3-550-0226-1 Barrel Vault Recaulking.pdf

PDF 6 MB Posted

Attached to
Barrel Vault Recaulking
Solicitation number
550-0226-1
Issued by
King County, Spokane City, Washington

About this file

This is a public works solicitation issued by the Washington State Convention Center (a King County public facilities district), doing business as Seattle Convention Center (SCC), for exterior barrel vault recaulking services at the facility's Arch location in downtown Seattle. The project involves removing and replacing existing caulking and backer rod on a barrel vault glazing system comprising 416 glass panels (approximately 64" x 58" each) located in the skybridge area between grid lines N17 and N22. Prospective bidders were required to attend a mandatory pre-bid meeting and walk-through on Monday, March 23, 2026, at 11:00 AM at SCC's administrative offices (705 Pike Street, Seattle, WA 98101). Sealed bid proposals were due by 3:00 PM on Monday, April 7, 2026, submitted electronically through the SCC public procurement portal. Bid opening occurred via Microsoft Teams meeting on the same date. Substantial completion must be achieved by August 5, 2026, with all equipment removal required by end of day on the substantial completion date. The scope of work requires removal of all existing caulking and backer rod, cleaning and preparation of all joint areas, installation of new backer rod matching existing profiles, and application of GE UltraGlaze SSG4000 silicone caulk in black color. Work is available 24 hours daily on the exterior area, though interior storage areas require clearance during the weekend of July 25–26 due to an internal event.

The estimated cost of work is $750,000. A bid guarantee equal to five percent of the base bid amount is required, acceptable in the form of a bid bond, postal money order, certified check, or cashier's check. No payment or performance bond is required if the contract sum is $150,000 or less. For contracts exceeding $150,000, AIA Payment Bond and Performance Bond forms (A312) covering 100 percent of the contract sum including all change orders and state sales tax are mandatory. The project is subject to Washington State prevailing wage requirements under Chapter 39.12 RCW, with the King County prevailing wage schedule effective April 7, 2026, provided in the specifications. MWBE voluntary participation goals are set at 10 percent for Minority Business Enterprises and 6 percent for Women's Business Enterprises. The apprenticeship utilization requirement of 15 percent of total contract labor hours applies only to public works projects estimated at $2,000,000 or more; this project falls below that threshold. Bidders must be registered as vendors through the SCC public procurement portal and possess a current certificate of registration as a contractor in compliance with Chapter 18.27 RCW, a Washington Unified Business Identifier (UBI) number, and required industrial insurance and employment security coverage. The contract documents include prevailing wage schedules, general terms and conditions, insurance and bonding requirements, and detailed specifications for the GE UltraGlaze SSG4000 structural glazing silicone product. Progress payments are made within 30 days of receipt of properly executed applications for payment, with 5 percent retainage held in accordance with RCW 60.28.011.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Seattle Convention Center

PROJECT SPECIFICATIONS FOR BARREL VAULT RECAULKING

CONTRACT 550-0226-1

FEBRUARY 24, 2026

TABLE OF CONTENTS Page 1

TABLE of CONTENTS

ADVERTISEMENT FOR BIDS

INSTRUCTIONS TO BIDDERS

SUBCONTRACTOR LIST FORM A

SUBCONTRACTOR LIST FORM B

PUBLIC WORKS DRAFT CONTRACT for “BARREL VAULT RECAULKING”

GENERAL TERMS and CONDITIONS

PREVAILING WAGES SCHEDULE

KING COUNTY, AS OF APRIL 7, 2026

DRAWINGS and SPECIFICATIONS

SCOPE OF WORK

CONSTRUCTION DOCUMENTS DRAWING SET

MANUFACTURER’S PRODUCT SPECIFICATIONS

END OF TABLE OF CONTENTS

ADVERTISEMENT FOR PUBLIC WORKS BIDS

Sealed bid proposals are sought for the following public works project:

Title: BARREL VAULT RECAULKING

Public Works Contract No. 550-0226-1

Description of Project: The project consists of removing and replacing the exterior caulking for the barrel‑vault glazing system in the skybridge at SCC’s Arch facility. Contractor will remove all existing caulking and backer rod, properly clean and prepare all joints, and install new backer rod matching the existing profile.

Owner’s Contact: David Cononetz, Director of Facilities david.cononetz@seattlecc.com

(206) 694-5140

Address: 705 Pike Street Seattle WA 98101-2310

Mandatory Pre-bid Meeting: 11:00 AM, Monday, March 23, 2026 Seattle Convention Center 705 Pike Street Seattle, WA 98101 (meet at reception desk)

Bid Receipt Deadline/Location: 3:00 PM, Monday, April 7, 2026

Submit Online at SCC Public Procurement Portal:

seattleconventioncenter.bonfirehub.com

Bid Opening: Microsoft Teams Join the meeting now

Meeting ID: 256 409 270 706 91 Passcode: ZA6a257u

Dial in by phone +1 206-485-3632,,619763537# United States, Seattle Phone conference ID: 619 763 537#

MWBE Voluntary Goals: Minority Business Enterprises – 10% participation Women’s Business Enterprises – 6% participation

Document Availability: Bidders may obtain plans, specifications and addenda from seattleconventioncenter.bonfirehub.com, or by contacting John McCarthy, SCC Buyer, at john.mccarthy@seattleconventioncenter.com.

mailto:david.cononetz@seattlecc.com https://seattleconventioncenter.bonfirehub.com/ https://teams.microsoft.com/meet/25640927070691?p=FIzD4EPxxhrPMQ4b76 https://nam04.safelinks.protection.outlook.com/?url=https%3A%2F%2Fteams.microsoft.com%2Fmeet%2F25640927070691%3Fp%3DFIzD4EPxxhrPMQ4b76&data=05%7C02%7CChris.Mullen%40seattleconventioncenter.com%7Ce8b6dc126fb142e6fdec08de700a6e8a%7Cd7fcd9f7d2aa44c1a43040a78680e7bd%7C0%7C0%7C639071387278932877%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C4000%7C%7C%7C&sdata=z64LTqb9yn5C2FclEm4FZps%2F7ScQDop%2FlGCXI9Fqgao%3D&reserved=0 tel:+12064853632,,619763537 https://seattleconventioncenter.bonfirehub.com/ mailto:john.mccarthy@seattleconventioncenter.com

INSTRUCTIONS TO BIDDERS Page 1

INSTRUCTIONS to BIDDERS for

SCC FACILITIES CONSTRUCTION

PART 0 – GENERAL

0.01 EXPLANATION TO PROSPECTIVE BIDDERS

A. Introduction and Background: The Washington State Convention Center, a King County public facilities district DBA Seattle Convention Center (SCC), in accordance with its authority under Chapter 36.100 RCW and its procurement policy and procedures, has issued this request for bid proposals to solicit responses from contractors interested in and qualified to perform Arch facility in downtown Seattle, WA.

B. Project Scope: The project consists of removing and replacing the exterior caulking for the barrel‑vault glazing system in the skybridge at SCC’s Arch facility. Contractor will remove all existing caulking and backer rod, properly clean and prepare all joints, and install new backer rod matching the existing profile.

C. For purposes of this solicitation, the following designations apply:

1. “Owner” is the Washington State Convention Center DBA Seattle Convention Center, a King County public facilities district, which may also be denoted as “SCC”. The “Owner’s Contact” is David Cononetz, Director of Facilities, who may be reached at david.cononetz@seattlecc.com.

2. “A/E” is not applicable to this project.

3. “RCW” is the Revised Code of Washington and “WAC” is the Washington

Administrative Code, which together provide the statutory and regulatory framework for public works projects undertaken by the SCC.

4. “Substantial Completion” must be achieved by August 5, 2026.

5. “Estimated Cost of the Work” is $750,000.

D. A mandatory Pre-bid Meeting / Walk-through will be conducted starting at 11:00 AM on

Monday, March 23, 2026 at the SCC. Bidders should plan to meet at SCC’s administrative offices reception desk on Level 2 prior to proceeding to the job location. The SCC’s address is 705 Pike Street, located at the corner of 7th Avenue and Pike Street downtown Seattle.

For directions to the SCC, please contact the SCC receptionist at 206-694-5000 between the hours of 8:00 am and 5:00 pm, Monday through Friday.

mailto:david.cononetz@seattlecc.com

INSTRUCTIONS TO BIDDERS Page 2

All potential bidders must attend the pre-bid meeting. All attendees at the meeting will be asked to sign the attendance sheet and participate in a building walkthrough of the relevant areas of the facility.

Substantive questions arising at the pre-bid meeting will be documented and answered in a bid addendum, as specified below. The SCC will be bound only by written answers;

oral responses given at the pre-bid meeting are considered unofficial until confirmed by written response.

E. Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit a request in writing by logging in to the SCC public procurement portal (seattleconventioncenter.bonfirehub.com) and submitting a vendor discission no later than the end of the day on Thursday, March 26, 2026. Oral explanations or instructions given before the award of a contract will not be binding. Any information given to a prospective bidder concerning a solicitation will be furnished to all other prospective bidders by addendum to the solicitation if that information is judged by the Owner to be necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders. Any addendum to this solicitation will be issued not later than the close of business on March 31, 2026.

F. Prevailing Wages: All work under this solicitation is subject to Washington State prevailing wage requirements (reference Chapter 39.12 RCW and WAC 296-127): Wages to be paid workers, laborers or mechanics, pursuant to any contract resulting for this solicitation shall not be less than the prevailing rate of wage in the same trade or occupation in the locality within the State where the labor is performed. By submission of a properly completed and signed bid proposal, the bidder agrees to comply with all provisions of these statutory requirements.

The current King County prevailing wage schedule is provided as a separate document for this solicitation.

Questions regarding prevailing wages should be directed to the Washington State Department of Labor & Industries, Prevailing Wage Section, P.O. Box 44540, Olympia, WA 98504-4540, PW1@Lni.wa.gov, 360-902-5300.

G. MWBE Utilization: In accordance with the legislative findings and policies set forth in

Chapter RCW 39.19, the SCC strongly encourages participation in all its contracts by minority-, women-owned, small and otherwise disadvantaged businesses. MWBEs may either be certified by the Washington State Office of Minority and Women’s Business Enterprises (OMWBE) or may be self-identified. Participation may be either on a direct basis in response to this solicitation or as a subcontractor to a bidder. However, no preference will be included in the evaluation of bids, no minimum level of MWBE participation shall be required as a condition for receiving an award, and bids will not be rejected or considered non-responsive on that basis.

mailto:PW1@Lni.wa.gov

INSTRUCTIONS TO BIDDERS Page 3

Specific conditions and additional actions necessary to fulfill the requirements of this section are contained in the “General Terms and Conditions for SCC Facilities Construction”.

H. Apprenticeship Utilization: Consistent with 39.04.320 RCW, the SCC requires that 15% of the total contract labor hours for public works projects estimated to cost two million dollars ($2,000,000) or more be performed by apprentices registered with the Washington State Apprenticeship and Training Council (WSATC). Specific conditions and additional actions necessary to fulfill the requirements of this section are contained in the “General Terms and Conditions for SCC Facilities Construction”.

Bidders may contact the Washington State Department of Labor & Industries’ regional apprenticeship consultant office for King County at 206-515-2842 to obtain information on available apprenticeship programs, or get general apprenticeship program information at the Labor & Industries website, www.lni.wa.gov/TradesLicensing/Apprenticeship/.

0.02 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK

By submitting a bid in response to this solicitation, the bidder acknowledges that it has taken all practicable steps to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including (as applicable) but not limited to (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and roads; (3) uncertainties of weather or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during the work. The bidder also acknowledges that it has satisfied itself as to the character, quality and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including exploratory work done by the Owner as applicable, as well as from the drawings and specifications included in the Contract Documents. Any failure of the bidder to take the actions described and acknowledged in this paragraph will not relieve that bidder from responsibility for estimating properly the difficulty and cost of successfully performing the Work.

By submitting a bid proposal under this solicitation, the bidder affirmatively acknowledges that scheduling the Work will be affected by Owner’s event schedule, and will be subject to Owner’s prior approval, which approval will not be unreasonably withheld. The exterior area of the barrel vault will be available for work 24 hours a day. On the weekend of July 25-26, there will be an event inside this area so any items stored inside will need to be moved to the loading dock or off site for storage.

http://www.lni.wa.gov/TradesLicensing/Apprenticeship/

INSTRUCTIONS TO BIDDERS Page 4

0.03 PRODUCT SUBSTITUTIONS

No product substitutions will be considered as part of this bid process. The awarded Contractor may propose product substitutions, which will be considered by the Owner and, if approved, memorialized through the Change Order process.

0.04 PREPARATION OF BIDS

A. Bidders must be registered as a vendor through the SCC public procurement portal

(seattleconventioncenter.bonfirehub.com). Bid submissions must be submitted through the SCC public procurement portal. The individual who has signed/submitted the bid through the portal shall be the authorized designee responsible for bid submissions.

B. If the solicitation includes alternate bid items, failure to bid on the alternates may disqualify the bid. If bidding on all items is not required, bidders should indicate “no bid” on the SCC public procurement portal BidTable for any item on which no price is submitted.

C. If the bid amount contains any work which requires trenching exceeding a depth of four

(4) feet, all costs for trench safety shall be included in the Base Bid as a separate item for adequate trench safety systems in compliance with 39.04.180 RCW, Ch. 49.17 RCW, and 296-155-650 WAC. Unless indicated as not applicable (“N/A”), Bidder must include a lump sum dollar amount in the BidTable (even if the value is $0.00) in order for the bid to be responsive.

D. Unless otherwise specified, the SCC requires bidders to submit bid prices for the Work on a lump-sum bid basis.

E. Substitute bid forms will not be considered unless this solicitation authorizes their submission.

F. All bidders for Small Works Projects must be currently registered on the MRSC Small Works Roster found at mrscrosters.org.

0.05 BID AMOUNTS

A. The bid prices shown for each item on the bid proposal shall include all labor, material, equipment, overhead and profit to complete all the work for that item.

B. The actual cost of any building permit fees necessary for the work will be a direct reimbursement to the Contractor or paid directly to the permitting agency by the Owner.

Fees for these permits should not be included by the bidder in the bid amount.

https://mrscrosters.org/

INSTRUCTIONS TO BIDDERS Page 5

0.06 TAXES

The bid amounts shall not include Washington State sales and use tax (WSST). All other taxes imposed by law may be included in the bid amount. The Owner will include WSST in its progress payments to the Contractor. The Contractor shall in turn pay the WSST to the WS Department of Revenue and shall furnish documentation of payment to the Owner upon request.

NOTE: Contractor must provide payment/performance bond(s) for the contract amount plus the associated WSST.

0.07 ACKNOWLEDGEMENT OF ADDENDA

Bidders shall acknowledge receipt of all addenda to this solicitation by identifying the addendum number(s) on the SCC public procurement portal’s Submittal Questionnaire. Failure to do so may result in the bid being declared non-responsive.

0.08 BID GUARANTEE & BID ERRORS

A. A bid guarantee in the amount of five percent (5%) of the base bid amount is required.

Failure of the bidder to provide a bid guarantee shall render the bid non-responsive.

Acceptable forms of bid guarantee are a bid bond or postal money order, certified check or cashier’s check made payable to the Washington State Convention Center. At the time of bid, the bidder must upload an electronic copy of the acceptable bid guarantee to the SCC public procurement portal at seattleconventioncenter.bonfirehub.com.

If any of the 3 lowest bidders has indicated a cashier’s check as their form of bid security, they will be contacted by SCC with instructions on how to submit the original/valid cashier’s check within 48 hours of being notified.

The Owner will return bid guarantees to unsuccessful bidders as soon as is practicable, but not sooner than the execution of a contract with the successful bidder. The successful bidder’s bid guarantee will be returned with the official Notice to Proceed with the Work of the contract.

B. The bidder must allow sixty (60) days from the bid opening date for acceptance of its bid by the Owner.

C. In the event a bidder discovers an error in its bid following the bid opening, the bidder may request to withdraw its bid under the following conditions:

1. Written notification is received by the Owner within 24 hours following bid opening, and

INSTRUCTIONS TO BIDDERS Page 6

2. The bidder provides written documentation of the claimed error satisfactory to the Owner within 72 hours following the bid opening.

The Owner will approve or disapprove the request for withdrawal of the bid in writing. If the bidder’s request for withdrawal of its bid is approved, the bidder will be released from further obligation to the Owner without penalty. If it is disapproved, the Owner may retain the bidder’s bid guarantee.

0.09 BIDDER RESPONSIBILITY

It is the intent of the Owner to award a contract for the public works solicited herein to the low responsive and responsible bidder. Criteria utilized to determine bidder responsibility are specified below.

A. Basic Bidder Responsibility Criteria: The bidder must:

1. Have a current certificate of registration as a contractor in compliance with chapter

18.27 RCW, which must have been in effect at the time of bid submittal;

2. Have a current Washington Unified Business Identifier (UBI) number;

3. Have, if applicable:

a. Industrial Insurance (workers’ compensation) coverage for the bidder’s employees working in Washington, as required in Title 51 RCW;

b. A Washington Employment Security Department number, as required in Title

50 RCW;

4. Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3);

5. For public works projects subject to the apprentice utilization requirements of RCW 39.04.320, not have been found out of compliance by the Washington State Apprentice and Training Council for working apprentices out of ratio, without appropriate supervision, or outside their approved work processes as outlined in the standards of apprenticeship under 39.04.340 RCW for the one-year period immediately preceding the first date of advertising of the project;

6. Not having been determined to have been in violation of Washington State wage laws as promulgated in chapters 49.46, 49.48, or 49.52 RCW.

B. Supplemental Bidder Responsibility Criteria: In addition to the basic bidder responsibility criteria, above, the successful bidder must meet the following supplemental bidder responsibility criteria. As evidence that the bidder meets the supplemental bidder

INSTRUCTIONS TO BIDDERS Page 7 responsibility in this section, the apparent low bidder will be asked to submit the documentation specified below to the Owner within two (2) business days of the bid submittal deadline. The Owner reserves the right to request such documentation from other bidders.

Supplemental Criteria Required Documentation

1. The bidder shall have at least five (5) years pf experience working with projects of a size and scope similar to the present requirement.

1. Contractor references from at least three (3) completed projects, the start date of at least one of which dates from five (5) years prior to the bid submittal deadline established herein, which were comparable in scope to the present project.

Include:

a. Project name

b. Project size

c. Project starting and ending dates

d. Contact name, title, and phone number and/or e-mail address

2. The bidder shall have available to the present project an on-site supervisor/manager with no less than five (5) years of experience successfully completing projects of similar scope.

2. The name of the on-site supervisor/manager the bidder proposes to assign to the project, along with references from at least three (3) completed projects.

Include:

a. Project name

b. Project size

c. Project starting and ending dates

d. Contact name, title, and phone number and/or e-mail address

3. The bidder shall have the demonstrated capability to develop detailed work plans for projects of a scope similar to the present project.

3. Not less than three (3) examples of a detailed project work plan, to include such items as equipment lists, work team composition, scheduling, and dealing with the engineering details.

Bidders with concerns about the relevancy or restrictiveness of the Supplemental Bidder Responsibility Criteria specified above may submit a request to the Owner to modify the criteria. Such requests shall be in writing, shall describe the nature of the concern(s), and shall propose specific modifications to the criteria that will, in the opinion of the requester, make the criteria more relevant and/or less restrictive of competition. Bidders

INSTRUCTIONS TO BIDDERS Page 8 are to submit such requests to the Owner’s Contact and to SCC Procurement (procurement@seattleconventioncenter.com) no later the close of business on Thursday, March 26. In the event that the Owner determines that the responsibility criteria should be changed, an addendum to the solicitation will be issued.

0.10 SUBMISSION OF BID PROPOSALS

A. Bids must be submitted on or before the time as specified in the Advertisement for Bids.

B. Bids shall be submitted electronically through the SCC public procurement portal as specified in the Advertisement for Bids.

C. Prior to the bid opening, the Owner will designate the official bid clock. Any part of the bid proposal or bid modification not received prior to the time specified, per the designated bid clock, will not be considered and the bid will be returned to the bidder unopened.

D. A bid may be withdrawn electronically by a bidder’s authorized representative before the bid submittal date and time specified in the Advertisement for Bids.

E. People with disabilities who wish to request special accommodation (e.g., sign language interpreters, Braille, etc.) need to contact the Owner’s Contact at least ten (10) working days prior to the scheduled bid deadline.

F. In the event the SCC public procurement portal is unavailable to all users at the bid submittal deadline, SCC will contact bidders within 24 hours, and SCC will extend the bid submittal time.

G. Neither SCC nor SCC’s public procurement portal can guarantee the availability of internet connectivity or related telecommunication and hosting services and will not be liable or responsible if the bidder and its representative(s) or designee(s) cannot connect to the SCC public procurement portal.

0.11 BID OPENING / RESULTS

A. Bid Opening: It is Owner’s intention to publicly open the bid proposals received immediately following the submittal deadline. Bidder attendance at the bid opening is not required. Such bid opening shall be conducted via live stream on Microsoft Teams. A link to the live stream for bid opening can be found both in the Advertisement for Bids and the solicitation’s posting on the SCC public procurement portal. The Owner, however, reserves the right to open the bids at an alternative time and place to be determined. In any event, bid results will be available by 12:00 noon on the first business day following the bid due date on the SCC public procurement portal.

mailto:procurement@seattleconventioncenter.com

INSTRUCTIONS TO BIDDERS Page 9

Because final contract award is based on an evaluation of bidder responsiveness and responsibility as noted herein, bidders are cautioned that the announcement of bid amounts at the bid opening does not constitute a contract award.

B. Responsiveness Screening: Bid proposals received by the published deadline will be administratively screened for responsiveness, i.e., meeting all the material requirements of the solicitation.

C. Responsibility Documentation: The apparent low bidder will be asked by the Owner to submit the documentation specified in Section 0.09.B, above; the bidder must supply the requested information within two (2) business days of the request. Withholding information or failure to submit all the information requested may render the bid non-responsive.

D. Evaluation: The Owner will evaluate the responsibility documentation submitted by the apparent low bidder to determine if said bidder meets the supplemental bidder responsibility criteria. In making this determination, the Owner will require the bidder to “substantially meet the criteria” taken all together, such that a bidder may be declared to be responsible under the solicitation if the Owner is confident that the bidder is capable of successfully performing the project based on the documentation provided.

E. Appeals: If the Owner determines that the apparent low bidder does not meet the supplemental bidder responsibility criteria specified herein, the Owner shall notify said bidder in writing with the reasons for its determination. If the bidder disagrees with this determination, it may appeal the determination within two (2) business days of receipt of the Owner’s determination by presenting additional information to the Owner. The Owner will consider the additional information before issuing its final determination. If the final determination affirms that the bidder is not responsible, the Owner will not execute a contract with any other bidder until two (2) business days after the bidder determined to be not responsible has received the final determination.

0.12 SUBCONTRACTOR LISTING

Pursuant to 39.30.060 RCW, if the base bid plus the net value of any selected alternates is one million dollars ($1,000,000) or more, the bidder shall comply with the following requirements:

A. Subcontractor Form A: At the time of bid submittal, the bidder shall provide names and license numbers of the subcontractors with whom the bidder will subcontract for the performance of heating, ventilation and air conditioning (HVAC), plumbing, and electrical work, as applicable.

B. Subcontractor Form B: Within 48 hours of bid submittal, the bidder shall provide names of the subcontractors with whom the bidder will subcontract for the performance of

INSTRUCTIONS TO BIDDERS Page 10 structural steel installation and rebar installation. Subcontractor List Form B must be submitted via email to procurement@seattleconventioncenter.com.

C. The bidder can name itself for the performance of the work.

D. Substitution of a listed subcontractor may be made by the prime contractor for the following reasons:

1. Refusal of the listed subcontractor to sign a contract with the prime contractor;

2. Bankruptcy or insolvency of the listed subcontractor;

3. Inability of the listed subcontractor to perform the requirements of the proposed contract or the project;

4. Inability of the listed subcontractor to obtain the necessary bonding, insurance, or other statutory requirements to perform the work detailed in the contract;

5. Refusal or inability to provide a letter of bondability from a surety company; or

6. The listed subcontractor is barred from participating in the project as a result of a court order or summary judgement.

E. The bidder shall not list more than one subcontractor for each category of work identified unless subcontractors vary with bid alternates, in which case the bidder must indicate which subcontractor will be used for which alternate.

F. Failure of the bidder to submit as part of the bid the names of such subcontractors or to name itself to perform such work shall render the bidder's bid non-responsive and, therefore, void.

0.13 CONTRACT AWARD & EXECUTION

A. Contract Award: The Owner intends to award a contract for the work solicited herein to the responsive and responsible bidder offering the low aggregate amount for the base bid plus selected additive or deductive alternates, and meeting all other bid submittal requirements. Notwithstanding the preceding sentence, issuance of this public works project bid solicitation does not obligate the Owner to contract in whole or in part for the work specified herein.

B. Contract Execution: The apparent successful bidder will be expected to return to the

Owner a signed contract, insurance certificate and payment/performance bond(s) within fifteen (15) days after receipt of the finalized contract. If said bidder fails to sign all contractual documents or provide the bond(s) and evidence of insurance as required within the time specified, the Owner reserves the right to rescind award of the contract, and award the contract to the next lowest responsible bidder. The contract will only

INSTRUCTIONS TO BIDDERS Page 11 become effective when signed by the Owner. Prior to the Owner’s signature, any and all costs incurred shall be the sole responsibility of the bidder.

C. Subcontractor Responsibility Criteria: The awarded Contractor shall include the language of “Basic Bidder Responsibility Criteria”, Section 0.09.A, above, in each of its first-tier contracts, and shall require each of its subcontractors to include the same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties. Upon request of the Owner, the Contractor shall promptly provide documentation demonstrating that a subcontractor meets the subcontractor’s responsibility criteria cited. The requirements of this section apply to all subcontractors, regardless of tier.

0.14 PUBLIC WORKS BID PROTEST PROCEDURE

Any bidder on a SCC public works project is entitled to protest a bid result. Only protests stipulating an issue of fact concerning the following subjects will be considered:

• A matter of bias, discrimination or conflict of interest on the part of the SCC;

• Errors in reading or recording a bid;

• Non-compliance with procedures described in the bid package documents or with SCC policy.

Bidders are advised that the following procedure is the only administrative remedy available to bid protesters.

A. All bid protests must be provided to the SCC in writing, and must include the following:

1. An assertion as to the basis for the protest relative to the allowable protest subjects, above;

2. A complete statement of the facts of the protest, including reference to any specific section(s) of the bid package documents which is/are relevant to the protest;

3. Documentation in support of the protest, as appropriate;

4. The name, address and telephone number of the person representing the protesting party, if applicable.

B. Bid protests must be presented within five (5) business days of an announcement of contract award, and are to be addressed to procurement@seattleconventioncenter.com.

INSTRUCTIONS TO BIDDERS Page 12

C. The bid protest will be reviewed by the SCC President/CEO or their designee (“Reviewing Official”). Such review may include consultation with SCC staff, legal counsel and others as necessary, and the protesting party may be contacted for additional information.

D. Within ten (10) business days, the Reviewing Official will prepare a final report regarding the merits of the protest, and a decision on action, if any, which the SCC will take as a result. A copy of the report will be promptly provided to the protesting party.

E. During the protest review period, the SCC will not commence work on the project at issue, except where, in the considered judgment of the SCC, emergency conditions dictate otherwise.

END OF INSTRUCTIONS TO BIDDERS

FORM A - SUBCONTRACTOR LIST Page 1

Project Name: Project No.:

Bidder Name:

At Bid Submittal Time Submit FORM A to: seattleconventioncenter.bonfirehub.com

In compliance with the contract documents, the following subcontractor list is submitted:

SUBCONTRACTOR LISTING – RCW 39.30.060

If the base bid and the sum of the additive alternates is one million dollars or more, the Bidder shall provide names of the subcontractors with whom the Bidder will directly subcontract for performance of the following work. If the Bidder intends to perform the work, the Bidder must enter its name for that category of work.

The Bidder shall not list more than one subcontractor for each category of work identified UNLESS subcontractors vary with bid alternates, in which case the Bidder must indicate which subcontractor will be used for which alternate. Substitutions are prohibited except as outlined in RCW 39.30.060.

Failure of the Bidder to submit the NAMES of such subcontractors or to name itself to perform such work may render the Bidder’s bid nonresponsive and, therefore, VOID.

Bidders who name themselves to perform the work are expected to perform the work and the Seattle Convention Center reserves the right to reject substitution of the bidder with a subcontractor unless the bidder demonstrates a change in circumstances from the time of bid submission that is outside of the control of the bidder.

Category of Work Alternate Bid

(if applicable)

Firm Name Firm License Number

1. HVAC, Base Bid n/a

a. HVAC, Alternate Bid

2. Plumbing, Base Bid n/a

a. Plumbing, Alternate Bid

3. Electrical, Base Bid n/a

a. Electrical, Alternate Bid

Bidder may attach a separate sheet for additional alternate bid subcontractors.

Submitted By: __________________________________________________ Print Name and Title of Authorized Person

Subcontractor List Form A For HVAC, Plumbing, and Electrical https://app.leg.wa.gov/rcw/default.aspx?cite=39.30.060

FORM B - SUBCONTRACTOR LIST Page 1

Project Name: Project No.:

Bidder Name:

Within 48 Hours of Bid Submittal Time email FORM B as an attachment to:

procurement@seattleconventioncenter.com

Subject line on email shall include: Project No., Project Name, Contractor Name, Form B

In compliance with the contract documents, the following subcontractor list is submitted:

SUBCONTRACTOR LISTING – RCW 39.30.060

If the base bid and the sum of the additive alternates is one million dollars or more, the Bidder shall provide names of the subcontractors with whom the Bidder will directly subcontract for performance of the following work. If the Bidder intends to perform the work, the Bidder must enter its name for that category of work.

The Bidder shall not list more than one subcontractor for each category of work identified UNLESS subcontractors vary with bid alternates, in which case the Bidder must indicate which subcontractor will be used for which alternate. Substitutions are prohibited except as outlined in RCW 39.30.060.

Failure of the Bidder to submit the NAMES of such subcontractors or to name itself to perform such work may render the Bidder’s bid nonresponsive and, therefore, VOID.

Bidders who name themselves to perform the work are expected to perform the work and the Seattle Convention Center reserves the right to reject substitution of the bidder with a subcontractor unless the bidder demonstrates a change in circumstances from the time of bid submission that is outside of the control of the bidder.

Category of Work Alternate Bid # (if applicable) Firm Name Firm License Number

1. Structural Steel Installation, Base Bid n/a

a. Structural Steel Installation, Alternate Bid

2. Rebar Installation, Base Bid n/a

a. Rebar Installation, Alternate Bid

Bidder may attach a separate sheet for additional alternate bid subcontractors.

Submitted By: __________________________________________________ Print Name and Title of Authorized Person

Subcontractor List Form B For Structural Steel Installation and Rebar Installation mailto:procurement@seattleconventioncenter.com

[ISSUE DATE TBD]

CONTRACT FORM Page 1

CONTRACT

for

BARREL VAULT RECAULKING

THIS CONTRACT is made and entered into this day of [month, year TBD] between the Wash-ington State Convention Center, a King County public facilities district DBA Seattle Convention Center (hereinafter called “Owner” and also referred to as “SCC”), and [Contractor name TBD] (hereinafter called “Contractor”).

WITNESSETH: The parties hereto by these presents do covenant and agree with each other as follows:

FIRST: Contractor agrees to furnish all permits, material, labor, tools, equipment, facilities, etc., neces-sary to perform and complete in a workmanlike manner the Work called for in the Contract Documents entitled “BARREL VAULT RECAULKING”, SCC Contract No. 550-0226-1. Said Contract Documents shall include Contractor’s bid submittal dated , all documents as listed on the project specifications Table of Contents, Exhibit A to this Contract, and all duly executed modifications incorpo-rated in the documents and this Contract.

SECOND: Contractor hereby agrees to substantially complete all the Work under the Contract Docu-ments within [number of days to Substantial Completion TBD (TBD)] calendar days after the date of No-tice to Proceed, which number of days shall constitute the “Contract Time”. Contractor further agrees to complete all punch list items within thirty (30) calendar days after the date of Substantial Completion.

All the Work shall be fully and finally completed in accordance with the Contract Documents within for-ty-five (45) calendar days after Substantial Completion has been established by the Owner, which date shall constitute Final Completion under this Contract.

THIRD: In consideration of the performance by the Contractor of the Work contained herein, the Owner agrees to pay the Contractor for said Work completed in accordance to the Contract Documents a total of [Contract Sum TBD] dollars [($TBD)], plus applicable Washington State sales tax.

[ISSUE DATE TBD]

CONTRACT FORM Page 2

THIS CONTRACT, consisting of two (2) pages and two (2) attachments (“Table of Contents” and “General Terms and Conditions for SCC Facilities Construction”) which are incorporated herein by this reference, is executed by the persons signing below, who warrant they have the authori-ty to execute.

[COMPANY NAME TBD] WASHINGTON STATE CONVENTION CENTER

PUBLIC FACILITIES DISTRICT DBA SEATTLE

CONVENTION CENTER

[authorized signatory TBD] [signatory title TBD]

Date

Jennifer LeMaster SCC President & CEO

APPROVED as to FORM:

Matthew R. Hendricks SCC General Counsel

END OF CONTRACT FORM

PROJECT SPECIFICATIONS BARREL VAULT RECAULKING

GENERAL CONDITIONS Page 1

GENERAL TERMS and CONDITIONS for

SCC FACILITIES CONSTRUCTION

PART 1 – GENERAL PROVISIONS

1.1 DEFINITIONS

A. “Architect”, “Engineer” or “A/E”: A person or entity lawfully entitled to practice architecture or engineering, representing Owner within the limits of its delegated authority.

B. “Claim”: Contractor’s exclusive remedy for re-solving disputes with Owner regarding the terms of a change order or a request for equitable ad-justment, as more fully set forth in Part 8.

C. “Contract Documents”: Advertisement for Bids, Instructions to Bidders, completed Bid Proposal Form(s), these General Conditions, Supple-mental Conditions (if applicable), public works Contract, Drawings and Specifications, addenda and modifications thereto.

D. “Contract Sum”: Total amount payable by Own-er to Contractor for completion of the Work.

E. “Contract Time”: Number of calendar days stat-ed for achieving Substantial Completion.

F. “Final Acceptance”: Written acceptance from the Owner that the Work has been completed.

G. “Final Completion”: Work is fully and finally complete in accordance with the Contract Doc-uments.

H. “Notice to Proceed”: Written notice from Owner that sets the date for Contract Time to begin.

I. "Owner": The Washington State Convention

Center (a King County public facilities district DBA Seattle Convention Center, also “SCC”) or its authorized representative with the authority to enter into, administer, and terminate the Work and make related determinations and findings.

J. “Prior Occupancy”: Owner’s use of all or parts of the project before Substantial Completion.

K. “Substantial Completion”: Stage in the progress of the Work where Owner has full and unre-stricted use and benefit of the facilities, as set forth in Section 6.7. All Work other than inci-dental corrective or punch list work shall have been completed.

L. “Work”: Construction and services required, including but not limited to labor, materials, supplies, equipment, services, permits, manu-facture and fabrication of components, per-formed, furnished, or provided in accordance with the Contract Documents.

1.2 ORDER OF PRECEDENCE

Conflicts or inconsistencies in the Contract Docu-ments shall be resolved by giving the documents precedence in the following order: signed public works Contract, including any change orders; Modi-fications to the General Conditions; Supplemental Conditions; General Conditions; Specifications – Divi-sion I provisions shall have precedence over other divisions; Drawings – large scale over small scale drawings; signed and completed form of proposal, i.e., bid form(s); Instructions to Bidders; and Adver-tisement for Bids.

1.3 CONTRACTOR REPRESENTATIONS

Contractor makes the following representations to Owner:

1. The Contract Sum is reasonable compensation for the Work. Contract Time is adequate for the performance of the Work.

2. Contractor is financially solvent and thus able to perform the obligations required by the Con-tract.

GENERAL CONDITIONS Page 2

3. Contractor is able to furnish the plant, tools, materials, supplies, equipment and labor re-quired to complete the Work, and has experi-ence and competence to do so.

PART 2 – INSURANCE AND BONDS

2.1 CONTRACTOR’S LIABILITY INSURANCE

A. Contractor shall obtain all the insurance re-quired by the Contract Documents. Insurance coverage shall name the Owner as an additional insured. Companies writing the insurance shall be licensed to do business under Title 48 RCW.

Contractor shall include in its bid the cost of all insurance and bonds required to complete the base bid work and accepted alternates. Insur-ance carriers shall be acceptable to Owner and Carrier’s A.M. Best rating shall be indicated on the insurance certificate.

B. Prior to commencement of the Work, Contrac-tor shall furnish Owner a completed certificate of insurance coverage. The certificates shall be signed by a person authorized by that insurer to bind coverage on its behalf. If requested by Owner, Contractor shall also provide the copies of the insurance policies. The form of all policies shall be subject to Owner’s review and approval which will not be unreasonably withheld. Re-view of the Contractor’s insurance by Owner shall not relieve or decrease the liability of Con-tractor.

C. Contractor shall maintain the insurance cover-age required by the Contract Documents during the Work and for one year after Final Ac-ceptance. None of the insurance coverages may be cancelled or materially changed without 30 days prior notice to Owner.

2.2 REQUIRED COVERAGE AND LIMITS

A. Required coverage shall be as follows:

1. Public Liability Insurance, including con-tractual liability, against claims for bodily injury, personal injury, death or property damage occurring or arising out of the exe-cution of the Work under this Contract. In-surance shall cover claims caused by any act, omission, or negligence of the Contrac-tor or its representatives. Limits of liability insurance shall be:

Each Occurrence $1,000,000 General Aggregate Limits $1,000,000 (other than products-commercial operations) Products-Commercial Operations Limit $1,000,000 Personal and Advertising Injury Limit $1,000,000 Fire Damage Limit $50,000 (any one fire) Medical Expense Limit $5,000 (any one person)

2. If the contract is for underground utility work, then the Contractor shall provide proof of insurance for that above in the form of Explosion, Collapse and Under-ground (XCU) coverage.

3. Employers Liability on an occurrence basis in an amount not less than $1,000,000 per occurrence.

4. Automobile Liability. If Contractor-owned personal vehicles are used, a Business Au-tomobile Policy covering at a minimum Code 2 “owned autos only” must be se-cured. If Contractor employee’s vehicles are used, the Contractor must include under the Business Automobile Policy Code 9, coverage for non-owned autos. The mini-mum limit for automobile liability is $1,000,000 per occurrence, using a com-bined single limit for bodily injury and prop-erty damage.

5. Contracts for Hazardous Substance Removal

(Asbestos Abatement, PCB Abatement, etc.).

In addition to insurance coverage as outlined above, Contractor shall provide Environmen-tal Impairment Liability insurance for the hazardous substance removal for $500,000

GENERAL CONDITIONS Page 3 each occurrence, $1,000,000 aggregate, or $1,000,000 each occurrence/aggregate bodi-ly injury and property damage combined single limit. Insurance certificate must state that the insurer is covering hazardous sub-stance removal. Should this insurance be se-cured on a “claims made” basis, the cover-age must be continuously maintained for one year following Final Completion.

6. Worker’s Compensation coverage pursuant to the Washington State Industrial Insurance Act, the Federal Longshoremen’s and Harbor Worker’s Act and the Jones Act.

7. Builder’s Risk on an “all risk” basis, insuring against the perils of fire and extended cover-age and physical loss or damage including theft, vandalism, malicious mischief, collapse, false work, temporary buildings, and debris removal including demolition resulting from the enforcement of any applicable legal re-quirements. Such insurance shall be in the amount of the Contract Sum including all change orders for the Work on a replacement cost basis until Substantial Completion. For projects not involving buildings, Installation Floater is acceptable for the Builder’s Risk In-surance. Owner and Contractor waive all sub-rogation rights against each other, any Sub-contractors, A/E, A/E’s subconsultants, sepa-rate contractors, if any, and any of their sub-contractors, for damages caused by fire or other perils to the extent covered by property insurance obtained pursuant to this section or other property insurance applicable to the Work, except such rights as they have to pro-ceeds of such insurance held by Owner as fi-duciary. The policies shall provide such waiv-ers of subrogation by endorsement or other-wise. A waiver of subrogation shall be effec-tive to a person or entity even though that person or entity would otherwise have a duty of indemnification, contractual or otherwise, did not pay the insurance premium directly or indirectly, and whether or not the person or entity had an insurable interest in the proper-ty damaged.

2.3 PAYMENT AND PERFORMANCE BONDS

Payment and performance bonds for 100% of the Contract Sum, including all Change Orders and state sales tax, shall be furnished by Contractor. No pay-ment or performance bond is required if the Con-tract Sum is $150,000 or less and Contractor agrees that Owner may, in lieu of the bond, retain 10% of the Contract Sum for the period allowed by RCW 39.08.010.

AIA Payment Bond and Performance Bond forms (A312) are required by the Owner for this contract.

These forms may be obtained from the Contractor’s bonding agent. The Payment Bond shall cover pay-ments to laborers and mechanics, including pay-ments to Employee Benefit Funds, and payments to subcontractors and material suppliers.

PART 3 – TIME AND SCHEDULE

3.1 PROGRESS AND COMPLETION

Contractor shall diligently prosecute the Work, with adequate forces, so as to achieve Substantial Com-pletion within the Contract Time, and to achieve Final Completion within the time specified in the Contract.

3.2 CONSTRUCTION SCHEDULE

A progress schedule satisfactory to Owner shall be submitted by Contractor within seven (7) days of the Notice to Proceed. Owner may withhold progress payments until a satisfactory schedule has been submitted. Contractor shall update the schedule as required to demonstrate the progress of the Work. If Contractor is not in conformance with the schedule, Contractor shall take such steps as are necessary to bring the actual completion dates of the Work into conformance with the schedule, and notify Owner of Contractor's plans to do so.

3.3 OWNER’S RIGHT TO SUSPEND OR STOP THE

WORK

GENERAL CONDITIONS Page 4

Owner may, at its sole discretion, order Contractor, in writing, to suspend all or any part of the Work for up to 90 days, or for such longer period as mutually agreed. Upon receipt of this notice, Contractor shall immediately suspend the Work and take all reason-able steps to minimize the costs of performance di-rectly attributable to such suspension. Contractor shall be entitled to an equitable adjustment in the Contract Time, or Contract Sum, or both, for any increases in the time or cost of performance directly attributable to the suspension, provided Contractor complies with all requirements set forth in Part 7.

If Contractor fails or refuses to perform its obliga-tions in accordance with the Contract Documents, Owner may order Contractor, in writing, to stop the Work, until satisfactory corrective action has been taken. Contractor shall not be entitled to an equita-ble adjustment in the Contract Time or Contract Sum for any increased cost or time of performance at-tributable to Contractor’s failure or refusal to per-form.

3.4 DELAY

A. No default by Owner or Contractor shall occur for any delay or failure of performance, other than the payment of money, if such delay or failure was caused by an act of Force Majeure.

Acts of Force Majeure are as follows:

1. Acts of God or the public enemy;

2. Fire or other casualty for which neither

Contractor nor any Subcontractor is respon-sible;

3. Quarantine or epidemic;

4. Strike or defensive lockout;

5. Unusually severe weather conditions which could not have been reasonably anticipat-ed; and

6. Unusual delay in receipt of supplies or products which were timely ordered and for which no substitute reasonably acceptable to Owner was available.

For changes in the time of performance directly attributable to an act of Force Majeure, Con-tractor shall be entitled to an equitable adjust-ment in the Contract Time, provided it makes a request for equitable adjustment according to Section 7.3. Contractor shall not be entitled to an adjustment in the Contract Sum resulting from an act of Force Majeure.

B. Contractor shall be entitled to an equitable ad-justment in Contract Time, and may be entitled to an equitable adjustment in Contract Sum, if the cost or time of performance is changed due solely to the fault or negligence of Owner. For these equitable adjustments, Contractor must make a request according to Part 7. Contractor shall not be entitled to an adjustment in Con-tract Time or in the Contract Sum for any delay or failure of performance if caused by Contrac-tor or anyone for whose acts Contractor is re-sponsible.

C. Contractor shall make all reasonable efforts to prevent and mitigate the effects of any delay.

3.5 LABOR DISPUTES

Contractor shall promptly notify Owner of any actual or potential labor dispute.

3.6 DAMAGES FOR FAILURE TO ACHIEVE TIMELY

COMPLETION

A. It is acknowledged that the Contractor’s failure to achieve Substantial Completion of the Work within the Contract Time provided by the Con-tract Documents will cause the Owner to incur substantial economic damages and losses of types and in amounts which are impossible to compute and ascertain with certainty as a basis for recovery by the Owner of actual damages, and that liquidated damages represent a fair, reasonable and appropriate estimate thereof.

Accordingly, in lieu of actual damages for such delay, the Contractor agrees that liquidated damages may be assessed and recovered by the Owner as against Contractor and its Surety, in the event of delayed completion and without

GENERAL CONDITIONS Page 5 the Owner being…