3 - 459-24-001 CFA Kitchen_IFC_Drawings.pdf

PDF 16 MB Posted

Attached to
CFA Kitchen Renovation
Solicitation number
36C26124R0081
Issued by

About this file

This document appears to be a set of drawings for the CFA Kitchen Renovation project, solicitation number 36C26124R0081, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21.

The solicitation is for interested participants from the NCO 21 MACC Group 2 to perform the CFA Kitchen Renovation work. No additional details about the required products or services, response dates, award dates, pricing terms, set asides, incumbents, or other key information are provided in this document, as it consists solely of design drawings without any narrative or contractual details.

View the file

Other files

File Type Posted
4 - RFI FORM CFA Kitchen Renovation.docx DOCX document
5 - Price Proposal Breakdown.pdf PDF
1 - 36C26124R0081.docx DOCX document
2 - 459-24-002 CFA Kitchen_IFC_Specifications.pdf PDF
8 - P07 WAGE DETERMINATION HI202400001 05.17.24.pdf PDF
6 - Attachment C_Contractor Certification RE Safety and EMR.docx DOCX document
9 - Site Visit Map.pdf PDF
7 - Pre_Bid RFI.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, California 90807

MAT PERKINS

804-372-0067

A u to d e s k D o c s

/4

-2

-0

C F

A K it c h e n

R e n o v a ti o n H o n o lu lu V

/4

-2

-0

.C

F A

.K it c h e n .D e s ig n .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:2

:3

P M

GI000

COVER SHEET 459-24-002

08/02/2024 M.Perkins K.McDermott

ISSUED FOR

CONSTRUCTION

RENOVATE KITCHEN AT CLC

BUILDING 110

459 PATTERSON ROAD, HONOLULU, HI 96819

ISSUED FOR CONSTRUCTION

08/02/2024

459-24-002 Renovate Kitchen at CLC Building - 110

SPARK M. MATSUNAGA VA MEDICAL CENTER

ADD ALTERNATES

NONE

DEDUCT ALTERNATE

NONE

CONTRACTOR'S SCOPE OF WORK:

THE PROJECT SHALL RENOVATE THE EXISTING KITCHEN SPACE INTO A FUNCTIONAL KITCHEN THAT MEETS ALL CURRENT VA DESIGN GUIDES, AND LOCAL CODE REQUIREMENTS.

THE RENOVATION SHALL INCLUDE DEMOLISHING THE 2 EXISTING KITCHEN HOOD VENTILATION SYSTEMS AND REPLACING WITH NEW. NEW HOOD MUST MEET ALL VA REQUIREMENTS, NEW HOOD MUST ALSO BE A PERFECT FIT IN THE PROVIDED SPACE. NEW DUCTWORK, NEW HOODS, MAKE-UP AIR FAN AND EXHAUST FAN TO BE INCLUDED.

OTHER ITEMS INCLUDED IN THE RENOVATION:

• TEMPORARILY REMOVE EQUIPMENT AS REQUIRED TO PERFORM WORK.

• INSTALL EQUIPMENT (AND REQUIRED UTILITIES) IN TEMPORARY LOCATIONS.

• CONVERT EXISTING OFFICE AREA TO FOOD STORAGE.

• REPLACE CEILING, LIGHTING AND ALL FINISHES.

• AUGMENT MECHANICAL SYSTEM. REPLACE EXTERIOR AND INTERIOR COOLING UNITS FOR WALK-IN COOLERS #1 AND #2.

• REPLACE GREASE INTERCEPTOR.

• INSTALL NEW KITCHEN EQUIPMENT PROVIDED BY VA.

• REINSTALL EXISTING ITEMS TO REMAIN, REPAIR / REPLACE AS REQUIRED TO RESTORE FULL FUNCTIONALITY.

• INSTALL NEW SINK AND DISHWASHING MACHINE.

CO: Charee K. Harris Contracting Officer Network Contract Office (NCO) 21 VA Sierra Nevada Health Care System 975 Kirman Avenue, Reno, NV 89502 Phone: (775)-788-5511 Fax: (775)-788-5552

COR: Marvin A. Patacsil Management & Program Analyst Facilities

Management Service (FMS) VA PIHCS (Pacific Island Health Care System) Department of Veterans Affairs Pacific Islands HealthCare System 459 Patterson Road, Honolulu, HI 96819 Phone: (808) 433-0162 (Office) Phone: (808) 940-1133 (Mobile) Mail: marvin.patacsil@va.gov

SHEET INDEX

SHEET NUMBER SHEET NAME

GENERAL

GI000 COVER SHEET

GI050 GENERAL NOTES

GI101 ARCHITECTURAL LIFE SAFETY PROTECTION PLAN

GI201 INFECTION CONTROL PLAN & INTERIM LIFE

PHOTO REFERENCES

R-901 PHOTO REFERENCES

R-902 PHOTO REFERENCES

R-903 PHOTO REFERENCES

ARCHITECTURAL

A-001 SYMBOLS, & GENERAL NOTES

AD101 ARCHITECTURAL DEMOLITION FLOOR PLAN

A-101 ARCHITECTURAL FLOOR PLAN

A-102 ARCHITECTURAL ATTIC AND ROOF PLANS

AC101 ARCHITECTURAL REFLECTED CEILING PLAN - FIRST LEVEL

A-401 ARCHITECTURAL ENLARGED VIEWS

INTERIORS

IN001 INTERIOR FINISH BOARDS

IN101 INTERIOR FLOOR AND WALL FINISH PLAN

EQUIPMENT & FURNITURE

Q-101 INTERIOR EQUIPMENT & FURNITURE

Q-102 EQUIPMENT- BASIS OF DESIGN

PLUMBING

P-000 PLUMBING ABBREVIATIONS AND SYMBOLS

PD101 PLUMBING PLAN - FIRST LEVEL - DEMO

P-101 PLUMBING PLAN - FIRST LEVEL - NEW

MECHANICAL

M-000 MECHANICAL ABBREVIATIONS AND SYMBOLS

MD101 MECHANICAL PLAN - FIRST LEVEL - DEMO

MD201 ROOF MECHANICAL PLAN - DEMO

M-101 MECHANICAL PLAN - FIRST LEVEL - NEW

M-201 ROOF MECHANICAL PLAN - NEW

M-501 MECHANICAL DETAILS

M-601 MECHANICAL SECTIONS

M-701 MECHANICAL SCHEDULES

M-901 MECHANICAL CUTSHEETS

M-902 MECHANICAL CUTSHEETS

ELECTRICAL

E-000 ELECTRICAL ABBREVIATIONS AND SYMBOLS

ED-101 ELECTRICAL PLAN - FIRST LEVEL - EXISTING

ED-401 ELECTRICAL PLAN - ENLARGED PLAN EXISTING

E-101 ELECTRICAL PLAN - FIRST LEVEL - NEW

E-401 ELECTRICAL ENLARGED PLANS

E-402 ELECTRICAL PLAN - ENLARGED PLAN - LIGHTING PLAN

E-601 ELECTRICAL ONE-LINE

E-701 ELECTRICAL SCHEDULES

E-702 ELECTRICAL SCHEDULES

E-901 ELECTRICAL CUTSHEETS

Triple C A&E Group, the A-E of record can certify that no Asbestos Containing Building Materials (ACBM) or Lead Based Products were designed/specified in the design.

_________________________ Signature 07/16/2024 Date

Author: Mat Perkins, AIA NCARB, PMP, LEED BD+C Triple C - The A&E Group

LOCATION MAP

VICINITY MAP

CS: Craig Armstrong Contract Specialist Network Contract Office (NCO) 21 711 Kapiolani Blvd Honolulu, HI 96813 Phone: (808)-835-9686

Revisions: Date:

month/day /ye ar

/0

2/

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, California 90807

MAT PERKINS

804-372-0067

A u to d e s k D o c s

/4

-2

-0

C F

A K it c h e n

R e n o v a ti o n H o n o lu lu V

/4

-2

-0

.C

F A

.K it c h e n .D e s ig n .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:2

:3

P M

GI050

GENERAL NOTES 459-24-002

08/02/2024 M.Perkins S.Pollard

ISSUED FOR

CONSTRUCTION

RENOVATE KITCHEN AT CLC

BUILDING 110

459 PATTERSON ROAD, HONOLULU, HI 96819

1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR

THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL

AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING

SPECIFICATION MANUAL FOR NEW WORK AND THE MPI

MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR

REPAINTING WORK.

2. PAINTING WORK: INCLUDES TAPING, SURFACE

PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD

PAINTING AND FINISHING AS REQUIRED BY STANDARD

PRACTICE, MANUFACTURER OR SPECIFICATION. REQUIRED

COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP

PRIMING, SURFACE TREATMENT AND FINISHING. THE WORK

ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF

OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS

MAY REQUIRE OTHER TYPES OF PAINTING, INCLUDING, BUT

NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND

FACTORY PRIMING.

3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED

OTHERWISE, CONTRACTOR IS TO FIELD PAINT ANY

SURFACES DISTURBED BY THE SCOPE OF WORK,

WHETHER OR NOT PREVIOUSLY PAINTED, AND ALL NEW

ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED

TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL

AND EXPOSED PIPING AND FITTINGS (INCLUDING IRON AND

PVC).

4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD

PAINTING OF INTERIOR AND EXTERIOR EXPOSED PIPES,

DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND

PRIMED METAL SURFACES OF EQUIPMENT IN EXPOSED

AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL

WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF

ELECTRICAL AND MECHANICAL WORK IN ELECTRICAL AND

MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED

OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF

PIPING FOR MECHANICAL AND PLUMBING WORK IS

COVERED IN THE MECHANICAL OR PLUMBING

SPECIFICATIONS.

5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT

AN EDGE, CORNER, CHANGE OF MATERIALS OR CHANGE

OF PAINT COLOR. COMPLETED PAINTING SHALL NOT

IMPEDE THE INTENDED OPERATION OF ANY ITEM, SUCH AS

WINDOWS, DRAWERS, HINGES, DOORS, ETC.

6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE

REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND

COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA

ON ONE SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF

TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE

ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING

EDGES OR CORNERS.

7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT

PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR

INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE

INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC

MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND

EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL

EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS,

LIGHTING FIXTURES, SWITCHGEAR, MOTORS,

DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR

SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO

PAINT AN ITEM OR SURFACE, FOLLOW PROCEDURES

LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION

(RFI).

8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE

INDICATED, DO NOT PAINT METAL SURFACES OF ANODIZED

ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE,

COPPER, BRASS, BRONZE AND SIMILAR FINISHED

MATERIALS.

9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED,

DO NOT PAINT SURFACES SUCH AS WALLS AND CEILINGS

IN CONCEALED AND GENERALLY INACCESSIBLE AREAS,

INCLUDING FURRED AREAS, UTILITY TUNNELS, PIPE

SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL

CONCRETE IN PIPE SPACE.

10. OPERATING PARTS AND SENSING DEVICES: UNLESS

OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF

OPERATING UNITS SUCH AS VALVES, DAMPER

OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT

SENSING OR EMITTING DEVICES THAT MIGHT NOT

FUNCTION PROPERLY IF PAINTED.

11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-

REQUIRED LABELS.

12. ALL INTERIOR SURFACES, WALLS, FRAMES, ETC.,

REQUIRED TO HAVE NEW FINISHES APPLIED, SHALL HAVE

ALL EXISTING AND CONTRACTOR CAUSED HOLES, CRACKS,

AND OTHER IMPERFECTIONS FILLED WITH APPROVED

PATCHING MATERIAL. PATCH TO BE FINISHED FLUSH WITH

ADJACENT SURFACE, WITH TEXTURE TO MATCH TEXTURE

OF ADJACENT SURFACE. SEE SPECIFICATIONS FOR

PATCHING REQUIREMENTS.

13. THE CONTRACTOR SHALL FIELD VERIFY EXISTING PAINT

MATERIALS AND FINISHES. APPLY THE APPROPRIATE

SEPARATION COAT (PRIMER/BONDING COAT) BETWEEN ALL

NON-COMPATIBLE COATINGS (I.E. WHERE NEW WATER-

BORNE ACRYLIC IS TO BE INSTALLED OVER EXISTING OIL

BASE PAINT).

GENERAL PAINTING NOTES:

1. THE PRIMARY OBJECTIVE OF APPLYING SEALANT IS TO

FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR

BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR

WET\DAMP LOCATIONS. PROPER PRIMING MUST BE USED

WITH SEALANTS.

2. THE PRIMARY OBJECTIVE OF APPLYING CAULKING IS TO

ENHANCE APPEARANCE AND FINISH AT INTERIOR

APPLICATIONS AND IN SOME SITUATIONS TO REDUCE

AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE

EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER

PENETRATIONS (FIRE CAULKING) AND TO DECREASE

SOUND TRANSMISSION THROUGH WALLS AND CEILINGS.

OTHER USES MAY BE NOTED IN THE SPECIFICATIONS

AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS

ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING

SHOULD BE USED, FOLLOW PROCEDURES LISTED IN

SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).

3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED)

SHALL BE USED AT HORIZONTAL AND VERTICAL CONCRETE

JOINTS AND AS NOTED.

4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION

JOINT MATERIAL, AS REQUIRED, SHALL BE USED AT

MASONRY AND CONCRETE CONTROL JOINTS.

5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF

SEALANT BETWEEN PERIMETER SOLE PLATES AND

FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR

THRESHOLDS IN SEALANT UNLESS NOTED OTHERWISE.

6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL

AROUND BOTH SIDES OF DOOR FRAMES.

7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL

AROUND INTERIOR WALL MOUNTED EQUIPMENT FRAMES

AND EXPOSED SUPPORTS.

8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS

BETWEEN DIFFERENT WALL MATERIALS (TILE TO BRICK,

CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL

TO P-LAM, ETC).

9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL

GAPS OR 1/16TH INCH OR MORE.

10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS

THROUGH, FLOORS AND WALLS.

11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND

CEILING PIPE PENETRATIONS. WHERE ESCUTCHEONS ARE

SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A

BED OF SEALANT.

12. USE SPECIFIED CAULK OR SEALANT AROUND

PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH

AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE

ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS,

LIGHTING, VENTS, ETC.

GENERAL SEALANT / CAULKING

NOTES:

1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.

2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND

REGULATIONS. WHEN REQUIRED BY CODE, ALL WORK

MUST BE INSPECTED AND APPROVED BY LOCAL

AUTHORITIES.

3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE

VERIFIED BY THE CONTRACTOR(S) PRIOR TO FABRICATION

AND CONSTRUCTION. IF INCONSISTENCIES,

CONTRADICTIONS OR OMISSIONS ARE DISCOVERED

FOLLOW PROCEDURES LISTED IN SECTION 01 26 13

REQUESTS FOR INFORMATION (RFI).

4. GENERAL CONTRACTOR SHALL COORDINATE ALL

MECHANICAL AND ELECTRICAL DUCT SIZES AND

LOCATIONS.

5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT

THE USE OF A KEY OR SPECIAL KNOWLEDGE.

6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE

INSTALLED LEVEL WITH EACH OTHER AND PLUMB.

7. THE WORK INDICATED IN THE NOTES DESCRIBES THE

GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED

TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE

FULL SCOPE OF WORK.

8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE

FIELD VERIFIED. IF DIMENSIONAL INFORMATION IS

REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN

SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).

9. FIELD VERIFICATION: BEFORE BIDDING AND DURING

CONSTRUCTION, CONTRACTOR SHALL VERIFY THAT

ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE

CONTRACT DOCUMENTS. REPORT DISCREPANCIES TO

ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING

WORK RELATED TO ANY DISCREPANCIES. SEE

SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES,

SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT

BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION

PRIOR TO BIDDING, THE CONTRACTOR WILL BE DEEMED TO

HAVE ELECTED THE MORE COSTLY TIME, METHOD,

SYSTEM, PRODUCT, SUBCONTRACT AND/OR MATERIAL.

11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS

AS "NIC" IS NOT IN THE CONTRACT. HOWEVER, THE

CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK

INDICATED AS NIC.

12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS

WITH COR, INCLUDING STAGING AREAS, MATERIAL

STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY

OPERATIONS, INTERRUPTION OF UTILITIES. SEE

SPECIFICATIONS.

13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE

THE PLACEMENT OF EACH TRADE'S WORK SO THAT THERE

ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR

FUNCTION IMPAIRED. IT IS ESPECIALLY IMPORTANT TO

COORDINATE PENETRATIONS THROUGH FOUNDATIONS,

FLOORS, WALLS AND CEILING SPACES. SEE

SPECIFICATIONS.

14. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN

DISSIMILAR METALS. SEE SPECIFICATIONS.

15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY

SHALL BE FIRE TREATED. SEE SPECIFICATIONS. ALL

SURFACE ATTACHED METAL SHALL BE SEPARATED FROM

CONCRETE OR MASONRY BY NON-METALLIC MATERIAL

SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL

AS APPROVED BY ARCHITECT AND COR.

16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL

EQUIPMENT, FIXTURES, DEVICES, MECHANICAL, PLUMBING

OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR,

MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL

ELEVATION COORDINATION.

17. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK

PERMITS TO BE COORDINATED WITH COR. SUBMIT

CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.

GENERAL NOTES: GENERAL FIRE & LIFE SAFETY

NOTES:

FIRE ALARM

1. WHENEVER FIRE ALARM WORK TAKES PLACE IN AN AREA

THAT IS BEING REMODELED, AT THE CONCLUSION OF THE

WORK, THE FIRE ALARM CONTRACTOR IS TO TEST ALL

FIRE ALARM DEVICES WITHIN THE AREA OF THE REMODEL

AREA WHETHER OR NOT THEY WERE MODIFIED AS PART

OF THE PROJECT.

FIRE EXTINGUISHERS

1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE

WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND

SHALL MAINTAIN THEM DURING THE COURSE OF

CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb.

CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C

FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED AND

SHALL BE DRY CHEMICAL TYPE.

EXIT & EMERGENCY LIGHTING

1. EXISTING EXIT AND EMERGENCY LIGHTING TO REMAIN.

ANY FIXTURES DISTURBED DURING THE COURSE OF WORK

SHALL BE REPAIRED AND / OR REPLACED TO MATCH

EXISTING CONDITIONS.

FIRE SPRINKLER SYSTEM

1. EXISTING FIRE SPRIKLER MAIN PIPES, BRANCH LINES AND

SPRINKLER HEADS TO BE RETAINED AND REUSED. ANY

PART OF THE FIRE SPRINKLER SYSTEM THAT IS

DISTURBED BY NEW WORK SHALL BE REPAIRED AND / OR

REPLACED TO MATCH EXISTING CONDITIONS.

2. WHENEVER EXISTING FIRE SPRINKLER PIPING IS

REMOVED, THE FIRE SPRINKLER CONTRACTOR IS TO

ANALYZE THE PIPING FOR OBSTRUCTIONS AND PROVIDE

WRITTEN OBSTRUCTION DOCUMENTATION IN

ACCORDANCE WITH NFPA REQUIREMENTS TO THE VA.

FIRE STOPPING

1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE

STOPPING.

GENERAL

1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE

OR FLAME-PROOFED IN AN APPROVED MANNER.

2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS

LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF

NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF

NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE

INSTALLATION, INCLUDING INSULATION, FACING

MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.

3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-

CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS

SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25

AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED

IN ACCORDANCE WITH ASTM E 84.

4. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR

PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A

UL APPROVED METHOD AND MATERIAL.

FIRE & SMOKE DAMPERS

1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED

AND REUSED.

2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM.

THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER AND

FIRE ALARM SYSTEM.

1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO

COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES

AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE

ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF

DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND,

FOLLOW PROCEDURES LISTED IN SECTION 01 26 13

REQUESTS FOR INFORMATION (RFI). IF DISCREPANCIES

ARE DISCOVERED AFTER THE BIDFOLLOW PROCEDURES

LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION

(RFI) PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.

2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL

AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED

BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND

SHOP DRAWINGS CONTRACTOR SHALL VERIFY

DIMENSIONS AND RECOMMEND DIMENSIONAL

MODIFICATIONS AS REQUIRED.

3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR

PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS,

SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR

ELEVATIONS AND EXTERIOR ELEVATIONS.

4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON

STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.

MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES

MAY ALSO CONTAIN DIMENSIONAL INFORMATION RELATED

TO EQUIPMENT SIZES AND CLEARANCES.

5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X

4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT

NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT

ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT

BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE.

(FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE

SHOWN IN THE 16THS OF AN INCH, BUT STANDARD

MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").

6. FLOOR PLAN DIMENSIONS

A. THE LOWEST FLOOR OVERALL BUILDING

DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE

FOUNDATION WALL TO THE OPPOSITE OUTSIDE

FACE OF THE FOUNDATION WALL (OR, FROM

OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS

SHOWN.

B. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE

TO ONE FACE OF THE STUDS, BOTH FACES OF

MASONRY WALLS, OR BOTH FACES OF CONCRETE

WALLS, ETC, UNLESS NOTED OTHERWISE.

C. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL

(UNLESS NOTED AS "NOM").

D. DOOR OPENING DIMENSIONS IN FRAME

CONSTRUCTION (WOOD OR STEEL STUDS) ARE

TYPICALLY SHOWN AT THEIR CENTERLINES.

HOWEVER, WHEN THE EDGE OF THE DOOR IS

IMPORTANT, OR MAKES THE PLACEMENT CLEARER,

THE DIMENSION MAY BE TO THE ACTUAL FRAME

EDGE.

E. DOOR DIMENSIONS IN LOAD-BEARING MASONRY

AND CONCRETE WALLS ARE TO "ROUGH"

OPENINGS (FACES OF MASONRY OR CONCRETE).

TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE

THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE

EACH SIDE) AND PLUS 1/2" TOTAL FOR THE

HEAD/SILL DIMENSIONS.

F. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS

TO ADJACENT WALLS: BETWEEN FRAME FACES

AND FACES OF STUDS, OR FACES OF MASONRY OR

CONCRETE, AT NEARBY PERPENDICULAR WALLS

ARE TYPICALLY 4", DEPENDING ON HARDWARE

CLEARANCES AND FRAME REQUIREMENTS (2.5"-

DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=

4.0")

G. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH

AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR

PREFABRICATED STAIR ENCLOSURES, ARE NOTED

"CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES

OF FINISHES.

H. DIMENSIONS DESIGNATED WITH "MIN" INDICATE

THE MINIMUM CLEARANCE OR SEPARATION

REQUIRED.

7. ROOF PLAN DIMENSIONS

A. UN-DIMENSIONED LOCATIONS OF ROOFTOP

EQUIPMENT AND CONSTRUCTION OFTEN MAY BE

DETERMINED BY THE FLOOR PLAN BELOW, SUCH

AS ROOF HATCH DETERMINED BY REFERENCE TO A

FIXED WALL AND LADDER, OR MECHANICAL

EQUIPMENT DETERMINED BY DUCT PENETRATIONS

BETWEEN JOISTS.

B. UN-DIMENSIONED ITEMS SUCH AS EQUIPMENT

RAILS, HVAC EQUIPMENT, SCREEN WALLS,

ANTENNAS, WALK PADS, LADDERS, SCUPPER

LOCATIONS, ETC., MAY BE LOCATED FROM

MECHANICAL AND ELECTRICAL DRAWINGS OR

LOCATED BY SCALING. CONFIRM ALL ROOF ITEM

DIMENSIONS WITH THE ARCHITECT AND COR PRIOR

TO CONSTRUCTION.

8. VERTICAL DIMENSIONS

A. UNLESS NOTED OTHERWISE, THE FIRST FLOOR

REFERENCE ELEVATION IS 100'-0". THIS IS

REFERENCED TO A GROUND ELEVATION ABOVE

MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR

STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0"

ARE "-" (PREFIXED WITH A MINUS SIGN).

B. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON

ARCHITECTURAL DRAWINGS ARE TO TOP OF

DECKING OR SHEATING, BUT DO NOT INCLUDE

FINISHES OR ROOFING MATERIAL.

C. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE

TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD-

BEARING MASONRY OR CONCRETE WALLS, WHERE

THEY ARE TO ROUGH OPENINGS). HEIGHT

REFERENCES SHOULD BE TO THE NEXT LOWER

FINISH FLOOR ELEVATION

D. LIGHTING HEIGHTS ON WALLS ARE TO

CENTERLINES OF THE ELECTRICAL BOXES, UNO.

EQUIPMENT, VENT, PLUMBING AND FIXTURE

ELEVATIONS ARE TO CENTERLINES OF THE WALL

PENETRATIONS, UNO.

E. SOME VERTICAL DIMENSIONS ARE SHOWN ON

PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND

ELEVATION CHANGES. A PLAN ELEVATION CHANGE

SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND

INDICATES THE + OR - ELEVATION CHANGE IN

INCHES FROM THE FINISHED FLOOR ELEVATION

(FFE) NEXT TO IT.

GENERAL DIMENSIONING

NOTES:

1. HALF-TONED OR LIGHT LINES INDICATE EXISTING

CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE

EXTENT OF DEMOLITION.

2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY,

AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES

TO MEET APPROVAL OF CODE AGENCIES. COORDINATE

DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR

SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE

COR RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS

FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING

THE PRE-CONSTRUCTION WALK THROUGH.

4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS,

VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR

CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO

MAINTAIN THE INTEGRITY OF THE WALL, FLOOR, AND/OR

ROOF ASSEMBLY.

5. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND

DEMOLITION FOR RELATED DEMOLITION WORK.

6. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED

UTILITY & DEMOLITION WORK AND PROJECT PHASING

NOTES. COORDINATE UTILITY SYSTEM SHUTDOWNS WITH

COR.

GENERAL DEMOLITION AND

PHASING NOTES:

Revisions: Date:

month/day /ye ar

/0

2/

LIFE SAFETY SYMBOLS

XX PATH OF TRAVEL (NO CHANGE)

EXIT LIGHTING (NO CHANGE)

1i

FIRE EXTINGUISHER CABINET (FEC)

FIRE EXTINGUISHERS (FE)

FIRE HOSE CABINETS (FHC)

HEAT DETECTOR

SMOKE DETECTOR

DIRECTION OF EGRESS

APPLICABLE BUILDING CODES

• 2021 NFPA 101 LIFE SAFETY CODE & 2019 NFPA 72

NATIONAL FIRE ALARM AND SIGNALING CODE & 2019 NFPA

13 STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS.

EXCEPTION OF NFPA 5000 AND NFPA 900

• 2021 INTERNATIONAL MECHANICAL CODE (IMC)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION

(OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2020 NATIONAL ELECTRICAL CODE (NEC)

• 2021 INTERNATIONAL PLUMBING CODE (IPC)

• ASME BOILER AND PRESSURE VESSEL CODE

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY

STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT,

BARRIER FREE DESIGN GUIDE (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED

CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND

RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR

STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF

STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-

RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00

00 AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –

ASHRAE STANDARD 62.1-2016; MEDICAL SPACES - ASHRAE

170-2013, NON-MEDICAL SPACES - ASHRAE 62.1-2016

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS –

ASHRAE STANDARD 15–2013

• 2018 INTERNATIONAL BUILDING CODE (IBC) WHERE

DIRECTED BY VA STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF

APPLICABLE STANDARD OR CODE SHALL BE USED

APPLICABLE BUILDING GUIDES

• VA FIRE PROTECTION DESIGN GUIDE, 8TH EDITION (2021)

BUILDING CODE:

CONSTRUCTION TYPE:

TYPE II (222) PER NFPA 220, Chapter 4

TYPE OF BUILDING REHABILITATION: RECONSTRUCTION,

CHAPTER 43.

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING

ELEMENTS:

STRUCTURAL FRAME 2 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 2 HOURS

FLOORS 2 HOURS

ROOFS/ CEILINGS 1 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA

101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY

FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT

SIZE)

SMOKE COMPARTMENTS 1/2 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 2 HOURS

MEDICAL GAS / HAZARDOUS

STORAGE 1 HOURS

CLASSIFICATION OF OCCUPANCY:

NEW: AMBULATORY HEALTH CARE Occupancy per Chapter 20.

EXISTING: HEALTH CARE Occupancy per Chapter 18/19 18/19.1.1.4.2 (3) Changes of Occupancy. A change from a hospital or nursing home to an ambulatory health care occupancy shall not be considered a change in occupancy or occupancy subclassification.

18/19.1.1.4.3 REHABILITATION (1) MAJOR REHABILITATION SHALL

INVOLVE THE MODIFICATION OF THAN 50%, OR MORE THAN

4500 FT2, OF THE AREA OF THE SMOKE COMPARTMENT.

MIXED BUILDING OCCUPANCY TYPE:

PRIMARY - HEALTHCARE

SECONDARY - AMBULATORY HEALTH CARE OCCUPANCY

6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:

(1) Mercantile, BUSINESS, industrial, or storage use

6.1.14.3 Mixed Occupancies

6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.

6.2 Hazard of Contents.

6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.

EXIT ACCESS TRAVEL DISTANCE:

18/19.2.6.2.1 The travel distance between any point in a room and an exit shall not exceed 150 ft.

18/19.2.6.2.2 The maximum travel distance...shall be permitted to be increased by 50 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.

HEALTH CARE OCCUPANCY; PROTECTED = 200'-0"

OCCUPANT LOAD:

18/19.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

THERE IS NO CHANGE TO BUILDING OCCUPANT LOAD.

EXISTING EGRESS PATHWAYS, OR RATED WALLS LOCATIONS.

MEANS OF EGRESS:

18/19.2.3 Capacity of Means of Egress.

18/19.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.

18/19.2.3.2 The clear width of any corridor or passageway required for exit access shall not be less than 44 in. (1120 mm).

18/19.2.4 Number of Means of Egress.

18/19.2.4.3 Not less than two exits of the types described in 18.2.2 shall be accessible from each smoke compartment.

18/19.2.4.4 Egress from smoke compartments addressed in 18.2.4.3 shall be permitted through adjacent compartments provided that the two required egress paths are arranged so that both do not pass through the same adjacent smoke compartment.

PROTECTION OF VERTICAL OPENINGS:

18/19.3.1 Protection of Vertical Openings.

18/19.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PROTECTION FROM HAZARDS:

18.3.2 Protection from Hazards.

18.3.2.1 Hazardous Areas

18.3.2.1.1 Any hazardous areas shall be protected in accordance with Section 8.7, and the areas addressed in 18.3.2.1.2 and 18.3.2.1.3 shall be protected as indicated.

18.3.2.1.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:

(1) Boiler and fuel-fired heater rooms

(2) Central/bulk laundries larger than 100 ft2

(3) Paint Shops

(4) Physical plant maintenance shops

(5) Rooms with soiled linen in volume exceeding 64 gal

(6) Rooms with collected trashed in volume exceeding 64 gal.

(7) Storage rooms larger than 100 ft2 and storing combustible material 18.3.2.1.3The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:

(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.

(2) Storage rooms larger than 50ft2 but not exceeding 100 ft2 and storing combustible material.

18.3.2.4 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.

18.3.5.12 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

NO CHANGE TO FUNCTION OR OCCUPANT LOAD, AND

THEREFORE NO CHANGE TO REQUIRED PARKING.

WIDTH PROVIDEDP: XX"

R: XX" WIDTH REQUIRED

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

CONTRACT LIMIT

ACCESSIBLE PATH EXIT

F

FE

FE

E -1

.1

E-2 ▬ 50.9'

SOCIAL

WORKER

A116

121 SF

PUBLIC

TOILET

A115

42 SF

PUBLIC

TOILET

A114

42 SF

FOOD

STORAGE

A113

121 SF

NON-FOOD

STORAGE

A112

74 SF

KITCHEN

A-111

321 SF

WARE

WASHING

A111A

132 SF

REC/ DINING

ROOM

A117

1314 SF

COOKING

A111B

230 SF

COOLER #1

88 SF

COOLER #2

69 SF

MECH

A111B

190 SF

MECH.-ECC

A111D

87 SF

OUTDOOR

REC.

STORAGE

A111C

96 SF

TRASH

A110A

33 SF

HAC

A110

40 SF

LINEN HOLD

A109

70 SF

COMM.

A102C

38 SF

ELECTRICAL

A102A

125 SF

MECH

A102B

135 SF

ACNS

A101

137 SF

DIETICIAN

A112

147 SF

TELE.

A102

48 SF

ACOS

A100

131 SF

CHAPLAIN

A106

115 SF

SECRETARY

A103

42 SF

LOBBY

CA-1A

1082 SF

CORRIDOR

CB-1

556 SF

CORRIDOR

CB-2

169 SF

PATIENT

STORAGE

B100

135 SF

BMS STOR.

B101

131 SF

OXY. STOR.

B101A

65 SF

E

.9

A

C C

E S

S

IB

L E

P

A T

H

1156 SF

KITCHEN

EXIT ONTO DOCK AREA

E.6

C.7

CORRIDOR

CA-4

191 SF

7.1 8

COVERED DROP OFF

CORRIDOR

CA-3

144 SF

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEY PLAN

TRIPLE C - The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, California 90807

MAT PERKINS

804-372-0067

AREA OF WORK

SCALE: NO SCALE

A u to d e s k D o c s

/4

-2

-0

C F

A K it c h e n

R e n o v a ti o n H o n o lu lu V

/4

-2

-0

.C

F A

.K it c h e n .D e s ig n .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:2

:3

P M

GI101

ARCHITECTURAL LIFE SAFETY PROTECTION

PLAN

459-24-002

08/02/2024 M.Perkins S.Pollard

ISSUED FOR

CONSTRUCTION

RENOVATE KITCHEN AT CLC

BUILDING 110

459 PATTERSON ROAD, HONOLULU, HI 96819

1/8" = 1'-0" E1

LIFE SAFETY PROTECTION PLAN

NOTE: THERE ARE NO PROPOSED CHANGES TO PROGRAM, NO ADDITIONAL

SQUARE FOOTAGE, ROOMS, ETC.

SCOPE OF WORK IS REPLACEMENT OF EQUIPMENT AND SMALL REMODEL.

THE EXISTING LIFE SAFETY CONDITIONS, INCLUDING

PATHS OF TRAVEL, SHALL REMAIN UNCHANGED.

EXISTING WALL CONFIGURATION NOT CHANGING - RATED WALLS WERE NOT

ABLE TO BE VERIFIED AND THEREFORE NOT SHOWN. CONTRACTOR IS TO

MAINTAIN RATINGS OF ALL EXISTING RATED WALL SYSTEMS.

PATH OF TRAVEL SCHEDULE - FIRST FLOOR

Mark From Room To Room Length

LEVEL 1

Exit Pathway

E3 COOKING A111B 130' - 10 7/32"

E-1 COOKING A111B CORRIDOR CA-4 65' - 1 5/16"

E-2 FOOD STORAGE A113 CORRIDOR CA-4 50' - 10 5/8"

EGRESS SIZING (AREA)

Area Information By Function Occupancy Requirements Egress Requirements

Number Name Area Occupancy (NFPA) Fixed Seats OL Sprinklered

Sprinklered Factors Required Width

Stair Other Stair Other

LEVEL 1

KITCHEN 1,155.52 SF 8 Yes 0.40" 0.20" 3.20" 1.60"

LEVEL 1 1,155.52 SF 8 3.20" 1.60"

NOTE: SHELVING IN KITCHEN AREA IS EXISTING TO REMAIN

AND IS TYPICALLY A 4 SHELF ROLLING UNIT 6'-6" HIGH -

LEAVING 2''0" CLEAR TO CEILING. REFER TO Q-101 FOR

EQUIPMENT LAYOUT.

Revisions: Date:

month/day /ye ar

/0

2/

SB

TYPE D

A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)

PROCEDURES AS PER THE SPARK M MATSUNAGA VA

MEDICAL CENTER ICRA PLAN AND AS DIRECTED BY THE

CONTRACTING OFFICER REPRESENTATIVE (COR).

B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS

PATH OF TRAVEL AND INTERIM LIFE SAFETY MEASURES

(ILSM) WITH THE COR. ALL INTERIOR DOORS THAT LEAD TO

THE CONSTRUCTION SITE SHALL BE POSTED AS PER THE

ISLM PLAN.

C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING

WORK.

D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS

SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER

WORK.

E. CONSTRUCT ANTEROOM AT ENTRANCES TO

CONSTRUCTION AREAS AND REQUIRE ALL CONSTRUCTION

PERSONNEL TO PASS THROUGH THIS ROOM TO BE

VACUUMED WITH HEPA VACUUM CLEANER PRIOR TO

LEAVING THE SITE.

F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL

FOR OCCUPIED AREAS ON THE FLOOR.

G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;

REVIEW WITH COR AND VA SAFETY GROUP.

H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION

AREA AT ALL TIMES (24/7). WHETHER OCCUPIED OR NOT,

THROUGHOUT DURATION OF PROJECT USING HEPA

EQUIPPED AIR FILTRATION UNITS.

J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE

OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR

OR EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE

CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN

CONSTRUCTION AREA TO PREVENT CONTAMINATION OF

EXISTING DUCT SYSTEM.

K. REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS

AND VISITORS SO THEY DO NOT EXIT THROUGH THE

CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO

THE CONSTRUCTION AREA THAT READS: "CONSTRUCTION

AREA-DO NOT ENTER".

L. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND

KEEP A CURRENT HOT WORK PERMIT ON SITE.

M. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE

SURE THEY REMAIN EFFECTIVE.

N. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA.

ALL DEBRIS REMOVAL SHALL BE IN COVERED CARTS

AND/OR CONTAINERS.

O. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM

PIPES AND CONDUITS APPROPRIATELY AND IMMEDIATELY

TO MAINTAIN DUST PROTECTION AND NEGATIVE AIR

PRESSURE.

P. MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST

MOPS, WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING

RAGS FOR CLEANING FINE DUST FROM FLOORS AND

ADJACENT OCCUPIED AREAS. ANY DUST TRACKED OUTSIDE

OF CONSTRUCTION AREA SHALL BE CLEANED IMMEDIATELY.

Q. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION

AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH

DISINFECTANT, REMOVE CONSTRUCTION BARRIERS (UPON

APPROVAL). PATCH OR REPAIR ANY DAMAGE FROM

CONSTRUCTION BARRIER REMOVAL AND REMOVE

ISOLATION OF HVAC SYSTEM.

R. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL

PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY

PERSONNEL, INFECTION CONTROL GROUP, AND COR.

ICRA NOTES:

ICRA SYMBOL LEGENDINFECTION CONTROL RISK

ASSESSMENT:

STEP 1: TYPE D

IDENTIFY THE TYPE OF CONSTRUCTION PROJECT

ACTIVITY (TYPE A–D)

TYPE A: INSPECTION AND NONINVASIVE ACTIVITIES.

TYPE B: SMALL-SCALE, SHORT-DURATION ACTIVITIES

THAT CREATE MINIMAL DUST.

TYPE C: WORK THAT GENERATES A MODERATE TO

HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR

REMOVAL OF ANY FIXED BUILDING COMPONENTS OR

ASSEMBLIES.

TYPE D: MAJOR DEMOLITION AND CONSTRUCTION

PROJECTS.

STEP 2: HIGH RISK

IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE

AFFECTED.

IF MORE THAN ONE RISK GROUP WILL BE AFFECTED,

SELECT THE HIGHER RISK GROUP.

STEP 3: CLASS IV

MATCH THE PATIENT RISK GROUP (LOW, MEDIUM,

HIGH, HIGHEST) WITH THE PLANNED CONSTRUCTION

PROJECT TYPE (A, B, C, D) ON THE FOLLOWING MATRIX,

TO FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR

LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED.

STEP 4: IDENTIFY THE AREAS SURROUNDING THE PROJECT

AREA, ASSESSING POTENTIAL IMPACT.

BELOW ABOVE NORTH SOUTH EAST WEST

_______________________RISK GROUP_____________________

LOW LOW N/A N/A N/A N/A

STEP 5:

IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT

ROOMS, MEDICATION ROOM, AND SO ON.

STEP 6:

IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND

ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE

OUTAGES.

STEP 7.

IDENTIFY CONTAINMENT MEASURES, USING PRIOR

ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,

SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?

STEP 8.

CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A

RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR

EXAMPLE, WALL, CEILING, ROOF)?

NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE

ISOLATED FROM THE OCCUPIED AREAS DURING

CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO

SURROUNDING AREAS.

STEP 9.

WORK HOURS: CAN OR WILL THE WORK BE DONE DURING

NON-PATIENT-CARE HOURS?

STEP 10.

DO PLANS ALLOW FOR ADEQUATE NUMBER OF

ISOLATION/NEGATIVE AIRFLOW ROOMS?

STEP 11.

DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE

OF HAND-WASHING SINKS?

STEP 12.

DOES THE INFECTION PREVENTION AND CONTROL STAFF

AGREE WITH THE MINIMUM NUMBER OF SINKS FOR THIS

PROJECT? (VERIFY AGAINST FACILITY GUIDELINES INSTITUTE

(FGI) DESIGN AND CONSTRUCTION GUIDELINES FOR TYPES

AND AREA.)

STEP 13.

DOES THE INFECTION PREVENTION AND CONTROL STAFF

AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED

UTILITY ROOMS?

STEP 14.

PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES

WITH THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,

HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).

C

LA

S S

IV

DURING CONSTRUCTION

PROJECT

UPON COMPLETION OF

PROJECT

1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

4. Seal holes, pipes, conduits, and punctures.

5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave work site.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Prevention & Control Department and thoroughly cleaned by the owner’s Environmental Services Dept.

2. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.

3. Contain construction waste before transport in tightly covered containers.

4. Cover transport receptacles or carts. Tape covering unless solid lid.

5. Vacuum work area with HEPA filtered vacuums.

6. Wet mop area with cleaner/disinfectant.

7. Upon completion, restore HVAC system where work was performed.

Construction Project Type

Patient Risk Group LOW Risk Group MEDIUM Risk Group

HIGH Risk Group

HIGHEST Risk Group

I II II III/IV

I II III IV

I II III/IV IV

II III/IV III/IV IV

TYPE A TYPE B TYPE C TYPE D

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST

CONTROL EGRESS DOOR NON-

TRANSFERRING MULTI-SHEETED

ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

DINING AREA ONE SIDE -SERVICE

CORRIDOR - NO SPACES ABOVE OR BELOW

REPLACING MECHANICAL AND KITCHEN

EQUIPMENT

1 HR BARRIERS, SOLID, HEPA FILTRATION

MINOR RISK, CONTRACTOR TO PROVIDE

PROTECTION DURING WALL/ROOF WORK

AFTER HOURS WORK NOT ALLOWED (TO

PREVENT DISRUPTION OF RESIDENTS)

N/A

YES, NO CHANGE TO EXISTING HW SINKS

ACOS

A100

131 SF

ACNS

A101

137 SFTELE.

A102

48 SF

SECRETARY

A103

42 SF

ELECTRICAL

A102A

125 SF

MECH

A102B

135 SF

COMM.

A102C

38 SF

CHAPLAIN

A106

115 SF

TOILET

A107

37 SF

NON-FOOD

STORAGE

A112

74 SF

LINEN HOLD

A109

70 SF

HAC

A110

40 SF

COOKING

A111B

230 SF

DIETICIAN

A112

147 SF

FOOD

STORAGE

A113

121 SF

PUBLIC

TOILET

A114

42 SF

PUBLIC

TOILET

A115

42 SF

SOCIAL

WORKER

A116

121 SF

REC/ DINING

ROOM

A117

1314 SF

WARE

WASHING

A111A

132 SF

MECH

A111B

190 SF

OUTDOOR

REC.

STORAGE

A111C

96 SF

MECH.-ECC

A111D

87 SF

TRASH

A110A

33 SF

PATIENT

STORAGE

B100

135 SF

BMS STOR.

B101

131 SF

OXY. STOR.

B101A

65 SF

CORRIDOR

CB-1

556 SF

CORRIDOR

CB-2

169 SF

LOBBY

CA-1A

1082 SF

CORRIDOR

CA-3

144 SF

CORRIDOR

CA-4

191 SF

KITCHEN

A-111

321 SF

COOLER #1

88 SF

COOLER #2

69 SF

M

IN

C

LR

4' -6

MIN

4'-0" CLR

4 6

O R

E M

P T

IE

D

D A

IL

Y

P E

R V

A F

IR

E

P R

O T

E C

T

IO

N D

E S

IG

N

G U

ID

E

'-0

M

IN

IM

U M

A W

A Y

F R

O M

B

LD

G

121212

COORDINATE WITH COR FOR

DOOR REMOVAL / WALL

REPLACEMENT TO LIMIT

TIME THAT MAIN CORRIDOR

IS AFFECTED

3' -0

1 2

WEEKLY CHANGED

OR MORE AS

NEEDED PRE-FILTER

FLEX DUCT

MONTHLY CHANGED

HEPA FILTER

HEPA NEGATIVE AIR

UNIT

PROVIDE STICKY MATS (CHANGED END OF

EVERY SHIFT OR MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

PRESSURE INDICATOR SHALL BE AT

0.01 OR GREATER (VERIFY DAILY). IF

NOT VERIFY ALL OPENING SUCH AS

DOOR ARE CLOSED AND/OR

CHANGE NEGATIVE AIR PRE-FILTER.

SUPPLY DUCTS EITHER

KEEP RUNNING OR

COVER WHEN NOT

RUNNING TO KEEP

DUST OUT.

A

V

O

TAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION

E

FIRE EXTINGUISHER

ON PORTABLE FLOOR

BRACKET (SHALL

REQUIRE MORE THAN

ONE.)

PUBLIC AREA

CONSTRUCTION AREA

A

A

PROVIDE CLOSER

AND LATCH ON

DOORS

PROVIDE STICKY MATS (CHANGED END OF

EVERY SHIFT OR MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

PRESSURE INDICATOR SHALL BE AT

0.03-INCH WATER GAUGE OR GREATER

(VERIFY DAILY). IF NOT VERIFY ALL

OPENING SUCH AS DOOR ARE CLOSED

AND/OR CHANGE NEGATIVE AIR PRE-

FILTER.

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

(SHALL REQUIRE MORE THAN

ONE.)

PUBLIC AREA

CONSTRUCTION AREA

WEEKLY CHANGED

OR MORE AS

NEEDED PRE-FILTER

MONTHLY CHANGED

HEPA FILTER

HEPA NEGATIVE AIR UNIT

HEPA VACUUM OR DISPOSABLE

COVERALLS DISPENSER &

COLLECTION BIN.CONSTRUCTION

ANTE ROOM

ANTE ROOM BARRIERS SAME

AS CONSTRUCTION BARRIERS

OR PREFAB UNIT

SHOE COVER DISPENSER &

COLLECTION BIN.

EXISTING WALLS USED AS

BARRIERS SHALL HAVE ALL

PENETRATIONS VERIFIED AND

SEALED BEFORE

CONSTRUCTIONS STARTS

A

A

TEMPORARY WALL TO EXTEND

AND BE SEALED TO DECK /

FLOOR ABOVE WHEN RATED

ENCLOSURE REQUIRED

FLOOR LINE

CEILING SYSTEM AS

SCHEDULED

EXISTING STRUCTURE

F

IN

IS

H E

D F

LO

O

R T

O U

N D

E R

S

ID

E O

F S

T R

U C

T U

R E

V E

R

IF

Y F

LO

O

R T

O F

LO

O

R H

E

IG

H T

RENOVATED SPRINKLER

SYSTEM

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

KEY PLAN

TRIPLE C - The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, California 90807

MAT PERKINS

804-372-0067

AREA OF WORK

SCALE: NO SCALE

A u to d e s k D o c s

/4

-2

-0

C F

A K it c h e n

R e n o v a ti o n H o n o lu lu V

/4

-2

-0

.C

F A

.K it c h e n .D e s ig n .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:2

:3

P M

GI201

INFECTION CONTROL PLAN & INTERIM LIFE 459-24-002

08/02/2024 M.Perkins S.Pollard

ISSUED FOR

CONSTRUCTION

RENOVATE KITCHEN AT CLC

BUILDING 110

459 PATTERSON ROAD, HONOLULU, HI 96819

1/8" = 1'-0" E1

ICRA PLAN

KEYNOTES

1 KITCHEN HOOD TO BE REPLACED. SEE MECHANICAL SHEETS FOR ADDITIONAL

INFORMATION.

2 NEW KITCHEN HOOD ABOVE TO REPLACE EXISTING HOOD. CLOSE OFF HOOD BEING

WORKED ON WITH PLASTIC SHEETING. SEAL WITH DUCT TAPE WHEN NOT IN USE.

3 CONTRACTOR RESPONSIBLE FOR ENSURING ROUTE FOR SUPPLY AND REMOVAL OF

MATERIALS IS APPROVED BY COR, AND THAT ALL MATERIALS, EQUIPMENT, ETC, CAN

BE TRANSPORTED ALONG ENTIRE LENGTH OF ROUTE, INCLUDING FITTING THROUGH

DOORWAYS, AROUND CORNERS, ETC.

4 TEMPORARY CONSTRUCTION BARRIER

5 TEMPORARY CONSTRUCTION BARRIER. ALIGN WITH BACK OF DOOR FRAME AND

ENSURE SMOOTH WORKING OF CORRIDOR DOOR

6 TEMPORARY CONSTRUCTION BARRIER DOOR WITH CLOSER AND LATCH

7 ANTEROOM SEE DETAILSON THIS SHEET

8 COORDINATE WITH COR FOR FINAL LOCATION OF CONSTRUCTION DUMPSTER

9 TEMPORARY LOCATION FOR REACH-IN COOLER/ FREEZER. CONTRACTOR TO PROVIDE

POWER.

10 TEMPORARY LOCATION FOR FOOD WARMERS. CONTRACTOR TO PROVIDE POWER.

11 KITCHEN AREA TO BE OUT OF SERVICE AND UNOCCUPIED DURING FULL

CONSTRUCTION DURATION.

12 PROVIDE TEMPORARY DUST TIGHT ENCLOSURES AROUND WORK AREA AND EXISTING

EQUIPMENT TO REMAIN DURING ANY ACTIVITIES WHICH PRODUCE DUST

13 CONTRACTOR TO PROVIDE SIGNAGE - "NOT AN EXIT". SIGNAGE TO REMAIN IN PLACE

DURING CONSTRUCTION.

NOTE:

CONSTRUCTION ACTIVITY OUTSIDE OF THE CONSTRUTION AREA TO BE LIMITED TO OFF-HOURS TO MINIMIZE DOWN-TIME. COORDINATE DOWN-TIME WITH COR TO ENSURE RECREATION/DINING AREA

REMAINS OPERATIONAL.

UTILIZE MOBILE HEPA CARTS FOR REPLACEMENT / INSTALLATION OF CEILING MECHANICAL FIXTURES

OUTSIDE OF CONSTRUCTION ARA.

CONTRACTOR TO SUBMIT PHASING PLAN & SCHEDULE TO COR FOR APPROVAL. VERIFY DEBRIS ROUTE

WITH COR.

HEPA CART EXAMPLE - UTILIZE FOR CEILING GRID AND DIFFUSER WORK OUTSIDE OF

CONSTRUCTION AREA

1/4" = 1'-0" B7

TYPICAL CONSTRUCTION LAYOUT- CLASS IV

1/4" = 1'-0"

B5

TYPICAL CLASS IV ANTE ROOM

1/2" = 1'-0" B3

CROSS SECTION AA - CLASS IV

VA TO RROVIDE CONTRACTOR WITH ICRA AND PCRA FORMS

AFTER PROJECT AWARD.

Revisions: Date:

month/day /ye ar

/0

2/

ARCHITECTURAL SYMBOLS

SHEET NUMBER

A-100 Sheet Number

Discipline Code

A-1 1/8" = 1'-0"

View Name

VIEW TITLE

Drawing Scale

Drawing Number

1/8" = 1'-0"

View NameA-1 A101R101

VIEW TITLE WITH REFERENCES

Drawing Scale

Sheet Number

Drawing Number

Reference Sheet Number

EXTERIOR ELEVATIONS

INTERIOR ELEVATIONS

A-200

A1 Position on Sheet

Sheet Number

Position on Sheet

Sheet Number

A1

A2B2

B1

A-350

MATCH LINES

MATCHLINE

SEE: A1/A-101B

Sheet Number

Position on Sheet

AREA REFERENCE

A

SEE: (X/X-XXX)

Reference to Area

View Reference for Additional Information

BUILDING SECTION

Position on Sheet

Sheet Number

SIM

X

X-XXX

SIM

X

X-XXX

WALL SECTION

Position on Sheet

Sheet Number

X

X-XXX

SIM

DETAIL - SECTION

SIM

X

X-XXX

Position on Sheet

Sheet Number

DETAIL - PLAN/RCP

SIM

X

X-XXX

Position on Sheet

Sheet Number

DRAWING REVISIONS

Revision Number

NORTH ARROW

True North

PLAN

NORTH Plan North

0 4'-0" 8'-0" 16'-0"

IF THIS IS NOT A 42"x30" SHEET IT IS A

REDUCED SIZE PLOT, USE GRAPHIC

SCALE ACCORDINGLY.

GRAPHIC SCALE

COLUMN GRID LINES

Column Grid Line (New)

Column Grid Line (Existing)

1 2

A

B

LEVEL DATUM

LEVEL XX

0' - 0"

Level Name

Level Elevation

SPOT ELEVATION

0'-0"

Spot Elevation

ROOM TAG

ROOM

NAME

ABC123

150 SF

Room Name

Room Number

CEILING TAG

Type Mark

1' - 0" AFF

Ceiling Type

Ceiling Height

DOOR NUMBER TAG

New Door Door Number Tag

1A

Existing Door Door Number Tag

1A101

WINDOW TAG

Interior Window Tag

XX

XX

Exterior Window Tag

CURTAIN WALL TAG

XX

Interior Curtain Wall Tag

Exterior Curtain Wall Tag

XX

AD100

Room Code Room Area Or Volume

1T

CURTAIN PANEL TAG

Interior Curtain Wall Tag

WALL TYPE TAG

≠ A# B

C

V V Item - VA Supplied & Installed

V C ITEM -

VA Supplied & Contractor Installed

C C Item - Contractor Supplied & Installed

FFE Tag (By JSN)A1000

1i FFE Tag Furnished By VA Equipment Vendor

? KEYNOTE

1"

R 1/2"

90°

DIMENSION TO FACE OF

FINISH, FACE OF CONCRETE,

COLUMN CENTERLINE, OR AS

NOTED.

DIMENSIONS

1"

Symbol Indicates No Sound

Attenuation

Partition Type

CMU/Stud Width

Partition Modifier Partition Modifier II

KEYNOTE TAG

SEE A-720 STANDARD PARTITION TYPES

Contract Limit line Style

Not In Contract Area

CONTRACT LIMIT GRAPHIC

LINE STYLES

Centerline

Demolished

Temporary

Hidden

Overhead

Beyond

FURNITURE, FIXTURE, & EQUIPMENT

8'-6"1

Name

Room Name Room Number

Existing Finish Key

Ceiling Height

HVAC RETURN DIFFUSER

HVAC EXHAUST DIFFUSER

RECESSED LUMINAIRE (24x48)

ACOUSTICAL TILE CEILING (24x48)

GYPSUM BOARD CEILING

REFLECTED CEILING SYMBOLS

HVAC SUPPLY DIFFUSER

SPRINKLER

EXISTING NEW

CEILING POWER

ACCESS PANEL

MATERIALS LEGEND

CONCRETE (SECTION)

GRANULAR FILL

CONCRETE MASONRY UNITS

BRICK

RIGID INSULATION (SECTION)

ACOUSTIC/THERMAL INSULATION (SECTION)

STEEL (SECTION)

ALUMINUM (SECTION)

WOOD FINISH (SECTION)

LUMBER FINISH (SECTION)

EARTHWORK (SECTION)

STUD WALL (PLAN & SECTION)

EXISTING WALL TO REMAIN (PLAN & SECTION)

DEMOLISHED WALL (PLAN &

SECTION)

EXISTING TO REMAIN

EXISTING TO BE REMOVED

EXISTING TO REMAIN

NEW CONSTRUCTION

DOOR NUMBER

SYMBOL AND MINIMUM

CLEARANCES

18" MIN.

12" MIN.

6" MIN.

1A

WALL LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

4401 Atlantic Avenue, Suite 200

Long Beach, California 90807

MAT PERKINS

804-372-0067

A u to d e s k D o c s

/4

-2

-0

C F

A K it c h e n

R e n o v a ti o n H o n o lu lu V

/4

-2

-0

.C

F A

.K it c h e n .D e s ig n .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:2

:3

P M

A-001

SYMBOLS, & GENERAL NOTES 459-24-002

08/02/2024 M.Perkins S.Pollard

ISSUED FOR

CONSTRUCTION

RENOVATE KITCHEN AT CLC

BUILDING 110

459 PATTERSON ROAD, HONOLULU, HI 96819

ABBREVIATIONS

° DEGREE

± PLUS/MINUS

⌀ DIAMETER

≈ ALMOST EQUAL

∠ ANGLE

℄ CENTER LINE

Δ DELTA, DEFLECTION

ϕ ELECTRICAL PHASE

≠ NOT EQUAL

Ω OHM, OMEGA

BOUNDARY LINE

FLOW LINE

≡ IDENTITY

INITIAL LENGTH

MOMENT LINE

PROPERTY LINE, PLATE

½ ONE HALF FRACTION

¼ ONE QUARTER FRACTION

¾ THREE QUARTERS FRACTION

> GREATER THAN

≥ GREATER THAN OR EQUAL TO

< LESS THAN

≤ LESS THAN OR EQUAL TO

ABCDEFGHIJKMNOPQRSTUVWXYZ 1234567890

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATION

AB ANCHOR BOLT, AUGER BORING

ABA ARCHITECTURAL BARRIERS ACT

ABC AGGREGATE BASE COURSE

ABS AIR BREAK SWITCH

AC ASBESTOS CEMENT OR ASPHALTIC

CONCRETE

ACB AIR CIRCUIT BREAKER

ACI AMERICAN CONCRETE INSTITUTE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACSR ALUMINUM CONDUCTOR STEEL

REINFORCED

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

ADO AUTOMATIC DOOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .