This is a Purchase Description (PD) for a Turbomolecular Pumping Station (TMPS) to replace a discontinued Agilent Technologies/Varian TPS-compact TV301 model. The TMPS will support the Air Force Metrology Calibration Program (AFMETCAL) in maintaining high-vacuum and vacuum metrology calibration equipment across the Air Force, enabling evacuation of vacuum Test, Measurement, and Diagnostic Equipment (TMDE) to high-vacuum levels. The system must be a fully integrated, oil-free, benchtop "plug-and-play" unit combining a turbomolecular high-vacuum pump, dry scroll backing pump, integrated system controller, and separate variable leak valve with an ISO 100 flange connection on the pumping system outlet.
The TMPS must meet specific performance parameters including a high-vacuum pump speed of at least 215 L/s for nitrogen, achieve a vacuum pressure of 1×10⁻⁹ mbar, and maintain a compression ratio for nitrogen greater than 1×10⁻¹¹. The dry scroll backing pump shall operate at no less than 56,000 RPM and achieve an ultimate pressure of at least 0.1 mbar, with warm-up time from cold start to nominal operating speed in less than 15 minutes. The system shall operate in environments from 41°F to 95°F and be powered by 115 VAC at 50/60 Hz, single phase. The variable leak valve requires ultra-high vacuum capability down to 1×10⁻⁹ Torr (L/s), withstand inlet pressures to 500 psi, utilize sapphire-to-copper sealing with 13,000:1 mechanical advantage, and feature dual locking knobs with adjustable closure stops. The TMPS chassis must not exceed 18 inches in length/depth, 15 inches in width, 12 inches in height, and weigh no more than 50 lbs. The contractor shall provide a Commercial Off-The-Shelf operator's manual with component listings, installation/maintenance procedures, and block diagrams; a comprehensive deliverable component list; environmental, safety, and health documentation; and a minimum two-year warranty from delivery. All equipment will be inspected and tested against specified requirements using test equipment with NIST traceability or Air Force Metrology Calibration Program approved sources.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
27M-083A-VA
October 9, 2026 Rev 0
PURCHASE DESCRIPTION
FOR
Vacuum Turbo Pump
1.0 SCOPE: For this Purchase Description (PD), the Turbomolecular Pumping Station will be referred to as TMPS. The TMPS will replace the Agilent Technologies/Varian TPS-compact TV301 (Model: 969-8221M003), which contains the following components: TV301 turbomolecular pump, integrated controller, variable leak valve and dry scroll backing pump. The manufacturer (Agilent/Varian) has discontinued this item and ceased its support of the key components. This acquisition will aid AFMETCAL in maintaining support for a multitude of different high-vacuum and vacuum metrology calibration equipment across the Air Force. The new standard would support high-vacuum chambers, vacuum sensors, transducers, and other similar high-vacuum TMDE. The TMPS shall evacuate vacuum TMDE up to high-vacuum levels in absolute mode.
2.0 PERFORMANCE REQUIREMENTS:
2.1 Operations: The TMPS is required to feature an integrated, oil-free, benchtop pumping system combining a turbomolecular high-vacuum pump, a dry scroll/backing pump, and an integrated system controller. The acquisition shall also contain a separate variable leak valve. The TMPS shall be a fully integrated, self-contained "plug-and-play" unit. The roughing and backing operations shall not require physical pumping or oil-sealed backing pumps to achieve high-vacuum operation. Users are expected to interact solely with the system's main interface or display panel during operation. The connection on the top of the pumping system shall be an ISO 100 Flange (ISO-LF DN 100).
2.2 Range and Pumping Speed: The TMPS shall be capable of evacuating chambers and measuring pressure across the following parameters:
2.2.1 The High-Vacuum Pump Speed shall be at least 215 L/s for Nitrogen
2.2.2 The Vacuum Pressure shall obtain a vacuum of 1*10^-9 mbar
2.2.3 The Compression Ratio for Nitrogen shall be greater than 1*10^-11
2.3 Backing Pump System:
2.3.1 The TMPS shall contain an integrated, oil-free dry scroll backing pump
2.3.2 The dry scroll pump shall have a rotational speed no less than 56,000 RPM
2.3.3 The backing pump shall be dry (scroll mechanism) to prevent any hydrocarbon contamination of the turbomolecular pump, high-vacuum chamber, and calibration standard.
2.3.4 The backing pump shall achieve an ultimate pressure of at least 0.1 mbar or better on its own.
2.4 Environmental Requirements: The TMPS shall be able to operate or be stored in the following environmental conditions:
2.4.1 Operating Temperature: 41 to 95°F (5 to 35°C)
2.4.2 Storage Temperature: -4 to 158°F (-20 to 70°C)
2.4.3 Operating Humidity: 0 to 90% RH (non-condensing)
2.4.4 Storage Humidity: 0 to 95% RH (non-condensing)
2.5 Warm-Up Time: The TMPS shall reach its nominal operating rotational speed (e.g., 56,000 RPM or greater) from a cold start in less than 15 minutes.
3.0 FUNCTIONAL REQUIREMENTS:
3.1 Medium: The TMPS shall operate using air or nitrogen.
3.2 Vent Valve Operations:
3.2.1 The system shall have a manual variable venting option located on the pump system.
3.2.2 Delay and Open Time: The system shall allow user-configurable vent valve.
3.3 System Protection:
3.3.1 Overpressure/Failure Protection: In the event of a power failure, the TMPS shall automatically close its inlet or isolate/vent the system to protect the high-vacuum pump.
3.3.2 Over-temperature Protection: The TMPS shall feature integrated thermistor sensors to monitor pump and controller temperatures and automatically shut down or throttle in the event of an over-temperature condition (e.g., pump or controller over-temperature).
3.3.3 Short Circuit and Overvoltage Protection: The system controller shall feature electrical protections against short circuits, overcurrent, and overvoltage, displaying corresponding fault indicators on the panel or via serial communications.
4.0 MECHANICAL & PHYSICAL REQUIREMENTS:
4.1 Size and Weight:
4.1.1 The TMPS chassis shall be compact and shall not exceed 18 inches (457 mm) in length/depth, 15 inches (381 mm) in width, and 12 inches (305 mm) in height.
4.1.2 The TMPS benchtop assembly shall not exceed 50 lbs.
4.2 Vacuum Connections: The high-vacuum inlet flange of the turbomolecular pump shall be ISO-LF DN 100 with standard claw-clamp or collar-flange connections to ensure a direct physical connection to existing chambers and calibration standards. The exhaust/vent connection of the dry scroll backing pump shall feature a standard connection (e.g., 1/8" BSP with a fitted silencer or standard ISO-KF fitting) to safely route exhaust or contain noise.
4.3 Variable Leak Valve:
4.3.1 Ultra-High Vacuum (UHV) Range & Extreme Leak Sensitivity: The valve shall provide stable, continuous flow regulation from atmospheric pressure down to an adjustable minimum controllable leak rate of less than or equal to 1*10^-9 Torr (L/s) under normal ambient operation, and less than or equal to 1*10^-9 Torr (L/s) when condensable vapors are eliminated from the inlet gas, while maintaining system vacuum integrity below 1*10^-11 Torr.
4.3.2 High-Pressure Inlet Capability: The valve inlet port and internal seal barrier must safely withstand, control, and isolate high-pressure gas backfill cylinders at supply pressures up to 500 psi maximum without leakage, diaphragm distortion, or seal failure.
4.3.3 Frictionless, Non-Galling Compression Sealing Interface: The primary vacuum seal must consist of an optically flat synthetic sapphire disk mating axially against a captured, replaceable OFHC copper or copper-alloy gasket ring. The sealing mechanism must operate strictly by perpendicular compression with zero shear, rotation, or sliding friction across the mating surfaces to avoid seizing, scoring, or particulate generation.
4.3.4 13,000:1 Mechanical Advantage with Zero-Backlash Drive: Sapphire positioning shall be actuated through a threaded drive shaft-and-lever mechanism providing a mechanical advantage of at least 13,000:1 for sub-micron closure control. The drive must be spring-washer preloaded to eliminate mechanical backlash and provide immediate flow response to micro-adjustments.
4.3.5 Dual Locking Knobs with Adjustable Travel/Closure Stop: Control actuation must utilize dual knurled locking knobs coupled with an adjustable positive stop collar. This assembly must allow operators to lock in repeatable gas-admission setpoints or establish a defined leak-tight shutoff stop that prevents overdriving, over-torquing, and sapphire fracture.
4.3.6 Standardized Vacuum Flange Interfaces & Compact Envelope: The valve body must feature a standard Outside Diameter (OD) ConFlat (CF 2.75 / CFF) main vacuum mounting flange and a 1-1/3” OD Mini-ConFlat (CF 1.33 / Mini-CFF) gas inlet port, with a total weight not exceeding 4.0 lbs (1.8 kg) and an overall maximum height not exceeding 4.5 inches (114 mm).
4.4 Construction: The TMPS shall be designed and constructed of materials that meet the requirements of this specification and in accordance with the best commercial practices for industry approved equipment. It shall be the contractor’s responsibility to assure the government that such design objectives as reliability, accuracy of operation, maintainability and ease of operation have been given due consideration in the manufacture of this equipment. All parts such as shafts, bearings, regulators, switches, controls, connectors, etc., shall have proper clearance and adjustments. They shall work together so that the equipment shall supply the rated requirements without unnecessary strains, vibrations, and overheating. They shall be able to withstand the conditions met in shipping, storage, installation, and services. All materials and parts of this equipment shall be capable of withstanding environmental testing requirements of this specification.
4.5 AC Power Rating: The power required to operate the TMPS shall be nominal 115 VAC (±10%) at 50/60 Hz, single phase.
4.5.1 The TMPS shall not use more than one outlet.
4.5.2 Necessary detachable power cords shall be provided.
4.6 Individual Unique Identifier Designation: The TMPS shall be clearly labeled with a model number, serial number, and manufacturer’s name. Unique item identification labeling shall follow Item Identification and Valuation requirements as stated in the contract. The TMPS shall be clearly labeled with an expiration date of the Warranty Agreement.
4.7 Fan Blade Protection: The system shall contain a removable screen that protects the blades from the pump from being damaged by debris greater than 0.7 mm diameter.
4.8 Electrical Protection: The TMPS shall have a user-serviceable fuse or circuit breaker to protect the electronics in the event of excessive current. Fuses shall be replaceable or circuit breakers resettable without removing internal covers/panels or voiding the manufacturer's service warranty.
5.0 OPERATOR’S MANUAL: A Commercial Off the Shelf (COTS) operator’s manual shall include the following:
5.1 Individual Component Listings: The manual shall list the field replaceable components, which includes OEM manufacturer’s name, and OEM part number. If applicable, include component range and uncertainty.
5.2 Installation and Maintenance Procedures: The manual shall have instructions for installation and powering up the unit as well as instructions of how to properly maintain the system.
5.3 Diagrams: Block diagrams of the TMPS.
6.0 Deliverable Component List: A comprehensive list of all components expected with the delivery shall be provided with each shipment. The list at a minimum shall include the P/N, noun, and quantity.
7.0 Environment, Safety, and Operational Health: A combination of the system manual, other documentation, and/or the system itself shall identify potential environment, safety and operational health hazards and how they are mitigated when the design itself cannot mitigate them. This will be accomplished through stating the hazard and accompanying mitigation through the use of safety devices, use of warnings, or use of special operational procedures to counter such hazards.
8.0 WARRANTY & TECHNICAL SUPPORT: A warranty and technical support normally offered by the vendor for this product shall be provided with the unit. The warranty shall last at least two years from delivery.
9.0 TESTING: The TMPS will be inspected and accepted at a destination specified elsewhere in this contract. The item will be checked with test equipment and parameters equal to or better than those required assuring specified performance requirements are met. Test equipment has first echelon certification directly traceable to the National Institute of Standards and Technology (NIST) or other AFMETCAL approved sources where required. Test will be performed to assure the TMPS meets or exceeds all of the requirements of this purchase description. Such testing does not relieve the contractor of performing all inspections and quality control checks at the point of fabrication as necessary to assure performance as specified.