3 - 459-24-001 CFA Kitchen_IFC_Drawings.pdf
PDF 16 MB Posted
- Attached to
- CFA Kitchen Renovation
- Solicitation number
- 36C26124R0081
About this file
This document appears to be a set of drawings for the CFA Kitchen Renovation project, solicitation number 36C26124R0081, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21.
The solicitation is for interested participants from the NCO 21 MACC Group 2 to perform the CFA Kitchen Renovation work. No additional details about the required products or services, response dates, award dates, pricing terms, set asides, incumbents, or other key information are provided in this document, as it consists solely of design drawings without any narrative or contractual details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4 - RFI FORM CFA Kitchen Renovation.docx | DOCX document | |
| 5 - Price Proposal Breakdown.pdf | ||
| 1 - 36C26124R0081.docx | DOCX document | |
| 2 - 459-24-002 CFA Kitchen_IFC_Specifications.pdf | ||
| 8 - P07 WAGE DETERMINATION HI202400001 05.17.24.pdf | ||
| 6 - Attachment C_Contractor Certification RE Safety and EMR.docx | DOCX document | |
| 9 - Site Visit Map.pdf | ||
| 7 - Pre_Bid RFI.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, California 90807
MAT PERKINS
804-372-0067
A u to d e s k D o c s
/4
-2
-0
C F
A K it c h e n
R e n o v a ti o n H o n o lu lu V
/4
-2
-0
.C
F A
.K it c h e n .D e s ig n .E
H R
M .A
R C
H .B
R
.r v t
/2
/2
:2
:3
P M
GI000
COVER SHEET 459-24-002
08/02/2024 M.Perkins K.McDermott
ISSUED FOR
CONSTRUCTION
RENOVATE KITCHEN AT CLC
BUILDING 110
459 PATTERSON ROAD, HONOLULU, HI 96819
ISSUED FOR CONSTRUCTION
08/02/2024
459-24-002 Renovate Kitchen at CLC Building - 110
SPARK M. MATSUNAGA VA MEDICAL CENTER
ADD ALTERNATES
NONE
DEDUCT ALTERNATE
NONE
CONTRACTOR'S SCOPE OF WORK:
THE PROJECT SHALL RENOVATE THE EXISTING KITCHEN SPACE INTO A FUNCTIONAL KITCHEN THAT MEETS ALL CURRENT VA DESIGN GUIDES, AND LOCAL CODE REQUIREMENTS.
THE RENOVATION SHALL INCLUDE DEMOLISHING THE 2 EXISTING KITCHEN HOOD VENTILATION SYSTEMS AND REPLACING WITH NEW. NEW HOOD MUST MEET ALL VA REQUIREMENTS, NEW HOOD MUST ALSO BE A PERFECT FIT IN THE PROVIDED SPACE. NEW DUCTWORK, NEW HOODS, MAKE-UP AIR FAN AND EXHAUST FAN TO BE INCLUDED.
OTHER ITEMS INCLUDED IN THE RENOVATION:
• TEMPORARILY REMOVE EQUIPMENT AS REQUIRED TO PERFORM WORK.
• INSTALL EQUIPMENT (AND REQUIRED UTILITIES) IN TEMPORARY LOCATIONS.
• CONVERT EXISTING OFFICE AREA TO FOOD STORAGE.
• REPLACE CEILING, LIGHTING AND ALL FINISHES.
• AUGMENT MECHANICAL SYSTEM. REPLACE EXTERIOR AND INTERIOR COOLING UNITS FOR WALK-IN COOLERS #1 AND #2.
• REPLACE GREASE INTERCEPTOR.
• INSTALL NEW KITCHEN EQUIPMENT PROVIDED BY VA.
• REINSTALL EXISTING ITEMS TO REMAIN, REPAIR / REPLACE AS REQUIRED TO RESTORE FULL FUNCTIONALITY.
• INSTALL NEW SINK AND DISHWASHING MACHINE.
CO: Charee K. Harris Contracting Officer Network Contract Office (NCO) 21 VA Sierra Nevada Health Care System 975 Kirman Avenue, Reno, NV 89502 Phone: (775)-788-5511 Fax: (775)-788-5552
COR: Marvin A. Patacsil Management & Program Analyst Facilities
Management Service (FMS) VA PIHCS (Pacific Island Health Care System) Department of Veterans Affairs Pacific Islands HealthCare System 459 Patterson Road, Honolulu, HI 96819 Phone: (808) 433-0162 (Office) Phone: (808) 940-1133 (Mobile) Mail: marvin.patacsil@va.gov
SHEET INDEX
SHEET NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI050 GENERAL NOTES
GI101 ARCHITECTURAL LIFE SAFETY PROTECTION PLAN
GI201 INFECTION CONTROL PLAN & INTERIM LIFE
PHOTO REFERENCES
R-901 PHOTO REFERENCES
R-902 PHOTO REFERENCES
R-903 PHOTO REFERENCES
ARCHITECTURAL
A-001 SYMBOLS, & GENERAL NOTES
AD101 ARCHITECTURAL DEMOLITION FLOOR PLAN
A-101 ARCHITECTURAL FLOOR PLAN
A-102 ARCHITECTURAL ATTIC AND ROOF PLANS
AC101 ARCHITECTURAL REFLECTED CEILING PLAN - FIRST LEVEL
A-401 ARCHITECTURAL ENLARGED VIEWS
INTERIORS
IN001 INTERIOR FINISH BOARDS
IN101 INTERIOR FLOOR AND WALL FINISH PLAN
EQUIPMENT & FURNITURE
Q-101 INTERIOR EQUIPMENT & FURNITURE
Q-102 EQUIPMENT- BASIS OF DESIGN
PLUMBING
P-000 PLUMBING ABBREVIATIONS AND SYMBOLS
PD101 PLUMBING PLAN - FIRST LEVEL - DEMO
P-101 PLUMBING PLAN - FIRST LEVEL - NEW
MECHANICAL
M-000 MECHANICAL ABBREVIATIONS AND SYMBOLS
MD101 MECHANICAL PLAN - FIRST LEVEL - DEMO
MD201 ROOF MECHANICAL PLAN - DEMO
M-101 MECHANICAL PLAN - FIRST LEVEL - NEW
M-201 ROOF MECHANICAL PLAN - NEW
M-501 MECHANICAL DETAILS
M-601 MECHANICAL SECTIONS
M-701 MECHANICAL SCHEDULES
M-901 MECHANICAL CUTSHEETS
M-902 MECHANICAL CUTSHEETS
ELECTRICAL
E-000 ELECTRICAL ABBREVIATIONS AND SYMBOLS
ED-101 ELECTRICAL PLAN - FIRST LEVEL - EXISTING
ED-401 ELECTRICAL PLAN - ENLARGED PLAN EXISTING
E-101 ELECTRICAL PLAN - FIRST LEVEL - NEW
E-401 ELECTRICAL ENLARGED PLANS
E-402 ELECTRICAL PLAN - ENLARGED PLAN - LIGHTING PLAN
E-601 ELECTRICAL ONE-LINE
E-701 ELECTRICAL SCHEDULES
E-702 ELECTRICAL SCHEDULES
E-901 ELECTRICAL CUTSHEETS
Triple C A&E Group, the A-E of record can certify that no Asbestos Containing Building Materials (ACBM) or Lead Based Products were designed/specified in the design.
_________________________ Signature 07/16/2024 Date
Author: Mat Perkins, AIA NCARB, PMP, LEED BD+C Triple C - The A&E Group
LOCATION MAP
VICINITY MAP
CS: Craig Armstrong Contract Specialist Network Contract Office (NCO) 21 711 Kapiolani Blvd Honolulu, HI 96813 Phone: (808)-835-9686
Revisions: Date:
month/day /ye ar
/0
2/
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, California 90807
MAT PERKINS
804-372-0067
A u to d e s k D o c s
/4
-2
-0
C F
A K it c h e n
R e n o v a ti o n H o n o lu lu V
/4
-2
-0
.C
F A
.K it c h e n .D e s ig n .E
H R
M .A
R C
H .B
R
.r v t
/2
/2
:2
:3
P M
GI050
GENERAL NOTES 459-24-002
08/02/2024 M.Perkins S.Pollard
ISSUED FOR
CONSTRUCTION
RENOVATE KITCHEN AT CLC
BUILDING 110
459 PATTERSON ROAD, HONOLULU, HI 96819
1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR
THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL
AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING
SPECIFICATION MANUAL FOR NEW WORK AND THE MPI
MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR
REPAINTING WORK.
2. PAINTING WORK: INCLUDES TAPING, SURFACE
PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD
PAINTING AND FINISHING AS REQUIRED BY STANDARD
PRACTICE, MANUFACTURER OR SPECIFICATION. REQUIRED
COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP
PRIMING, SURFACE TREATMENT AND FINISHING. THE WORK
ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF
OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS
MAY REQUIRE OTHER TYPES OF PAINTING, INCLUDING, BUT
NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND
FACTORY PRIMING.
3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED
OTHERWISE, CONTRACTOR IS TO FIELD PAINT ANY
SURFACES DISTURBED BY THE SCOPE OF WORK,
WHETHER OR NOT PREVIOUSLY PAINTED, AND ALL NEW
ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED
TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL
AND EXPOSED PIPING AND FITTINGS (INCLUDING IRON AND
PVC).
4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD
PAINTING OF INTERIOR AND EXTERIOR EXPOSED PIPES,
DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND
PRIMED METAL SURFACES OF EQUIPMENT IN EXPOSED
AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL
WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF
ELECTRICAL AND MECHANICAL WORK IN ELECTRICAL AND
MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED
OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF
PIPING FOR MECHANICAL AND PLUMBING WORK IS
COVERED IN THE MECHANICAL OR PLUMBING
SPECIFICATIONS.
5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT
AN EDGE, CORNER, CHANGE OF MATERIALS OR CHANGE
OF PAINT COLOR. COMPLETED PAINTING SHALL NOT
IMPEDE THE INTENDED OPERATION OF ANY ITEM, SUCH AS
WINDOWS, DRAWERS, HINGES, DOORS, ETC.
6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE
REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND
COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA
ON ONE SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF
TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE
ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING
EDGES OR CORNERS.
7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT
PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR
INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE
INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC
MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND
EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL
EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS,
LIGHTING FIXTURES, SWITCHGEAR, MOTORS,
DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR
SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO
PAINT AN ITEM OR SURFACE, FOLLOW PROCEDURES
LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION
(RFI).
8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE
INDICATED, DO NOT PAINT METAL SURFACES OF ANODIZED
ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE,
COPPER, BRASS, BRONZE AND SIMILAR FINISHED
MATERIALS.
9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED,
DO NOT PAINT SURFACES SUCH AS WALLS AND CEILINGS
IN CONCEALED AND GENERALLY INACCESSIBLE AREAS,
INCLUDING FURRED AREAS, UTILITY TUNNELS, PIPE
SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL
CONCRETE IN PIPE SPACE.
10. OPERATING PARTS AND SENSING DEVICES: UNLESS
OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF
OPERATING UNITS SUCH AS VALVES, DAMPER
OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT
SENSING OR EMITTING DEVICES THAT MIGHT NOT
FUNCTION PROPERLY IF PAINTED.
11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-
REQUIRED LABELS.
12. ALL INTERIOR SURFACES, WALLS, FRAMES, ETC.,
REQUIRED TO HAVE NEW FINISHES APPLIED, SHALL HAVE
ALL EXISTING AND CONTRACTOR CAUSED HOLES, CRACKS,
AND OTHER IMPERFECTIONS FILLED WITH APPROVED
PATCHING MATERIAL. PATCH TO BE FINISHED FLUSH WITH
ADJACENT SURFACE, WITH TEXTURE TO MATCH TEXTURE
OF ADJACENT SURFACE. SEE SPECIFICATIONS FOR
PATCHING REQUIREMENTS.
13. THE CONTRACTOR SHALL FIELD VERIFY EXISTING PAINT
MATERIALS AND FINISHES. APPLY THE APPROPRIATE
SEPARATION COAT (PRIMER/BONDING COAT) BETWEEN ALL
NON-COMPATIBLE COATINGS (I.E. WHERE NEW WATER-
BORNE ACRYLIC IS TO BE INSTALLED OVER EXISTING OIL
BASE PAINT).
GENERAL PAINTING NOTES:
1. THE PRIMARY OBJECTIVE OF APPLYING SEALANT IS TO
FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR
BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR
WET\DAMP LOCATIONS. PROPER PRIMING MUST BE USED
WITH SEALANTS.
2. THE PRIMARY OBJECTIVE OF APPLYING CAULKING IS TO
ENHANCE APPEARANCE AND FINISH AT INTERIOR
APPLICATIONS AND IN SOME SITUATIONS TO REDUCE
AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE
EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER
PENETRATIONS (FIRE CAULKING) AND TO DECREASE
SOUND TRANSMISSION THROUGH WALLS AND CEILINGS.
OTHER USES MAY BE NOTED IN THE SPECIFICATIONS
AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS
ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING
SHOULD BE USED, FOLLOW PROCEDURES LISTED IN
SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED)
SHALL BE USED AT HORIZONTAL AND VERTICAL CONCRETE
JOINTS AND AS NOTED.
4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION
JOINT MATERIAL, AS REQUIRED, SHALL BE USED AT
MASONRY AND CONCRETE CONTROL JOINTS.
5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF
SEALANT BETWEEN PERIMETER SOLE PLATES AND
FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR
THRESHOLDS IN SEALANT UNLESS NOTED OTHERWISE.
6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND BOTH SIDES OF DOOR FRAMES.
7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND INTERIOR WALL MOUNTED EQUIPMENT FRAMES
AND EXPOSED SUPPORTS.
8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS
BETWEEN DIFFERENT WALL MATERIALS (TILE TO BRICK,
CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL
TO P-LAM, ETC).
9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL
GAPS OR 1/16TH INCH OR MORE.
10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS
THROUGH, FLOORS AND WALLS.
11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND
CEILING PIPE PENETRATIONS. WHERE ESCUTCHEONS ARE
SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A
BED OF SEALANT.
12. USE SPECIFIED CAULK OR SEALANT AROUND
PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH
AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE
ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS,
LIGHTING, VENTS, ETC.
GENERAL SEALANT / CAULKING
NOTES:
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND
REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK
MUST BE INSPECTED AND APPROVED BY LOCAL
AUTHORITIES.
3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE
VERIFIED BY THE CONTRACTOR(S) PRIOR TO FABRICATION
AND CONSTRUCTION. IF INCONSISTENCIES,
CONTRADICTIONS OR OMISSIONS ARE DISCOVERED
FOLLOW PROCEDURES LISTED IN SECTION 01 26 13
REQUESTS FOR INFORMATION (RFI).
4. GENERAL CONTRACTOR SHALL COORDINATE ALL
MECHANICAL AND ELECTRICAL DUCT SIZES AND
LOCATIONS.
5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT
THE USE OF A KEY OR SPECIAL KNOWLEDGE.
6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE
INSTALLED LEVEL WITH EACH OTHER AND PLUMB.
7. THE WORK INDICATED IN THE NOTES DESCRIBES THE
GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED
TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE
FULL SCOPE OF WORK.
8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE
FIELD VERIFIED. IF DIMENSIONAL INFORMATION IS
REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN
SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
9. FIELD VERIFICATION: BEFORE BIDDING AND DURING
CONSTRUCTION, CONTRACTOR SHALL VERIFY THAT
ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE
CONTRACT DOCUMENTS. REPORT DISCREPANCIES TO
ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING
WORK RELATED TO ANY DISCREPANCIES. SEE
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES,
SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT
BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION
PRIOR TO BIDDING, THE CONTRACTOR WILL BE DEEMED TO
HAVE ELECTED THE MORE COSTLY TIME, METHOD,
SYSTEM, PRODUCT, SUBCONTRACT AND/OR MATERIAL.
11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS
AS "NIC" IS NOT IN THE CONTRACT. HOWEVER, THE
CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK
INDICATED AS NIC.
12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS
WITH COR, INCLUDING STAGING AREAS, MATERIAL
STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY
OPERATIONS, INTERRUPTION OF UTILITIES. SEE
SPECIFICATIONS.
13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE
THE PLACEMENT OF EACH TRADE'S WORK SO THAT THERE
ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR
FUNCTION IMPAIRED. IT IS ESPECIALLY IMPORTANT TO
COORDINATE PENETRATIONS THROUGH FOUNDATIONS,
FLOORS, WALLS AND CEILING SPACES. SEE
SPECIFICATIONS.
14. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN
DISSIMILAR METALS. SEE SPECIFICATIONS.
15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY
SHALL BE FIRE TREATED. SEE SPECIFICATIONS. ALL
SURFACE ATTACHED METAL SHALL BE SEPARATED FROM
CONCRETE OR MASONRY BY NON-METALLIC MATERIAL
SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL
AS APPROVED BY ARCHITECT AND COR.
16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL
EQUIPMENT, FIXTURES, DEVICES, MECHANICAL, PLUMBING
OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR,
MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL
ELEVATION COORDINATION.
17. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK
PERMITS TO BE COORDINATED WITH COR. SUBMIT
CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.
GENERAL NOTES: GENERAL FIRE & LIFE SAFETY
NOTES:
FIRE ALARM
1. WHENEVER FIRE ALARM WORK TAKES PLACE IN AN AREA
THAT IS BEING REMODELED, AT THE CONCLUSION OF THE
WORK, THE FIRE ALARM CONTRACTOR IS TO TEST ALL
FIRE ALARM DEVICES WITHIN THE AREA OF THE REMODEL
AREA WHETHER OR NOT THEY WERE MODIFIED AS PART
OF THE PROJECT.
FIRE EXTINGUISHERS
1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE
WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND
SHALL MAINTAIN THEM DURING THE COURSE OF
CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb.
CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C
FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED AND
SHALL BE DRY CHEMICAL TYPE.
EXIT & EMERGENCY LIGHTING
1. EXISTING EXIT AND EMERGENCY LIGHTING TO REMAIN.
ANY FIXTURES DISTURBED DURING THE COURSE OF WORK
SHALL BE REPAIRED AND / OR REPLACED TO MATCH
EXISTING CONDITIONS.
FIRE SPRINKLER SYSTEM
1. EXISTING FIRE SPRIKLER MAIN PIPES, BRANCH LINES AND
SPRINKLER HEADS TO BE RETAINED AND REUSED. ANY
PART OF THE FIRE SPRINKLER SYSTEM THAT IS
DISTURBED BY NEW WORK SHALL BE REPAIRED AND / OR
REPLACED TO MATCH EXISTING CONDITIONS.
2. WHENEVER EXISTING FIRE SPRINKLER PIPING IS
REMOVED, THE FIRE SPRINKLER CONTRACTOR IS TO
ANALYZE THE PIPING FOR OBSTRUCTIONS AND PROVIDE
WRITTEN OBSTRUCTION DOCUMENTATION IN
ACCORDANCE WITH NFPA REQUIREMENTS TO THE VA.
FIRE STOPPING
1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE
STOPPING.
GENERAL
1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE
OR FLAME-PROOFED IN AN APPROVED MANNER.
2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS
LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF
NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF
NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE
INSTALLATION, INCLUDING INSULATION, FACING
MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.
3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-
CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS
SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25
AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED
IN ACCORDANCE WITH ASTM E 84.
4. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR
PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A
UL APPROVED METHOD AND MATERIAL.
FIRE & SMOKE DAMPERS
1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED
AND REUSED.
2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM.
THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER AND
FIRE ALARM SYSTEM.
1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO
COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES
AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE
ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF
DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND,
FOLLOW PROCEDURES LISTED IN SECTION 01 26 13
REQUESTS FOR INFORMATION (RFI). IF DISCREPANCIES
ARE DISCOVERED AFTER THE BIDFOLLOW PROCEDURES
LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION
(RFI) PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.
2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL
AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED
BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND
SHOP DRAWINGS CONTRACTOR SHALL VERIFY
DIMENSIONS AND RECOMMEND DIMENSIONAL
MODIFICATIONS AS REQUIRED.
3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR
PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS,
SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR
ELEVATIONS AND EXTERIOR ELEVATIONS.
4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON
STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.
MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES
MAY ALSO CONTAIN DIMENSIONAL INFORMATION RELATED
TO EQUIPMENT SIZES AND CLEARANCES.
5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X
4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT
NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT
ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT
BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE.
(FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE
SHOWN IN THE 16THS OF AN INCH, BUT STANDARD
MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").
6. FLOOR PLAN DIMENSIONS
A. THE LOWEST FLOOR OVERALL BUILDING
DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE
FOUNDATION WALL TO THE OPPOSITE OUTSIDE
FACE OF THE FOUNDATION WALL (OR, FROM
OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS
SHOWN.
B. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE
TO ONE FACE OF THE STUDS, BOTH FACES OF
MASONRY WALLS, OR BOTH FACES OF CONCRETE
WALLS, ETC, UNLESS NOTED OTHERWISE.
C. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL
(UNLESS NOTED AS "NOM").
D. DOOR OPENING DIMENSIONS IN FRAME
CONSTRUCTION (WOOD OR STEEL STUDS) ARE
TYPICALLY SHOWN AT THEIR CENTERLINES.
HOWEVER, WHEN THE EDGE OF THE DOOR IS
IMPORTANT, OR MAKES THE PLACEMENT CLEARER,
THE DIMENSION MAY BE TO THE ACTUAL FRAME
EDGE.
E. DOOR DIMENSIONS IN LOAD-BEARING MASONRY
AND CONCRETE WALLS ARE TO "ROUGH"
OPENINGS (FACES OF MASONRY OR CONCRETE).
TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE
THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE
EACH SIDE) AND PLUS 1/2" TOTAL FOR THE
HEAD/SILL DIMENSIONS.
F. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS
TO ADJACENT WALLS: BETWEEN FRAME FACES
AND FACES OF STUDS, OR FACES OF MASONRY OR
CONCRETE, AT NEARBY PERPENDICULAR WALLS
ARE TYPICALLY 4", DEPENDING ON HARDWARE
CLEARANCES AND FRAME REQUIREMENTS (2.5"-
DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=
4.0")
G. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH
AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR
PREFABRICATED STAIR ENCLOSURES, ARE NOTED
"CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES
OF FINISHES.
H. DIMENSIONS DESIGNATED WITH "MIN" INDICATE
THE MINIMUM CLEARANCE OR SEPARATION
REQUIRED.
7. ROOF PLAN DIMENSIONS
A. UN-DIMENSIONED LOCATIONS OF ROOFTOP
EQUIPMENT AND CONSTRUCTION OFTEN MAY BE
DETERMINED BY THE FLOOR PLAN BELOW, SUCH
AS ROOF HATCH DETERMINED BY REFERENCE TO A
FIXED WALL AND LADDER, OR MECHANICAL
EQUIPMENT DETERMINED BY DUCT PENETRATIONS
BETWEEN JOISTS.
B. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT
RAILS, HVAC EQUIPMENT, SCREEN WALLS,
ANTENNAS, WALK PADS, LADDERS, SCUPPER
LOCATIONS, ETC., MAY BE LOCATED FROM
MECHANICAL AND ELECTRICAL DRAWINGS OR
LOCATED BY SCALING. CONFIRM ALL ROOF ITEM
DIMENSIONS WITH THE ARCHITECT AND COR PRIOR
TO CONSTRUCTION.
8. VERTICAL DIMENSIONS
A. UNLESS NOTED OTHERWISE, THE FIRST FLOOR
REFERENCE ELEVATION IS 100'-0". THIS IS
REFERENCED TO A GROUND ELEVATION ABOVE
MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR
STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0"
ARE "-" (PREFIXED WITH A MINUS SIGN).
B. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON
ARCHITECTURAL DRAWINGS ARE TO TOP OF
DECKING OR SHEATING, BUT DO NOT INCLUDE
FINISHES OR ROOFING MATERIAL.
C. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE
TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD-
BEARING MASONRY OR CONCRETE WALLS, WHERE
THEY ARE TO ROUGH OPENINGS). HEIGHT
REFERENCES SHOULD BE TO THE NEXT LOWER
FINISH FLOOR ELEVATION
D. LIGHTING HEIGHTS ON WALLS ARE TO
CENTERLINES OF THE ELECTRICAL BOXES, UNO.
EQUIPMENT, VENT, PLUMBING AND FIXTURE
ELEVATIONS ARE TO CENTERLINES OF THE WALL
PENETRATIONS, UNO.
E. SOME VERTICAL DIMENSIONS ARE SHOWN ON
PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND
ELEVATION CHANGES. A PLAN ELEVATION CHANGE
SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND
INDICATES THE + OR - ELEVATION CHANGE IN
INCHES FROM THE FINISHED FLOOR ELEVATION
(FFE) NEXT TO IT.
GENERAL DIMENSIONING
NOTES:
1. HALF-TONED OR LIGHT LINES INDICATE EXISTING
CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE
EXTENT OF DEMOLITION.
2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY,
AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES
TO MEET APPROVAL OF CODE AGENCIES. COORDINATE
DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR
SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE
COR RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS
FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING
THE PRE-CONSTRUCTION WALK THROUGH.
4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS,
VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR
CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO
MAINTAIN THE INTEGRITY OF THE WALL, FLOOR, AND/OR
ROOF ASSEMBLY.
5. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND
DEMOLITION FOR RELATED DEMOLITION WORK.
6. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED
UTILITY & DEMOLITION WORK AND PROJECT PHASING
NOTES. COORDINATE UTILITY SYSTEM SHUTDOWNS WITH
COR.
GENERAL DEMOLITION AND
PHASING NOTES:
Revisions: Date:
month/day /ye ar
/0
2/
LIFE SAFETY SYMBOLS
XX PATH OF TRAVEL (NO CHANGE)
EXIT LIGHTING (NO CHANGE)
1i
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
• 2021 NFPA 101 LIFE SAFETY CODE & 2019 NFPA 72
NATIONAL FIRE ALARM AND SIGNALING CODE & 2019 NFPA
13 STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS.
EXCEPTION OF NFPA 5000 AND NFPA 900
• 2021 INTERNATIONAL MECHANICAL CODE (IMC)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2020 NATIONAL ELECTRICAL CODE (NEC)
• 2021 INTERNATIONAL PLUMBING CODE (IPC)
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT,
BARRIER FREE DESIGN GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND
RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF
STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00
00 AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2016; MEDICAL SPACES - ASHRAE
170-2013, NON-MEDICAL SPACES - ASHRAE 62.1-2016
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS –
ASHRAE STANDARD 15–2013
• 2018 INTERNATIONAL BUILDING CODE (IBC) WHERE
DIRECTED BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF
APPLICABLE STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
• VA FIRE PROTECTION DESIGN GUIDE, 8TH EDITION (2021)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: RECONSTRUCTION,
CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA
101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT
SIZE)
SMOKE COMPARTMENTS 1/2 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS
MEDICAL GAS / HAZARDOUS
STORAGE 1 HOURS
CLASSIFICATION OF OCCUPANCY:
NEW: AMBULATORY HEALTH CARE Occupancy per Chapter 20.
EXISTING: HEALTH CARE Occupancy per Chapter 18/19 18/19.1.1.4.2 (3) Changes of Occupancy. A change from a hospital or nursing home to an ambulatory health care occupancy shall not be considered a change in occupancy or occupancy subclassification.
18/19.1.1.4.3 REHABILITATION (1) MAJOR REHABILITATION SHALL
INVOLVE THE MODIFICATION OF THAN 50%, OR MORE THAN
4500 FT2, OF THE AREA OF THE SMOKE COMPARTMENT.
MIXED BUILDING OCCUPANCY TYPE:
PRIMARY - HEALTHCARE
SECONDARY - AMBULATORY HEALTH CARE OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantile, BUSINESS, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
18/19.2.6.2.1 The travel distance between any point in a room and an exit shall not exceed 150 ft.
18/19.2.6.2.2 The maximum travel distance...shall be permitted to be increased by 50 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.
HEALTH CARE OCCUPANCY; PROTECTED = 200'-0"
OCCUPANT LOAD:
18/19.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
THERE IS NO CHANGE TO BUILDING OCCUPANT LOAD.
EXISTING EGRESS PATHWAYS, OR RATED WALLS LOCATIONS.
MEANS OF EGRESS:
18/19.2.3 Capacity of Means of Egress.
18/19.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.
18/19.2.3.2 The clear width of any corridor or passageway required for exit access shall not be less than 44 in. (1120 mm).
18/19.2.4 Number of Means of Egress.
18/19.2.4.3 Not less than two exits of the types described in 18.2.2 shall be accessible from each smoke compartment.
18/19.2.4.4 Egress from smoke compartments addressed in 18.2.4.3 shall be permitted through adjacent compartments provided that the two required egress paths are arranged so that both do not pass through the same adjacent smoke compartment.
PROTECTION OF VERTICAL OPENINGS:
18/19.3.1 Protection of Vertical Openings.
18/19.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
18.3.2 Protection from Hazards.
18.3.2.1 Hazardous Areas
18.3.2.1.1 Any hazardous areas shall be protected in accordance with Section 8.7, and the areas addressed in 18.3.2.1.2 and 18.3.2.1.3 shall be protected as indicated.
18.3.2.1.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:
(1) Boiler and fuel-fired heater rooms
(2) Central/bulk laundries larger than 100 ft2
(3) Paint Shops
(4) Physical plant maintenance shops
(5) Rooms with soiled linen in volume exceeding 64 gal
(6) Rooms with collected trashed in volume exceeding 64 gal.
(7) Storage rooms larger than 100 ft2 and storing combustible material 18.3.2.1.3The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:
(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.
(2) Storage rooms larger than 50ft2 but not exceeding 100 ft2 and storing combustible material.
18.3.2.4 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.
18.3.5.12 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO CHANGE TO FUNCTION OR OCCUPANT LOAD, AND
THEREFORE NO CHANGE TO REQUIRED PARKING.
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
CONTRACT LIMIT
ACCESSIBLE PATH EXIT
F
FE
FE
E -1
.1
E-2 ▬ 50.9'
SOCIAL
WORKER
A116
121 SF
PUBLIC
TOILET
A115
42 SF
PUBLIC
TOILET
A114
42 SF
FOOD
STORAGE
A113
121 SF
NON-FOOD
STORAGE
A112
74 SF
KITCHEN
A-111
321 SF
WARE
WASHING
A111A
132 SF
REC/ DINING
ROOM
A117
1314 SF
COOKING
A111B
230 SF
COOLER #1
88 SF
COOLER #2
69 SF
MECH
A111B
190 SF
MECH.-ECC
A111D
87 SF
OUTDOOR
REC.
STORAGE
A111C
96 SF
TRASH
A110A
33 SF
HAC
A110
40 SF
LINEN HOLD
A109
70 SF
COMM.
A102C
38 SF
ELECTRICAL
A102A
125 SF
MECH
A102B
135 SF
ACNS
A101
137 SF
DIETICIAN
A112
147 SF
TELE.
A102
48 SF
ACOS
A100
131 SF
CHAPLAIN
A106
115 SF
SECRETARY
A103
42 SF
LOBBY
CA-1A
1082 SF
CORRIDOR
CB-1
556 SF
CORRIDOR
CB-2
169 SF
PATIENT
STORAGE
B100
135 SF
BMS STOR.
B101
131 SF
OXY. STOR.
B101A
65 SF
E
.9
A
C C
E S
S
IB
L E
P
A T
H
1156 SF
KITCHEN
EXIT ONTO DOCK AREA
E.6
C.7
CORRIDOR
CA-4
191 SF
7.1 8
COVERED DROP OFF
CORRIDOR
CA-3
144 SF
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN
TRIPLE C - The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, California 90807
MAT PERKINS
804-372-0067
AREA OF WORK
SCALE: NO SCALE
A u to d e s k D o c s
/4
-2
-0
C F
A K it c h e n
R e n o v a ti o n H o n o lu lu V
/4
-2
-0
.C
F A
.K it c h e n .D e s ig n .E
H R
M .A
R C
H .B
R
.r v t
/2
/2
:2
:3
P M
GI101
ARCHITECTURAL LIFE SAFETY PROTECTION
PLAN
459-24-002
08/02/2024 M.Perkins S.Pollard
ISSUED FOR
CONSTRUCTION
RENOVATE KITCHEN AT CLC
BUILDING 110
459 PATTERSON ROAD, HONOLULU, HI 96819
1/8" = 1'-0" E1
LIFE SAFETY PROTECTION PLAN
NOTE: THERE ARE NO PROPOSED CHANGES TO PROGRAM, NO ADDITIONAL
SQUARE FOOTAGE, ROOMS, ETC.
SCOPE OF WORK IS REPLACEMENT OF EQUIPMENT AND SMALL REMODEL.
THE EXISTING LIFE SAFETY CONDITIONS, INCLUDING
PATHS OF TRAVEL, SHALL REMAIN UNCHANGED.
EXISTING WALL CONFIGURATION NOT CHANGING - RATED WALLS WERE NOT
ABLE TO BE VERIFIED AND THEREFORE NOT SHOWN. CONTRACTOR IS TO
MAINTAIN RATINGS OF ALL EXISTING RATED WALL SYSTEMS.
PATH OF TRAVEL SCHEDULE - FIRST FLOOR
Mark From Room To Room Length
LEVEL 1
Exit Pathway
E3 COOKING A111B 130' - 10 7/32"
E-1 COOKING A111B CORRIDOR CA-4 65' - 1 5/16"
E-2 FOOD STORAGE A113 CORRIDOR CA-4 50' - 10 5/8"
EGRESS SIZING (AREA)
Area Information By Function Occupancy Requirements Egress Requirements
Number Name Area Occupancy (NFPA) Fixed Seats OL Sprinklered
Sprinklered Factors Required Width
Stair Other Stair Other
LEVEL 1
KITCHEN 1,155.52 SF 8 Yes 0.40" 0.20" 3.20" 1.60"
LEVEL 1 1,155.52 SF 8 3.20" 1.60"
NOTE: SHELVING IN KITCHEN AREA IS EXISTING TO REMAIN
AND IS TYPICALLY A 4 SHELF ROLLING UNIT 6'-6" HIGH -
LEAVING 2''0" CLEAR TO CEILING. REFER TO Q-101 FOR
EQUIPMENT LAYOUT.
Revisions: Date:
month/day /ye ar
/0
2/
SB
TYPE D
A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)
PROCEDURES AS PER THE SPARK M MATSUNAGA VA
MEDICAL CENTER ICRA PLAN AND AS DIRECTED BY THE
CONTRACTING OFFICER REPRESENTATIVE (COR).
B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS
PATH OF TRAVEL AND INTERIM LIFE SAFETY MEASURES
(ILSM) WITH THE COR. ALL INTERIOR DOORS THAT LEAD TO
THE CONSTRUCTION SITE SHALL BE POSTED AS PER THE
ISLM PLAN.
C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING
WORK.
D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS
SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER
WORK.
E. CONSTRUCT ANTEROOM AT ENTRANCES TO
CONSTRUCTION AREAS AND REQUIRE ALL CONSTRUCTION
PERSONNEL TO PASS THROUGH THIS ROOM TO BE
VACUUMED WITH HEPA VACUUM CLEANER PRIOR TO
LEAVING THE SITE.
F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL
FOR OCCUPIED AREAS ON THE FLOOR.
G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;
REVIEW WITH COR AND VA SAFETY GROUP.
H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION
AREA AT ALL TIMES (24/7). WHETHER OCCUPIED OR NOT,
THROUGHOUT DURATION OF PROJECT USING HEPA
EQUIPPED AIR FILTRATION UNITS.
J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE
OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR
OR EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE
CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN
CONSTRUCTION AREA TO PREVENT CONTAMINATION OF
EXISTING DUCT SYSTEM.
K. REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS
AND VISITORS SO THEY DO NOT EXIT THROUGH THE
CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO
THE CONSTRUCTION AREA THAT READS: "CONSTRUCTION
AREA-DO NOT ENTER".
L. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND
KEEP A CURRENT HOT WORK PERMIT ON SITE.
M. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE
CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE
SURE THEY REMAIN EFFECTIVE.
N. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA.
ALL DEBRIS REMOVAL SHALL BE IN COVERED CARTS
AND/OR CONTAINERS.
O. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM
PIPES AND CONDUITS APPROPRIATELY AND IMMEDIATELY
TO MAINTAIN DUST PROTECTION AND NEGATIVE AIR
PRESSURE.
P. MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST
MOPS, WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING
RAGS FOR CLEANING FINE DUST FROM FLOORS AND
ADJACENT OCCUPIED AREAS. ANY DUST TRACKED OUTSIDE
OF CONSTRUCTION AREA SHALL BE CLEANED IMMEDIATELY.
Q. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION
AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH
DISINFECTANT, REMOVE CONSTRUCTION BARRIERS (UPON
APPROVAL). PATCH OR REPAIR ANY DAMAGE FROM
CONSTRUCTION BARRIER REMOVAL AND REMOVE
ISOLATION OF HVAC SYSTEM.
R. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL
PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY
PERSONNEL, INFECTION CONTROL GROUP, AND COR.
ICRA NOTES:
ICRA SYMBOL LEGENDINFECTION CONTROL RISK
ASSESSMENT:
STEP 1: TYPE D
IDENTIFY THE TYPE OF CONSTRUCTION PROJECT
ACTIVITY (TYPE A–D)
TYPE A: INSPECTION AND NONINVASIVE ACTIVITIES.
TYPE B: SMALL-SCALE, SHORT-DURATION ACTIVITIES
THAT CREATE MINIMAL DUST.
TYPE C: WORK THAT GENERATES A MODERATE TO
HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR
REMOVAL OF ANY FIXED BUILDING COMPONENTS OR
ASSEMBLIES.
TYPE D: MAJOR DEMOLITION AND CONSTRUCTION
PROJECTS.
STEP 2: HIGH RISK
IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE
AFFECTED.
IF MORE THAN ONE RISK GROUP WILL BE AFFECTED,
SELECT THE HIGHER RISK GROUP.
STEP 3: CLASS IV
MATCH THE PATIENT RISK GROUP (LOW, MEDIUM,
HIGH, HIGHEST) WITH THE PLANNED CONSTRUCTION
PROJECT TYPE (A, B, C, D) ON THE FOLLOWING MATRIX,
TO FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR
LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED.
STEP 4: IDENTIFY THE AREAS SURROUNDING THE PROJECT
AREA, ASSESSING POTENTIAL IMPACT.
BELOW ABOVE NORTH SOUTH EAST WEST
_______________________RISK GROUP_____________________
LOW LOW N/A N/A N/A N/A
STEP 5:
IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT
ROOMS, MEDICATION ROOM, AND SO ON.
STEP 6:
IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND
ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE
OUTAGES.
STEP 7.
IDENTIFY CONTAINMENT MEASURES, USING PRIOR
ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,
SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?
STEP 8.
CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A
RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR
EXAMPLE, WALL, CEILING, ROOF)?
NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE
ISOLATED FROM THE OCCUPIED AREAS DURING
CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS.
STEP 9.
WORK HOURS: CAN OR WILL THE WORK BE DONE DURING
NON-PATIENT-CARE HOURS?
STEP 10.
DO PLANS ALLOW FOR ADEQUATE NUMBER OF
ISOLATION/NEGATIVE AIRFLOW ROOMS?
STEP 11.
DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE
OF HAND-WASHING SINKS?
STEP 12.
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE MINIMUM NUMBER OF SINKS FOR THIS
PROJECT? (VERIFY AGAINST FACILITY GUIDELINES INSTITUTE
(FGI) DESIGN AND CONSTRUCTION GUIDELINES FOR TYPES
AND AREA.)
STEP 13.
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED
UTILITY ROOMS?
STEP 14.
PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES
WITH THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,
HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).
C
LA
S S
IV
DURING CONSTRUCTION
PROJECT
UPON COMPLETION OF
PROJECT
1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Seal holes, pipes, conduits, and punctures.
5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave work site.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Prevention & Control Department and thoroughly cleaned by the owner’s Environmental Services Dept.
2. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
3. Contain construction waste before transport in tightly covered containers.
4. Cover transport receptacles or carts. Tape covering unless solid lid.
5. Vacuum work area with HEPA filtered vacuums.
6. Wet mop area with cleaner/disinfectant.
7. Upon completion, restore HVAC system where work was performed.
Construction Project Type
Patient Risk Group LOW Risk Group MEDIUM Risk Group
HIGH Risk Group
HIGHEST Risk Group
I II II III/IV
I II III IV
I II III/IV IV
II III/IV III/IV IV
TYPE A TYPE B TYPE C TYPE D
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST
CONTROL EGRESS DOOR NON-
TRANSFERRING MULTI-SHEETED
ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
DINING AREA ONE SIDE -SERVICE
CORRIDOR - NO SPACES ABOVE OR BELOW
REPLACING MECHANICAL AND KITCHEN
EQUIPMENT
1 HR BARRIERS, SOLID, HEPA FILTRATION
MINOR RISK, CONTRACTOR TO PROVIDE
PROTECTION DURING WALL/ROOF WORK
AFTER HOURS WORK NOT ALLOWED (TO
PREVENT DISRUPTION OF RESIDENTS)
N/A
YES, NO CHANGE TO EXISTING HW SINKS
ACOS
A100
131 SF
ACNS
A101
137 SFTELE.
A102
48 SF
SECRETARY
A103
42 SF
ELECTRICAL
A102A
125 SF
MECH
A102B
135 SF
COMM.
A102C
38 SF
CHAPLAIN
A106
115 SF
TOILET
A107
37 SF
NON-FOOD
STORAGE
A112
74 SF
LINEN HOLD
A109
70 SF
HAC
A110
40 SF
COOKING
A111B
230 SF
DIETICIAN
A112
147 SF
FOOD
STORAGE
A113
121 SF
PUBLIC
TOILET
A114
42 SF
PUBLIC
TOILET
A115
42 SF
SOCIAL
WORKER
A116
121 SF
REC/ DINING
ROOM
A117
1314 SF
WARE
WASHING
A111A
132 SF
MECH
A111B
190 SF
OUTDOOR
REC.
STORAGE
A111C
96 SF
MECH.-ECC
A111D
87 SF
TRASH
A110A
33 SF
PATIENT
STORAGE
B100
135 SF
BMS STOR.
B101
131 SF
OXY. STOR.
B101A
65 SF
CORRIDOR
CB-1
556 SF
CORRIDOR
CB-2
169 SF
LOBBY
CA-1A
1082 SF
CORRIDOR
CA-3
144 SF
CORRIDOR
CA-4
191 SF
KITCHEN
A-111
321 SF
COOLER #1
88 SF
COOLER #2
69 SF
M
IN
C
LR
4' -6
MIN
4'-0" CLR
4 6
O R
E M
P T
IE
D
D A
IL
Y
P E
R V
A F
IR
E
P R
O T
E C
T
IO
N D
E S
IG
N
G U
ID
E
'-0
M
IN
IM
U M
A W
A Y
F R
O M
B
LD
G
121212
COORDINATE WITH COR FOR
DOOR REMOVAL / WALL
REPLACEMENT TO LIMIT
TIME THAT MAIN CORRIDOR
IS AFFECTED
3' -0
1 2
WEEKLY CHANGED
OR MORE AS
NEEDED PRE-FILTER
FLEX DUCT
MONTHLY CHANGED
HEPA FILTER
HEPA NEGATIVE AIR
UNIT
PROVIDE STICKY MATS (CHANGED END OF
EVERY SHIFT OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
PRESSURE INDICATOR SHALL BE AT
0.01 OR GREATER (VERIFY DAILY). IF
NOT VERIFY ALL OPENING SUCH AS
DOOR ARE CLOSED AND/OR
CHANGE NEGATIVE AIR PRE-FILTER.
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN NOT
RUNNING TO KEEP
DUST OUT.
A
V
O
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
E
FIRE EXTINGUISHER
ON PORTABLE FLOOR
BRACKET (SHALL
REQUIRE MORE THAN
ONE.)
PUBLIC AREA
CONSTRUCTION AREA
A
A
PROVIDE CLOSER
AND LATCH ON
DOORS
PROVIDE STICKY MATS (CHANGED END OF
EVERY SHIFT OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
PRESSURE INDICATOR SHALL BE AT
0.03-INCH WATER GAUGE OR GREATER
(VERIFY DAILY). IF NOT VERIFY ALL
OPENING SUCH AS DOOR ARE CLOSED
AND/OR CHANGE NEGATIVE AIR PRE-
FILTER.
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(SHALL REQUIRE MORE THAN
ONE.)
PUBLIC AREA
CONSTRUCTION AREA
WEEKLY CHANGED
OR MORE AS
NEEDED PRE-FILTER
MONTHLY CHANGED
HEPA FILTER
HEPA NEGATIVE AIR UNIT
HEPA VACUUM OR DISPOSABLE
COVERALLS DISPENSER &
COLLECTION BIN.CONSTRUCTION
ANTE ROOM
ANTE ROOM BARRIERS SAME
AS CONSTRUCTION BARRIERS
OR PREFAB UNIT
SHOE COVER DISPENSER &
COLLECTION BIN.
EXISTING WALLS USED AS
BARRIERS SHALL HAVE ALL
PENETRATIONS VERIFIED AND
SEALED BEFORE
CONSTRUCTIONS STARTS
A
A
TEMPORARY WALL TO EXTEND
AND BE SEALED TO DECK /
FLOOR ABOVE WHEN RATED
ENCLOSURE REQUIRED
FLOOR LINE
CEILING SYSTEM AS
SCHEDULED
EXISTING STRUCTURE
F
IN
IS
H E
D F
LO
O
R T
O U
N D
E R
S
ID
E O
F S
T R
U C
T U
R E
V E
R
IF
Y F
LO
O
R T
O F
LO
O
R H
E
IG
H T
RENOVATED SPRINKLER
SYSTEM
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY PLAN
TRIPLE C - The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, California 90807
MAT PERKINS
804-372-0067
AREA OF WORK
SCALE: NO SCALE
A u to d e s k D o c s
/4
-2
-0
C F
A K it c h e n
R e n o v a ti o n H o n o lu lu V
/4
-2
-0
.C
F A
.K it c h e n .D e s ig n .E
H R
M .A
R C
H .B
R
.r v t
/2
/2
:2
:3
P M
GI201
INFECTION CONTROL PLAN & INTERIM LIFE 459-24-002
08/02/2024 M.Perkins S.Pollard
ISSUED FOR
CONSTRUCTION
RENOVATE KITCHEN AT CLC
BUILDING 110
459 PATTERSON ROAD, HONOLULU, HI 96819
1/8" = 1'-0" E1
ICRA PLAN
KEYNOTES
1 KITCHEN HOOD TO BE REPLACED. SEE MECHANICAL SHEETS FOR ADDITIONAL
INFORMATION.
2 NEW KITCHEN HOOD ABOVE TO REPLACE EXISTING HOOD. CLOSE OFF HOOD BEING
WORKED ON WITH PLASTIC SHEETING. SEAL WITH DUCT TAPE WHEN NOT IN USE.
3 CONTRACTOR RESPONSIBLE FOR ENSURING ROUTE FOR SUPPLY AND REMOVAL OF
MATERIALS IS APPROVED BY COR, AND THAT ALL MATERIALS, EQUIPMENT, ETC, CAN
BE TRANSPORTED ALONG ENTIRE LENGTH OF ROUTE, INCLUDING FITTING THROUGH
DOORWAYS, AROUND CORNERS, ETC.
4 TEMPORARY CONSTRUCTION BARRIER
5 TEMPORARY CONSTRUCTION BARRIER. ALIGN WITH BACK OF DOOR FRAME AND
ENSURE SMOOTH WORKING OF CORRIDOR DOOR
6 TEMPORARY CONSTRUCTION BARRIER DOOR WITH CLOSER AND LATCH
7 ANTEROOM SEE DETAILSON THIS SHEET
8 COORDINATE WITH COR FOR FINAL LOCATION OF CONSTRUCTION DUMPSTER
9 TEMPORARY LOCATION FOR REACH-IN COOLER/ FREEZER. CONTRACTOR TO PROVIDE
POWER.
10 TEMPORARY LOCATION FOR FOOD WARMERS. CONTRACTOR TO PROVIDE POWER.
11 KITCHEN AREA TO BE OUT OF SERVICE AND UNOCCUPIED DURING FULL
CONSTRUCTION DURATION.
12 PROVIDE TEMPORARY DUST TIGHT ENCLOSURES AROUND WORK AREA AND EXISTING
EQUIPMENT TO REMAIN DURING ANY ACTIVITIES WHICH PRODUCE DUST
13 CONTRACTOR TO PROVIDE SIGNAGE - "NOT AN EXIT". SIGNAGE TO REMAIN IN PLACE
DURING CONSTRUCTION.
NOTE:
CONSTRUCTION ACTIVITY OUTSIDE OF THE CONSTRUTION AREA TO BE LIMITED TO OFF-HOURS TO MINIMIZE DOWN-TIME. COORDINATE DOWN-TIME WITH COR TO ENSURE RECREATION/DINING AREA
REMAINS OPERATIONAL.
UTILIZE MOBILE HEPA CARTS FOR REPLACEMENT / INSTALLATION OF CEILING MECHANICAL FIXTURES
OUTSIDE OF CONSTRUCTION ARA.
CONTRACTOR TO SUBMIT PHASING PLAN & SCHEDULE TO COR FOR APPROVAL. VERIFY DEBRIS ROUTE
WITH COR.
HEPA CART EXAMPLE - UTILIZE FOR CEILING GRID AND DIFFUSER WORK OUTSIDE OF
CONSTRUCTION AREA
1/4" = 1'-0" B7
TYPICAL CONSTRUCTION LAYOUT- CLASS IV
1/4" = 1'-0"
B5
TYPICAL CLASS IV ANTE ROOM
1/2" = 1'-0" B3
CROSS SECTION AA - CLASS IV
VA TO RROVIDE CONTRACTOR WITH ICRA AND PCRA FORMS
AFTER PROJECT AWARD.
Revisions: Date:
month/day /ye ar
/0
2/
ARCHITECTURAL SYMBOLS
SHEET NUMBER
A-100 Sheet Number
Discipline Code
A-1 1/8" = 1'-0"
View Name
VIEW TITLE
Drawing Scale
Drawing Number
1/8" = 1'-0"
View NameA-1 A101R101
VIEW TITLE WITH REFERENCES
Drawing Scale
Sheet Number
Drawing Number
Reference Sheet Number
EXTERIOR ELEVATIONS
INTERIOR ELEVATIONS
A-200
A1 Position on Sheet
Sheet Number
Position on Sheet
Sheet Number
A1
A2B2
B1
A-350
MATCH LINES
MATCHLINE
SEE: A1/A-101B
Sheet Number
Position on Sheet
AREA REFERENCE
A
SEE: (X/X-XXX)
Reference to Area
View Reference for Additional Information
BUILDING SECTION
Position on Sheet
Sheet Number
SIM
X
X-XXX
SIM
X
X-XXX
WALL SECTION
Position on Sheet
Sheet Number
X
X-XXX
SIM
DETAIL - SECTION
SIM
X
X-XXX
Position on Sheet
Sheet Number
DETAIL - PLAN/RCP
SIM
X
X-XXX
Position on Sheet
Sheet Number
DRAWING REVISIONS
Revision Number
NORTH ARROW
True North
PLAN
NORTH Plan North
0 4'-0" 8'-0" 16'-0"
IF THIS IS NOT A 42"x30" SHEET IT IS A
REDUCED SIZE PLOT, USE GRAPHIC
SCALE ACCORDINGLY.
GRAPHIC SCALE
COLUMN GRID LINES
Column Grid Line (New)
Column Grid Line (Existing)
1 2
A
B
LEVEL DATUM
LEVEL XX
0' - 0"
Level Name
Level Elevation
SPOT ELEVATION
0'-0"
Spot Elevation
ROOM TAG
ROOM
NAME
ABC123
150 SF
Room Name
Room Number
CEILING TAG
Type Mark
1' - 0" AFF
Ceiling Type
Ceiling Height
DOOR NUMBER TAG
New Door Door Number Tag
1A
Existing Door Door Number Tag
1A101
WINDOW TAG
Interior Window Tag
XX
XX
Exterior Window Tag
CURTAIN WALL TAG
XX
Interior Curtain Wall Tag
Exterior Curtain Wall Tag
XX
AD100
Room Code Room Area Or Volume
1T
CURTAIN PANEL TAG
Interior Curtain Wall Tag
WALL TYPE TAG
≠ A# B
C
V V Item - VA Supplied & Installed
V C ITEM -
VA Supplied & Contractor Installed
C C Item - Contractor Supplied & Installed
FFE Tag (By JSN)A1000
1i FFE Tag Furnished By VA Equipment Vendor
? KEYNOTE
1"
R 1/2"
90°
DIMENSION TO FACE OF
FINISH, FACE OF CONCRETE,
COLUMN CENTERLINE, OR AS
NOTED.
DIMENSIONS
1"
Symbol Indicates No Sound
Attenuation
Partition Type
CMU/Stud Width
Partition Modifier Partition Modifier II
KEYNOTE TAG
SEE A-720 STANDARD PARTITION TYPES
Contract Limit line Style
Not In Contract Area
CONTRACT LIMIT GRAPHIC
LINE STYLES
Centerline
Demolished
Temporary
Hidden
Overhead
Beyond
FURNITURE, FIXTURE, & EQUIPMENT
8'-6"1
Name
Room Name Room Number
Existing Finish Key
Ceiling Height
HVAC RETURN DIFFUSER
HVAC EXHAUST DIFFUSER
RECESSED LUMINAIRE (24x48)
ACOUSTICAL TILE CEILING (24x48)
GYPSUM BOARD CEILING
REFLECTED CEILING SYMBOLS
HVAC SUPPLY DIFFUSER
SPRINKLER
EXISTING NEW
CEILING POWER
ACCESS PANEL
MATERIALS LEGEND
CONCRETE (SECTION)
GRANULAR FILL
CONCRETE MASONRY UNITS
BRICK
RIGID INSULATION (SECTION)
ACOUSTIC/THERMAL INSULATION (SECTION)
STEEL (SECTION)
ALUMINUM (SECTION)
WOOD FINISH (SECTION)
LUMBER FINISH (SECTION)
EARTHWORK (SECTION)
STUD WALL (PLAN & SECTION)
EXISTING WALL TO REMAIN (PLAN & SECTION)
DEMOLISHED WALL (PLAN &
SECTION)
EXISTING TO REMAIN
EXISTING TO BE REMOVED
EXISTING TO REMAIN
NEW CONSTRUCTION
DOOR NUMBER
SYMBOL AND MINIMUM
CLEARANCES
18" MIN.
12" MIN.
6" MIN.
1A
WALL LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
4401 Atlantic Avenue, Suite 200
Long Beach, California 90807
MAT PERKINS
804-372-0067
A u to d e s k D o c s
/4
-2
-0
C F
A K it c h e n
R e n o v a ti o n H o n o lu lu V
/4
-2
-0
.C
F A
.K it c h e n .D e s ig n .E
H R
M .A
R C
H .B
R
.r v t
/2
/2
:2
:3
P M
A-001
SYMBOLS, & GENERAL NOTES 459-24-002
08/02/2024 M.Perkins S.Pollard
ISSUED FOR
CONSTRUCTION
RENOVATE KITCHEN AT CLC
BUILDING 110
459 PATTERSON ROAD, HONOLULU, HI 96819
ABBREVIATIONS
° DEGREE
± PLUS/MINUS
⌀ DIAMETER
≈ ALMOST EQUAL
∠ ANGLE
℄ CENTER LINE
Δ DELTA, DEFLECTION
ϕ ELECTRICAL PHASE
≠ NOT EQUAL
Ω OHM, OMEGA
BOUNDARY LINE
FLOW LINE
≡ IDENTITY
INITIAL LENGTH
MOMENT LINE
PROPERTY LINE, PLATE
½ ONE HALF FRACTION
¼ ONE QUARTER FRACTION
¾ THREE QUARTERS FRACTION
> GREATER THAN
≥ GREATER THAN OR EQUAL TO
< LESS THAN
≤ LESS THAN OR EQUAL TO
ABCDEFGHIJKMNOPQRSTUVWXYZ 1234567890
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT, AUGER BORING
ABA ARCHITECTURAL BARRIERS ACT
ABC AGGREGATE BASE COURSE
ABS AIR BREAK SWITCH
AC ASBESTOS CEMENT OR ASPHALTIC
CONCRETE
ACB AIR CIRCUIT BREAKER
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACSR ALUMINUM CONDUCTOR STEEL
REINFORCED
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
ADO AUTOMATIC DOOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .