This is a Statement of Work and Scope of Services for a Request for Quote (RFQ) issued by the U.S. Coast Guard First District Base Boston for the replacement of motor fan drive shaft bearings at Building 14. The contractor must remove and replace five existing bearings on a Westinghouse Lite-Line T MAC AC Motor (Model T8EP, 150 HP, 1775 RPM, 460 Volts, 3 Phase) and is responsible for all labor, materials, tools, equipment, lifting, hoisting, and protective measures. New bearings must meet current equipment technical specifications, and a material specification sheet for all five bearings must be submitted with the quote. The project is subject to Prevailing Wages, Service Contract Act, and the Buy American Act, with NAICS code 811310 and a size standard of $12.5M.
Work must be completed within 45 days of contract award, performed between 0600-1600 hours on weekdays only, with no weekend or holiday work permitted without prior Contracting Officer's Representative (COR) approval. A site visit is highly recommended and can be scheduled between August 10-13, 2026, between 0900-1130 hours by contacting COR Hubert Kobu at 781-654-6174 or hubert.L.kobu1@uscg.mil. The contractor shall provide a firm fixed price quote with detailed price breakdown and lead time for parts, register in the System Award Management (SAM) database prior to award, submit a completed SF-18 form, and maintain a one-year workmanship warranty and three-year parts/materials warranty. Invoicing must be submitted through the Invoice Processing Platform (IPP) with requisition number, UEI number, company information, and corresponding contract line item numbers clearly indicated. All contractor personnel must present valid government-issued identification, provide a base access list 48 hours before work begins, and minimize vehicle entry to two vehicles per day.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12_31120PR260000166RFQ CLAUSES.docx | DOCX document | |
| 7_31120PR260000166WRREV.pdf | ||
| 12_31120PR260000166SF18A.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
SCOPE OF SERVICES FOR
Blast Bay Fan Bearings Replacement
REQUEST FOR QUOTE (RFQ) 70Z02426Q0000166A
UNITED STATES COAST GUARD
FIRST DISTRICT
BASE BOSTON
COMMANDING OFFICER
UNITED STATES COAST GUARD
427 Commercial St. Boston MA. 02109
Contents
| 1. Introduction/Background | 2 |
| 2. Scope of Work | 2 |
| 3. Period of Performance | 2 |
| 4. Site Visit | 2 |
| 5. Safety | 3 |
| 6. Award | 3 |
| 7. Invoicing | 3 |
| 8. Acceptance | 3 |
| 9. Warranty | 3 |
| 10. Base Access | 4 |
| 11. General | 4 |
| 12. Submittals | 5 |
| 13. Referenced Attachments | 6 |
1. Introduction/Background Building 14 blast bay has a large motor on the roof of building 14 that is required to run when painting or blasting work is occurring. The motor bearings have failed causing sever noise and vibrations; as well as stopping IPF operations relative to sand blasting and painting inside the bay. The motor information is as follows: (1) - Westinghouse Lite-Line T MAC AC Motor, Model T8EP, 150 Horsepower, 1775 RPM’s, Frame 445T, 460 Volts, 169 Amps, 3 Phase and Motor Style is 7738631G88. This project is subject to Prevailing Wages, Service Contract Act, and the Buy American Act.
2. Scope of Work
| A. | The contractor shall remove and replace the existing fan drive shaft bearings(5each). The new bearings shall, at a minimum, meet the current equipment technical specifications. |
| B. | The contractor shall be responsible for all facets of removal of the old parts, provision and installation of new parts. The Contractor is responsible for all measurements and parts identifications and must field verify for replacement materials. |
| C. | The contractor shall provide all labor, materials, tools, equipment, lifting, hoisting, platforms and everything necessary to replace the bearings. |
| D. | The contractor shall protect the existing roofing system to prevent any roof damage while the work is being performed. |
E. The contractor shall submit a specification sheet for the five bearings with their quote submission.
3. Period of Performance A. The overall period of performance is 45 days after the award date. Work may be performed between 0600-1600. Prior to work commencing, the contractor shall provide a scheduled start time at least 5 days prior to start. No work shall be allowed on weekends or holidays without prior approval of the Contracting Officer’s Representative (COR).
4. Site Visit A. A site visit is highly recommended prior to bidding; a set date and time will be coordinated by the COR. The contractor shall contact the COR, Hubert Kobu at 781-654- 6174, or hubert.L.kobu1@uscg.mil to have his representants added to the site visit list. Site visits can be any day between 8/10/2026 and 8/13/2026 and any time between 0900 and 1130.
5. Safety A. Unforeseen Hazardous Material
1. If material(s) that may be hazardous to human health upon disturbance are encountered during construction operations, stop that portion of work and notify the COR immediately. If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to FAR 52.236-2 Differing Site Conditions. The US Coast Guard does not have test reports for known hazardous materials in the work areas.
6. Award A. It is the government’s intent to make award to the low-cost responsive offeror through issuance of a firm fixed price contract.
1. Under FAR 4.1103 prospective contractor shall be registered in System Award Management (SAM) prior to award. Failure for contractor to be registered in (SAM) shall result in Contracting Officer proceeding with next successful registered contractor. Website: www.sam.gov
7. Invoicing A. Invoices shall be uploaded to the Invoice Processing Platform (IPP) an account can be created at https://www.ipp.gov. To ensure proper payment, all invoices shall have requisition number/purchase order number, company name and address, UEI number, invoice number and date clearly indicated on your invoice. It is recommended that the contractor attach a copy of the Purchase Order (PO)/Contract to their invoice(s).
1. The contractor shall itemize invoices with the appropriate corresponding CLIN as listed on the PO.
8. Acceptance A. The Government will take acceptance once all the work has been completed. Site has been cleaned of all construction debris and removed from the base.
9. Warranty A. Vendor shall provide a minimum, one year workmanship warranty and three-year parts/materials warranty.
10. Base Access A. The contractors shall provide an access list of personnel authorized access to the base and work area 48 hours before starting work. All persons musty have/present a valid government issued ID to enter the base, there will be no exceptions. Deliveries of materials and equipment can be via the USCG loading dock when not in use by the USCG. Minimize vehicles brought onto the base to only 2 vehicles per day. A site-specific access list will be provided to the contractor upon request.
11. General A. Inspection: The Government will have a COR on the site. The COR for this contract is Hubert Kobu at hubert.L.kobu1@uscg.mil. The contractor shall inform the COR of day-to-day activities and plans. At the start of each workday, the contractor shall check in with the COR.
B. Coordination with the Coast Guard and other Contractors
1. Other projects may be in progress during this contract execution. In the event of conflicts, arrangements will be made to coordinate all activities between other contractors and/or Coast Guard personnel. The COR will make every attempt to provide notice of changes at least 24 hours prior to established dates to allow for revisions to the schedule.
2. Areas of the facility not under construction shall remain in operation during construction. Keep all construction activities and personnel clear of facility operations. Coast Guard operations shall take priority if conflicts are present.
C. Operation of Government Facilities: The facility may have Government personnel working in certain areas during the execution of the contract. The Coast Guard will keep interference with the contractor’s operation to a minimum. However, the contractor shall take precautions to see that no debris, materials, equipment, or personnel shall endanger the safety of Coast Guard or other personnel working in the area.
D. Temporary Utilities and Controls
1. The contractor shall provide and remove, at no cost to the Government, all additional equipment and other apparatus necessary to serve the work site. The government makes no guarantee as to quality, quantity or continuity of utility services and will not be liable for any effects these services have on contractor’s equipment or the progress schedule.
E. Sanitary Facilities
1. The contractor may utilize sanitary facilities as indicated by the COR. If additional sanitary facilities are needed, the contractor shall provide and remove temporary facilities at no cost to the Government, with location coordinated with the COR. The government makes no guarantee as to quality, quantity or continuity of such services and will not be liable for any effects these services have on contractor’s equipment or the progress schedule.
F. Removals
1. All rubbish and trash created as a result of fulfilling these specifications shall be removed from the site daily at contractor’s expense or as otherwise dictated within this scope. The contractor is responsible for the transfer of material to and from the worksite and/or dumpster area as well as any debris caused in-between.
G. Delivery Storage and Handling
1. The contractor shall deliver all materials to the job site in the manufacturer’s sealed and undamaged containers or wrappings and place in designated storage/lay down areas. Damaged materials shall not be used.
H. Cleanup
1. The contractor shall remove all scraps and debris generated by this operation by the end of each working day. After each job completion/installation/etc. the area shall be cleaned. All debris shall be removed and disposed of in accordance with applicable City, State and Federal Laws.
2. At the completion of the project all spaces must be cleaned and disinfected.
I. Smoking
1. All contractor and subsequent employees shall not smoke cigarettes, cigars, vapes, and/or pipes in any Government Building or within 50ft thereof. Smoking outside the building will be permitted past the 50ft mark and/or in designated areas only. The contractor shall be responsible for maintaining a clean environment in the designated smoking areas if used.
J. Protection of Existing Structures, Utilities, Work
1. The contractor shall supply and maintain protective measures against damage to existing structures, utilities, or interruption of any service. Failure to do so may result in cessation of all work. All damages or interruption of utilities services resulting from failure to take necessary precautions shall be repaired or restored at no additional cost to the Government.
12. Submittals The contractor shall submit the following deliverables in accordance with the table below.
| Deliverable |
| Frequency |
| No. of Copies and to Whom |
Date Required
Material specification sheets Once One; KO By submission dateline
13. Referenced Attachments System Pictures.
Fan Enclosure Structure Fan Motor Box
Fan Enclosure (Interior)
Bearings
Shaft coupling; between the two fans
Fan shaft through wall
Motor shaft to Fan shaft
Fan