. Proposals will be evaluated on a 100-point scale based on understanding of the project (15 points), relevant experience (25 points), qualifications of team (20 points), project approach (25 points), and cost proposal (15 points). The City reserves the right to reject any or all proposals, waive informalities, request additional information, negotiate scope and fees, and cancel the solicitation at any time. The City will provide available building drawings, facilitate building access, coordinate staff meetings, and review deliverables in a timely manner.

View the file

Other files

File Type Posted
2-NON-COLLUSION AFFIDAVIT.pdf PDF
1-Public Works Verification.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Erie, Pennsylvania

Department of Planning and Zoning

Request for Proposals (RFP)- 6564-26 Municipal Building Green Roof Feasibility Study, Design, and Implementation Plan

RFP Open Date

September 16, 2026

Proposal Submission Due Date

November 10, 2026

Budget

Not to Exceed $50,000

Cooper Moore- City of Erie Assistant Planner

Jeanne Ardillo- City of Erie Purchasing Manager

1. Introduction

The City of Erie ("City") invites qualified consulting firms with demonstrated experience in green infrastructure, architecture, engineering, and sustainable building design to submit proposals for the development of a comprehensive Green Roof Feasibility Study, Design, and Implementation Plan for the City of Erie Municipal Building.

The City has secured grant funding to evaluate the feasibility of installing one or more vegetated green roof systems on the Municipal Building, located at 626 State Street, Erie PA 16501. This project will provide the City with the technical information necessary to determine whether a green roof is a viable investment and to prepare the project for future implementation. The project will recommend intensive and/or extensive green roof solutions and consider the feasibility of all options, including modular tray systems and built-up roofs. This project is funded through a Pennsylvania Historical & Museum Commission Keystone Planning grant. All proposed designs must be in compliance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties. The selected consultant will evaluate existing building conditions, identify feasible green roof locations, quantify anticipated environmental and financial benefits, identify short and long-term maintenance needs, determine viability of end user access, and prepare construction-ready conceptual plans suitable for future bidding and construction.

As a complementary component of the project, the consultant will also conduct a focused study of the City Hall lobby and develop conceptual design options for improving the space as a welcoming, accessible, functional, and contemporary civic environment. The lobby component should explore opportunities to connect the building's interior public experience with the broader themes of sustainability and civic identity.

2. Project Background

The City of Erie is committed to advancing fiscal and environmental sustainability by improving municipal infrastructure and reducing long-term operating costs through innovative environmental initiatives, while preserving the historical integrity of our building.

Green roofs have the potential to:

• Reduce building energy consumption

• Extend roof lifespan

• Improve stormwater management

• Reduce urban heat island effects

• Improve air quality

• Enhance aesthetics and public visibility of municipal sustainability efforts

• Support biodiversity and pollinator habitat

The City of Erie is committed to advancing sustainable infrastructure, responsible development, energy efficiency, and high-quality civic design. The City Hall building represents an important opportunity to demonstrate these principles. A green roof could serve as both functional infrastructure and a visible example of sustainable design, while improvements to the building's public interior could create a more welcoming and engaging civic environment.

3. Project Objectives

The selected consultant shall develop a conceptual scheme for green roofs on the Municipal Building and produce an implementation plan that enables the City to make informed decisions regarding the installation of one or more green roofs.

The project shall include:

• Evaluation of existing roof conditions

• Structural feasibility assessment

• Identification of suitable roof areas

• Recommendation of most practicable roof system (intensive/extensive)

• Life-cycle cost analysis

• Energy savings analysis

• Investigation of potential renewable energy generation (solar, etc.)

• Stormwater management analysis

• Development of implementation alternatives

• Identification of appropriate plant species for local climate and rooftop exposure

• Preparation of buildable drawings and technical specifications

In addition to the above, the project shall also include:

• Exploration of opportunities to improve the City Hall lobby as a welcoming and functional civic space

• Consideration of ways the lobby and green roof can work together to communicate the City’s sustainability goals

• Establishment of a realistic path from study and design to construction

4. Scope of Services

The consultant shall complete, at a minimum, the following tasks.

Task 1 – Existing Conditions Assessment

Conduct a comprehensive review of the Municipal Building including:

• Existing roof systems

• Structural capacity

• Mechanical equipment locations

• Roof access

• Utilities

• Drainage conditions

• Existing construction documents (provided by the City if available)

• Necessary site visits

Task 2 – Feasibility Study

Prepare a feasibility study evaluating:

• Structural suitability for green roof installation

• Opportunities for one large green roof or multiple smaller installations

• Extensive versus intensive green roof systems

• Construction constraints

• Maintenance considerations

• Historical integrity constraints

• Phasing opportunities

• Potential permitting requirements

• Cost considerations

The study shall include recommendations regarding the preferred alternative.

Task 3 – Benefits Analysis

Prepare an analysis of anticipated project benefits for two recommended green roof options including, but not limited to:

Energy Performance

Estimate annual:

• Heating savings

• Cooling savings

• Peak demand reduction

• Utility cost savings

• Carbon emissions reductions

Include assumptions and modeling methodology used.

Stormwater Benefits

Estimate:

• Annual runoff reduction

• Peak flow reduction

• Water quality benefits

Environmental Benefits

Evaluate:

• Urban heat island mitigation

• Air quality improvements

• Habitat creation

• Potential for rooftop space activation and employee access

Economic Benefits

Provide:

• Life-cycle cost analysis

• Roof lifespan extension

• Return on investment

• Payback period

• Long-term and deferred maintenance costs

Task 4 – Conceptual Design and Buildable Drawings

Once one of the conceptual schemes is selected, prepare design documents sufficient for future implementation, including:

• Existing conditions drawings

• Roof plans

• Proposed green roof layouts

• Drainage plans

• Planting plans

• Typical sections

• Details

• Structural recommendations

• Construction notes

• Outline technical specifications

Drawings shall be of sufficient quality and level of detail to support future engineering refinement and construction procurement.

Task 5 – Cost Estimate

Provide an opinion of probable construction costs including:

• Materials

• Installation

• Structural modifications

• Irrigation (if recommended)

• Maintenance requirements

• Contingency

Task 6 – Final Report

Prepare a comprehensive report containing:

• Executive Summary

• Existing Conditions

• Feasibility Study

• Historical Integrity Impact Analysis

• Benefit Analysis

• Preferred Alternative

• Cost Estimate

• Implementation Strategy

• Funding Opportunities

• Final Drawings

Deliver both digital and print-ready versions.

Task 7 – City Hall Lobby Assessment and Conceptual Redesign

As a secondary component of the project, the consultant shall evaluate the existing City Hall lobby and develop conceptual options for its redesign.

The assessment shall consider:

• Existing layout and circulation

• Accessibility

• Public entry experience

• Wayfinding

• Reception and information functions

• Lighting

• Acoustics

• Furniture

• Materials and finishes

• Signage

• Public seating

• Security considerations

• Opportunities for public art

• Opportunities for plants and biophilic elements

• Connection to the building's history and civic identity

The consultant shall develop conceptual design options rather than full construction documents for the lobby.

At a minimum, the consultant shall provide:

• Existing conditions documentation

• One or more conceptual floor plans

• Conceptual renderings or perspectives

• Material and finish concepts

• Furniture and layout recommendations

• Lighting concepts

• Preliminary opinion on probable construction cost

The lobby design should explore opportunities to visually and experientially connect the interior public space with the proposed green roof and broader sustainability initiatives.

For example, the consultant may consider interpretive displays, views toward vegetation, natural materials, interior planting, educational elements, or other features that allow visitors to understand the Municipal Building as a demonstration of living architecture and sustainable civic design.

5. Deliverables

The selected consultant shall provide:

• Existing Conditions Memorandum

• Feasibility Study

• Energy Savings Analysis

• Historical Integrity Impact Analysis

• Benefit Analysis

• Cost Estimate

• Conceptual Design Drawings

• Buildable Drawings

• Final Implementation Report

• Electronic files (PDF and editable CAD or Revit files where applicable)

6. Project Schedule

The anticipated schedule is:

Milestone Target

RFP Issued September 16 2026

Questions Due October 21 2026

Proposal Due November 10 2026

Consultant Selection November 18 2026

Notice to Proceed November 23 2026

Project Completion Within 120 days of Notice to Proceed

7. Budget

The total contract amount shall not exceed $50,000.

The proposal shall include a detailed fee schedule showing labor, reimbursable expenses, and total project cost.

8. Consultant Qualifications

The City seeks firms with demonstrated experience in:

• Green roof planning and design

• Structural engineering

• Architecture

• Civil engineering

• Building energy modeling

• Sustainable infrastructure

• Municipal projects

• Construction document preparation

Experience with public-sector clients and green infrastructure projects is preferred.

9. Proposal Requirements

Proposals shall include:

Respondent’s Certification Form

Respondent’s Tax Certification Form

Cover Letter

Including:

• Firm name

• Contact information

• Authorized representative

Firm Qualifications

• Company history

• Relevant experience

• Similar completed projects

• References (minimum of three)

Project Team

Identify:

• Project Manager

• Key personnel

• Relevant qualifications

Project Approach

Describe:

• Understanding of the project

• Proposed methodology

• Quality control procedures

• Schedule

Fee Proposal

Include:

• Lump sum fee

• Breakdown by task

• Hourly rates (if applicable)

10. Evaluation Criteria

Proposals will be evaluated using the following criteria:

Criteria Points

Understanding of Project 15

Relevant Experience 25

Qualifications of Team 20

Project Approach 25

Cost Proposal 15

Total: 100 Points

The City reserves the right to interview selected firms prior to award.

11. City Responsibilities

The City will:

• Provide available building drawings and relevant records

• Facilitate access to the Municipal Building

• Coordinate meetings with City staff

• Review deliverables in a timely manner

12. General Conditions

The City reserves the right to:

• Reject any or all proposals.

• Waive informalities or irregularities.

• Request additional information from proposers.

• Negotiate scope and fees with the selected consultant.

• Cancel this solicitation at any time.

Submission of a proposal does not oblige the City to award a contract.

13. Submission Instructions

Proposals shall only be submitted and accepted electronically in PDF format via PennBid NO hard copies or email submissions will be accepted. ).

Submissions shall include all required materials described in this RFP.

Late submissions may not be considered.

Submission instructions, due date, and contact information will be provided in the official advertisement.

14. Questions

Questions regarding this Request for Proposals shall be submitted via PennBid in Project 6564-26 by the date specified in the project schedule.

Responses will be distributed to all known proposers through an official addendum.

The City of Erie encourages participation by qualified firms committed to advancing sustainable infrastructure and innovative environmental design. The City looks forward to partnering with a consultant that can develop a practical, data-driven plan for implementing green roof infrastructure that delivers measurable environmental, economic, and community benefits.

File details come from the government source that posted it. Updated .