2SD0132 - Post Award Schedule .pdf

PDF 14 KB Posted

Attached to
GSA Seeking 3, 456 SF of office space in Rapid City, SD
Solicitation number
2SD0132
Issued by

About this file

This document includes a Request for Lease Proposals (RLP) from the General Services Administration to lease approximately 4,777-5,279 ABOA square feet of office space in Rapid City, South Dakota. Key details include:

  • The space must be located within the delineated area and on the first floor, with separate entrances for employees and visiting veterans. A security system is required.

  • The lease term is for 10 years firm with an 8 year amortization for tenant improvements and building specific amortized capital. The tenant improvement allowance is $55.42 per ABOA SF and no allowance for building specific amortized capital.

  • 10 surface parking spaces are required. The space cannot be in a strip mall and must accommodate a Veteran's Benefit Service Center with secure and well-lit entrances.

  • Offers may be submitted through the Automated Advanced Acquisition Program monthly portal. Award will be made to the lowest priced technically acceptable offer without negotiations based on the requirements. The space must meet all federal requirements for accessibility, seismic, energy efficiency and sustainability.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AAAP POST-AWARD SCHEDULE, PAGE 1 OF 1 PSA VERSION - REV (10/22)

AAAP Project Specific Advertisement (PSA) Attachment: Post-Award Schedule

This attachment details the post-award schedule for this project. It hereby replaces the Attachment referenced in section

1.05 of the RLP (R100) and should be used when reviewing section 4.01 of the Lease (L100).

The below post-award schedule commences within 5 working days of lease award. The time frames below apply to the management of the design and construction process, concluding at the date of acceptance for the space.

Activity Working Days

Lessor-Provided Design Intent Drawings 83

Government (GSA and Client) Review and Approval of Lessor Provided Design Intent Drawings

Lessor Preparation and Submission of Construction Documents 13

Government Review of Construction Drawings 60

Lessor Preparation and Submission of the TI and BSAC Price Proposal

Government Reviews and Approves Pricing 15

Government Issues Notice to Proceed with Construction 5

Lessor Completes Construction of TIs and Completion of Other Required Construction Work

Government Inspects and Accepts Finished Space 14

AAAP POST-AWARD SCHEDULE, PAGE 2 OF 2 PSA VERSION - REV (10/22)

Total Work Days from Lease Award to Government Acceptance 322

File details come from the government source that posted it. Updated .