3-26-10-15 Addendum No. 1.pdf

PDF 126 KB Posted

Attached to
2026 Sanitary Sewer and Storm Sewer Rehabilitation Project
Solicitation number
US.254373
Issued by
Lehigh County, Pennsylvania

About this file

This is an Addendum No. 1 to contract documents issued by Hanover Township, Lehigh County, Pennsylvania for the 2026 Sanitary Sewer and Storm Sewer Rehabilitation Project. The project comprises three contracts: Contract "A" for sanitary sewer main CIPP lining along Marcon Boulevard, Airport Road, and Willowbrook Road Easement; Contract "B" for sanitary sewer manhole epoxy lining in the same locations; and Contract "C" for storm sewer pipe CIPP lining on Lloyd Street. The scope of work includes rehabilitation of approximately 3,210 linear feet of 8-inch sanitary sewer main via cured-in-place pipe lining, approximately 1,040 linear feet of 10-inch to 18-inch storm sewer, and 125 vertical feet of full-depth sanitary sewer manhole lining. Sealed bids were to be received online via PennBid until 2:00 p.m. on Wednesday, October 21, 2026, with public opening and reading at 7:00 p.m. the same day at the Hanover Township Municipal Building, 2202 Grove Road, Allentown, Pennsylvania 18109. The contract term reflects amendments to completion timelines, with work to be substantially complete within forty (40) calendar days after contract commencement and ready for final payment within eighty-five (85) calendar days after contract commencement, with substantial completion defined as all materials successfully installed and only punchlist items remaining.

Bid security in the amount of ten percent (10%) of the total bid price is required in the form of a certified check, bank check, or bid bond from a surety meeting contract requirements. The successful bidder must furnish performance, payment bonds, and insurance per the contract terms. The project is subject to Pennsylvania Prevailing Wage Act minimum wage requirements and compliance with the Commonwealth of Pennsylvania Public Works Employee Verification Act. Specification documents and bid forms were available at no cost through PennBid, with project questions to be submitted through PennBid's "Ask A Question" feature.

View the file

Other files

File Type Posted
1-26-10-21 Specifications.pdf PDF
2-26-10-21 Construction Plans.pdf PDF
4-26-10-21 Bid Results - PennBid.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 1 – Page 1

HT-26-024

HT-26-025

HANOVER TOWNSHIP

LEHIGH COUNTY, PENNSYLVANIA

CONTRACT DOCUMENTS FOR

2026 SANITARY SEWER AND STORM SEWER REHABILITION PROJECT

• CONTRACT "A" - SANITARY SEWER MAIN CIPP LINING - MARCON

BLVD., AIRPORT ROAD AND WILLOWBROOK ROAD EASEMENT

• CONTRACT "B" - SANITARY SEWER MANHOLE EPOXY LINING -

MARCON BLVD., AIRPORT ROAD AND WILLOWBROOK ROAD

EASEMENT

• CONTRACT "C" - STORM SEWER PIPE CIPP LINING - LLOYD STREET

ADDENDUM NO. 1

October 15, 2026

In accordance with Section 70, Article 4 “Agreement” of the Contract Documents, the above referenced project shall be amended as indicated hereinafter. The inclusion of this Addendum into the Contract Documents shall be noted on the Bid Form and in the Agreement. All other provisions of the Contract Documents shall remain in full force and effect.

A. CONTRACT SPECIFICATIONS:

REVISION NO. 1 – Section 70 – Agreement, Article 4.01 – Time is of the Essence

Add after first sentence: “Work shall be considered for Substantial Completion only when all materials have been successfully installed and only punchlist items including but not limited post lining CCTV remain to be completed and/or corrected in respect to each Contract.

REVISION NO. 2 – Section 70 – Agreement, Article 4.02 – Contract Times: Days

Delete: “The work will be completed within forty (40) calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the

General Conditions, and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 40 calendar days after the date when the Contract

Times commence to run.”

Addendum No. 1 – Page 2

Replace With: “The work shall be considered Substantially Complete in accordance with Paragraph 15.03 of the General Conditions within forty (40) calendar days after the Contract Times commence to run as provided in

Paragraph 4.01 of the General Conditions, and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within eight-five

(85) calendar days after the date when the Contract Times commence to run.”

END OF ADDENDUM NO. 1

P:\HT\2026\HT-26-024\HT-26-024 Spec\Addendum No. 1\26-10-15 Addendum No. 1.doc

CONTRACT DOCUMENTS FOR
2026 SANITARY SEWER AND STORM SEWER REHABILITION PROJECT
ADDENDUM NO. 1
A. CONTRACT SPECIFICATIONS:

File details come from the government source that posted it. Updated .