295928_Drawings.pdf
PDF 3 MB Posted
- Solicitation number
- W90VN824R0052
About this file
This document is a Request for Proposal (RFP) for the repair of roads and installation of a new snow melting system in the AHA areas of Camp Casey. The RFP is issued to existing Area I & II General Construction Multiple Award Indefinite Delivery Indefinite Quantity (MAIDIQ) Contractors under Contract Number: W91QVN-24-D-0001, 0002, 0003, etc. The work includes repairing the existing exterior power distribution system, installing a new snow melting system with heating cables, and repairing the roads. The contractor is required to provide 5-year warranties on the snow melting system and workmanship. The contractor must be experienced in snow melting system design, assembly, testing, installation, and service. This is a Defense contract issued by the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation W90VN824R0052.pdf | ||
| 295928_ELEC_DWG.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.RING NO. DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
E - 1
E - 2
ELECTRICAL
T-1
T - 1
GENERAL
295928
SYSTEM, AHA AREAS, CP CASEY
REPAIR ROAD AND SNOW MELTING
TITLE SHEET
KIM, SY
NTS
CP CASEY
SYSTEM, AHA AREAS,
REPAIR ROAD AND SNOW MELTING
SCOPE OF WORK, SPECIAL NOTE
SITE LAYOUT PLAN
CROSS-SECTION DIARGRAM AND DETAIL (TWELVE(12) LINE)E - 3
E - 4
E - 5
TWELVE(12) LINE TYPE HEATING CABLE WIRING DIAGRAM/ HEATING
CABLE DETAIL
E - 6
GUARDRAIL AND BOLLARD DETAIL
FEWR NO 295928
E - 7
NEW EXTERIOR HEATING CABLE DISTRIBUITION-1
NEW EXTERIOR HEATING CABLE DISTRIBUITION-2
TITLE SHEET
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
1.
2.
SCOPE OF WORK
A. REPAIR/MAINTENANCE (K)
CONNECTIONS FOR GOVERNMENT APPROVAL.
SUBMITTAL INCLUDING FULLY DETAILED SHOP DRAWING, CATALOG CUTS, WIRING
SHIPPED TO THE SITE, THE CONTRACTOR SHALL PREPARE A COMPLETE HARDWARE
BEFORE ANY COMPONENTS ARE FABRICATED AND/OR INTEGRATED INTO ASSEMBLIES, OR
INCLUDED ON THE PLAN.
PANEL-MOUNTING DETAILS SHALL BE SHOWN. OUTER DIMENSIONS OF ALL PANELS SHALL BE
INTERNAL-MOUNTED INSTRUMENTS, SWITCHES, DEVICES, AND EQUIPMENT INDICATED. ALL
THE CONTRACTOR SHALL PROVIDE ARRANGEMENT PLANS OF ALL PANEL FRONT- AND
MAINTENANCE AND OPERATION OF ALL COMPONENTS OF THE CONTROL SYSTEM.
TRAINING SESSIONS SHALL BE CONDUCTED TO EDUCATE AND TRAIN THE PERSONNEL IN
OPERATION AND MAINTENANCE OF THE CONTROL SYSTEM FOR DPW PERSONNEL. THE
THE CONTRACTOR SHALL CONDUCT SPECIFICALLY ORGANIZED TRAINING SESSIONS IN
TRAINING SHALL INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING:
1. PREVENTATIVE MAINTENANCE PROCEDURES.
2. TROUBLESHOOTING.
3. TESTING.
FIVE(5) YEARS OF WARRANTY
3.
4.
5.
6.
7.
8.
CALIBRATION OF THE EQUIPMENT, OR OTHER WORK.
CONTRACTOR SHALL PROVIDE FOLLOWING QUALIFICATIONS:10.
3. 5-YEARS OF EXTENDED WARRANTY CERTIFICATE
THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING 11.
12.
ALL DAMAGED AREA INCLUDING SODDING, UTILITIES, STRUCTURES
TO THEIR ORIGINAL CONDITION AND OPERATION DURING AND
1.
3.
SPECIAL NOTES
9.
AFTER INSTALLATION OF ELECTRICAL SYSTEM WITHOUT CHARGING
TO GOVERNMENT
AND INSTALLATION OF THE AUTOMATIC SNOW MELTING CONTROL SYSTEM.
CONTRACTOR SHALL PROVIDE SHOP DRAWINGS REQUIRED FOR FABRICATION, ASSEMBLY,
NEW AUTOMATIC SNOW MELTING SYSTEM CONTROL PANEL AND HEATING CABLE.
SHOP DRAWING SHALL INCLUDE CONTROL AND CONNECTION DIAGRAMS BETWEEN
13.
EXISTING DRAINAGE SYSTEM.
CONTRACTOR SHALL INSTALL SNOW MELTING SYSTEM TO DRAIN MELTED SNOW INTO
14.
E-1
INSTRUMENT AND CONTROL SYSTEM MANUFACTURING COMPANY.
2. THE SNOW MELTING SYSTEM COMPANY SHALL BE SPECIALIZED IN THE DESIGN, ASSEMBLY, TESTING, INSTALLATION, SERVICE FOR AT LEAST TEN (10) YEARS.
SITE VISITS EVERY 6 MONTHES DURING THE WARRANTY PERIOD TO PERFORM INSPECTION AND
2.
THE WARRANTY PERIOD. IN ADDITION, THE CONTRACTOR SHALL PROVIDE THREE (3)-DAY
NOTICE TO CORRECT ANY SYSTEM PROBLEMS WITHOUT CHARGE TO GOVERNMENT DURING
OF FINAL COMPLETION. THE CONTRACTOR SHALL BE AVAILABLE ON TWENTY-FOUR (24)-HOUR
DEFECTS IN MATERIALS, WORKMANSHIP FOR FIVE (5) CALENDAR YEAR FROM THE DATE
CONDUCTIVE FILLER AND SURFACE OF CONCRETER PAVED ROAD SHALL BE WARRANTED AGAINST
THE ENTIRE AUTOMATIC SNOW MELTING SYSTEM, INCLUDING HIGH STRENGTH THERMALLY
ROUTE ON PROJECTED CONCRETE PAVED ROADS TO BE OPERATIONAL FOR VARIOUS TYPES AND SIZES OF VEHICLES.
THE CONTRACTOR SHALL PROVIDE SITE INVESTIGATION TO DETERMINE THE APPROPRIATED HEATING CABLE
SENSORS.
HEATING CABLE, HIGH STRENGTH THERMALLY CONDUCTIVE FILLER, SNOW/HUMID &TEMPERATURE
PROVIDE 5(FIVE)-YEARS OF EXTENDED WARRANTY FOR AUTOMATIC SNOW MELTING SYSTEM,
1. CONTRACTOR SHALL EMPLOY SNOW MELTING SYSTEM INSTALLER WHO SHALL BE AN
FIRE CODE AND SPECIFICATIONS.
LATEST NATIONAL ELECTRICAL CODE, NATIONAL ELECTRICAL SAFETY CODE,
ALL ELECTRICAL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE
NTS
ELECTRICAL
KIM, SY
COR TO DEVELOP SHOP DRWAING.
THE CONTRACTOR SHALL CORRDINATE WITH PERSONNEL OF AHA CONTROL, DPW THRU
15. THE CONTRACTOR SHALL COORDINATE ALL PHASES OF WORK WITH THE CONTRACTING OFFICER.
SCOPE OF WORK, SPECIAL NOTE
CP CASEY
SYSTEM, AHA AREAS,
REPAIR ROAD AND SNOW MELTING
CHARGING TO GOVERNMENT.
ROAD CONDITION SUCH AS GRADING, DRAINAGE SYSTEM, ETC WITHOUT
EXTERIOR POWER SYSTEM ,AND PROVIDE HEATING CABLE TO MEET THE
RESONPSIBLE TO VERIFY EXISTING SITE CONDITION INCLUDING EXISTING
ARE ESTIMATED FOR BIDDING PURPOSE ONLY. CONTRACTOR SHALL BE
E-6 "NEW EXTERIOR HEATING CABLE DISTRIBUITION PLAN"
LOCATION AND LENGTH OF HEATING CABLE SHOWN ON THE DRAWING
COORDINATING WITH PERSONNEL OF AHA AREAS CONTROL, DPW THRU COR.
CONCEPTUAL. CONTRACTOR SHALL INSTALL THEM TO MEET SITE CONDITION BY
LOCATION OF TRANSFORMERS, ELECTRIC MANHOLE, AUTOMATIC SNOW MELTING SYSTEM ARE
AS SHOWN ON THE DRAWINGS.
SYSTEM INCULUDING HEATING CABLE, AUTOMATIC SNOW MELTING SYSTEMS ON THE SURFACE OF THE ROADS.
REPAIR EXISTING ROADS BY PROVIDING NEW SNOW MELTING
295928
LINE, PAD MOUNTED TRANSFORMER, BOLLARDS & GUARDRAIL
REPAIR EXISTING EXTERIOR POWER DISTRIBUTION SYSTEM INCLUDING PRIMARY LINE AND SECONDARY
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
E-2
SITE LAYOUT PLAN
NOT TO SCALE
NTS
ELECTRICAL
SITE LAYOUT PLAN
KIM, SY
W A
L L
W A
L L
W A
L L
WALL
W A
L L
WALL
00-49341
3-48PN
00-49341
4-200PN
00-49341
4-200PN
01-49550
00-49341
LAUNDRY
KSC
PEST
647667
UTIL
B&G
WH-1
WH-2
DPW HQ
A
B
629 685
651A
833T
808 811
746 715 726
A B
00-49341
A
B
1149 1151
10291144
A
B
1918 1879
A
B
A
B
A
B
2372A
2373T
A C
2451 2400
A
B
A
B
2648 2605
2609T
2514 2540
8008T
2540T
26462645
1991 1963
A B
18331832
1962 1812
456A
CCTT
CCTT
SIMNET
463Z
SSSC
TSAK MILES 2000
549 546
8114T
560G
A B
86M
48T
A
B
39 55
134 133
186 192
202A
208 215 214
213 212
258252
249 262
1785 235
237 238
FOOT BR
VEH BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
VEH BR 1821
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
1158A
1158B
RAILHEAD
447A
F
F
497A
497B
458Z
2372?
QA00894-0J
QA00893-0J
QA00892-0J
ADMIN
EXER W/LAT
EXER W/LAT
QA00138-9J
QA01300-8J
00-54151 BUP 020122
00-54152 BUP 020122
00-54132 BUP 010801
00-54127 BUP 040430
00-54158 BUP 030104
00-54129 BUP 011109
00-54157 BUP AFTER 2026
00-54156 BUP 031030
00-54130 BUP 020330
00-54131 BUP 020929
00-54155 BUP 030506
03-57200 REPAIR 041007
99-47353
4-200PN
01-QA00604 BUP
XX-QA00606 BUP 0310XX
95-44142
4-184PN
95-44066
4-184PN
96-QA00466 BUP
95-44066
4-184PN
95-44066
4-184PN
95-44066
4-184PN
01-55893 BUP
99-QA00603 BUP
XX-QA00602 BUP 0310XX
99-47353
4-200PN
96-43269
4-184PN
97-44592
4-200PN
XX-QA00287 BUP
01-55894 BUP
99-51682
4-200PN
99-51820
3-48PN
97-44592
4-200PN
99-51682
4-200PN
99-51682
4-200PN
01-55882 BUP
A
B
A B
2022(?)
VEH BR
VEH BR
472?
455?
1839T
1840T
BARRIER
1564 1566
635A
2002B
A B
48A
A
B
A B
A B
A
B
A
B
A
B
174 Z
GRAVES
GRAVES
B A
S K
E T
B A
L L
C O
U R
T
T E
N N I
S
C
U R
T
706(707A)
(2298)
1071?
A B
1760?
KS-124
VEH BR?
VEH BR?
MASTER PLANNING DIV
DPW / CASEY
BARRIER
BARRIER
FLAG
FO
TBALL FIELD
(SYN
TH
ETIC
TU
RF AREA)
1919LIFT STATION
CAMP CASEY (WEST) CAMP CASEY (EAST)
CP CASEY
SYSTEM, AHA AREAS,
REPAIR ROAD AND SNOW MELTING
E-6
E-7
295928
425 160
M.I HEATING CABLE
THERMAL CONDUCTOR
SNOW, HUMID
TEMPERATURE SENSORS
ROAD SURFACE HEATED BY HEATING CABLE
M. I. HEATING CABLE
BASE
SNOW, HUMID
TEMPERATURE SENSORS
TRANSFORMER
HEATING CABLE (APPRX. 1000mm(W))
ROAD SURFACE AREA HEATED BY
"A"
NOT TO SCALE
CONDUCTIVE FILLER (RASIN TYPE)
HIGH STRENGTH THERMALLY
APPROX. 60mm
BURIAL DEPTH:
HEATING CABLE CONCRETE PAVED ROAD
"B"
160160160160160 160160160160
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
NTS
E-3
1 OF 2WAY (6 LINE), CROSS-SECTION DETAIL "A"
UP WAY LINE
NOT TO SCALE
ROAD SURFACEROAD SURFACE
M.I. HEATING CABLE
THERMAL CONDUCTOR
NOT TO SCALE
CONDUCTIVE FILLER (RASIN TYPE)
HIGH STRENGTH THERMALLY
GROOVING HOLE
CROSS-SECTION DETAIL "B"
CONCRETE SURFACE
SUBBASE
DOWN WAY LINE
ELECTRICAL
DETAIL (TWELVE(12) LINE)
CROSS-SECTION DIARGRAM AND
KIM, SY
G
G
(TYPICAL OF 2WAY (12 LINE))
CONTROL PANEL(TYPICAL)
UNDERGROUND CONDUIT
UNDERGROUND POWER WIRING AND CONDUIT
CP CASEY
SYSTEM, AHA AREAS,
REPAIR ROAD AND SNOW MELTING
2WAY (12 LINE), CROSS-SECTION DIAGRAM (TYPICAL)
1 NOT TO SCALE
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
E-4
NTS
2 NOT TO SCALE
3. 600V 1C Cu STEEL SHEATH
1. HEATING ELEMENT CONDUCTOR
2. GLASS FIBER INSULATION
HEATING ELEMENT
HOT SECTION
MgO POWDER
(SUS)
COLD LEAD SECTION
(HEATING PART)
CONNECTION SLEEVE
Ag WELDING
LEED WIREHEATING CABLE
COLD SECTIONCOLD SECTION HEATING SECTION
HEATING CABLE AND LEED WIRE CONNECTION DETAIL
- CONDITION OF USE (TEMPERATURE) : -30 DEGREE C ~ 200 DEGREE C
- HEATING CABLE SPACING: 150mm~160mm
[MINERAL INSULATED HEATING CABLE]
MODEL: 600V SINGLE CONDUCTOR Cu STEEL
- MANUFACTURER: KMIC SNOW MELTING SYSTEM
- MAX. TENSILE STENGTH: 32kN (MIN.)
4. H.D.P.E. JACKET
(MI Heating System)
UP WAY LINE
600V 1C Copper HDPE JACKET
COPPER PIG TAIL
DOWN WAY LINE
MANUFACTURER: SHINYOUNG HTS CO. OR APPROVED EQUAL.
TRANSFORMER
G
G
METAL ENCL, RADIAL TYPE,
NEW PAD MOUNTED TRANSFORMER, OIL-FILLED, SELF-COOLED, LOAD BREAK SW,
ELECTRICAL
HEATING CABLE DETAIL
CABLE WIRING DIAGRAM/
TWELVE(12) LINE TYPE HEATING
KIM, SY
- HEAT GENERATION: 6 LINE 350~400 WATTS/SM
CONTROL PANEL(TYPICAL) SNOW, HUMID
FOR DOWN WAY LINE & UP WAY LINE
TEMPERATURE SENSORS (TYPICAL)
CP CASEY
SYSTEM, AHA AREAS,
REPAIR ROAD AND SNOW MELTING
TEL 010-9289-1102, FAX 02-6280-8265
TWELVE(12) LINE TYPE HEATING CABLE WIRING DIAGRAM (TYPICAL)
M.I HEATING CABLE DETAIL (TYPICAL)
1 WAY: DOWN WAY LINE, IN 103 C.
1 WAY: UP WAY LINE, IN 103 C.
PROVIDE NEW 2WAY UNDERGROUND SEC. LINE
295928
3PH, 11.4KV-220/380V, 60HZ
W/BUILT-IN PROTECTIVE DEVICES
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
ELECTRICAL
KIM, SY
CP CASEY
SYSTEM, AHA AREAS,
REPAIR ROAD AND SNOW MELTING
139.8
100 69
.2
RAIL TIE - B/N
22.7
.2
31.2
.2
.2
31.2
�� Φ139.8 x 4.5 x 2100
9.
4.5
.3
85 165
.3
22064
22 x 40
.2 ø22x30
65 200 200 65 ø24x19 ø22x64 ø19x30
POST Φ139.8 x 4.5 x 2.100
B/N-1 RAIL CONNECTION - B/N
FFL
E-5
NTS
BOLLARD DETAIL
GUARDRAIL AND BOLLARD DETAIL
1 GUARDRAIL - 1 ( H810xW400 - SB1)
AC PAVEMENT AREA ON GROUND
WWW.JDIND.CO.KR
TEL 1577-8549, FAX 031-952-7871
OR APPROVED EQUAL PRODUCT.
1. ABOVE INFORMATION IS JONG-DO CO., LTD
NOTE:
POST DETAIL
BLOCK-OUT DETAIL
GUARDRAIL SECTION-A
PLAN
GUARDRAIL SECTION-B
GUARDRAIL INSTALLATION BOLT/NUT DETAIL POST CAP DETAIL
RAIL SECTION
CONC CAP
YELLOW
BLACK
EXPANSION JOINT
13MM WIDE
BARS
4-D13CONC FDN
REINFORCED
350 DIA
CONC RAMP
CONC GROUT
FILLED WITH
150 DIA PIPE
STL PIPE
150 DIA
WELDED TO
DOWEL BARS
20 DIA
PITCH=150MM
REINF
D10 SPIRAL
600030000
SCALE: 1:300
12000
MELTED SNOW INTO EXISTING DRAINAGE SYSTEM.
CONTRACTOR SHALL INSTALL SNOW MELTING SYSTEM TO DRAIN
CHARGING TO GOVERNMENT.
CONDITION SUCH AS GRADING, DRAINAGE SYSTEM, ETC WITHOUT
SYSTEM ,AND PROVIDE HEATING CABLE TO MEET THE ROAD
SITE CONDITION INCLUDING EXISTING EXTERIOR POWER
CONTRACTOR SHALL BE RESONPSIBLE TO VERIFY EXISTING
THIS DRAWING ARE ESTIMATED FOR BIDDING PURPOSE ONLY.
LOCATION AND LENGTH OF HEATING CABLES SHOWN ON
NOTE.
1.
2.
3.
PERSONNEL OF RLFC RANGE CONTROL, DPW THRU COR.
INSTALL THEM TO MEET SITE CONDITION BY COORDINATING WITH
MELTING SYSTEM ARE CONCEPTUAL. CONTRACTOR SHALL
LOCATION OF TRANSFORMERS, HANDHOLES, AUTOMATIC SNOW
SCALE:
1/300
NEW PAD MOUNTED TRANSFORMER, METAL ENCL, RADIAL TYPE,
60HZ, 150KVA W/BUILT-IN PROTECTIVE DEVICES (15A FUSE)
&PROVIDE NEW BOLLARDS (3EA) TO PROTECT TRANSFORMER.
OIL-FILLED, SELF-COOLED, LOAD BREAK SW, 3PH, 11.4KV-220/380V,
NEW EXTERIOR HEATING CABLE DISTRIBUITION PLAN
O/H
O/H P
P O /H
O /H
O/H
O /H
O /H
P P
S
S
O/H
S
0.1 6M
0.6 m
.05
.8m
NEMA 4X (SUS) ENCL. (TYPCAL)
E-4
&PROVIDE NEW BOLLARDS (2EA) TO PROTECT CONTROL PANEL.
TWELVE(12) LINE (TYPICAL) TYPE HEATING CABLE WIRING DIAGRAM
SEE SNOW MELTING SYSTEM CONTROL DIAGRAM ON
NEW AUTOMATIC SNOW MELTING SYSTEM CONTROL PANEL "P1"
U/G
U /G
U /G
P P
MELTING SYSTEM CONTROL PANEL "P1"
4-#2/0 & #4(G) IN 103C TO AUTOMATIC SNOW
NEW U/G CONCRETE ENCASED SEC LINE
AND #2/0, 600V, "XLP" IN 103C3-2/0/C,24KV,"XLP"
NEW U/G CONCRETE ENCASED PRIMARY LINE
CP CASEY
SYSTEM, AHA AREAS,
REPAIR ROAD AND SNOW MELTING
KIM, SY
ELECTRICAL
DISTRIBUITION-1
NEW EXTERIOR HEATING CABLE
295928
1:300 E-6
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
E-4
1 OF 2WAY (6 LINE, TYPICAL)
TYPICAL HEATING CABLE END /
E-5
REPLACE/EXTEND EXIST TURF AREA W/ NEW GUARDRAIL
APPROXI. L = 35 LM
SEE HEATING CABLE WIRING DIAGRAM ON
SEE GUARDRAIL DETAIL ON
EXIST PRIMARY POLE/ PROVIDE NEW HIGH VOLTAGE CABLE RISER SET
NEW TERMINATION
AND ADAPTER KIT 24KV-3EA & 600V-1EA
(LIGHTNING ARRESTER (18KV-3EA),
FOR SINGLE CONDUCTOR,
FUSE CUTOUT SWITCHES & NECESSARY ACCESSORIES
CONCRETE POLE (TYPICAL)
EXIST SEC LINE
NEW UNDERGROUND TWELVE(12) LINE HEATING CABLE
/ APPROXIMATE LENGTH OF HEATING CABLE 50M (2WAY)
E-3
2SEE CROSS SECTION DETAIL ON (TYPCAL)
EXIST AHA GETE
CONCRETE POLE (TYPICAL)
EXIST PRIMARY LINE
NEW BOLLARD (TYPICAL)
600030000
SCALE: 1:300
12000
NEW HIGH VOLTAGE CABLE RISER SET
(LIGHTNING ARRESTER (18KV-3EA),
KIT 24KV-3EA & 600V-1EA
AND ADAPTER
NEW PAD MOUNTED TRANSFORMER, METAL ENCL, RADIAL TYPE,
60HZ, 400KVA W/BUILT-IN PROTECTIVE DEVICES (50A FUSE)
&PROVIDE NEW BOLLARDS (2EA) TO PROTECT TRANSFORMER.
OIL-FILLED, SELF-COOLED, LOAD BREAK SW, 3PH, 11.4KV-220/380V,
SCALE:
1/300
NEW EXTERIOR HEATING CABLE DISTRIBUITION PLAN
MELTED SNOW INTO EXISTING DRAINAGE SYSTEM.
CONTRACTOR SHALL INSTALL SNOW MELTING SYSTEM TO DRAIN
CHARGING TO GOVERNMENT.
CONDITION SUCH AS GRADING, DRAINAGE SYSTEM, ETC WITHOUT
SYSTEM ,AND PROVIDE HEATING CABLE TO MEET THE ROAD
SITE CONDITION INCLUDING EXISTING EXTERIOR POWER
CONTRACTOR SHALL BE RESONPSIBLE TO VERIFY EXISTING
THIS DRAWING ARE ESTIMATED FOR BIDDING PURPOSE ONLY.
LOCATION AND LENGTH OF HEATING CABLES SHOWN ON
NOTE.
1.
2.
3.
PERSONNEL OF RLFC RANGE CONTROL, DPW THRU COR.
INSTALL THEM TO MEET SITE CONDITION BY COORDINATING WITH
MELTING SYSTEM ARE CONCEPTUAL. CONTRACTOR SHALL
LOCATION OF TRANSFORMERS, HANDHOLES, AUTOMATIC SNOW
S -1
S -1804
E-3
2SEE CROSS SECTION DETAIL ON (TYPCAL)
EXIST PRIMARY POLE "P4B-32"/ PROVIDE
O /H
O /H
O /H
P
P
P
P
P
LINE(TYPICAL)
EXIST O/H PRIMARY
LINE(TYPICAL)
EXIST O/H PRIMARY
0.1 6M
0.6
.05
.8m
&PROVIDE NEW BOLLARDS (2EA) TO PROTECT CONTROL PANEL.
TWELVE(12) LINE (TYPICAL) TYPE HEATING CABLE WIRING DIAGRAM
SEE SNOW MELTING SYSTEM CONTROL DIAGRAM ON
NEMA 4X (SUS) ENCL. (TYPCAL)
NEW AUTOMATIC SNOW MELTING SYSTEM CONTROL PANEL "P2"
E-4
U /G
U /G
S E C
AND #2/0, 600V, "XLP" IN 103C3-2/0/C,24KV,"XLP"
NEW U/G CONCRETE ENCASED PRIMARY LINE
/ APPROXIMATE LENGTH OF HEATING CABLE 145M (2WAY)
EXIST TELEPHONE M/H
NEW UNDERGROUND TWELVE(12) LINE HEATING CABLE
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
KIM, SY
E-7
295928
ELECTRICAL
CP CASEY
SYSTEM, AHA AREAS,
REPAIR ROAD AND SNOW MELTING
DISTRIBUITION-2
NEW EXTERIOR HEATING CABLE
1:300
NEW TERMINATION
SWITCHES & NECESSARY ACCESSORIES
AUTOMATIC SNOW MELTING SYSTEM CONTROL PANEL "P2"
2SET OF 4#250KCMIL & 1#2/0(G) 103C TO
NEW U/G CONCRETE ENCASED SEC LINE
FOR SINGLE CONDUCTOR, FUSE CUTOUT
E-4
1 OF 2WAY (6 LINE, TYPICAL)
TYPICAL HEATING CABLE END /
SEE HEATING CABLE WIRING DIAGRAM ON
CONCRETE POLE (TYPICAL)
EXIST PRIMARY LINE
EXIST AHA GETE
NEW BOLLARD (TYPICAL)
| ELEC_295928_TITLE |
| ELEC_295928_PDF |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
File details come from the government source that posted it. Updated .