3-04 LAX RSI Program Special Conditions - Attachment 04.pdf
PDF 155 KB Posted
- Solicitation number
- 0521-2026-09-RFB-231762
- Issued by
- Los Angeles County, California
About this file
This is a Special Conditions attachment document for the Los Angeles World Airports (LAWA) Residential Sound Insulation (RSI) Program at Los Angeles International Airport (LAX) in California. The document outlines contractual modifications and coordination requirements for contractors bidding on Group 12 construction services. The program involves retrofitting eligible residential dwellings with acoustic upgrades, including replacement of windows and doors with acoustically-rated assemblies, attic insulation, carpentry work, interior and exterior finishing, roof equipment platforms, ventilation unit installation, and electrical service upgrades. Bidders are required to demonstrate experience and capability to execute these residential sound insulation modifications across multiple properties.
The Special Conditions impose two primary requirements on successful contractors. First, a cross-default clause establishes that any default by the contractor under any other LAWA contract will be automatically construed as a default under this contract, with LAWA retaining all available remedies. Second, the contractor must provide coordination services with Southern California Edison (SCE) for electrical utility upgrades, which necessitates having a qualified Dry Utilities Consultant on staff. This consultant must submit a resume for LAWA approval, coordinate with SCE to expedite service upgrades, prepare and submit comprehensive technical documentation including CPIS, plot plans, load calculations, and traffic control plans to applicable city departments, and remain involved throughout construction completion and inspections by the City of El Segundo's Building and Safety Department and Public Works Utility group.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAX RESIDENTIAL SOUND INSULATION PROGRAM
ATTACHMENT 4:
Special Conditions
LAX RESIDENTIAL SOUND INSULATION PROGRAM
SPECIAL CONDITIONS
GENERAL
The following Special Condition is added to number 39 of the General Conditions of the Contract:
Cross Default. If Contractor has defaulted under any other contract it has with LAWA, then that default shall be construed as a default under this Contract. The remedy of LAWA shall be the exercise of any of its rights and remedies provided for herein, or otherwise available at law or equity. No failure of LAWA to exercise its right, remedy or power hereunder shall operate as a waiver thereof, nor shall any single or partial exercise by LAWA of any right, remedy or power hereunder preclude any other or future exercise of any right, remedy, or power.
The following Special Condition is added to number 16 of the General Conditions of the Contract:
Coordination. SoCal Edison Coordination – The program requires the bidding contractors to have a Dry Utilities Consultant available to coordinate the SoCal Edison activities to maintain construction schedule.
There may be units within this bid group that require coordination with SoCal Edison (SCE) for electrical upgrades. The bidding contractor will be required to provide the following:
• Have an electrical service Dry Utilities Coordinator available to the Contractor
• Contractor to forward Dry Utilities Consultant resume to LAWA for review and approval
• Dry Utilities Consultant to work with Edison to accomplish service upgrades (either overhead or underground) in an expedient manner to meet the program schedule
• Dry Utilities consultant to oversee submission of full submittal package to include CPIS, Plot Plan with coordinated meter spot, Service Number, Cut Sheets for Proposed Equipment & their detail on the Plot Plan, Load Calcs
• Dry Utilities consultant to oversee TD Map Preparation and Submission (with Traffic Control Plan as necessary) to City Departments
• Dry Utilities Consultant to remain involved through completion of the construction (including inspections by City of El Segundo’s Building and Safety Department, Public Works & Utility group – before and after construction)