This is an Invitation for Bid (IFB) issued by the Town of Needham Department of Public Works for on-call roof maintenance services for various municipal and school buildings. The Town seeks a qualified contractor to provide comprehensive roofing inspection, preventative maintenance, and emergency repair services for 34 buildings and facilities, including schools, town offices, water treatment plants, and pump stations with a combined roof area of approximately 912,500 square feet. Biannual inspections and preventative maintenance are required in April and October each year, with inspections to be completed within two weeks of the mutually agreed start date. The contractor must respond to emergency service requests within two hours, immediate non-emergency requests within 48 hours, and schedule routine work within two weeks. The deadline for written questions is December 9, 2026 at 5:00 PM, with sealed bids due December 15, 2026 at 1:00 PM at the Administration Office, 500 Dedham Avenue, Needham, MA 02492. Contract award is anticipated in January 2027. The initial contract term is January 1, 2027 through December 31, 2027, with renewal options for up to four additional one-year terms through December 31, 2031.
Bidding is based on unit prices for each building's biannual preventative maintenance and inspection, as well as hourly rates for on-call repairs at three tiers: weekdays 7:00 AM to 5:00 PM, weekdays 5:00 PM to 7:00 AM and Saturdays, and Sundays and holidays. Additionally, bidders must specify a materials markup percentage applied to a base of $25,000. No price adjustments, fuel surcharges, or vehicle charges are permitted. The Town will award the contract to the lowest responsible and eligible bidder based on combined bid prices for years one through three. A 5% bid deposit is required, and bonds are required based on contract value: a payment bond of 50% of contract price if the annual value is $25,000 or more, or 100% of contract price if annual value reaches $150,000 or more; a performance bond in full contract amount is required if annual value exceeds $150,000. Bidders must be DCAMM-certified in roofing, provide proof of three years continuous business operation, submit five references (at least three from governmental units), possess FAA Part 107 drone certification, comply with prevailing wage requirements, carry workers' compensation and general liability insurance with the Town as additional insured, and ensure all employees complete ten-hour OSHA construction safety training. No pre-bid meeting is scheduled.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB 27DPW141B 1
Town of Needham Department of Public Works
Public Services Administration Building, 500 Dedham Avenue Needham, Massachusetts 02492
Telephone (781) 455-7550
ACKNOWLEDGEMENT OF RECEIPT
Release Date November 27, 2026
Bid Title On Call Roof Maintenance
Bid Number 27DPW141B
Number of Documents
The Bid Package consists of 2 PDF documents. Returning this form confirms receipt of all the documents.
Pre-Bid Meeting NA
Questions Due December 9, 2026 at 5:00PM
Bids are Due December 15, 2026 at 1:00PM, Administration Office of the Department of Public Works located at the Public Services Administration Building, 500 Dedham Ave., Needham, MA, 02492
Please provide the requested information below as acknowledgment that you have received our bid package noted above. It is recommended that interested bidders complete this acknowledgment and return via email to dpwbids@needhamma.gov. Only by doing this, will the Town be able to provide notification of any addenda or answered questions relating to this bid. Only those companies or individuals shown on the Distribution Register will receive addenda to this bid. By completing and returning this acknowledgement will ensure you are recorded on the Distribution Register.
Proposals from companies or individuals not acknowledging the addenda may be rejected as not responsive.
Name of Company or Individual
Name / Title of Contact
Address
City/Town, State, Zip Code
Telephone Number
Fax Number
Email Address
Signature
Date
Addenda will be posted to the Town’s website. Please check the website for addenda before submitting your bid to the Town. Bidders who access the bid package from the Town’s website are responsible for checking the website periodically for any addenda that may be issued by the Town.
IFB 27DPW141B 2
On Call Roof Maintenance
27DPW141B
Release Date November 27, 2026
Pre-Bid Conference
NA
Deadline for Questions
December 9, 2026 at 5:00PM
Bids Due
December 15, 2026 at 1:00PM Director of Administration Public Service Administration Building 500 Dedham Ave.
Needham, MA 02492
IFB 27DPW141B 3
(Advertised in the Hometown Weekly issue of Thursday, November 26, 2026) (Advertised on the MNPA’s website, Thursday, November 26, 2026)
(Published in Central Register issue of Wednesday, November 25, 2026) (Advertised in CommBuys on Thursday, November 26, 2026)
LEGAL NOTICE
Town of Needham
Invitation for Bid (IFB) Bid #27DPW141B
The Town of Needham is accepting sealed bids for On Call Roof Maintenance. Copies of the Invitation for Bid (IFB) package will be available beginning Friday, November 27, 2026 at the Administration Office of the Public Works Department, 500 Dedham Ave., Needham, MA 02492 during normal business hours, or from the Town’s web site www.needhamma.gov/bids.aspx and will be available until the submission deadline. Sealed bids must be submitted no later than 1:00pm, December 15, 2026, to the Administration Office of the Public Works Department, Town of Needham, 500 Dedham Ave., Needham, MA 02492. LATE BIDS WILL NOT BE CONSIDERED. Bids will be publicly opened after submission deadline. The Town reserves the right to reject any and all bids as determined to be in the best interests of the Town and to waive minor informalities.
Kathleen King Town Manager
November 27, 2026
IFB 27DPW141B 4
IFB 27DPW141B
Procurement in Brief
Primary Procurement Contact Ashley Ellis, Management Analyst Contract Manager Barry Dulong, Director of Building Maintenance
Bid Package Available
November 27, 2026- Information and details of bidding requirements may be obtained at the Administration Office DPW, PSAB, 500 Dedham Ave., Needham, MA 02492, or online at the Town’s web site http://www.needhamma.gov/bids.aspx
Pre-Bid Meeting NA
Bid Deposit 5% bid deposit is required as part of bid
Deadline for Written Questions
December 9, 2026 at 5:00PM By Mail: DPW - 500 Dedham Ave., Needham, MA 02492
By Email: dpwbids@needhamma.gov Questions are to be clearly labeled as: QUESTIONS - On Call Roof Maintenance, 27DPW141B
Addenda
If any changes are made to this bid, an addendum will be issued. Addenda will be posted on the Town’s webpage and emailed to all bidders on record as having received the bid package.
When and where bids are due
1:00pm, December 15, 2026, Administration Office DPW, PSAB, 500 Dedham Ave., Needham, MA 02492.
LATE BIDS WILL NOT BE CONSIDERED
Where bids will be opened Charles River Room, PSAB, 500 Dedham Ave., Needham, MA, 02492, after submission deadline
Contract Award Anticipated January 2027 Approval of Town Manager and Town Counsel is REQUIRED
Contract Length
This Agreement shall be for a term commencing January 1, 2027, and ending December 31, 2027. This agreement may be renewed or extended for up to 4 years, in one-year terms, at the sole discretion of the Town.
IFB 27DPW141B 5
Upon Award of Contract
Payment Bond Refer to Bond Requirements (Article 1.08 below)
Performance Bond Refer to Bond Requirements (Article 1.08 below)
Insurance Refer to Contract Terms
* Facsimile transmissions for written inquiries must be sent prior to the above date and time deadlines.
Any hand delivery or facsimile received after the due date and time will not be addressed. The time/date stamp machine located in the receiving office will govern for the date and time requirements mentioned in the table above and throughout this document. Please allow enough time for hand delivery or facsimile transmissions.
** The time for award may be extended by the Town. The Town reserves the right to change, delay, cancel, or expedite the contract award date. The Bidder agrees that the offer is effective for (a) at least ninety (90) calendar days from the opening date of the bids (b) a contract is executed, or (c) this bid is cancelled, whichever of (a), (b) or (C) occurs first. The Town reserves the right to reject any and all bids as determined to be in the best interests of the Town and to waive minor informalities.
IFB 27DPW141B 6
PART 1 – GENERAL CONDITIONS AND SUBMISSION REQUIREMENTS
1.01 Intent
The Town of Needham (hereinafter referred to as the “Town”), acting through its Town Manager, invites highly qualified bidders to submit sealed bids to perform all labor necessary for On Call Roof Maintenance.
All bids are subject to the provisions of M.G.L. Chapter 149. The Town will award the contract to the lowest responsible and eligible bidder as set forth in section 1.15. The Town of Needham reserves to itself the right to accept or reject any and all bids, or to allow or deny variations from these specifications.
Such actions will be deemed to be in the best interest of the Town. Unless sooner rejected or accepted, all bid proposals must be firm and continue in effect for a minimum of ninety (90) calendar days from the date of bid opening.
1.02 Proposed Contract Term
The initial term of this agreement shall commence upon signature of the contract and end December 31, 2027. This agreement may be renewed or extended for up to 4 yearly extensions, through December 31, 2028, December 31, 2029, December 31, 2030, and December 31, 2031, respectively, at the sole option of the Town and upon the terms described in the Invitation for Bid. The maximum term of this contract will result in an ending date of December 31, 2031. The successful Bidder must enter into the Form Agreement prepared by Town Counsel (Sample Available Online).
The Town may terminate the Contract at any time upon written notice for any reason including its own convenience or for cause, including but not limited to, failure to perform the work required under the contact, failure to document satisfactorily to the Town amounts being charged, failure to have any necessary local, State or Federal licenses and/or permits, failure to pay any and all required taxes, failure to comply with any local, State or Federal regulations pertaining to services to be provided, failure to promptly correct any performance or lack of performance which conflicts with the Town's use, and failure for satisfactory behavior of all staff and management. In the case of a termination for cause, the Town shall give the Contractor a written notice as provided in the Agreement.
1.03 Pre-Bid Conference and Requests for Interpretation
Refer to Procurement in Brief for details.
Bidders shall promptly raise the issue of any ambiguity, inconsistency or error, which they may discover upon examination of the bid documents, the work site or any other conditions which apply to the work.
Inquiries concerning any part of this Bid shall be directed to the individual(s) listed under the Procurement in Brief. Bidders should note that oral communications are not binding on the Town and only written responses by the Town will be considered. All requests/questions must be submitted in writing. Questions may be delivered by hand, fax or email as referenced under the Procurement in Brief by the deadline. Questions that may be asked during any pre-bid conference should also be sent in writing in order to receive an official response. Requests properly presented that in the opinion of the Town require interpretation, correction, or change in the Bid Documents will result in an issuance of an Addendum to the Bid Documents. Such Addendum shall subsequently become part of the contract. The Town will forward responses to all persons who are on record as receiving the bid package.
Questions received after the due date will not be responded to unless the Town determines it is necessary.
Bidders, please allow enough time for hand delivery or facsimile transmissions.
1.04 Information About Changes to the Bid (Addenda)
In the event that changes/additions are made to this bid, an addendum will be issued to every person (entity) on record as receiving the bid package. Addenda will be emailed, if an email address was not provided, then it will be faxed. If a fax number was not provided, then the addenda will be mailed.
Addenda will also be posted to the website. Please check back on the website for addendums before submitting your bid to the Town. Bidders may not be notified individually of Addendums.
IFB 27DPW141B 7
1.05 Bid Submission
The bidder shall submit his/her proposal upon the bid forms supplied within these specifications. The bidder shall specify the unit prices as requested for each bid item. All bids shall be signed correctly with ink; in order to qualify, the bidder must provide bids for each required item within a section. All bids shall be submitted to the Director of Administration, Town of Needham, Administration Office, 500 Dedham Avenue, Needham, MA 02492. Each bid shall be sealed in an envelope on which is clearly indicated: Name & Address of Bidder, IFB 27DPW141B, On Call Roof Maintenance, due at 1:00PM, December 15, 2026. All submitted bids shall include Invitation for Bids, Bid Information, Bid Scope of Work, and all Addenda issued, and all portions of the BID FORMS must be completed and submitted in order for a submission to be deemed acceptable. Bidders will submit insurance certificates validating current coverage at the time of bid submission. Bids received at the Administration Office after the time of opening of bids designated in the IFB will be returned to the bidder unopened. Bids will be publicly opened and read aloud after the bid due date in the Charles River Room at the Public Services Administration Building, 500 Dedham Avenue, Needham, MA 02492.
1.06 Bid Deposit
All bids must be accompanied by a bid deposit in an amount that is not less than five percent (5%) of the value of the bid. They shall be made payable to the Town of Needham and shall be in the form of certified check, treasurer’s or cashier’s check issued by a responsible bank or trust company, or a bid bond issued by a surety licensed to do business in the Commonwealth of Massachusetts; and shall be conditioned upon the faithful performance by the principal of the agreements contained in the bid.
1.07 Bid Form
All bids must be made on the attached bid forms.
Bids shall be firm for the duration of the contract. No price adjustments will be allowed. Fuel surcharges or vehicle charges, travel charges, or adjustments will not be allowed. Payment for materials and/or service will be made only after satisfactory performance or all requirements of the specification and upon approval by the Director of Public Works or their designate. The Town reserves the right to accept or reject any or all bids, wholly or in part, and to make the award in the best interest of the Town.
1.08 Bond Requirements
If the value of the contract (per year) is $25,000 or more, the following shall apply:
LABOR & MATERIALS BOND (PAYMENT BOND)
Pursuant to M.G.L. c. 149, § 29, the Contractor shall furnish a payment bond from a surety company qualified to do business under the laws of the Commonwealth of Massachusetts and satisfactory to the Town, in an amount of one half of the total Contract price for payment for labor performed or furnished and materials used or employed therein, when the Contract is executed. The payment bond shall be on the form provided by the Town.
It is distinctly agreed and understood that any changes made in the drawings and specifications for this work, whether such changes increase or decrease the amount of work required, or any change in the manner or time of payments made by the OWNER to the CONTRACTOR, shall in no way void, release or affect the liability and surety on the bond given by the CONTRACTOR.
If the value of the contract (per year) is $150,000 or more, the following shall apply:
LABOR & MATERIALS BOND (PAYMENT BOND)
Pursuant to M.G.L. c. 149, § 29, the Contractor shall furnish a payment bond from a surety company qualified to do business under the laws of the Commonwealth of Massachusetts and satisfactory to the Town, in an amount of the total Contract price for payment for labor performed or furnished and materials
IFB 27DPW141B 8
used or employed therein, when the Contract is executed. The payment bond shall be on the form provided by the Town.
PERFORMANCE BOND
A performance bond in the full amount of the contract will be required at the time of this contract for each year of the term of this contract if the contract value is $150,000 or more. The performance bond amount may need to be adjusted as the contract value is identified for each individual year. All performance assurances must be in-place before work can commence.
1.09 Insurance Requirement
Insurance Certificates indicating coverage for general liability, property damage, and workers’ compensation as outlined in Sample Agreement available online and must include the Town of Needham as additionally insured (at time of award). The selected bidder shall take out and maintain during the life of this contract Workers’ Compensation Insurance for all employees employed on the site of this project, in a manner and to the extent provided by Chapter 152 of the General Laws and shall provide the Town with written evidence showing compliance with this statute at the time of award.
The selected Bidder shall indemnify and save the Town harmless from and against all claims, suits, damages and outlays resulting from or by reason of loss, damage or injury of or to any person or property, wherever located which shall be caused by any action or operation under this agreement.
1.10 OSHA Training
The bidder certifies that all employees to be employed at the worksite shall have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least ten (10) hours in duration at the time the employee begins work and shall furnish documentation of successful completion of said course with the first certified payroll report for each employee (Chapter 306 of the Acts of 2004).
1.11 DCAMM Certification
DCAMM Certification in the prime category of Roofing is required.
1.12 Statement of Compliance
The CONTRACTOR shall submit a Statement of Compliance stating that persons employed by the award recipient are paid in accordance with the provisions of Sections 26 to 27H of Chapter 149 of the General Laws (i.e. “The Prevailing Wage Law”).The selected Bidder will not be permitted to either assign or underlet the contract, nor assign either legally or equitably any monies there under, or its claim thereto without the previous written consent of the Town.
1.13 Prevailing Wage Rates
The state prevailing wage law, MGL Chapter 149, Section 27B requires contractors and subcontractors to submit certified payroll records to the Town. Contractors and subcontractors must submit weekly payroll records either by (1) first class mail, or (2) electronic mail. Furthermore, every weekly submittal of payroll records must contain a signed statement by the employer that indicates (1) that the records are correct, and (2) the rate of wages that each worker receives. Please feel free to contact the Department of Labor Standards at (617) 626-6953 if you have any questions. Questions about enforcement of the prevailing wage law may be directed to the Attorney General’s Fair Labor and Business Practices Division at (617) 727-3465.
1.14 Duration of Bid Prices
All bids are to remain valid for 90 days after the opening of the bids.
IFB 27DPW141B 9
1.15 Contractor Selection
The Town will review all bids and will award the contract to the lowest responsible and eligible bidder based upon the combined total bid price for years one through three.
The Town reserves to itself the right to accept or reject any and all bids, or to allow or deny variations from these specifications.
In the event that there is a tie bid between two (2) responsible and eligible bidders, the award of the contract will be determined by a coin toss. The bidder’s whose submission was received earliest shall be assigned “Heads” in the coin toss. In the event that there is a tie bid with three (3) or more responsible and eligible bidders, the award shall be made by a draw by lot limited to those bidders. The coin toss/draw by lot shall be scheduled within two (2) business days from when it was determined by the Town to be a tie bid. The bidders involved shall be given an opportunity to attend. The coin toss/drawing shall be witnessed by at least three (3) Town officials. The tie breaker event shall be held at the location of bid submission during regular business hours.
Upon Vendor selection, the Town of Needham will mail to the selected Vendor(s), three (3) contracts to be executed by the Vendor(s) and returned to the Town of Needham with the appropriate insurance certificates. The Town of Needham will then counter execute the three (3) contracts and return one complete contract to the Vendor(s). The Town’s Standard Contract is available online. Bidders are expected to review the sample contract “Short Form Agreement”. Unless otherwise noted by the Town, the terms and conditions contained therein are NOT negotiable.
It is the intention of the Town of Needham not to award a contract under this or any other proposal if the Contractor cannot furnish satisfactory evidence that he/she has the ability and experience to perform this class of work and that he/she has sufficient capital and equipment to enable him/her to prosecute the work successfully and to complete it within the time named in the contract. The Town of Needham reserves the right to reject this or any other proposal or to award the contract as is deemed to be to the best interest of said Town.
1.16 General Safety, Licenses, & Performance
The contractor’s personnel working on this project must hold all necessary licenses and permits to perform the work required under this contract as required by the Town of Needham under the Commonwealth of Massachusetts regulations. The contractor must submit the names and all qualifying materials of the site supervisor that will be assigned to this project. All work will be done in accordance with applicable industry standards, codes and regulations, and/or manufacturer's specifications. Contractor is responsible for providing adequate safety measures during work to ensure protection of life and property. Any Town buildings, grounds and surrounding property damaged by the selected contractor will be restored to its original state, at the cost of the selected contractor.
The contractor shall be informed that there is a thirty (30) day cancellation clause in this contract for improper service. Complaints not rectified within a reasonable length of time from day of notice as determined by the Town may cause the Town to notify the contractor by registered or certified mail that the contract will be cancelled thirty days from the date of the letter. Any defective workmanship shown to be caused by improper or faulty installation shall cause the Contractor to correct, repair and/or replace all material and labor at no cost to the Town. The Contractor will warrant that all workmanship shall be first class and shall be performed by persons qualified and licensed in their respective trades.
Any additional work that is performed beyond this agreement must be approved by the appropriate Town authority. The absence of approval from the appropriate Town authority will be considered a violation of the contract.
IFB 27DPW141B 10
1.17 Site Maintenance and Inspection
The selected contractor will be responsible for maintaining the work site in a safe and orderly fashion on a daily basis. The contractor is responsible for the proper securing of all items associated with the project, including but not limited to: debris, tools, material, scaffolding, ladders, etc. The contractor is responsible for the repair or replacement of any item, equipment, space or area which may be damaged by the contractor during the execution of this project. The contractor is responsible for the removal and disposal of all debris and materials generated from this project.
1.18 Private Property
Before any work is performed on private property, the Contractor must have in his/her possession a RIGHT OF ENTRY form signed by the property owner. The Town may assist the Contractor in obtaining permission.
1.19 Dig Safe Law
Before proceeding with excavation operations, the Contractor shall notify the State of Massachusetts Underground Plant Damage Prevention System (Dig Safe) at 1-888-344-7233, and shall make such supplemental investigations.
1.20 Private Utilities Coordination
Coordination with private utilities is the sole responsibility of the contractor (including natural gas, electricity, telephone, cable, etc.). The contractor shall be responsible for notifying Dig Safe prior to any start of work. Any assistance the Town may offer in coordinating with private utilities shall not absolve the contractor’s responsibility to coordinate with private utilities as necessary to accomplish the contract work.
The contractor shall be responsible and liable for all damages to the existing utilities and structures.
1.21 Public Utilities Coordination
Coordination with public utilities is the sole responsibility of the contractor (including water, sewer, and drain). The contractor shall be responsible to call the Water, Sewer & Drain Inspectors at least 48 hours prior to the start of work to schedule said inspections at 781-455-7550, Mon.-Fri. 8:30 am - 5:00 pm. The Water Sewer, & Drains Inspectors must inspect the work. Any assistance the Town may offer in coordinating the public utilities shall not absolve the contractor’s responsibility to coordinate with public utilities as necessary to accomplish the contract work. The contractor shall be responsible and liable for all damages to the existing utilities and structures. At the contractors request the Town will supply water from hydrants for work. The use and operation of Town of Needham fire hydrants is restricted to Town employees only. The Town will set up a fire hydrant connection assembly each day to supply water as needed. The contractor is responsible for proper connection to the hydrant assembly and may operate the click valve only.
1.22 Traffic Controls
The Contractor shall furnish all local Police Officers to direct traffic and to keep the traffic off any part of the roadway in which construction is being carried out on, as, in the opinion of the Engineer are necessary for such purpose. Arrangements for officers shall be made well in advance of the work schedule for each day. If for any reason the Contractor cancels work for that day, and the Needham Police Department is not given advance notice, the Contractor will be responsible for that officer's wages. If the contractor has performed work that has not been accepted by the town and has to be redone to meet the specification, then the contractor is responsible for the expense of the police details due to poor workmanship or warrantee issues. Except in the instance above, the Owner will reimburse the Contractor for all other police details. The contractor must submit payments directly to the Needham Police Department or other police department’s that have supplied officers to the job site and supply copies of invoices showing invoice has been paid to the Department of Public Works as proof of payment.
IFB 27DPW141B 11
1.23 Material Disposal
The Contractor, at no additional cost to the Town, shall dispose of all material that has been removed from each location.
1.24 Quantities
Unless otherwise stated, the quantities set forth herein are ESTIMATES ONLY. Any quantities indicated on the Bid Price Form or elsewhere in the bid package are estimates only and are given solely as a basis for the comparison of bids. The Vendor shall have no claim for additional compensation, or refuse to do the work called for, or provide the requested items, by reason of the actual quantities involved being greater or lesser by any amount than those called for in the bid.
1.25 Subcontracting
The Contractor shall keep the work under his personal control and shall not assign by power of attorney or otherwise, or sublet the work or any part thereof, without the previous written consent of the Owner.
Should the Contractor require the services of one or more sub-contractors, the Contractor shall submit to the Owner, at the time of submittal of bids, the name and references for the sub-contractor(s) for review and approval by the Owner. Said sub-contractor(s) shall not begin any work or bring any equipment, etc., onto the site until such approval is given. Under no circumstances shall the Contractor sub-contract more than forty percent of the work on the project. The Contractor shall be responsible for the operations of any sub-contractor(s) and the sub-contractor shall be subject to the directions of the Contractor's Project Supervisor.
1.26 Invoices & Reporting
Upon verification that the work has been completed, invoices must be sent to Town of Needham, Administration Division, Department of Public Works, 500 Dedham Avenue, Needham, MA 02492. Each bill shall contain a cover sheet listing the broken-out labor and materials cost, and back-up documents including materials costs, and other relevant information. Certified payroll will be required. Invoices shall not be processed for payment until the above information is provided in a format acceptable to the Director of Administration or their designee. Invoices for on-call services must specify the cost of labor, hours worked, and cost of materials for each project. Invoices shall be itemized by units and by location or project. Additionally, all invoices must be submitted within 30 Calendar Days upon completion of the work.
Any invoices submitted after 30 Calendar Days, without prior written notice and approval, may be rejected and deemed ineligible for payment.
1.27 Payment
Payment shall be made on the amount of work performed based upon the unit prices placed on the bid forms. Payment shall be made upon submission of an invoice and acceptance of the work by the Director of Public Works, or their designated agent. The payment of these amounts shall be considered full and complete payment for all labor, material and equipment necessary, including traffic control, to perform the specified work. Fuel surcharges, vehicle charges, travel charges, and adjustments will not be allowed.
The Town will not be responsible for payment of any charges not itemized to the Town’s satisfaction. Pre-payment is NOT allowed. Invoices must include the Town’s purchase order number.
Invoices for additional services must include the date and times of the work, the type of the services performed; the number of hours or units to be charged, and the name of the person who authorized the work.
1.28 CORI/SORI
See Article 30 of Sample Agreement.
IFB 27DPW141B 12
1.29 Supplemental Equal Opportunity Anti-Discrimination & Affirmative Action Program
This contract is subject to the Supplemental Equal Opportunity Anti-Discrimination and Affirmative Action Program (EEO/AA) provisions attached to the Project Manual.
IFB 27DPW141B 13
1.30 Submission Requirements
Quality Requirements
All bidders must furnish proof of a minimum of three (3) continuous years in business.
All bidders must provide owner contact information for five (5) projects of similar nature and scope completed within the last five (5) years.
The bidder shall submit their proposal upon the bid forms supplied within these specifications. The bidder shall specify the unit prices as requested for each bid item. All bids shall be signed correctly with ink; in order to qualify, the bidder must provide bids for each required item within a section.
Submission Requirements
1. The bid is to be submitted and addressed as follows: Director of Administration, PSAB, 500 Dedham Ave., Needham, MA 02492.
2. The bid is to be clearly marked IFB 27DPW141B On Call Roof Maintenance.
3. Bidder must acknowledge all addenda related to this IFB, if any.
4. Bidder must submit a completed Bid Form A: Bid Form or an exact copy, signed by an individual authorized to negotiate for and contractually bind the Bidder. All prices must be reflective of all costs for delivery. No price adjustments will be allowed. Fuel surcharges or vehicle surcharges or adjustments will not be allowed.
5. Bidder must submit a completed Bid Form B: Bidder Information Response form.
6. Bidder must submit a completed Bid Form C: Authentication Form.
7. Bidder must submit a signed Bid Form D: Certificate of Good Faith.
8. Bidder must submit a completed Bid Form E: Certificate of Compliance with Massachusetts Tax Laws or Certificate of Good Standing issued by the Massachusetts Department of Revenue.
9. Bidder must submit a completed Bid Form F: Certificate of Compliance for Public Construction More than $10,000.00.
10. Bidder must provide the required number of references. For each, provide the following: a contact person and title, customer’s name, address, telephone number, email, and a brief description of the actual services provided (sample format included in bid package).
11. Bidder must submit a completed Bid Form H: Certificate of Authority (attached) or Corporate Resolution; if applicable.
12. Bids must be received and time stamped no later than the deadline stated in the Procurement Schedule (Where and When Bids are Due). LATE BIDS WILL NOT BE CONSIDERED.
13. A Bid Deposit is required.
14. DCAMM eligibility letter and update statement are required.
15. Delivery will be at the expense of the Bidder. Any and all damages that may occur due to packaging or shipping will be at the sole responsibility of the Bidder.
16. Any additional requirements as required in the Scope of Service.
The Town reserves the right to reject any and all bids as determined to be in the best interests of the Town and to waive minor informalities.
IFB 27DPW141B 14
PART 2 – SCOPE OF WORK
2.01 General
The Contractor shall provide comprehensive roofing inspection, preventative maintenance, and on-call repair services for various Town of Needham and Needham Public School buildings and facilities identified in this specification.
Services shall include, but not be limited to, biannual roof inspections, preventative maintenance, cleaning of roof drainage systems, identification of deficiencies, leak investigations, emergency leak response, temporary repairs, and permanent roof repairs as authorized by the Town.
The Contractor shall be capable of servicing multiple types of roofing systems, including slate shingles, built-up roofing, asphalt shingles, EPDM, and PVC roofing systems.
All work shall be performed in a professional and workmanlike manner, consistent with applicable building codes, manufacturer recommendations, industry standards, and the requirements of this specification.
The Town reserves the right to add or remove buildings and facilities from the contract throughout the contract term in accordance with the provisions of this specification.
2.02 Hours of Work
Normal hours of work shall be between 7:00 AM and 5:00 PM, Monday through Friday, unless otherwise specified by the Town.
No work shall be performed on Saturdays, Sundays, holidays, or outside normal working hours without prior authorization from the Director of Public Works or their designee. Emergency response services may be required outside of normal working hours, including weekends and holidays, as outlined in this specification.
All work performed under this contract shall be initiated or authorized by the Director of Public Works, Director of Building Maintenance, or their authorized designee. Work shall be performed in accordance with Town specifications, applicable manufacturer requirements, and any additional instructions provided by the Town.
The Contractor shall coordinate all work with the appropriate Town representative to minimize disruptions to building operations, occupants, and scheduled activities.
2.03 Response Time and Service Requests
The Contractor shall designate an employee or representative with the authority to act on behalf of the Contractor for receiving and coordinating service requests. The Contractor shall provide the Town with the designated representative's name, telephone number, email address, and a secondary contact for emergency situations.
The Town shall designate the employee or employees authorized to initiate service requests and approve work under this contract.
Requests for scheduled services and routine repairs shall be submitted in writing, including by email, mail, or other approved means. Emergency service requests may initially be communicated by telephone, with written confirmation to follow.
The Contractor shall meet the following response and scheduling requirements:
Emergency Response: The Contractor shall acknowledge and respond to emergency service requests within two (2) hours of notification. Response shall include arrival on site and commencement of appropriate measures to address the reported condition.
IFB 27DPW141B 15
Immediate Response: The Contractor shall respond to immediate, non-emergency service requests within forty-eight (48) hours of notification.
Scheduled Work: The Contractor shall acknowledge scheduled work requests within forty-eight (48) hours of notification and coordinate with the Town to schedule the work for completion within two (2) weeks, unless otherwise approved by the Town.
Emergency services shall be available twenty-four (24) hours per day, seven (7) days per week, including holidays.
Upon responding to an emergency leak or other condition involving active water intrusion, the Contractor shall take all reasonable measures necessary to mitigate further damage. This may include temporary patching, installation of temporary waterproofing materials, removal of standing water, protection of interior building components, and other appropriate temporary measures.
If permanent repairs cannot be completed during the initial response, the Contractor shall notify the Town and provide recommendations for corrective action and an anticipated schedule for completion.
The Contractor shall immediately notify the Town of any conditions that may result in significant property damage, structural deterioration, or a safety concern.
Failure to meet the required response times or scheduling obligations may result in a penalty of five hundred dollars ($500) per business day of noncompliance, as determined by the Director of Public Works or their designee, following written notification to the Contractor.
Continued or repeated failure to meet the requirements of this contract may be considered a breach of contract and may result in termination, subject to the applicable contract provisions and remedies available to the Town.
2.04 Supervision
The Contractor shall designate a Project Supervisor in writing upon receipt of the executed contract.
The Project Supervisor shall serve as the primary point of contact for the Town and shall be responsible for coordinating personnel, scheduling, work quality, safety, and overall contract performance. Any change in the designated Project Supervisor shall require prior written approval from the Director of Public Works or their designee. The Project Supervisor shall be present at each active job site during the execution of work and shall have the authority to make decisions and address issues on behalf of the Contractor. The Contractor shall provide adequate supervision and staffing to ensure all work is completed in a timely and professional manner. The Contractor shall employ a minimum of two (2) qualified workers on site during active repair and maintenance operations, unless otherwise approved by the Director of Public Works or their designee. Exceptions may be made for inspections, evaluations, or minor service calls where two workers are not necessary. Once work has commenced, the Contractor shall pursue and coordinate all work in a continuous and diligent manner until completion, unless otherwise directed by the Town or prevented by weather, safety conditions, or circumstances beyond the Contractor's control.
Failure to provide an approved Project Supervisor or maintain the required staffing levels may result in a penalty of two hundred dollars ($200) per business day of noncompliance, as determined by the Director of Public Works or their designee. The Town shall provide written notice of noncompliance to the Contractor. The Town reserves the right to require the removal or replacement of any Contractor employee whose conduct, performance, or failure to comply with Town requirements is deemed unacceptable.
IFB 27DPW141B 16
2.05 Specifications and Preventative Maintenance
The Contractor shall provide comprehensive roof inspections and preventative maintenance services twice annually, during the months of April and October, for each building and facility identified in this specification.
All biannual inspections and preventative maintenance activities for the buildings included in the contract shall be completed within a two (2) week period from the mutually agreed-upon start date, unless otherwise approved by the Town. Failure to comply with this requirement may result in a penalty of noncompliance as determined by the Director of Public Works. The Contractor shall coordinate an inspection and maintenance schedule with the Director of Building Maintenance or their designee prior to commencing work.
The Contractor shall be responsible for providing all labor, materials, equipment, tools, and supervision necessary to perform the required inspections and preventative maintenance.
Biannual Roof Inspections
During each biannual inspection, the Contractor shall thoroughly inspect accessible roof surfaces and associated components and shall:
Document the existing condition of each roof system.
Identify and document areas of deterioration, damage, or potential failure.
Identify specific areas of concern and recommend corrective action.
Document non-roofing-related conditions that may impact the performance or longevity of the roof system.
Identify deteriorated or porous masonry components that may contribute to water infiltration.
Inspect conditions surrounding roof-mounted equipment, including HVAC units, exhaust fans, curbs, and associated penetrations.
Inspect flashing, seams, membrane laps, roof penetrations, parapet walls, coping, and perimeter conditions.
Identify areas of ponding water, inadequate drainage, or other conditions that may contribute to premature roof deterioration.
Identify potential deficiencies in roof drainage systems.
Identify conditions that may impact existing manufacturer or installer warranties.
The Contractor shall provide a detailed written inspection report for each building within forty-eight (48) hours of completing the inspection. Reports shall include photographs, descriptions of identified deficiencies, their locations, recommended corrective actions, and an indication of the urgency of any recommended repairs.
Any condition requiring immediate attention shall be reported to the Town by telephone or email upon discovery and shall not be held until submission of the inspection report.
Preventative Maintenance
During each biannual preventative maintenance visit, the Contractor shall perform routine maintenance necessary to maintain the condition and functionality of each roof system. Preventative maintenance shall include, but not be limited to:
Remove accumulated debris from roof surfaces.
Clean and clear roof drains, gutters, downspouts, scuppers, and associated drainage systems.
Verify that roof drainage systems are functioning properly following cleaning.
Perform minor reinforcements and repairs to roof surfaces and flashing details, where appropriate and included within the approved preventative maintenance scope.
IFB 27DPW141B 17
Inspect and address minor deficiencies in roof seams, membrane laps, exposed fasteners, and flashing.
Inspect and reseal minor separations or deficiencies in sealants where appropriate.
Inspect roof penetrations, equipment curbs, and associated flashing for signs of deterioration or water intrusion.
Identify damaged or deteriorated roofing materials requiring additional repairs.
Remove and properly dispose of all debris and materials generated during maintenance activities.
The Contractor shall provide a detailed report of completed preventative maintenance activities for each building, including before-and-after photographs, within forty-eight (48) hours of completing the work.
Any repairs or corrective work that exceed routine preventative maintenance shall be brought to the attention of the Town and shall not be performed without prior authorization.
Drone and Thermal Imaging Requirements
The Contractor shall maintain a current Federal Aviation Administration (FAA) Part 107 Remote Pilot Certificate and shall provide qualified personnel and appropriate drone equipment for roof inspections and investigations.
The Contractor shall provide and operate a drone equipped with a radiometric thermal imaging camera capable of identifying potential trapped moisture, insulation deficiencies, and membrane delamination when requested by the Director of Building Maintenance or their designee, or when investigating reported roof leaks where thermal imaging is appropriate.
The Contractor shall also utilize drone equipment to access and inspect roof sections where conventional access is unsafe, difficult, or unavailable, when conditions permit.
All drone operations shall comply with applicable FAA regulations, required authorizations, and safety requirements. The Contractor shall provide thermal images, standard photographs, and an explanation of identified anomalies when thermal imaging services are performed.
Thermal imaging findings shall be treated as indicators of potential deficiencies and shall be evaluated in conjunction with other inspection findings and appropriate follow-up investigation.
On-Call Roofing Repairs
In addition to biannual inspections and preventative maintenance, the Contractor shall provide on-call roofing services to investigate, identify, and repair roof leaks and other roofing deficiencies on an as-needed basis.
The Contractor shall be capable of inspecting, maintaining, and repairing the following roof systems:
Slate shingles Built-up roofing Asphalt shingles EPDM roofing PVC roofing
All on-call repairs shall be authorized by the Director of Building Maintenance or their designee prior to commencement, except for emergency mitigation measures necessary to prevent further damage. Any emergency work performed prior to written authorization shall be promptly communicated to the Town and documented for subsequent review and approval.
IFB 27DPW141B 18
Upon completion of each repair, the Contractor shall provide documentation identifying the building, location of the repair, nature of the deficiency, work performed, materials used, labor hours, and photographs of the completed work.
The Contractor shall ensure that all repairs are compatible with the existing roofing system and shall coordinate with applicable manufacturers or warranty providers when necessary to avoid negatively impacting existing roof warranties.
Materials and Workmanship
All materials furnished by the Contractor shall be new, commercially acceptable, and appropriate for the existing roof system and intended application, unless otherwise approved by the Town. Materials used for repairs shall be compatible with existing roofing materials and shall meet applicable manufacturer specifications and installation requirements. All work shall be performed in accordance with accepted roofing industry practices, applicable building codes, and manufacturer recommendations. The Contractor shall not substitute materials or utilize repair methods that may negatively affect the performance, integrity, or warranty of an existing roofing system without prior written approval from the Town.
Building and Facility Inventory
The Contractor shall provide inspections, preventative maintenance, and on-call roofing services for the following Town and School buildings and facilities:
Location Roof Square Footage Williams School 585 Central Ave
46,461
Broadmeadow School 120 Broad Meadow Rd
64,952
Eliot School 135 Wellesley Ave
44,112
Hillside School 28 Glen Gary Rd
34,237
Mitchell School 187 Brookline St
50,285
Newman School 1155 Central Ave
92,172
Pollard School 200 Harris Ave
104,284
Needham High School 609 Webster St
121,470
High Rock 77 Ferndale Rd
32,761
Emery Grover 1330 Highland Ave
7,192
Town Hall 1471 Highland Ave
10,791
Library 1139 Highland Ave
21,054
Center at the Heights 300 Hillside Ave
11,342
PSAB
500 Dedham Ave
10,905
DPW Garage 470 Dedham Ave
23,174
Jack Cogswell Building 1421 Central Ave
31,000
IFB 27DPW141B 19
Daley Building 257R Webster St
10,966
Memorial Park Field House 92 Rosemary St.
5,708
Rosemary Recreation Complex 178 Rosemary St.
8,000
Public Safety Building 88 School St
30,092
Fire Station 2 707 Highland Ave
3,798
Stephen Palmer Building 83 Pickering St.
15,500
Alden Street Pump Station Alden St.
Great Plain Ave. Pump Station 1352 Great Plain Avenue
Kendrick Street Pump Station 120 Kendrick Street
Reservoir Avenue A Pump Station Reservoir Avenue
Reservoir Avenue B Pump Station Reservoir Avenue
2,500
West Street Pump Station West Street
1,400
Charles River Water Treatment Plant 914 Charles River Street
33,900
Dedham Ave. Pump Station 484 Dedham Avenue
1,400
St. Mary Pump Station 20 St. Mary Street
6,100
Charles River Wellfield Well # 1A 914 Charles River Street
3,400
Charles River Wellfield Well # 2 914 Charles River Street
1,600
Charles River Wellfield Well # 3A 914 Charles River Street
1,000
The Town reserves the right to add or remove buildings and facilities from the list identified in this specification throughout the contract term.
Any adjustments to the annual preventative maintenance cost resulting from the addition or removal of buildings shall be based on the applicable unit pricing submitted by the Contractor in the bid form and shall require prior written approval from the Town.
The Contractor shall not perform work at additional locations or incur additional costs without prior authorization from the Town.
The building list and approximate roof square footage are provided for informational and estimating purposes only. Actual roof configurations, access conditions, and roof areas may vary. Bidders are responsible for reviewing the information provided and considering the scope of services required when preparing their bids.
IFB 27DPW141B 20
PART 3 – CHECKLIST AND REQUIRED FORMS FOR SUBMISSION
Company Name: __________________________________________________
Bidder has completed and returned the Acknowledgment of Receipt form (via fax or email).
Bidder has completed, signed, and enclosed the Bid Form A: Bid Price Form or an exact copy.
Bidder has completed, signed, and enclosed the Bid Form B: Bidder Information Response form.
Bidder has completed, signed, and enclosed the Bid Form C: Authentication Form.
Bidder has completed, signed, and enclosed the Bid Form D: Certificate of Good Faith.
Bidder has completed, signed, and enclosed the Bid Form E: Certificate of Compliance with Massachusetts Tax Laws or Certificate of Good Standing issued by the Massachusetts Department of Revenue.
Bidder has completed, signed, and enclosed the Bid Form F: Certificate of Compliance for Public Construction More than $10,000.00.
Bidder has provided at least five (5) references on the Bid Form G: Professional Reference Form of which at least 3 are governmental units (municipal/county/regional district/state agency/special district).
If the bid submission is signed by someone other than the Owner/President of the company, a completed Bid Form H: Certificate of Authority of Corporate Resolution for the person who signed the proposal or a valid Corporate Resolution stating the individual has the authority to submit the proposal on behalf of the Company and can bind the Company to the contract if awarded.
The Bid Deposit (Bond) enclosed.
DCAMM eligibility letter and update statement are required.
Bidder acknowledged all addenda, if any Addendum Number 1 dated ____________________ Addendum Number 2 dated ____________________ Addendum Number 3 dated ____________________ Addendum Number 4 dated ____________________ Addendum Number 5 dated ____________________
This form must be completed and filed with bid submission
I…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .