289991_CIVIL_DWG.pdf
PDF 1 MB Posted
- Solicitation number
- W90VN824R0051
About this file
This document appears to be a set of civil engineering drawings related to a federal contract opportunity to repair the parking lot of the Apache Range at Camp Casey.
The key details are:
- The contract opportunity is for repair and maintenance work on the existing parking lot, including replacing asphalt pavement, sidewalks, and curbing; repainting parking lines and road edges; and installing new wheel stops.
- The project is located at Camp Casey, which is part of the United States Army Garrison Red Cloud under the US Army Installation Management Command.
- This is a solicitation issued only to existing Area I & II General Construction Multiple Award Indefinite Delivery Indefinite Quantity (MAIDIQ) contractors under Contract Numbers W91QVN-24-D-0001 through 0020, 0082, 0099, 0103, and 0107.
- The drawings provide site plans, removal plans, and construction details for the proposed repair work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation W90VN824R0051.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 T - 1 1 OF 1 TITLE SHEET
CIVIL
A
B C D
E F G H
SCHEDULE OF DRAWINGS
RING NO. RING NO.DWG. NO. DWG. NO.SHT. NO. SHT. NO.DESCRIPTION OF DRAWINGS DESCRIPTION OF DRAWINGSREF. NO. REF. NO.REVISION STATUS REVISION STATUS
SYMBOL BY
DESIGNED BY
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENERGY MANAGER
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
ENVIRONMENT
FORCE PROTECTION
CIVIL
T-1
TITLE SHEET
LOCATION PLAN AND GENERAL NOTES
REMOVAL PLAN
SITE LAYOUT PLAN AND SCOPE OF WORK
MISC. DETAILS4 OF 4
C - 4
C - 3
C - 2
C - 1
CAMP CASEY
FEWR NO. 289991
CAMP CASEY
REPAIR PARKING LOT OF APACHE RANGE
PAK, CS
289991
REPAIR PARKING LOT OF APACHE RANGE
LAUNDRY
647667
DPW HQ
629 685
651A
853 874
833T
808 811
746 715 726
11491151
10431170
10291144
1918 1879
2372A
2373T
23832379
2451 2400
3004 3005
2648 2605
2609T
2514 2540
8008T
2540T
26462645
1991 1963
18331832
17441707
1962 1812
491 499
456A
SIMNET
463Z
TSAK MILES 2000
549 546
8114T
560G
468454
86M
48T
134 133
186 192
202A
208 215 214
213 212
199 194
258252
249 262
1785 235
237 238
FOOT BR
VEH BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
VEH BR 1821
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
1158A
1158B
RAILHEAD
447A
497A
497B
458Z
QA00894-0J
QA00893-0J
QA00892-0J
EXER W/LAT
EXER W/LAT
QA00138-9J
QA01300-8J
00-54151 BUP 020122
00-54152 BUP 020122
00-54132 BUP 010801
00-54127 BUP 040430
00-54158 BUP 030104
00-54129 BUP 011109
00-54157 BUP AFTER 2026
00-54156 BUP 031030
00-54130 BUP 020330
00-54131 BUP 020929
00-54155 BUP 030506
03-57200 REPAIR 041007
XX-QA00606 BUP 0310XX
XX-QA00602 BUP 0310XX
2022(?)
VEH BR
VEH BR
472?
455?
1840T
BARRIER
1564 1566
635A
2002B
48A
706(707A)
(2298)
1071?
1760?
VEH BR?
VEH BR?
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
S
S
W
W
B
B
48T
A
B
39 55
134 133
186 192
202A
208 215 214
213 212
258252
249 262
1785 235
237 238
FOOT BR
VEH BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
F
00-54151 BUP 020122
00-54152 BUP 020122
99-47353
4-200PN
XX-QA00606 BUP 0310XX
95-44142
4-184PN
VEH BR
A B
48A
B
A B
A B
A
B
A
B
174 Z
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
- 1 SCALE = 1 : 3,000
LOCATION PLAN
N
THIS PROJECT
GENERAL NOTES :
COMMENCING WORK ON THE PROJECT.
INDICATED BY THE COR AND SHALL BE APPROVED PRIOR TO
UNDETAILED PORTION OF THE JOB INCLUDING OTHER AREAS
2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ANY
COVERED WITH TOP SOIL AND CARPET SODDED.
4. ALL UNPAVED AREAS WITHIN THE GRADING LIMIT LINES SHALL BE
SUBMISSION OF CONTRACT PROPOSAL.
DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND
EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
DISMANTLING, DEMOLISHING, OR REMOVING AT THE CONTRACTOR'S
TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR/RESTORATION
ITEMS WHICH WILL INTERFERE WITH THE CONSTRUCTION OPERATIONS.
UNDER GROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER
CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS
5. THE SITE INDICATED ON THE DRAWINGS SHALL BE GRADED AND
TO THE PROJECT CONTRACT.
TO ACCOMPLISH THE CIVIL SCOPE OF WORK AT NO ADDITIONAL COST
FORM ARE A PART OF THIS PROJECT. THE DETAILS SHALL BE UTILIZED
OF THE INSTALLATION MANAGEMENT AGENCY, KOREA REGION OFFICE"
DRAWINGS, FOR OM&A PROJECTS, KOREA, OCTOBER 2015, DEPARTMENT
6. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL
EXISTING SITE CONDITIONS PRIOR TO START OF WORK.
CHECK THE OTHER CONSTRUCTION REQUIREMENTS IN MEETING THE
FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO
7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY
CIVIL
LOCATION PLAN AND GENERAL NOTES
C-1
CAMP CASEY KEY MAP
A CLEAN CONDITION ACCEPTABLE TO THE COR.
MATERIALS, EQUIPMENT AND DEBRIS AND LEAVE THE PREMISES IN
ALL TIMES AND AT COMPLETION OF WORK, REMOVE ALL SURPLUS
8. THE CONTRACTOR SHALL KEEP THE CONSTRUCTION AREA CLEAN AT
CAMP CASEY
REPAIR PARKING LOT OF APACHE RANGE
PAK, CS
QTYNO. ITEM
REMOVAL SCHEDULE
REMARK
155.0 LM
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
C-2
CIVIL
LEGEND :
BUILDING
REMOVAL
CONC SIDEWALK/ PAD
BUSHES RELOCATION IN PROJECT SITE.
3. THE CONTRACTOR SHALL COORDINATE WITH COR FOR THE TREES AND
CONTRACTOR SHALL COORDINATE WITH COR.
2. CONTRACTOR SHALL CONFIRM THE UTILITIES BEFORE REMOVAL.
VERIFY ACTUAL QUANTITIES.
1. QUANTITIES ARE ESTIMATED QUANTITIES, THE CONTRACTOR SHALL
NOTE:
WOOD CURB
REMOVAL PLAN
W
SCALE = 1 : 300
N
AC PAVEMENT 1580.0 SM
100.0 SM3 CON'C SIDEWALK
REMOVAL PLAN
CAMP CASEY
REPAIR PARKING LOT OF APACHE RANGE
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
W
N
CIVIL
C-3
SITE LAYOUT PLAN1
- 3
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
1. REPLACE AC PAVEMENT.
1APPROX. 1600.0 SM
MILL/OVERAY W/ 50MM THK AC SURFACE COURSE,
1APPROX. 210.0 SM
REPLACE AC PAVEMENT,
GRANITE CURB, APPROX. 235.0 LM
REPLACE EXST WOOD CURB W/
COURSE.
2. MILL/OVERAY W/ 50MM THK AC SURFACE
CURB.
3. REPLACE EXST WOOD CURB W/ GRANITE
W/ NEW, APPROX. 120.0 SM
REPLACE EXST CON'C SIDEWALK AND RAMP
RAMP W/ NEW.
4. REPLACE EXST CON'C SIDEWALK AND
3.00 @ 10 = 30.00
2.80 @ 10 = 28.00
APPROX. 40 EA
INSTALL ELASTIC WHEEL STOP,
SCHEDULE #2 (CONSTRUCT/ALTERATION)
1. INSTALL ELASTIC WHEEL STOP.
2, 3
- 4
- 4
SITE LAYOUT PLAN AND SCOPE OF WORK
APPROX. 414.0 LM
W/ 150MM THK REFLECTIVE WHITE,
REPAINT PARKING LINE AND ROAD EDGD LINE
LINE W/ 150MM THK REFLECTIVE WHITE.
5. REPAINT PARKING LINE AND ROAD EDGD
SCALE = 1 : 300
CAMP CASEY
REPAIR PARKING LOT OF APACHE RANGE
300MM THK BASE COURSE
150MM THK SUBBASE COURSE
TYPICAL AC PAVEMENT SECTION AC PAVEMENT JOINT (NEW TO EXST)
1A 1B
1A
PRIME COAT
SUB GRADE
PAVEMENT
EXISTING
75MM THK ASPHALTIC CONCRETE
SUBGRADE
NEW PAVEMENT,
SEE DETAIL
MIN
EXST AC PAVEMENT
TACK COAT
SAWCUT & BITUMINOUS
PRIME COAT
NEW AC PAVEMENT
REFLECTIVE
WHITE PAINT
STRIPES (TYP)
CL
CL
150mm WIDE
PAVEMENT MARKING DETAILS
CURB
CONCRETE 25-18-8
SUBGRADE
A C
O R
P C
C P
A V
E M
E N
T
S E
C T
IO
N
SIDEWALK
GRANITE CURB
C
2% SLOPE
EXISTING SUBGRADE
TACK COAT
EXISTING BASE COURSE
VARIES
TO REMAIN
EXISTING SUBBASE COURSE
2% SLOPE
TO REMAIN
TO REMAIN
BASE COURSE NOT EXPOSED
MILLING & OVERLAY
EXISTING PCC PAVEMENT
50 / 100MM THK AC PAVEMENT
OVERAY ON EXSTING PCC W/
AC PAVEMENT
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
FORCE PROTECTION
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
SCALE: NONE
SCALE: NONE
C-4
GRANITE CURB
- SCALE: NONE
1C
2C
2C
JOINT
SEALER
JOINT
FILLER
R=3
TYP
R=3
TYP
TRANSVERSE CONTRACTION JOINTS
SHALL BE SPACED SO THAT RATIO
OF SLAB LENGTH TO WIDTH WILL
NOT EXCEED 1.25. THE DEPTH OF
THE CONTRACTION JOINT WILL BE
AT LEAST ONE-FOURTH OF THE
SIDEWALK SLAB THICKNESS,BUT NOT
LESS THAN THE MAXIMUM NOMINAL
SIZE OF THE AGGREGATE USED.
PROVIDE EXP JOINTS AT MAX 9.0 M
INTERVALS FOR STRAIGHT SECTIONS,
AT ALL RETURNS OF WALKS,
AND WHERE WALKS ABUT OTHER
CONCRETE STRUCTURES.
BROOM
FINISH FIN GRADE
3A S E C T I O N
3B
EXPANSION JOINT
3C
CONTRACTION JOINT
COMPACTED
NON-FROST-SUSCEPTIBLE
MATERIAL BASE
0.06
#8-150X150 WWF
2C
2B
ELEVATION
SECTION
2D
DRIVE WAY CURB
2A
PLAN
DIRECTION SHOWN
BY BROOM FINISHING IN THE
ROUGHEN CONCRETE SURFACE
CONCRETE
STANDARD CONCDROP CURB DROP CURB
CONC. SIDEWALKSTD. CONC. CURB
CONC. CURB
DROP CURB
0 15
TOP OF CONC CURB
AC PAVEMENT
DRIVE WAY CURB
FOR DET, SEE EXPANSION JOINT
CONCRETE RAMP
WIRE MESH 2%
100mm THK BASE COURSE
COMPACTED SUBGRADE
DRIVE WAY
CURB
DROP CURB
1:121:12
DRIVE WAY CURB
1:
DROP CURB
CONC. CURB
R=25
150150
4mm0 X 150 X150
10mm PREMOLDED12
15001375 1375
15001375 1375
SCALE: NONE
CONCRETE SIDEWALK
RAMP DETAIL
SCALE: NONE4
2D
4 -
MISC. DETAILS
CAMP CASEY
REPAIR PARKING LOT OF APACHE RANGE
| t1 |
| 1 |
| 2 |
| 3 |
| 4 |
File details come from the government source that posted it. Updated .