3-04 Bid Schedule-FM 2483 1.0 MG Elevated Storage Tank Rehabilitation.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
FM 2483 1. 0 MG Elevated Storage Tank Rehabilitation
Solicitation number
Bid #54-04-25
Issued by
Bell County, Texas

About this file

This document is a Bid Schedule Excel spreadsheet for the FM 2483 1.0 MG Elevated Storage Tank Rehabilitation project in Texas, involving a comprehensive rehabilitation of an existing elevated water storage tank. The project encompasses full interior and exterior painting/coating, surface preparation, tank improvements, and electrical upgrades, with specific line items including project documentation, containment, dehumidification, ladder and hatch improvements, safety installations, and detailed repair work such as grinding, seam welding, rafter replacement, and pit repairs. The bid includes a base bid and an alternate bid (Bid Alternate A), which involves additional gate valve installations, flange coupling adapters, and ductile iron pipe work.

The bid schedule indicates all line items are currently priced at $0, suggesting this is a preliminary or template document. The bidding process requires the three lowest bidders to complete and submit a Statement of Experience within 48 hours of notification of low bidder status, with potential bid rejection for non-compliance. No specific budget, funding sources, or contract term are explicitly stated in the document. The project appears to be a municipal infrastructure improvement initiative focused on maintaining and upgrading critical water storage infrastructure, with a comprehensive approach to tank rehabilitation that addresses both structural and functional improvements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

1.0 MG FM 2483 ELEVATED STORAGE TANK REHABILITATION
BASE BID
ITEM
NO.BID
QTYUOMITEM DESCRIPTIONUNIT
PRICEEXTENDED

AMOUNT

11LSProject Record Documents, per specification Section 01720 and in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
21LSProject Sign, per specification Section 01500 and in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
31LSPre-Construction Video, per specification Section 01500 and in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
41LSProject Photos, per specification Section 01340 and in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
51LSInterior (Wet) Painting/Coating/Surface Prep - This item includes all equipment, materials, and services (including mobilization, inspections, maintenance, and warranty), required to prepare the surface and paint the interior of the existing 1.0 MG Elevated Storage Tank in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
61LSExterior Painting (Full Rehabilitation) /Coating/Surface Prep - This item includes all equipment, materials, and services (including mobilization, inspections, maintenance, and warranty), required to prepare the surface and paint the exterior of the existing 1.0 MG Elevated Storage Tank in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
71LSTank Logo - This item includes all equipment, materials, and services required to paint the Logos in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
81LSContainment/Shrouding per specifications and in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
91LSDehumidification, per specifications and in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
101LSTank Improvements - This item includes all equipment, materials, and services required for the 1.0 MG Elevated Storage Tank improvements including, interior ladder improvements, tank entry hatch, roof and floor painters hatch, and access tube hatch improvements, installation of a new safety climb, installation of a new flap valve, grab bar installation, guardrail and handrail installation, roof vent improvements, Cla-val Repair Kit, sealing of tank floor drain, relocation of conduit and lights, roll up door improvements, and all other tank improvements in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
111LSElectrical Improvements – This item includes all equipment, materials, and services required to relocate existing electrical conduit, relocate lights near pedestal platform, inspect FAA obstruction light in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
12200HRExterior and Interior Grinding – This item includes all labor, tools, materials, equipment and incidentals necessary for exterior and interior grinding. Measurement and payment shall be per man hour.$ 0$ 0
13100LFSeam Welding – This item includes all labor, tools, materials, equipment and incidentals necessary for seam welding. Measurement and payment shall be per linear foot.$ 0$ 0
1430LFRafter Replacement – This item includes labor, tools, material, equipment and incidentals necessary for replacing rafters. Measurement and payment shall be per linear foot.$ 0$ 0
1530SQ FTRoof Plate Replacement – This item includes labor, tools, material, equipment and incidentals necessary for replacement of roof plate. Measurement and payment shall be per square feet of roof plate replacement.$ 0$ 0
16100SQ INPit Welding – This item includes all labor, tools, materials, equipment and incidentals necessary for pit welding repair. Measurement and payment shall be per square inch.$ 0$ 0
1720GALPit Filling – This item includes all labor, tools, materials, equipment and incidentals necessary for pit filling. Measurement and payment shall be per gallon.$ 0$ 0
TOTAL 1.0 MG FM 2483 ELEVATED STORAGE TANK REHABILITATION BASE BID AMOUNT (ITEMS 1 THRU 17)$ 0
1.0 MG FM 2483 ELEVATED STORAGE TANK REHABILITATION
BID ALTERNATE A
ITEM
NO.BID
QTYUOMITEM DESCRIPTIONUNIT
PRICEEXTENDED

AMOUNT

243EAGate Valves - This item includes all equipment, materials, and services required to furnish and install three (3) 12" gate valves in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
252EAFlange Coupling Adapters - This item includes all equipment, materials, and services required to furnish and install two (2) 12" flange coupling adapters in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
265LFDuctile Iron Pipe - This item includes all equipment, materials, and services required to furnish and install 12" ductile iron pipe in accordance with the Contract Documents for the project for the sum of:$ 0$ 0
TOTAL BID ALTERNATE A AMOUNT (ITEMS 24 THRU 26)$ - 0

TOTAL BASE BID = $ 0

TOTAL BASE BID + ALTERNATE A = $ 0

Bidder acknowledges that to be considered a responsive Bidder, the three lowest Bidders must complete and submit 01004 Statement of Experience within 48 hours of notification of low bidder status to demonstrate the Bidders’ responsibility and ability to meet the minimum requirements to complete the Work. Failure to submit the required information in 01004 Statement of Experience may result in the Owner considering the Bid non-responsive and result in rejection of the Bid by the Owner.

File details come from the government source that posted it. Updated .