Performance Work Statement (PWS)

1. Introduction This Performance Work Statement establishes a one‑time requirement for the removal, transportation, and lawful disposal of designated excess personal property and solid waste from the Wyoming State Office facility located at 5353 Yellowstone Avenue, Cheyenne, WY 82009. The objective is to ensure safe, timely, and complete removal and lawful disposal of all designated materials with minimal disruption and full compliance with applicable federal, state, and local laws and regulations.

The contractor shall furnish all labor, equipment, materials, supervision, and incidentals necessary to perform the work safely, efficiently, and with minimal disruption to building operations, in accordance with applicable federal, state, and local laws and regulations. Electronic waste is excluded; no e‑waste or e‑cycling services are included in this contract.

2. Background Excess personal property and solid waste have accumulated in the facility’s warehouse due to routine turnover and project activities. All materials designated for removal have been certified and cleared for disposal. Materials are located entirely within the first‑floor warehouse; no elevator access is required. The contractor may disassemble materials to facilitate removal if needed; however, disassembly is not required by the Government.

Currently, the warehouse contains a significant volume of excess property and solid waste that must be removed to maintain operational efficiency and safety. The accumulation of these materials impedes space utilization and could pose safety risks if not addressed. The desired end state is a cleared, safe, and fully usable warehouse space within forty-five calendar days of Notice to Proceed, with all materials lawfully disposed of and all required documentation received.

3. Scope The contractor shall perform a single mobilization to remove and dispose of all Government‑designated materials. For planning and price realism, the Government identifies the volume as up to five forty‑yard roll‑off equivalents, approximately two hundred cubic yards total. This measure is provided solely as an estimating tool; the Government does not prescribe container type or size, and the contractor may use any lawful means and equipment to accomplish the work.

4. Applicable Conditions and Site Access The facility is a GSA‑leased, multi‑agency building that will remain occupied during contractor operations. The Government will coordinate building access and escorts during work hours. The contractor shall describe staging and roll‑off placement needs in its plan, and the Government will notify the landowner in accordance with those needs. Roll‑offs may remain on‑site overnight. The Government will work with the contractor to identify appropriate parking and staging locations to support safe loading and transport.

5. General Requirements The contractor shall provide a minimum of five business days’ notice of intended arrival and shall coordinate the start date with the Government point of contact. Contractor personnel shall check in at the front desk upon arrival and shall be escorted while on site during work hours. The contractor shall not operate Government equipment and shall provide all tools, equipment, and protective materials necessary to perform the work. The contractor shall comply with all applicable OSHA requirements and shall implement appropriate personal protective equipment. The contractor shall always maintain unobstructed emergency exit routes and shall protect building occupants and property during performance. The warehouse floor is a concrete slab; any damage to walls, doors, or other building elements caused by contractor operations shall be the contractor’s responsibility to repair.

The contractor shall identify and mitigate risks to schedule, safety, and facility integrity in the Waste Management Plan.

6. Security and Escort All contractor personnel shall be escorted while on site during work hours. Escorts will be continuously available during those hours. No background checks or badges are required for escorted personnel. Contractor personnel shall remain within designated work areas and shall follow building security rules communicated by the Government.

7. Designated Materials Identification Designated materials are those tagged by the Government for removal and reconfirmed during the pre‑performance walk‑through associated with the Notice to Proceed. Materials are consolidated in the warehouse and will be identified by tags and by representative photographs included as an attachment to this PWS. The contractor shall remove only designated materials.

8. Disposal and Recycling Requirements The contractor shall lawfully dispose of all removed materials at legal facilities. The Government encourages maximization of recycling where practicable; however, there is no minimum recycling percentage requirement. The contractor’s Waste Management Plan shall describe how recycling will be considered and executed when feasible.

9. Documentation Requirements The contractor shall provide documentation sufficient to demonstrate lawful disposal. Documentation shall include weigh tickets or tonnage tickets and receipts that identify the destination facility. The Final Disposal Report shall provide a narrative summary of materials removed by general category and estimated volume or weight, the disposal methods used, the receiving facility or facilities, and copies of weigh tickets and receipts. Photographs are not required for close‑out documentation.

10. Performance Requirements Task 1: Waste Management Planning Within ten calendar days after the Notice to Proceed, the contractor shall submit a Waste Management Plan that describes identification and handling of designated materials, sorting and staging approach, equipment and resources, traffic control within the warehouse and staging areas, roll‑off placement and overnight parking if used, emergency egress maintenance, recycling approach where practicable, and lawful disposal methods and facilities.

Task 2: Mobilization, Removal, and Transportation.

The contractor shall mobilize once, perform removal and loading of designated materials from the warehouse, and transport them to lawful facilities. The contractor shall coordinate staging and roll‑off placement requirements with the Government, which will notify the landowner according to those needs. The contractor shall protect building finishes and maintain unobstructed emergency exit routes throughout performance.

Task 3: Site Cleanup.

Upon completion of removal and loading, the contractor shall clean the work area of debris attributable to contractor operations and restore areas affected by contractor activities to a neat and orderly condition.

Task 4: Final Disposal Report.

The contractor shall submit the Final Disposal Report within thirty (30) calendar days of removal, with the documentation described in Section 9. The report shall include itemized materials removed, weights, disposal methods, facility details, and supporting documentation. Reports shall be submitted in PDF format via email.

11. Schedule The contractor shall complete removal, site cleanup, and submission of the Final Disposal Report within forty‑five calendar days after the Notice to Proceed. The contractor shall coordinate the start date with the Government and provide five business days’ prior notice as required in Section 5.

12. Deliverables The contractor shall submit the deliverables listed below. Unless otherwise agreed, deliverables shall be submitted electronically in a searchable format to the Government point of contact.

Deliverable
Description
Due Date
Waste Management Plan
Identification and handling of designated materials; staging and loading approach; equipment and resources; roll‑off placement and overnight parking if used; recycling approach where practicable; lawful disposal facilities.

Within 10 calendar days of Notice to Proceed

Safety Plan
Hazards, PPE, occupant protection, traffic control, emergency egress maintenance, damage prevention for building finishes.

With proposal submission

Pre‑Performance Walk‑Through Confirmation

Confirmation that designated materials have been tagged and reconfirmed for removal, and that access and staging arrangements are set.

At mobilization, prior to removal

Completion of Removal and Site Cleanup

Confirmation that all designated materials are removed and areas are cleaned of contractor‑related debris.

Before Contractor leaves site.

Final Disposal Report

Narrative summary; weigh or tonnage tickets; facility receipts identifying destination facilities; lawful disposal confirmation

No later than forty‑five calendar days after Notice to Proceed

13. Acceptable Conditions Upon Completion Upon completion, the site shall be free of debris attributable to contractor operations, building surfaces and doors shall be free of damage, emergency egress shall have been maintained throughout performance, and all required documentation shall be received and accepted by the Government.

14. Government‑Furnished Information and Support

· The Government will provide a point of contact, building rules, and escorts during work hours.

· The Government will tag materials designated for removal and provide representative photographs of typical materials as an attachment to this PWS.

· The Government will coordinate landowner notification based on the contractor’s stated staging and roll‑off placement needs.

· The Government will not furnish equipment, materials, protective supplies, inventories, or disposal manifests.

15. Quality Assurance Surveillance Plan (QASP) The Government will evaluate contractor performance to confirm compliance with this PWS. Surveillance will occur at mobilization, during execution, and at close‑out. The Government will verify on‑time completion of removal, site cleanup, and documentation; compliance with safety and occupant protection requirements including unobstructed emergency egress; and completeness and accuracy of weigh or tonnage tickets and destination facility receipts. The acceptable condition upon completion is defined in Section 13. In the event of non‑performance or failure to meet acceptable conditions upon completion, the Government may apply appropriate contractual remedies as determined by the Contracting Officer.

Performance Requirement
Performance Standard
Acceptable Quality Level
Surveillance Method
Responsible Party
Waste Management Plan submitted
Plan submitted within ten calendar days after the Notice to Proceed and includes all required elements
100 percent compliance
Document review
COR
Removal and transportation of designated materials
All designated materials removed and transported in accordance with this PWS and completed within forty‑five calendar days after the Notice to Proceed
100 percent compliance
On‑site observation
COR
Emergency egress maintenance
Emergency exit routes remain unobstructed at all times
100 percent compliance
On‑site observation
COR
Protection of facility surfaces and finishes
No damage to walls, doors, or building finishes resulting from contractor operations
100 percent compliance
On‑site observation
COR
Site cleanup
Work areas left free of debris attributable to contractor operations
100 percent compliance
On‑site observation
COR
Final Disposal Report submitted
Report submitted on time and includes weigh or tonnage tickets and facility receipts identifying destination facilities
100 percent compliance
Document review
COR

16. Contractor Personnel and Equipment The contractor shall provide sufficient personnel and equipment to accomplish removal within the required schedule. Contractor personnel shall check in at the front desk upon arrival and remain within designated work areas during performance. The contractor shall not operate Government equipment and shall provide all equipment, tools, and protective materials necessary to perform the work safely and without damage to the facility.