3-6 PWS RTLP_TSAE - GranTex Single Services.docx
DOCX document 109 KB Posted
- Attached to
- Ballistic Rubber Single Services
- Solicitation number
- W912PB26QA077
About this file
This is a Performance Work Statement (PWS) for a non-personal services contract to provide range maintenance and lead/residue remediation at ballistic rubber-equipped live fire ranges throughout Germany operated by the U.S. Army Europe and Africa (USAREUR-AF). The contract period of performance runs from August 1, 2026 through December 31, 2026, with the primary objective of conducting refurbishment services and maintenance at ranges containing bullet catches equipped with ballistic rubber backstop material or rubber blocks to enhance operational safety and reduce ricochet probability.
The contractor is responsible for providing all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to perform the following core services: unscheduled refurbishment of bullet catch impact media, lead remediation during/after ballistic rubber removal, replacement or refurbishment of removed material to maintain safety hazard mitigation standards, and inspection, repair, replacement, and reinstallation of rubber matting covering bullet catches. Specific ranges to be serviced are located at Wackernheim, Oberdachstetten, Baumholder, Breitenwald, and Stuttgart, with performance standards requiring completion of each service request within ±5% of approved schedules and ±5% of approved cost estimates. The contractor must establish a 24/7 work reception system, comply with extensive safety requirements including German Baustellenverordnung (BaustellV) regulations, properly dispose of all hazardous waste including lead contamination and rubber materials in accordance with German environmental laws, obtain required background checks and installation access passes, complete multiple training certifications (Anti-Terrorism Level I, OPSEC, iWATCH), and submit numerous deliverables including quality control plans, safety plans, environmental compliance documentation, and Service Contract Reports via SAM.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - W912PB26QA077.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
RTLP_TSAE – Ballistic Rubber Single Services
17 APR 2026
Part 1 General Information
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide range maintenance and lead/residue remediation with Period of Performance from 01 AUG 2026 to 31 DEC 2026 by conducting refurbishment service or maintenance for Ranges containing a bullet catch, which incorporate the use of ballistic rubber backstop material or rubber blocks at target emplacements enhancing the operational safety of ranges while reducing the probability of ricochets. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.2 Background: As a cost saving effort, USAREUR-AF Range and Training Land Program (RTLP) contracted for the use of ballistic rubber. As part of it’s modernization responsibilities, RTLP began installing this material at selected 25 Meter live fire ranges in 2004. Since 2004, RTLP has replaced sand backstops with ballistic rubber at 13 USAREUR-AF ranges. Current costs for remediation at these ranges have saved the U.S. Army significant money per bullet catch and substantially reduced the previous costs incurred for sand replacement and lead remediation.
Seventh U.S. Army Training Command (7ATC), Training Support Activity Europe (TSAE) is responsible for managing and executing the USAREUR-AF Sustainable Range Program (SRP) IAW AR 350-19 (Army Sustainable Range Program) and DA-G3 guidance. One of the major core components of the SRP is RTLP which is responsible for the operation and modernization of USAREUR-AF’s live fire ranges and training facilities. In executing this mission RTLP contracted services and conducts periodic lead remediation on USAREUR-AF ranges. The purpose of this contract is to provide lead remediation at specified ballistic rubber equipped ranges.
1.3 Scope: The Contractor shall provide non-personal services for range maintenance to include services to the ballistic rubber and rubber coverings on ranges. The contractor shall accomplish remediation of lead, reinstallation of ballistic rubber material, and installation of rubber blocks for designated range target pits. The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents.
1.4 Objectives:
· Conduct unscheduled services or refurbishments of bullet catch impact media.
· Conduct lead remediation during/after ballistic rubber removal from bullet catch.
· Replace or refurbish material removed from bullet catch to maintain effective safety hazard mitigations.
· Inspect, repair/replace, and re-install rubber matting to cover bullet catch as needed.
The Government shall not exercise supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.5 General Information
1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within 10 working days after date of contract award (Deliverable #1).
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within 10 working days after receipt. If the Government has provided comments, the Contractor shall then have 3 working days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than 30 days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
a. A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.
b. How will the Contractor monitor work to ensure that performance complies with all deliverables (etc. timelines, deadlines, and goals)?
c. How will the Contractor monitor work to ensure that performance complies with all specifications and requirements of the contract, including clauses?
d. How will the Contractor monitor and ensure staff qualifications remain current and valid including DOCPER processes/approvals throughout contract performance?
e. How will the Contractor ensure all keys issued will remain controlled items (Paragraph 1.7 Key Control)?
f. How will the Contractor inventory and track maintenance of all Government Provided Equipment / Materials?
g. How will the Contractor identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future?
h. How will the Contractor file and save all Quality Control related documents for the life of the contract plus 5 years?
1.5.1.1 An Analysis of Quality Control and Timeliness of Submittals (i.e. deliverables) shall be provided to the COR within 2 working days upon completion of each option, period, or Task Order (Deliverable #2).
1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within 2 working hours of identifying those issues. Verbal reports shall be followed up by written reports within 1 working day (Deliverable #3).
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively. The contractor is not required to perform services on holidays.
The Recognized American national holidays are:
| New Year’s Day January 1st | M. L. King Memorial Day 3rd Monday in January | |||
| Presidents Day 3rd Monday in February | Memorial Day last Monday in May | |||
| Independence Day July 4th | Labor Day 1st Monday in September | |||
| Columbus Day 2nd Monday in October | Veteran’s Day November 11th | |||
| Thanksgiving Day 4th Thursday in November | Christmas Day December 25th |
1.5.3.2 Host Nation Holidays: Work shall be performed on local Host Nation holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.
The German national and local holidays are:
| 1st January | New Year’s Day (Neujahr) |
| 6th January | Three King’s Day (Heilige Drei Könige) |
| Varies yearly | Good Friday (Karfeitag) |
| Varies yearly | Easter Monday (Ostermontag) |
| 1st May | Labor Day (Tag der Arbeit) |
| Varies yearly | Ascension Day (Christi Himmelfahrt) |
| Varies yearly | Whit Monday (Pfingstmontag) |
| Varies yearly | Corpus Christi (Fronleichnam) |
| 15th August | Assumption Day (Mariä Himmelfahrt) |
| 3rd October | Day of German Unity (Tag der Deutschen Einheit) |
| 1st November | All Saints’ Day (Allerheiligen) |
| 25th December | 1st Christmas Day (1. Weihnachtsfeiertag) |
| 26th December | 2nd Christmas Day (2. Weihnachtsfeiertag) |
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0730-1630 Monday through Friday except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0730-1630 Monday through Friday. The Government facility is closed for operations during the recognized U.S. Holidays identified in paragraph 1.5.3.2 above. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.
1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0730-1630 Monday through Friday except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.5.4.3.1 Contractor Work Plan: RESERVED
1.5.5 Training Holidays: USAREUR has historically granted military personnel training holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.
1.5.6 Place of Performance: The work to be performed under this contract will be performed on various ranges throughout Germany.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: RESERVED
1.6.2 Personnel Security Clearance Requirements: RESERVED
1.6.3 Installation Access (Germany): Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with Army in Europe (AE) Regulation 190-16 (AE Reg 190-16) Installation Access Control or (AE) Regulation 604-1 for Germany specific contracts, will be grounds for denying access to U.S. installations and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. Should anything in this paragraph conflict with AE Reg 190-16 or (AE) Regulation 604-1, the regulation takes precedent.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
AE Reg 190-16 (and AE 190-16-G German translation) can be found on the following website:
https://media.defense.gov/2017/Apr/27/2001921546/-1/-1/0/AER190-16.pdf https://media.defense.gov/2017/Apr/27/2001921547/-1/-1/0/AER190-16-G.pdf
1.6.3.1 In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within 3 calendar days after contract award (Deliverable #4). The log must at a minimum contain the following information employee name, date of birth, nationality, and primary identification document number. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) working days after any changes to the log (Deliverable #5).
1.6.3.2 The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within 2 working days or last working day prior to start of weekend (Deliverable #6).
1.6.3.3 Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within 2 working days or last working day prior to the start of weekend (Deliverable #7).
1.6.3.4 Common Access Cards (CAC): RESERVED
1.6.4 Background Checks: Army in Europe (AE) Regulation 604-1 provides guidance pertaining to background checks for U.S. and Host Nation Contractors. A digital copy of a background check at the national level is required to process the request for installation access during period of performance.
1.6.4.1 U.S. Citizen: Contractors that work with or teach youth under the age of 18 years are subject to local and stateside background checks. The Requiring Activity Manager will determine the extent of background checks required. The Contractor employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the stateside background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within 2 working days of receipt by the Contractor, identifying such with the appropriate contract number (Deliverable #8). The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each unfavorable background check within 2 working days of receipt by the Contractor, identifying such with the appropriate contract number (Deliverable #9). When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.
1.6.4.2 Local Nationals and Third Country Nationals: Local national and third country national Contractors that work with or teach youths under the age of 18 years are subject to background checks as determined by the Requiring Activity Manager. As a minimum prior to beginning performance, Contractors employing local national and third country nationals shall furnish the Contracting Officer via the COR and the Requiring Activity Manager a Polizeiliches Fuehrungszeugnis, issued within the previous four months, no later than 5 working days after contract award (Deliverable #10). Forwarding correspondence from the Contractors shall identify the associated contract number. The Requiring Activity Manager will determine the favorability of the Polizeiliche Fuehrungszeugnis and notify the Contractor. The Contractor shall forward a copy of unfavorable Polizeiliche Fuehrungszeugnis to the Contracting Officer via the COR and the Requiring Activity Manager within 24 hours of receipt, identifying such with the appropriate contract number (Deliverable #11). Local nationals and third country nationals agree to the same employee termination provisions as stated for U.S. Citizens (see paragraph 1.6.4.1 above, in particular, same requirements to replace the employee (and within timeframe noted) when results of background check are unfavorable).
1.6.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).
1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.
1.7 Key Control: RESERVED
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Key Personnel: RESERVED
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.12.1 Contractor workspace (staging site, on-site office, desk or work area, etc.) shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance 5 working days after contract award (Deliverable #13). Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name. Requirements for Contractor vehicles is addressed under Part 4 paragraph 4.4.
1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). (For services at Child, Youth, and School Services where children are present, recommend personnel wear identification when children are present.) (Deliverable #14)
1.13 Contractor Travel: RESERVED
1.14 Other Direct Costs (ODCs): RESERVED
1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.16 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.17 The use of propaganda violates DoD Commercial Use of Imagery Guidelines stated at http://www.defenseimagery.mil/products/dodimagery/commercialuse.html The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.
1.18 Non-Disclosure Statements: The Contractor shall provide signed non-disclosure agreements to the Government no later than 14 calendar days (Deliverable #15) prior to commencement of work under the contract. Disclosure of information by Contractor personnel may result in Contractor personnel removal from performance under this contract.
1.19 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI (Deliverable #16). The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.20 Phase In /Phase Out Period: RESERVED
1.21 Safety: The following provides information pertaining to Safety and Accident Prevention: All work completed under this contract is performed on live-fire training facilities. Therefore, the contractors will receive a safety briefing by range personnel prior to any maintenance services being performed.
1.21.1 Host Nation Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)), and applicable Host Nation Safety Laws and Regulations.
The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:
(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel (Deliverable #17). Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.
(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1).
(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.
(d) The Contractor shall discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen (15) calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase.
(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
(i) Short sleeve shirt.
(ii) Long trousers.
(iii) Steel-toed safety boots.
(iv) Hard hat.
1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes. In particular, within the requirements of the German Safety and Health Protection Regulation for Construction Sites, Baustellenverordnung (BaustellV) (current version in effect), the Contractor shall coordinate all work at the site, including development of plans and providing advance notices.
The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. For the compliance with host nation laws and regulations, the Contractor shall comply with the non-exclusive list of duties described in this paragraph. If the Contractor determines that additional activities are required to fully comply, the Contractor shall ensure that compliance with the laws is complete. The duties include:
(a) Conditions of construction and operational activities to be considered include but are not limited to:
(i) For all construction activities meeting the following criteria: the work is scheduled to last longer than 30 working days and more than 20 workers are occupied simultaneously, or the volume of work is scheduled to exceed 500 person days, or the work presents particular tasks, e.g. excavations deeper than 5 meters, falls from a height of greater than 7 meters, exposures to hazardous chemical or biological substances, work at less than 5 meters from high voltage lines, underground earth works or tunnels, danger of drowning, diving, use of compressed air, work with ionizing radiation, explosives, or work involving assembly or dismantling of heavy prefabricated components (10 tons or greater).
(b) If the Contractor determines that the BaustellV, dated 10 June 1998, applies, the Contractor shall prepare a Safety and Health Protection Plan (SIGE) as required under that regulation. The SIGE shall be submitted two weeks prior to mobilization. In addition, the Contractor shall appoint a qualified Safety Coordinator who will ensure that safety measures are implemented during construction. The Safety Coordinator must meet minimum training and experience requirements required under Host Nation laws.
(c) The SIGE will be written in a comprehensive form and explained in language the workers understand and shall contain the following minimum information:
(i) Maintenance of tools and equipment.
(ii) Provisions for the storage and disposal of materials and waste, particular hazardous materials and substances.
(iii) Modifying performance periods for such work, taking into consideration the site conditions.
(iv) Organizing cooperation between different employers and Contractors without employees.
(v) Interaction between work at the site and other operational activities in the area, on which or near which the first identified work will be performed, and taking into consideration the instructions and advice of the coordinator as well as safety and health plans.
1.21.1.2 The Contractor shall complete and provide safety notifications required by host nation authorities and will provide documented proof to the Contracting Officer via the COR, no later than 10 working days (Deliverable #18) that such notifications were made.
1.22 Environmental Compliance: The following provides information on Environmental Compliance.
1.22.1 Environmental Compliance Plan and Program: The Contractor shall ensure all heavy metals, lead, ammunition residue, and unserviceable granulated rubber material resulting from live fire operations on ranges maintained herein shall be removed and disposed of in accordance with applicable European Host Nation hazardous material environmental laws/standards. Additionally, it is the responsibility of the Contractor to possess the proper permits for transporting and disposing of lead, heavy metal contaminates, and contaminated rubber granulated materials, and ensure contract personnel handling or disposing of hazardous materials have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. The Government shall not be held responsible nor liable for Contractor’s negligence, or inability to obtain required host nation certifications for transport of disposal of hazardous materials. In addition, the Contractor shall ensure that all Contractor controlled activities on US installations where ranges are supported are conducted in accordance with the installation Spill Prevention and Response Plan, Solid Waste Policy (Deliverable #19).
1.22.1.1 Baumholder: The Contractor shall ensure all heavy metals, lead, ammunition residue, and unserviceable granulated rubber material resulting from live fire operations on ranges maintained herein shall be removed and disposed of in accordance with applicable European Host Nation hazardous material environmental laws/standards. Additionally, it is the responsibility of the Contractor to possess the proper permits for transporting and disposing of lead, heavy metal contaminates, and contaminated rubber granulated materials, and ensure contract personnel handling or disposing of hazardous materials have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. The Government shall not be held responsible nor liable for Contractor’s negligence, or inability to obtain required host nation certifications for transport of disposal of hazardous materials. In addition, the Contractor shall ensure that all Contractor controlled activities on US installations where ranges are supported are conducted in accordance with the installation Spill Prevention and Response Plan, Solid Waste Policy (Deliverable #19).
The Contractor shall ensure that all of its operations and activities conform to the USAG Rheinland-Pfalz Hazardous Waste Management Plan. The Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor controlled activities on USAG Rheinland-Pfalz installations are conducted in accordance with the USAG Rheinland-Pfalz Spill Prevention and Response Plan, Solid Waste Management Plan, Final Governing Standards-Germany, and applicable German environmental laws/standards.
Prior to contract completion, the Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with Final Governing Standards Germany and applicable German environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the DPW Environmental Management Division (EMD).
The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the Garrison Fire Department at CIV 0611-143-531-7574.
The Contractor shall contact the COR or the USAG Rheinland-Pfalz Directorate of Public Works – Environmental Management Division (DPW-EMD), DSN 531-3103, CIV 06782-6-3103, Bldg. 8164, Rm 119, Smith Barracks, Baumholder Military Community for a copy of the Garrison Hazardous Waste Management Plan, Spill Prevention and Response Red Plan, Garrison Solid Waste Management Plan and German Final Governing Standards.
1.22.1.2 Kaiserslautern: The Contractor shall ensure all heavy metals, lead, ammunition residue, and unserviceable granulated rubber material resulting from live fire operations on ranges maintained herein shall be removed and disposed of in accordance with applicable European Host Nation hazardous material environmental laws/standards. Additionally, it is the responsibility of the Contractor to possess the proper permits for transporting and disposing of lead, heavy metal contaminates, and contaminated rubber granulated materials, and ensure contract personnel handling or disposing of hazardous materials have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. The Government shall not be held responsible nor liable for Contractor’s negligence, or inability to obtain required host nation certifications for transport of disposal of hazardous materials. In addition, the Contractor shall ensure that all Contractor controlled activities on US installations where ranges are supported are conducted in accordance with the installation Spill Prevention and Response Plan, Solid Waste Policy (Deliverable #19).
The Contractor shall ensure that all of its operations and activities conform to the USAG Rheinland-Pfalz Hazardous Waste Management Plan. The Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor controlled activities on USAG Rheinland-Pfalz installations are conducted in accordance with the USAG Rheinland-Pfalz Spill Prevention and Response Plan, Solid Waste Management Plan, Final Governing Standards-Germany, and applicable German environmental laws/standards.
Prior to contract completion, the Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with Final Governing Standards Germany and applicable German environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the DPW Environmental Management Division (EMD).
The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the Garrison Fire Department at CIV 0611-143-541-7417.
The Contractor shall contact the COR or the USAG Rheinland-Pfalz Directorate of Public Works – Environmental Management Division (DPW-EMD), DSN 541-4744, CIV 0611-143-541-4744, Bldg. 164, Rm 226, ROB, USAG Rheinland-Pfalz for a copy of the Garrison Hazardous Waste Management Plan, Spill Prevention and Response Red Plan, Garrison Solid Waste Management Plan and German Final Governing Standards.
1.22.1.3 Oberdachstetten: The Contractor shall ensure all heavy metals, lead, ammunition residue, and unserviceable granulated rubber material resulting from live fire operations on ranges maintained herein shall be removed and disposed of in accordance with applicable European Host Nation hazardous material environmental laws/standards. Additionally, it is the responsibility of the Contractor to possess the proper permits for transporting and disposing of lead, heavy metal contaminates, and contaminated rubber granulated materials, and ensure contract personnel handling or disposing of hazardous materials have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. The Government shall not be held responsible nor liable for Contractor’s negligence, or inability to obtain required host nation certifications for transport of disposal of hazardous materials.
The Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material.
Prior to contract completion, the Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with Final Governing Standards Germany and applicable German environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the DPW Environmental Division.
The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the USAG Ansbach Fire Department at CIV 09641-70-587-112.
For any questions the contractor shall contact the COR or USAG Ansbach Directorate of Public Works – Environmental Division, DSN 587-1677, CIV 09641-70-587-1677, email mary.b.boone4.civ@army.mil .
1.22.1.4 Stuttgart: The Contractor shall ensure that all of its operations and activities conform to the USAG Stuttgart Hazardous Waste Management Plan. The Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor controlled activities on USAG Stuttgart installations are conducted in accordance with the USAG Stuttgart Spill Prevention and Response Plan, Solid Waste Management Plan, Final Governing Standards-Germany, and applicable German environmental laws/standards.
Prior to contract completion, the Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with Final Governing Standards Germany and applicable German environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the DPW Environmental Division.
The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the Garrison Fire Department at CIV 0711-729-112.
The Contractor shall contact the COR or the USAG Stuttgart Directorate of Public Works-Environmental Division (DPW-ED), DSN 596-6135, CIV 09641-70596-6135, Bldg. 3318, RM 216, Kelley Barrcaks for a copy of the Garrison Hazardous Waste Management Plan, Spill Prevention and Response Red Plan, Garrison Solid Waste Management Plan and German Final Governing Standards.
1.22.1.5 Wiesbaden: The Contractor shall ensure that all of its operations and activities conform to the Local USAG’s environmental policy requirements. The Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor controlled activities on Local USAG installations are conducted in accordance with the Local USAG Spill Prevention and Response Plan, Solid Waste Policy, Final Governing Standards-Germany/Belgium, and applicable German/Belgian environmental laws/standards.
Prior to contract completion, the Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with Final Governing Standards Germany and applicable German environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the DPW Environmental Division.
The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the Garrison Fire Department at CIV 0611-705-117.
The Contractor shall contact the COR or the USAG Wiesbaden Directorate of Public Works-Environmental Division (DPW-ED), DSN 548-4092, CIV 0611143-548-4092, Bldg. 1059, Clay Kaserne for a copy of the Garrison Environmental Policy, Spill Prevention and Response Red Plan, Garrison Solid Waste Policy and German Final Governing Standards.
Current Environmental Policy (Garrison policy Number 22) is available at the Garrison website: http://www.wiesbaden.army.mil/policies/22EnvironmentalManagementSystem.pdf
Current Prohibited Refuse Disposal Practices Policy (Garrison policy Number 27) is available at the Garrison website:
http://www.wiesbaden.army.mil/policies/27Prohibited_Refuse_Disposal_Practices.pdf”
1.23 Required Training: The following provides information on training requirements.
1.23.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within 10 working days(Deliverable #3) after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 10 working days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion (Deliverable #20) for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within 2 working days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training (Deliverable #21) every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies
If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within 2 working days after completion of the training (Deliverable #22).
1.23.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 10 working days of employment under this contract (Deliverable #23). Verification of the training shall be provided to the COR within 2 working days after completion of the training (Deliverable #24). OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months (Deliverable #25). Verification of the training shall be provided to the COR within 2 working days after completion of the training (Deliverable #26).
If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within 2 working days after completion of the training (Deliverable #27).
1.23.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 working days after the contract is awarded and within 10 working days after new employees commence contract performance, with the results reported to the COR within 2 working days after the contract is awarded and within 2 working days after new employees commence contract performance (Deliverable #28). Verification of the training shall be provided to the COR within 2 working days after completion of the training (Deliverable #29). Training slides can be found on the Army OneSource we site:
http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx.
1.23.4 Information Assurance (IA) Training: RESERVED
1.23.5 Personally Identifiable Information (PII): RESERVED
1.24 Authorization to Perform Services in Germany
1.24.1 Contractors performing services in the Federal Republic of Germany (FRG) shall comply with German law. The Contractor shall determine whether performance requires registration with German authorities or authorization to do business in Germany and, if so, shall comply with all requirements.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .