2MO0422 Lease Summary (2).docx
DOCX document 31 KB Posted
- Attached to
- RLP for Springfield, MO
- Solicitation number
- 2MO0422
About this file
This document is a Request for Lease Proposal (RLP) from the General Services Administration (GSA) Public Buildings Service seeking offers of office space in Springfield, Missouri. The RLP specifies a required minimum and maximum square footage of between 1,130 to 1,180 square feet of space. The lease term is for a firm term of 10 years with an option for an additional 5 years. Offers are due by March 25, 2024 and occupancy is estimated to begin October 19, 2025. Interested offerors must submit proposals electronically through the Requirement Specific Acquisition Platform. The RLP provides contact information for the leasing specialist and contracting officer. Offerors must be registered in the System for Award Management to be eligible for award.
The related federal contract opportunity provides further details on the RLP, identifying the solicitation number and confirming it is for office space in Springfield, Missouri being conducted by the GSA Public Buildings Service Region 6.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VBA RLP.pdf | ||
| 2MO0422 Lease Summary (2).docx | DOCX document | |
| 2MO0422 VBA Springfield RLP Draft (5).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE: SAM.GOV PRESOLICITATION NOTICES/ADVERTISEMENTS FOR PROSPECTUS-LEVEL PROJECTS MUST BE PROVIDED TO THE OFFICE OF LEASING (OL) FOR PBS COMMISSIONER’S APPROVAL, PRIOR TO POSTING.
ALSO NOTE THAT PROSPECTUS-LEVEL RLPS MUST BE REVIEWED BY OL PRIOR TO ISSUANCE.
NOTE: THIS SECTION IS USED FOR BOTH THE PRE-SOLICITATION NOTICE/ADVERTISEMENT AND THE RLP PROCUREMENT SUMMARY
RLP Procurement Summary GSA Public Buildings Service
U.S. GOVERNMENT
General Services Administration (GSA) seeks to lease the following space:
| State: |
| MO |
| City: |
| […Springfield…] |
| Delineated Area: |
| NORTH – EAST KEARNEY TO I-44 S/N. GLENSTONE AVE. TO EAST DIVISION ST. |
EAST – 65 HIGHWAY TO EAST CHERRY ST. TO US 65 BR/GLENSTONE AVE.
SOUTH – 160 HIGHWAY/60 HIGHWAY
WEST – 13 HIGHWAY/NORTH KANSAS EXPRESSWAY
| Minimum Sq. Ft. (ABOA): |
| […1,130…] |
| Maximum Sq. Ft. (ABOA): |
| […1,180…] |
| Space Type: |
| [Office] |
| Parking Spaces (Total): |
| […5…] |
| Parking Spaces (Surface): |
| […5…] |
| Parking Spaces (Structured): |
| [……] |
| Parking Spaces (Reserved): |
| […5…] |
| Full Term: |
| […180 Months or 15 yrs…] |
| Firm Term: |
| […120 Months or 10 yrs…] |
| Option Term: |
| [……] |
| Additional Requirements: |
| 10 FT SETBACK |
1ST FLOOR PREFERRED OR IF HIGHER, ELEVATOR ACCESS IS REQUIRED
ABAAS COMPLIANT AND WHEELCHAIR ACCESSIBLE
PARKING WITHIN 50 FEET OF BUILDING ENTRANCE
ACTION: CHOOSE WHETHER OR NOT A FULLY SERVICED LEASE IS REQUIRED. ALSO CHOOSE 1-PERCENT-ANNUAL-CHANCE FLOODPLAIN (FORMERLY REFERRED TO AS “100-YEAR” FLOODPLAIN) UNLESS REQUIREMENT IS IDENTIFIED BY AGENCY AS A CRITICAL ACTION.
Offered space must meet Government requirements for fire safety, accessibility, seismic, and sustainability standards per the terms of the Lease. A fully serviced lease is required. Offered space shall not be in the 1-percent-annual chance floodplain (formerly referred to as 100-year floodplain).
Entities are advised to familiarize themselves with the telecommunications prohibitions outlined under Section 889 of the FY19 National Defense Authorization Act (NDAA), as implemented by the Federal Acquisition Regulation (FAR). ). For more information, visit: https://acquisition.gov/FAR-Case-2019-009/889_Part_B.
ACTION REQUIRED:
USE THIS SECTION FOR PRE-SOLICITATION NOTICE/ADVERTISEMENTS SEEKING EXPRESSION OF INTEREST. DO NOT USE FOR RLP PROCUREMENT SUMMARY.
ACTION REQUIRED: FOR PRE-SOLICITATION NOTICES/ADVERTISEMENTS SEEKING EXPRESSIONS OF INTEREST, INSERT THE FOLLOWING LANGUAGE ONLY FOR POTENTIAL SOLE SOURCE SUCCEEDING LEASE ACTIONS. DELETE FOR PROCUREMENT SUMMARY PAGE.
DO NOT USE FOR FULL AND OPEN PROCUREMENTS.
NOTE THAT ANY FIGURES USED FOR A COST BENEFIT ANALYSIS (CBA) MUST BE SUPPORTABLE.
CONSIDERATION OF “NON-PRODUCTIVE AGENCY DOWNTIME” IN A CBA SHOULD BE RARE.HIDDEN AND DELETED BY MACRO******************************************************************************************************
ACTION REQUIRED:
USE THIS SECTION FOR RLP PROCUREMENT SUMMARY NOTICES ONLY. DO NOT USE FOR PRE-SOLICITATION NOTICES/ADVERTISEMENTS SEEKING EXPRESSION OF INTEREST.
| Offers Due: |
| […3/25/2024…] |
| Occupancy (Estimated): |
| […10/19/2025…] |
Send Offers to:
ACTION REQUIRED: CHOOSE BETWEEN 2 TYPES OF OFFER SUBMISSIONS. USE VERSION 1 FOR PAPER BASED OFFER SUBMISSION (EMAIL, FAX, OR MAIL. USE VERSION 2 FOR LOP/RSAP SUBMISSION.
VERSION 1: USE THIS FOR “PAPER” SUBMISSIONS (EMAIL, FAX OR MAIL). DELETE 2ND VERSION.
Hidden and Deleted by Macro
VERSION 2: USE THIS FOR LOP/RSAP OFFER SUBMISSION. DELETE 1ST VERSION.
Electronic Offer Submission:
Offers must be submitted electronically through the Requirement Specific Acquisition Platform (RSAP), located at https://lop.gsa.gov/rsap/.
Interested parties must go to the RSAP website, select the “Registration” link and follow the instructions to register. Instructional guides and video tutorials are offered on the RSAP homepage and in the “HELP” tab on the RSAP website.
Solicitation Number:
| Solicitation (RLP) Number |
| 2MO0422 |
Government Contact Information (Not for Offer Submission)
| Role |
| Leasing Specialist – Lindsay Mead |
| lindsay.mead@gsa.gov |
Leasing Contracting Officer Kristin Schlueter kristin.schlueter@gsa.gov
Note: Entities not currently registered in the System for Award Management (SAM.gov) are advised to start the registration process as soon as possible.
ACTION REQUIRED: OPTIONAL LANGUAGE; MAY BE DELETED.
ACTION REQUIRED: IF INCLUDED, COMPLETE COLUMN D IN ITS ENTIRETY.
NOTE: THE CHECKLIST IS NOT INTENDED TO BE A SUBMITTAL REQUIREMENT; IT IS SIMPLY AN OPTIONAL GUIDE FOR OFFERORS.
An offeror checklist has been included with the RLP to underscore the documents that may be required by this RLP. Detailed requirements are contained in the RLP. In the event of an inconsistency between this checklist and the RLP, the RLP is the authoritative source.
10/2023 image1.png
File details come from the government source that posted it. Updated .