3-2026-09-01 Shickshinny Borough Crary St.Bid Results .pdf
PDF 231 KB Posted
- Attached to
- CRARY STREET STORMWATER IMPROVEMENTS
- Solicitation number
- Not on record
- Issued by
- Pennsylvania
About this file
This document is a bid results tabulation for the Crary Street Stormwater Improvements project in Shickshinny Borough, Pennsylvania. The project consists of replacement of storm drainage facilities on Crary Street and complete restoration of Crary Street and associated roadways. The base bid includes 16 line items encompassing mobilization/demobilization, traffic maintenance, superpave asphalt mixture installation at various depths and courses, milling of asphalt pavement, subbase installation, rolled bituminous curbing, thermoplastic pipe installation, inlet boxes, utility test pits, and bituminous swale shaping. The additive alternate section includes 6 additional line items for additional thermoplastic pipe, frames and grates, inlet boxes, and asphalt courses. Quantities range from 1 lump sum for mobilization to 780 square yards for wearing course asphalt installation.
Seven contractors submitted bids for this project: American Asphalt Paving, Ankiewicz Enterprises Inc., Don E. Bower Inc., James T. O'Hara Inc., Linde Corporation, Pioneer Construction Co. Inc., and Sikora Brothers Paving Inc. The base bid totals ranged from $105,627.00 (Don E. Bower Inc.) to $274,005.00 (James T. O'Hara Inc.). When the additive alternate items are included, total project costs ranged from $133,535.25 (Don E. Bower Inc.) to $358,745.00 (James T. O'Hara Inc.). Unit pricing varied significantly across bidders, particularly for items such as standard inlet boxes (ranging from $1,680.00 to $10,586.00 each) and thermoplastic pipe installation (ranging from $94.25 to $325.00 per linear foot).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Cost
Items Unit of Measure
Quantity Required
Unit Price
Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
#1-1 MOBILIZATION/ DEMOBILIZATION LS 1 $37,400.00 $37,400.00 $14,500.00 $14,500.00 $4,655.00 $4,655.00 $30,000.00 $30,000.00 $20,500.00 $20,500.00 $55,300.00 $55,300.00 $19,400.00 $19,400.00
#1-2 MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION LS 1 $1,630.00 $1,630.00 $12,470.00 $12,470.00 $630.00 $630.00 $3,000.00 $3,000.00 $1,500.00 $1,500.00 $1,780.00 $1,780.00 $2,600.00 $2,600.00
#1-3
SUPERPAVE ASPHALT MIXTURE DESIGN, FLEXIBLE BASE REPLACEMENT,
PG 64S-22, < 0.3 MILLION ESALS, 25.0 MM MIX, 4" DEPTH SY 105 $72.00 $7,560.00 $75.00 $7,875.00 $65.60 $6,888.00 $90.00 $9,450.00 $65.25 $6,851.25 $57.59 $6,046.95 $62.00 $6,510.00
#1-4
SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE, PG 64S-22, <
0.3 MILLION ESALS, 19.0 MM MIX, 3" DEPTH SY 120 $62.00 $7,440.00 $70.00 $8,400.00 $43.00 $5,160.00 $82.00 $9,840.00 $54.00 $6,480.00 $38.16 $4,579.20 $50.00 $6,000.00
#1-5
SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE, PG 64S-22, <
0.3 MILLION ESALS, 19.0 MM MIX, 2.5" DEPTH SY 90 $52.00 $4,680.00 $68.00 $6,120.00 $36.20 $3,258.00 $95.00 $8,550.00 $64.25 $5,782.50 $41.21 $3,708.90 $48.00 $4,320.00
#1-6
SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, < 0.3
MILLION ESALS, 25.0 MM MIX, 3" DEPTH SY 150 $51.00 $7,650.00 $70.00 $10,500.00 $35.10 $5,265.00 $42.00 $6,300.00 $44.00 $6,600.00 $39.39 $5,908.50 $47.00 $7,050.00
#1-7
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE (LEVELING),
PG 64S-22, < 0.3 MILLION ESALS, 9.5 MM MIX, SRL-L, INCLUDING
ASPHALT TACK COAT TON 35 $182.00 $6,370.00 $126.00 $4,410.00 $184.30 $6,450.50 $250.00 $8,750.00 $234.00 $8,190.00 $353.54 $12,373.90 $240.00 $8,400.00
#1-8
SUPERPAVE ASPHALT MIXTURE DESIGN, WEARING COURSE, PG 64S-22,
< 0.3 MILLION ESALS, 9.5 MM MIX, 1 1/2" DEPTH, SRL-L, INCLUDING
ASPHALT TACK COAT SY 780 $18.80 $14,664.00 $18.00 $14,040.00 $16.85 $13,143.00 $27.00 $21,060.00 $25.00 $19,500.00 $21.88 $17,066.40 $22.00 $17,160.00
#1-9
MILLING OF ASPHALT PAVEMENT SURFACE, 1 1/2" DEPTH, MILLED
MATERIAL RETAINED BY CONTRACTOR SY 690 $11.90 $8,211.00 $12.00 $8,280.00 $6.40 $4,416.00 $13.00 $8,970.00 $15.00 $10,350.00 $19.92 $13,744.80 $15.00 $10,350.00
#1-10 SUBBASE (PENNDOT NO. 2A), 6" DEPTH SY 315 $47.00 $14,805.00 $16.00 $5,040.00 $21.80 $6,867.00 $54.00 $17,010.00 $6.25 $1,968.75 $20.32 $6,400.80 $17.00 $5,355.00
#1-11 ROLLED BITUMINOUS CURB, COMPLETE IN PLACE LF 190 $37.00 $7,030.00 $60.00 $11,400.00 $31.20 $5,928.00 $10.00 $1,900.00 $6.25 $1,187.50 $8.57 $1,628.30 $35.00 $6,650.00
#1-12
12" THERMOPLASTIC PIPE, GROUP II, 12'-1.5' FILL, INCLUDING
EXCAVATION, BEDDING, AND 2A BACKFILL LF 228 $157.00 $35,796.00 $156.00 $35,568.00 $94.25 $21,489.00 $325.00 $74,100.00 $135.00 $30,780.00 $115.00 $26,220.00 $100.00 $22,800.00
#1-13 TYPE M FRAME AND GRATE EA 6 $1,180.00 $7,080.00 $2,856.00 $17,136.00 $1,340.00 $8,040.00 $1,500.00 $9,000.00 $820.00 $4,920.00 $1,255.00 $7,530.00 $2,400.00 $14,400.00
#1-14
STANDARD INLET BOX HEIGHT < /= 10' COMPLETE IN PLACE INCLUDING
EXCAVATION AND BACKFILL EA 6 $3,950.00 $23,700.00 $10,586.00 $63,516.00 $1,680.00 $10,080.00 $10,000.00 $60,000.00 $3,300.00 $19,800.00 $3,935.00 $23,610.00 $3,700.00 $22,200.00
#1-15 UTILITY TEST PIT EA 2 $1,940.00 $3,880.00 $1,500.00 $3,000.00 $550.00 $1,100.00 $2,500.00 $5,000.00 $1,200.00 $2,400.00 $2,090.00 $4,180.00 $500.00 $1,000.00
#1-16
SHAPE BITUMINOUS SWALE INCLUDING EXCAVATION AND GRADING,
GRAVEL SUBBASE AND PAVEMENT SEPARATE LF 215 $25.00 $5,375.00 $58.00 $12,470.00 $10.50 $2,257.50 $5.00 $1,075.00 $35.00 $7,525.00 $25.76 $5,538.40 $30.00 $6,450.00
Total Base Bid Items 1-1 to 1-16 $193,271.00 $234,725.00 $105,627.00 $274,005.00 $154,335.00 $195,616.15 $160,645.00
2 Add Alt 1
Pioneer Construction Co., Inc. Sikora Brothers Paving, Inc.
$233,390.00 $307,242.00 $133,535.25 $358,745.00 $189,820.50 $236,498.15 $197,975.00
American Asphalt Paving Ankiewicz Enterprises Inc Don E. Bower, INC James T. O'Hara, Inc. Linde Corporation
Base Bid Pricing (16)
Shickshinny Borough Crary St. Stormwater Improvements Bid Results 9-1-26
#2-1
12" THERMOPLASTIC PIPE, GROUP II, 12'-1.5' FILL, INCLUDING
EXCAVATION, BEDDING, AND 2A BACKFILL LF 111 $139.00 $15,429.00 $156.00 $17,316.00 $94.25 $10,461.75 $325.00 $36,075.00 $138.00 $15,318.00 $155.00 $17,205.00 $100.00 $11,100.00
#2-2 TYPE M FRAME AND GRATE EA 3 $1,180.00 $3,540.00 $2,856.00 $8,568.00 $1,340.00 $4,020.00 $1,500.00 $4,500.00 $840.00 $2,520.00 $1,255.00 $3,765.00 $2,400.00 $7,200.00
#2-3
STANDARD INLET BOX HEIGHT < /= 10' COMPLETE IN PLACE INCLUDING
EXCAVATION AND BACKFILL EA 3 $3,070.00 $9,210.00 $10,586.00 $31,758.00 $1,680.00 $5,040.00 $10,000.00 $30,000.00 $3,370.00 $10,110.00 $3,935.00 $11,805.00 $3,700.00 $11,100.00
#2-4
SUPERPAVE ASPHALT MIXTURE DESIGN, BASE COURSE, PG 64S-22, < 0.3
MILLION ESALS, 25.0 MM MIX, 3" DEPTH SY 65 $51.00 $3,315.00 $95.00 $6,175.00 $35.10 $2,281.50 $46.00 $2,990.00 $45.00 $2,925.00 $35.15 $2,284.75 $47.00 $3,055.00
#2-5
SUPERPAVE ASPHALT MIXTURE DESIGN, BINDER COURSE, PG 64S-22, <
0.3 MILLION ESALS, 19.0 MM MIX, 3" DEPTH SY 75 $62.00 $4,650.00 $98.00 $7,350.00 $51.60 $3,870.00 $82.00 $6,150.00 $55.00 $4,125.00 $57.15 $4,286.25 $48.00 $3,600.00
#2-6 SUBBASE (PENNDOT NO. 2A), 6" DEPTH SY 75 $53.00 $3,975.00 $18.00 $1,350.00 $29.80 $2,235.00 $67.00 $5,025.00 $6.50 $487.50 $20.48 $1,536.00 $17.00 $1,275.00 Total Add Alternate Items 2-1 to 2-6 $40,119.00 $72,517.00 $27,908.25 $84,740.00 $35,485.50 $40,882.00 $37,330.00
Total Base Bid Items 1-1 to 1-16 and Add Alternate Items 2-1 to 2-6 American Asphalt
$233,390.00
Ankiewicz Enterprises Inc
$307,242.00
Don E. Bower, Inc.
$133,535.25
James T.
O'Hara, Inc.
$358,745.00
Linde Corp.
$189,820.50
Pioneer Construction
$236,498.15
Sikora Brothers Paving
$197,975.00