Exhibit B – Agency Special Requirements

Agency Specific Requirements Unclassified Page 1 of 15

Initials: _____ (Lessor) / _____ (Gov’t)

Technical Analysis Center

Facility

Program of Requirements

Buckley Space Force Base, CO

Denver Technical Center

22 Mar 2023

Agency Specific Requirements Unclassified Page 2 of 15

Contents

1.0 Purpose of Project

1.1 Introduction

1.2 Mission and Function

2.0 General Space Requirements

2.1 Amount of Space

A. Square Footage (SF) Requirement

B. Space Breakdown

C. Proposed space breakdown

D. Exterior walls & ceilings

2.2 Delineated Area

2.3 Term of Lease

2.4 General Description of Space/Building Type

2.5 Building Wide Parameters

A. Site

B. Building Components and Design

C. Operating Hours

D. Security

E. Janitorial

F. Furniture

3.0 AGENCY SPECIFIC REQUIREMENTS (ASRs)

3.1 ASRs - EXTERIOR AND INTERIOR OFFICE SPACES

A. Space build out

B. References

C. Interior and Exterior Construction

D. Power and Cooling load

3.2 ASRs - EXTERIOR AND INTERIOR OFFICE SPACES

A. Exterior Site Requirements

B. General Interior Requirements

3.3 ASRs – Conference Rooms

A. Small Collaboration Rooms (2) – 240 SF with secure VTC capability

B. Medium Conference Room (1) – 400 SF with secure VTC capability

C. Large Conference Room (1) – 800 SF with secure VTC capability

D. Server / Comm / LAN Room (2) – 200 SF

E. Special Program Support Areas (2) – 300 SF

3.4 ASRs – ICD 705 Work Areas – Constructed to meet ICD / ICS 705 standards

A. Director Private Offices (2, approximately 190 SF each)

Agency Specific Requirements Unclassified Page 3 of 15

B. Deputy Director / Program Manager Private Offices (4, approximately 136 SF each)

C. Contract Representative and Security Private Offices (14, approximately 48 SF each)

D. Open Office Area (50 cubicle style workstations, approximately 48 SF each)

E. Printer / Scanner / Copy / Fax Area (Approximately 85 SF)

F. File Cabinet Storage Area (Approximately 200 SF)

G. Break Room (1 break room inside ICD 705 space)

3.5 ASRs – Unclassified Work Spaces

A. Reception Area approximately 200 SF

B. Printer / Copy / Fax Area – 1 printer at 1 location (Approximately 85 SF)

C. Break Room (1 break room outside ICD 705 perimeter, approximately 190 SF)

D. Special Program Support Areas (1 – outside ICD 705 space) – 300 SF

E. Shipping Room (1 – outside ICD 705 space) – 100 SF

F. Storage Room (1 – outside ICD 705 space) – 80 SF

Agency Specific Requirements Unclassified Page 4 of 15

1.0 Purpose of Project

1.1 Introduction

The following Program of Requirements (POR) is intended to further describe the special requirements for the Denver Technical Analysis Center (Denver TAC) facility. The GSA Request for

Lease Proposal and other lease documents (RLP/LD) establishes the minimum requirements. The

POR further defines the Denver TAC tenant improvement requirements for parking, private offices, open office space, operations floor and support space at varying security levels. This POR also provides further design guidance to the lessor in the submittal of leased space.

The information is here to assist the lessor in preparing their offers. Square footages listed are approximate and are provided as a guideline for space layout to ensure that the space and site offered will provide for an efficient layout and accommodate the needs of the Denver TAC in an efficient and effective manner. It should be noted that this POR has been developed prior to the award of a lease. When the offered space becomes available, it may be required to refine this POR and make adjustments to accommodate the space offered.

1.2 Mission and Function

The Denver Technical Analysis Center provides technical analysis for a variety of United States government programs using state of the art techniques and highly specialized analysts.

2.0 General Space Requirements

2.1 Amount of Space

A. Square Footage (SF) Requirement

The Denver TAC requires the lease of approximately 12,594 usable square feet for operations / office / support space for at least 70 employees.

B. Space Breakdown

See Table 1, space breakdown

From Table 1, 1 break room, 1 storage room, 1 printer station, 2 reception areas, 1 lab space and 1 shipping space will be outside the ICD 705 secure space. All other rooms will be inside the ICD 705 perimeter. The total area outside ICD 705 space is 1,261 square feet and the total area inside the ICD 705 secure perimeter is 11,333 square feet

C. Proposed space breakdown

The proposed space breakdown only includes the tenant’s required usable spaces. Additional spaces (restrooms, nursing rooms, mechanical rooms, electrical rooms, and other spaces as required) will be required to support the tenant spaces. Local controls for the electrical/mechanical/comm systems shall be in the ICD 705 secure space. In addition, internal circulation space has been included in the square footage requirements. Data and

Server rooms require proper air conditioning and uninterruptible power supply.

D. Exterior walls & ceilings

All exterior walls & ceilings with adjoining uses shall meet ICS/ICD 705 standards (Wall type

B or equivalent). Exterior in this sense means the exterior walls of the leased space, not the exterior walls of the building shell or any walls that are not part of the leased space. All interior walls, to include ceilings where appropriate, shall meet Sound Transmission Class

(STC) 50 standards.

Agency Specific Requirements Unclassified Page 5 of 15

Table 1. Space Breakdown

Count Area Total Area Notes

1 OFFICE/WORKSTATIONS 3,996

ICD 705 Private Office (Director) 2 190 380

ICD 705 Private Office (Deputy Director) 2 136 272

ICD 705 Private Office (PM) 2 136 272

ICD 705 Private Office 14 48 672 Approx 6'x8'

Open Office Cubicle 50 48 2,400 Approx 6'x8'

2 OFFICE SUPPORT 1,480

Reception Area 4 100 400

Break Room 2 190 380

Storage Room 2 80 160

Copy Room 2 85 170

Printer Stations 2 85 170

File Cabinets 2 100 200

3 ASSEMBLY AREAS 1,680

ICD 705 Small Conference Room 2 240 480

ICD 705 Medium Conference Room 1 400 400

ICD 705 Large Conference Room 1 800 800

4 INFORMATION & TECHNOLOGY 400

ICD 705 Comm Room 2 200 400 Anti-static floor

5 SPECIAL PROGRAM SUPPORT AREAS 900

ICD 705 Laboratory 1 300 300

ICD 705 Simulation Room 1 300 300

ICD 705 Special Purpose #3 1 300 300

5 SHIPPING / RECEIVING 300

ICD 705 Shipping Room 1 300 300

2.2 Delineated Area

Refer to RLP Section 1.03.

2.3 Term of Lease

Refer to RLP Section 1.02.

2.4 General Description of Space/Building Type

The proposed operations/office space shall be occupied by the Denver TAC in a professional, office-type development or business district allowing for normal day-to-day operations from 0600L – 1800L

Monday thru Friday. From time-to-time, access after normal working hours and on weekends will be required.

The Denver TAC requires a professional office / building / site appearance to maintain a professional and attractive appearance for users, visitors and mission partners. Key factors in site selection should include a modern professional appearance, Anti-Terrorist Force Protection (ATFP), parking, security, SUBTOTAL PROGRAM AREA 8,556

CIRCULATION ALLOWANCE 4038

TOTAL PROGRAM AREA 12,594

Agency Specific Requirements Unclassified Page 6 of 15 and good site circulation. ATFP requirements dictate that a parking garage cannot be located underneath the building.

24/7 security guard presence is required to meet security requirements for an ICD 705 secure facility.

The guard(s) will have a dedicated location on the same floor, outside the ICD 705 leased space and will maintain response time as set forth in ICD 705.

2.5 Building Wide Parameters

A. Site

The building site must accommodate good, safe, vehicular circulation throughout, provide adequate paved parking. The proposed site shall meet the ATFP requirements described in

2.5.D.1 below.

B. Building Components and Design

1. The building must be multi-story and the office space provided must be on or above the

6th floor. The true floor and true ceiling of the office space must be concrete slab.

2. The building shall be of sound and substantial construction, class A/B office space only.

3. The space shall have the potential for efficient layout and utilization as determined by the

Government at its sole discretion.

4. The space shall have at least 12,594 contiguous usable square footage minimum to be considered.

5. The building shall be in compliance with all of the Government’s minimum requirements set forth herein.

6. The building shall meet or exceed the International Building Code (IBC) latest edition

C. Operating Hours

Facility access is required 24 / 7 / 365. Normal day-to-day operations are 0600L – 1800L

Monday thru Friday. From time-to-time, access after normal working hours and on weekends will be required.

D. Security

1. Design and build-out of the proposed space shall meet the physical and construction security requirements as set forth in documents listed below.

• DoD Manual 5200.01 Volume 3, DoD Information Security Program: Protection of

Classified Information

• INTELLIGENCE COMMUNITY DIRECTIVE (ICD) NUMBER 705 (26 May, 2010)

• INTELLIGENCE COMMUNITY STANDARD (ICS) NUMBER 705-1 (17 Sep 2010)

• INTELLIGENCE COMMUNITY STANDARD (ICS) NUMBER 705-2 (28 Mar 2022)

• Technical Specifications for Construction and Management of Sensitive Compartmented

Information Facilities, Version 1.5.1 IC Tech Spec – for ICD/ICS 705 (28 Mar 2022)

• Code of Federal Regulations 32 CFR Parts 2001 (Classified National Security

Information) and 2004 (National Industrial Security Program).

• Risk Management Process: An Interagency Security Committee Standard, 2021 Edition.

2. Using the ICD/ICS standards, the Denver TAC has a Facility Security Level of II while incorporating the following countermeasures:

a. Use acceptable fragment retention film or preferred glazing systems to reduce glass fragmentation hazard (if not already incorporated in the film used for other requirements)

b. No operable windows within 18 feet of the ground or other access point

c. Protect non-window openings such as mechanical vents and exposed plenums to resist forcible entry

d. Prevent visual observation from the exterior into perimeter offices

Agency Specific Requirements Unclassified Page 7 of 15

e. Require all employees, contractors, and visitors who access the leased space to sign in and sign out electronically, or on a building register after-hours

f. Limit the number of leased space entry points to the fewest number practical

g. Provide electronic access control for employee entry doors without a guard post

(including afterhours access) in conjunction with CCTV (VSS) coverage

h. Install electronic access control and Intrusion Detection Systems (IDS) to control and monitor access into the leased space

i. Secure utility, mechanical, electrical, telecom rooms and access to interior space from the roof using locks and IDS

j. Secure alarm and physical access control panels, CCTV (VSS) components, controllers and cabling against unauthorized access

k. Provide communication system for security and emergency announcements

l. Provide uninterruptible emergency power to Intrusion Detection System (IDS) and electronic security systems for a minimum of 24 hours.

m. Implement a preventative maintenance program for all security systems. Any component becomes inoperable for service must be replaced or repaired within 12 hours

n. Develop plans for onsite security guard response to alarms and incidents

o. Limit access to leased space construction documents to those persons with an established need-to-know

3. Security spaces, as outlined in program space requirements, shall meet the ICD / ICS

705 Security Directives and Standards. The site Intrusion Detection Systems (IDS) will be purchased and installed by the Denver TAC to ensure compliance with ICD/ICS 705 requirements.

4. The primary controlled entry into the lease space’s unclassified area shall include a security monitor that can be viewed via Transmission Control Protocol / Internet Protocol

(TCP / IP). In addition, security cameras will monitor all outside entry points to the ICD

705 area to include, but not limited to doors and hallways. Controlled access is required to any stairwells and elevators via card reader or like device that will allow access to the

ICD 705 floor/area. Any stairwell/elevator adjacent to the ICD 705 area shall be monitored.

5. The project shall include the installation of an access control system for Denver TAC occupied spaces, including, but not limited to, card readers, electronic strikes, egress sensors/push to exit buttons and other items as required. Building access external to

Denver TAC occupied spaces will be per lessor directed procedures. Details of the access control system will be determined during the design process. The access control system, approved by the Denver TAC, will be purchased and installed by the the Denver

TAC.

6. Security personnel shall be US Citizens, or legally employable in the US, and will be required to monitor all security cameras and respond to all alarms. 24 / 7 security guard presence is required. Response times for Intrusion Detection Systems (IDS) shall meet the standards set forth in 2.5.D.1

7. Construction Surveillance Teams (CSTs) shall be used for the construction of the ICD

705 spaces. The contractor team is expected to provide the CSTs as part of the buildout of the space.

Agency Specific Requirements Unclassified Page 8 of 15

E. Janitorial

Janitorial service will be needed in restrooms and the reception areas of approximately 1,250 square feet according to the regular schedule of the buidling. The janitorial service inside the

ICD 705 spaces will be escorted by Denver TAC personnel but provided by the Lessor under this contract. Based on Security constraints, the Lessor is only required to clean the area inside the ICD 705 spaces once a month.

F. Furniture

Systems furniture, office furniture, executive offices, conference rooms / collaboration spaces, and proposed furniture configuration will be provided by GSA under a contract. The

Denver TAC requires coordination and approval prior to purchase and installation. Each work area in the ICD 705 space will have a configuration that supports 6 data lines and 2 hard line phone connections.

3.0 AGENCY SPECIFIC REQUIREMENTS (ASRs)

For quantity and floor areas for each space, see space breakdown

3.1 ASRs - EXTERIOR AND INTERIOR OFFICE SPACES

A. Space build out

Build out of space must be accomplished in accordance with all local codes, Interagency

Security Committee Standards and all requirements of the Request for Lease Proposal

(RLP/LD), including Special Requirements and all the attachments. Where discrepancies exist between the Special Requirement and the RLP/LD the more stringent requirement shall apply. Where further clarification is needed, it is the Offer’s responsibility to contact the

Governments Contracting Officer.

B. References

All square footages referenced in the RLP and attachments are approximate and may vary upon layout of the space. In relation to this RLP, they are to be used for estimating purposes only. The following Special Requirements will be required to be incorporated into the Design

Intent Drawings, Construction Drawings, and the Government leased Space.

C. Interior and Exterior Construction

For interior and exterior construction, the following documents must be adhered to. The

Denver TAC will clarify when construction and guidance is not clear.

1. Technical Specifications for Construction and Management of Sensitive Compartmented

Information Facilities, Version 1.5 IC Tech Spec – for ICD / ICS 705 (28 Mar 2022)

2. See para 2.5.D.1 for additional technical guidelines and documentation.

D. Power and Cooling load

1. Power demand of up to 60,000 W

2. Cooling requirement of 271,000 BTUh (22.5 Tons) with an air demand of 11,000cfm.

3.2 ASRs - EXTERIOR AND INTERIOR OFFICE SPACES

A. Exterior Site Requirements

1. The building site must accommodate good, safe, vehicular circulation and parking spaces.

2. Provide 70 parking spots plus an additional ten (10) visitor parking spaces.

3. Include accessible parking spaces as required by the Architectural Barriers Act

Accessibility Standards, (ABAAS) including accessible route to the building entrance.

4. Proposed site shall allow access to a loading dock.

Agency Specific Requirements Unclassified Page 9 of 15

B. General Interior Requirements

1. Finished floors in all work areas (open office area, IT equipment spaces, offices and operations center) shall be buffed concrete, carpet tiles, or similar long-lasting surface. Ceiling space should have open space showing or allowing easy access to air vents, cables, power, etc for open areas of office. Ceiling shall have thoughtful design to minimize noise while achieving inspection requirements of ICD 705.

2. Design and build-out shall include rough in (junction boxes, data trays and conduit) as required to support communication and data cabling. Rough-in requirements shall be determined and defined during the design process. Design will include the ability to have at least 6 data line pairs and 2 phone line drops per workstation. Data lines (fiber / copper) shall be easily inspected per ICD / ICS 705 requirements.

3. Provide and install a sound system capable of music playback and public address capability and associated wiring to a central location (to be determined by the Denver

TAC) for all occupied space within the Denver TAC office spaces.

a. The sound system will have public address capability to clearly hear public announcements in all Denver TAC spaces.

b. All speakers in private offices shall be individually controlled. Speakers in common areas can be controlled using one volume control.

c. Coaxial cable runs to each senior leader office, all conference rooms and to other areas that will be determined once space is identified.

4. Provide natural lighting to interior spaces as much as possible and practical. LED daylight lighting is required throughout the space.

5. Number of receptacles specified are at a minimum and may be increased to meet code and circuit loads.

6. Acoustical designs for all spaces shall incorporate guidelines and recommendation from the ICD / ICS 705 standards. Unless otherwise stated, STC 50 is required on all interior and exterior doors.

7. Building electrical design to include a redundant building electrical feed, a building backup generator, or uninterruptable power supply capable of powering security systems for 24 hours. Emergency power is also required to allow for graceful shutdown of information technology systems.

8. All secure area walls must meet ICD / ICS 705 standards and shall be confirmed by the

Denver TAC during the design phase. Wall B requirement is below in Figure 3.

9. Sound damping is required.

10. Noise cancellation equipment with controls in each room if required to meet STC-50.

Offeror will present two options to the Denver TAC before purchase and installation.

11. Offeror will identify locations in the ICD / ICS 705 area that can support floor loading for

2-drawer and 4-drawer GSA approved safes.

Agency Specific Requirements Unclassified Page 10 of 15

Figure 3. Wall B requirements

Agency Specific Requirements Unclassified Page 11 of 15

3.3 ASRs – Conference Rooms

Constructed to meet ICD / ICS 705 standards.

A. Small Collaboration Rooms (2) – 240 SF with secure VTC capability

1. Seating and conference room table for 10 people plus one workspace terminal.

2. Provide and install at least 6 data lines plus 2 phone drops. (refer to section 3.2.B.2)

3. Speaker phone and secure VTC capability.

4. Two walls shall have glass dry erase boards from 3’ to 6’ spanning 75% the length of the wall.

5. Room construction shall meet Noise Isolation Class (NIC) 50.

6. Acoustical ceiling above finished floor with Noise Reduction Coefficient (NRC) of 0.8 minimum.

7. Minimum of 50% of the walls surrounding and within the work areas shall include sound absorbing materials (NRC 0.8 minimum)

8. Provide high quality glass section facing main work area. Door locking mechanism required. Glass will be either be opaque or have mechanism to control opacity such as blinds.

9. One 75” TV monitor on wall, switchable between networks

10. Dimmable lighting.

11. Flooring: Commercial carpet tiles or similar surface.

B. Medium Conference Room (1) – 400 SF with secure VTC capability

1. Seating and conference room table for 30 people plus one workspace terminal.

2. Provide and install at least 6 data lines plus 2 phone drops. (refer to section 3.2.B.2)

3. Speaker phone and secure VTC capability.

4. Two walls shall have glass dry erase boards from 3’ to 6’ spanning 75% the length of the wall.

5. Room construction shall meet Noise Isolation Class (NIC) 50.

6. Acoustical ceiling above finished floor with Noise Reduction Coefficient (NRC) of 0.8 minimum.

7. Minimum of 50% of the walls surrounding and within the work areas shall include sound absorbing materials (NRC 0.8 minimum)

8. Provide high quality glass section facing main work area. Door locking mechanism required. Glass will be either be opaque or have mechanism to control opacity such as blinds.

9. Two 75” monitors on wall, switchable between networks

C. Large Conference Room (1) – 800 SF with secure VTC capability

1. Seating and conference room table for 60 people plus two workspace terminals.

2. Provide and install at least 6 data lines plus 2 phone drops per workspace. (refer to section 3.2.B.2)

3. Speaker phone and secure VTC capability.

4. Two walls shall have glass dry erase boards from 3’ to 6’ spanning 75% the length of the wall.

5. Room construction shall meet Noise Isolation Class (NIC) 50.

6. Acoustical ceiling above finished floor with Noise Reduction Coefficient (NRC) of 0.8 minimum.

7. Minimum of 50% of the walls surrounding and within the work areas shall include sound absorbing materials (NRC 0.8 minimum)

8. Provide high quality glass section facing main work area. Door locking mechanism required. Glass will be either be opaque or have mechanism to control opacity such as blinds.

Agency Specific Requirements Unclassified Page 12 of 15

9. Two 85” monitors on wall, switchable between networks

D. Server / Comm / LAN Room (2) – 200 SF

1. All doors shall be STC 50 compliant and have cypher lock or badge scan access control.

2. Provide & install standard 20-amp receptacles on perimeter walls (8’-0” on center max)

3. Room should accommodate: 12 communication equipment racks (~30” x ~84”), with required security separation, rack mounted UPS, badge scan access controls, and appropriate power drops from ceiling and/ or cable trays.

4. Room must accommodate: Dedicated electrical power supply for UPS, with power conditioning.

5. Provide anti-static floors.

6. HVAC must support data center environmental requirements, temperature control (65-

77F) control, humidity control (dew point 41.9 – 59 degrees F, Relative humidity 60% maximum), electricity monitoring (static electricity buildup) and security systems (Fire protection, water detection and suppression systems).

7. Flooring: Make recommendation for flooring design (for example provide anti-static tiles on 12” raised floor or buffed concrete) if needed based on recommended environmental design.

8. Must accommodate 1,000+ fiber / copper lines.

9. Coordinate all IT infrastructure decisions through the Denver TAC.

E. Special Program Support Areas (2) – 300 SF

1. Provide and install at least 6 data lines plus 2 phone drops for each of 6 workspaces

(refer to section 3.2.B.2)

2. Two walls shall have glass dry erase boards spanning 75% the length of the wall.

3. Room construction shall meet Noise Isolation Class (NIC) 50.

4. Acoustical ceiling above finished floor with NRC of 0.8 minimum.

5. Dedicated electrical power supply for UPS, with power conditioning.

6. Minimum of 50% of the walls surrounding and within the work areas shall include sound absorbing materials (NRC 0.8 minimum)

7. Provide high quality glass section facing main work area. Door locking mechanism required. Glass will be either be opaque or have mechanism to control opacity.

8. HVAC must support data center environmental requirements, temperature control (65-

77F) control, humidity control (dew point 41.9 – 59 degrees F, Relative humidity 60% maximum), electricity monitoring (static electricity buildup) and security systems (Fire protection, water detection and suppression systems).

10. Flooring: Commercial carpet tiles or similar surface.

3.4 ASRs – ICD 705 Work Areas – Constructed to meet ICD / ICS 705 standards

Constructed to meet ICD / ICS 705 standards.

A. Director Private Offices (2, approximately 190 SF each)

1. Provide doors with 12-inch side light with blinds. Door locking mechanism required.

2. Provide and install a minimum of 4 standard 20-amp receptacles near desk/ workstation.

3. Provide and install at least 6 data lines and 2 phone line drops

4. Each workspace shall accommodate three (3) monitors, six (6) CPUs, and 2 chairs.

5. Room construction shall meet STC 50.

6. Finished ceiling meeting ICD/ICS 705 standards with acoustical ceiling at a minimum of

9’-0” above finished floor with a Noise Reduction Coefficient (NRC) of 0.8 minimum.

Lessor will confirm ceiling height with the Denver TAC prior to construction.

7. Flooring: Commercial carpet tiles or similar surface.

Agency Specific Requirements Unclassified Page 13 of 15

8. One 65-inch monitor hung on the wall, switchable among different networks.

B. Deputy Director / Program Manager Private Offices (4, approximately 136 SF each)

1. Provide doors with 12-inch side light with blinds. Door locking mechanism required.

2. Provide and install a minimum of 4 standard 20-amp receptacles near desk/ workstation.

3. Provide and install at least 6 data lines and 2 phone line drops

4. Each workspace shall accommodate three (3) monitors, six (6) CPUs, and 2 chairs.

5. Room construction shall meet STC 50.

6. Finished ceiling meeting ICD/ICS 705 standards with acoustical ceiling at a minimum of

9’-0” above finished floor with a Noise Reduction Coefficient (NRC) of 0.8 minimum.

Lessor will confirm ceiling height with the Denver TAC prior to construction.

8. One 65-inch monitor hung on the wall, switchable among different networks.

C. Contract Representative and Security Private Offices (14, approximately 48 SF each)

1. Provide doors with 12-inch side light with blinds. Door locking mechanism required.

2. Provide and install a minimum of 4 standard 20-amp receptacles near desk/ workstation.

3. Provide and install at least 6 data lines and 2 phone line drops

4. Each workspace shall accommodate three (3) monitors, six (6) CPUs, and 2 chairs.

5. Room construction shall meet STC 50.

6. Finished ceiling meeting ICD/ICS 705 standards with acoustical ceiling at a minimum of

9’-0” above finished floor with a Noise Reduction Coefficient (NRC) of 0.8 minimum.

Lessor will confirm ceiling height with the Denver TAC prior to construction.

D. Open Office Area (50 cubicle style workstations, approximately 48 SF each)

50 Workstations in 3 sections—2 sections with 20 workstations, 1 section with 10

1. Open office area concept, integrated with teaming spaces and collaboration work areas.

2. Coordinated space layout with Government’s furniture plan and Information Technology

(IT) plan.

3. Acoustical ceiling above finished floor with NRC of 0.8 minimum

4. Provide and install at least 6 data lines and 2 phone line drops per workstation.

5. Minimum of 50% of the walls surrounding and within the work areas shall include sound absorbing materials (NRC 0/8 minimum).

6. Provide sound masking system in work areas.

7. Provide and install electrical power for furniture and IT equipment (maximum of three (3) workstations per 20-amp circuit). Provide and install 20-amp duplex receptacles at walls and columns (convenience outlets)

8. Each workstation is approximately 8’x6’ with desk space for 3 monitors, KVM, keyboard, mouse, and 6 CPUs.

9. Flooring: Commercial carpet tiles or similar surface.

10. Cube walls will rise to 80-inches and cubes will have individual opaque doors for line-of sight privacy

E. Printer / Scanner / Copy / Fax Area (Approximately 85 SF)

6 printers for various networks at 2 different locations

1. Designated location or alcove for office equipment

2. Provide dedicated power (20 amp) for each printer at each location

3. Provide sound absorbing material on ceiling / walls

4. Provide furniture options for printer stands or similar equipment

5. Flooring: Commercial carpet tiles or similar surface

Agency Specific Requirements Unclassified Page 14 of 15

F. File Cabinet Storage Area (Approximately 200 SF)

1. Identify location to position five GSA class 6 type safe file storage weighing approximately 1,000 lbs when full of material.

G. Break Room (1 break room inside ICD 705 space)

1. A minimum of 15 linear feet of base and 15 linear feet of overhead cabinets shall be provided and installed. Base cabinets shall be a minimum of 2’ deep. Overhead cabinets shall be a minimum of 1’ deep. Provide and install laminate or better countertop with a 4”

(minimum height) backsplash. Each cabinet section must have two adjustable shelves.

2. A standard stainless-steel double bowl sink with a garbage disposal and retractable hose gooseneck faucet.

3. Adequate space for a Government-provided two refrigerators and one (1) ice maker/water dispenser are required. Dimensions and location will be identified during design. A dedicated 120V 20-amp general-purpose duplex receptacle and a separate water line shall be provided and installed for each appliance.

4. Provide and install an adequate amount of dedicated duplex receptacles to support two countertop microwaves, dishwasher, industrial coffee maker, and 2 full size refrigerators.

Provide general-purpose duplex outlet around the perimeter of the room.

5. Resilient flooring or brushed concrete.

6. Freestanding preparation table, bar height, 12 linear feet by 3 linear feet wide.

7. Acoustical ceiling.

3.5 ASRs – Unclassified Work Spaces

A. Reception Area approximately 200 SF

1. Furniture design to support guest waiting for Denver TAC personnel.

2. Recommendations to support winter coats, and safeguard up to 100 cell phones.

3. Work area allowing for a dual monitor and single phone work station.

B. Printer / Copy / Fax Area – 1 printer at 1 location (Approximately 85 SF)

1. Designated location or alcove for office equipment

2. Provide dedicated power (20 amp) for each printer location.

3. Provide sound absorbing material on ceiling / walls.

4. Provide furniture options for printer stands or similar equipment.

5. Buffed concrete or similar.

C. Break Room (1 break room outside ICD 705 perimeter, approximately 190 SF)

1. A minimum of 20 linear feet of base and 20 linear feet of overhead cabinets shall be provided and installed. Base cabinets shall be a minimum of 2’ deep. Overhead cabinets shall be a minimum of 1’ deep. Provide and install laminate or better countertop with a 4”

(minimum height) backsplash. Each cabinet section must have two adjustable shelves.

2. Provide and install one (1) ceiling-mounted exhaust fan. The fan shall be installed to code, and it shall be vented to the exterior of the building.

3. A standard stainless-steel double bowl sink with a garbage disposal and retractable hose gooseneck faucet.

4. Adequate space for a Government-provided two refrigerators and one ice maker/water dispenser are required. Dimensions and location will be identified during design. A dedicated 120V 20-amp general-purpose duplex receptacle and a separate water line shall be provided and installed for each appliance.

5. Provide and install an adequate amount of dedicated duplex receptacles to support three countertop microwaves, dishwasher, three coffee makers, two full size refrigerators.

Provide general-purpose duplex outlet around the perimeter of the room.

6. Resilient flooring or brushed concrete.

Agency Specific Requirements Unclassified Page 15 of 15

7. Freestanding preparation table, bar height, 12 linear feet by 3 linear feet wide.

8. Acoustical ceiling.

D. Special Program Support Areas (1 – outside ICD 705 space) – 300 SF

1. Provide and install at least 6 data lines plus 2 phone drops for each of 6 workspaces

(refer to section 3.2.B.2)

2. Two walls shall have glass dry erase boards spanning 75% the length of the wall.

3. Room construction shall meet Sound Transmission Class (STC) 50.

4. Acoustical ceiling above finished floor with NRC of 0.8 minimum.

5. Dedicated electrical power supply for UPS, with power conditioning.

6. Minimum of 50% of the walls surrounding and within the work areas shall include sound absorbing materials (NRC 0.8 minimum)

7. Provide high quality glass section facing main work area. Door locking mechanism required. Glass will be either be opaque or have mechanism to control opacity.

8. HVAC must support data center environmental requirements, temperature control (65-

77F) control, humidity control (dew point 41.9 – 59 degrees F, Relative humidity 60% maximum), electricity monitoring (static electricity buildup) and security systems (Fire protection, water detection and suppression systems).

10. Flooring: Commercial carpet tiles or similar surface.

E. Shipping Room (1 – outside ICD 705 space) – 100 SF

1. Provide shipping room where packages can be received and prepared for shipment & pickup.

F. Storage Room (1 – outside ICD 705 space) – 80 SF

1. Provide storage room for miscellaneous and office supply items