Bid Document Summary

This is an informal bid document issued by the City of Raleigh Engineering Services Department, Facilities and Operations Division, for HVAC replacement at seven fire stations across Raleigh, North Carolina. The project involves the removal and disposal of existing HVAC systems and installation of new equipment at Fire Stations #1, #8, #9, #19, #23, #28, and #29, with a total of 15 HVAC units to be replaced across all locations. The mandatory pre-bid meeting is scheduled for November 5, 2026, at 9:00 AM at Fire Station #1, with attendance required for bid validation. The questions deadline is November 12, 2026, by 5:00 PM, and sealed bids are due by 2:00 PM on Thursday, December 3, 2026. Bids must be hand-delivered or mailed to the City of Raleigh, Facilities and Operations Division, with no electronic submissions accepted. The contractor shall complete all work within 180 consecutive calendar days from the Notice to Proceed. Award will be made to the lowest responsive, responsible bidder, with bids remaining valid for 45 days after opening.

Bidders must submit a single lump sum bid that includes an itemized cost for each fire station, with all labor, materials, equipment, and permitting fees included. An Owner's Site Conditions Allowance of $5,000 is included in the total bid. Equipment specifications require like-for-like replacement with preferred brands of Goodman or Rheem (or equally compatible), minimum 15 SEER units, and new digital non-programmable thermostats. The selected contractor must carry comprehensive insurance coverage including Workers' Compensation (statutory limits), Commercial General Liability ($2,000,000 aggregate), Commercial Automobile Liability ($1,000,000 combined single limit), and Builder's Risk Coverage equal to the total bid price. All work must comply with current North Carolina code and EPA regulations. The contractor is responsible for all permitting and inspections, and all work must be performed Monday through Friday, 8:00 AM to 5:00 PM. Contractors must comply with E-Verify requirements, the Iran Divestment Act Certification, and non-collusion provisions. The City reserves the right to reject any or all bids and may extend the work up to 50 percent of the original contract price under the same terms.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF RALEIGH ENGINEERING SERVICES

DEPARTMENT FACILITIES AND OPERATIONS DIVISION

Raleigh Municipal Building 222 West Hargett Street, Suite 605 Raleigh, NC 27601

INFORMAL BID DOCUMENTS FOR

Raleigh Fire Stations HVAC Replacement

Date of Issue: October 29, 2026

CITY OF RALEIGH

Index

• Index .............................................................................................. Page 2

• Advertisement For Bid .................................................................... Page 3-6

• Instructions to Bidders .................................................................... Page 7-12

• Bid Proposal Form .......................................................................... Page 13-15

• Procedure for reporting NC Sales Tax Expenditures ....................... Page 16-17

CITY OF RALEIGH – ADVERTISEMENT FOR BID (INFORMAL BID)

PROJECT: Raleigh Fire Stations HVAC Replacement PROJECT LOCATION: Fire Station #1 – 220 S Dawson St, Raleigh, NC 27601 Fire Station #8 – 5001 Western Blvd, Raleigh, NC 27606 Fire Station #9 – 4465 Six Forks Rd, Raleigh, NC 27609 Fire Station #19 – 4209 Spring Forest Rd, Raleigh, NC 27616 Fire Station #23 – 8312 Pinecrest Road, Raleigh, NC 27613 Fire Station #28 – 3500 Forestville Rd, Raleigh, NC 27616 Fire Station #29 – 12117 Leesville Rd, Raleigh, NC 27613

Informal Bid #: 274-ES-FO-FY27-FireStationsHVACReplacement

Owner and Contact: City of Raleigh, Facilities and Operations Division Raleigh Municipal Building 222 West Hargett Street, Suite 605, Raleigh, North Carolina 27601

Project Manager Contact: Steven Chelini e-mail: Steven.Chelini@raleighnc.gov

Additional Contact: Sophie Helewski e-mail: Sophie.Helewski@raleighnc.gov

NOTE: Do not refer or use previously published bid documents.

Pursuant to the General Statutes of North Carolina, Section 143-128 et. seq, contractors are invited to submit Sealed Single Prime Construction bids providing labor, material, and equipment for entering into a Single Prime Contract. The scope of work includes but is not limited to the following:

Replacement of HVAC equipment at select City of Raleigh Fire Stations

Cost Specifications:

Total cost of this project will be included within the bid package along with an itemized cost for each fire station. All labor, materials, equipment and permitting fees in relation to the purpose of this project are to be included. Bid proposals shall be for a single lump sum.

Project Scope:

The scope of work associated with this project includes the removal/disposal of existing HVAC systems, installation of new HVAC systems, installation of new line sets and all inspection/permitting fees. All work is to be performed in accordance with current North Carolina code.

mailto:Sophie.Helewski@raleighnc.gov

Equipment Specifications

• Like for like replacement for all systems.

• Preferred brand is: (1) Goodman (2) Rheem or equally compatible.

• 15 seer unit or greater.

• Air handler must be sized to handle up to a MERV 8 filter rating.

• New digital non-programmable thermostats.

• New electric heat strips, where applicable.

• New disconnects must be fusible single throw type. Exterior disconnects must be rated for outdoor use, only if necessary to replace.

Installation Specifications

• Remove and dispose of all old equipment and reclaim refrigerant in accordance with EPA

(Environmental Protection Agency) regulations.

• Existing line sets may be reused but must be flushed.

• Provide and install liquid line refrigerant filter driers, if applicable.

• Existing condensate drainage may be used but must be in accordance with updated code regulations.

• Provide new drain pan with overflow safety cutout switch, where applicable. If secondary drain is not used, a secondary drain switch must be installed.

• Provide and install the necessary stands/mounts for new equipment to ensure transitions are aligned and service is easily accessible. Existing stands/mounts may be utilized if applicable to the new equipment.

• Contractor will include new duct alterations for transitions and connections from new equipment to existing supply and return duct, if necessary. Duct replacement throughout the facility is not a part of this project.

• Equipment duct connections must be sealed with foil mastic sealant tape or equivalent

• Filter access must be easily accessible.

• Existing gas pipe may be utilized to connect to new equipment. Gas piping connected to the new equipment must be updated in accordance with current code regulations.

• The contractor is responsible for any leaks in the gas piping between the first shutoff valve and the unit gas valve. The City of Raleigh will be responsible for leaks between the first gas shut-off valve and the gas meter.

• Existing intake and exhaust flues can be used but must be updated in accordance with current code regulations.

• All electrical work in relation to the new equipment must be done by the contractor (ex.

upsize wires, breaker(s), and disconnecting means to accommodate new equipment).

• New electrical wire and flex/conduit must be provided for all new outdoor equipment to disconnecting means.

• Thermostat / low voltage wire going to the outdoor equipment must be protected where it is exposed to the elements.

• Seal or re-seal all wall penetrations in relation to the new equipment installation. Wall penetrations must be sealed in accordance with North Carolina and NFPA (National Fire Protection Association) regulations.

• All line sets must be pressure tested and a triple vacuum performed before opening condenser.

• Weigh in proper refrigerant charge, start-up, and checkout of system operations.

• All work shall be performed in accordance with North Carolina code.

• Contractor is to provide and is responsible for all permitting and inspection(s).

• All work is to be done Monday through Friday 8:00 a.m. to 5:00 p.m.

Sealed bids: Bidders are responsible for ensuring delivery of bids before the deadline.

(No faxed or emailed bids accepted) Bids will be received by:

Time: 2:00 PM Date: Thursday, December 3, 2026 Mail Delivery: City of Raleigh, Engineering Services Dept.

Attn: Steven Chelini

P.O. Box 590

Raleigh, NC 27602

Drop off Times: 9:00 am – 5:00 pm

Raleigh Municipal Building, 222 W. Hargett St.

Deliver to the 6th Floor, Suite 605 Raleigh, NC 27601

Mandatory Pre-Bid meeting will be held at each project site. Attendance is mandatory. Pre-bid attendance shall be used to validate bid submissions. Attendance to the pre-bid will be documented by the City.

Date: Thursday, November 5, 2026 Time: 9:00 AM Location: Fire Station #1 – 220 S. Dawson Street, Raleigh, NC 27601

The site visits will begin at Fire Station #1, followed by visits to the remaining fire station project sites.

Questions Deadline: Thursday, November 12, 2026, by 5:00 PM

Paper hard copy sealed bids are required and digital submissions are not allowed. Bidders have two (2) options for delivery of their bid documents:

• Early delivery via in person/hand delivery on the day of the bid opening during the time shown above. The City of Raleigh, Facilities and Operations Division project manager or representative will be onsite at that time to receive bids. Envelopes must be addressed and sealed and will be securely held.

• Mail-in / drop-off bids in accordance with the address and times shown above.

No public opening will be held in accordance with informal bidding rules.

Contractors are responsible for distributing documents to all sub-contractors.

Information related to this solicitation, including any addenda, will be posted to the Vendor Portal (https://evp.nc.gov/).

Bidders will be required to show evidence that they are licensed to perform the work in the Bidding Documents as required by North Carolina General Statute, Chapter 87.

https://evp.nc.gov/

No Bid may be withdrawn for Forty-Five (45) days after opening time.

The City reserves the right to reject any or all bids and to waive informalities.

END OF ADVERTISEMENT FOR BID

INSTRUCTIONS TO BIDDERS

GENERAL

Replacement of HVAC equipment at select City of Raleigh Fire Stations. This includes all inspection/permitting fees. All bid proposals shall be for a single lump sum.

PROJECT LOCATION

Fire Station #1 – 220 S Dawson St, Raleigh, NC 27601

Fire Station #8 – 5001 Western Blvd, Raleigh, NC 27606 Fire Station #9 – 4465 Six Forks Rd, Raleigh, NC 27609 Fire Station #19 – 4209 Spring Forest Rd, Raleigh, NC 27616 Fire Station #23 – 8312 Pinecrest Road, Raleigh, NC 27613 Fire Station #28 – 3500 Forestville Rd, Raleigh, NC 27616 Fire Station #29 – 12117 Leesville Rd, Raleigh, NC 27613

BID SCHEDULE

Mandatory Pre-Bid Conference: Thursday, November 5, 2026, at 9:00 AM

Questions Deadline: Thursday, November 12, 2026, by 5:00 PM

Bid Deadline: Thursday, December 3, 2026, by 2:00 PM

BID DOCUMENTS

Project Manager Contact: Steven Chelini e-mail: Steven.Chelini@raleighnc.gov phone: (919) 996-3420 City of Raleigh, Facilities and Operations Division 222 West Hargett Street, Suite 605, Raleigh, North Carolina 27601

Additional Contact: Sophie Helewski e-mail: Sophie.Helewski@raleighnc.gov phone: (919) 996-3420

Vendor Portal website will post all addenda. The City of Raleigh is not responsible for the accuracy of documents anyone may obtain from any other source.

mailto:Sophie.Helewski@raleighnc.gov

BID SUBMISSIONS

The submission of a bid will assume that the Contractor has fully examined the site and knows the existing conditions and has made every provision for operating under the existing conditions, and has included all necessary items, and has read and understands the Bidding Documents. No consideration shall be given to any claim for extra compensation or extension of contract time because of failure to comply with this provision.

Bids must be made in strict accordance with the “Bid Form” provided hereto and all blank spaces for Unit Prices shall be properly filled in. If no price increase, assign “$0”. When requested alternates (if applicable) or Unit Prices have no entry, the bid may be considered incomplete and the bid may be rejected as non-responsive. All bids must be submitted on the BID PROPOSAL FORM included herein. Prices given shall be both in writing and figures and the complete form shall be without any lineation, alterations, or erasures. In case of conflicting prices, the written prices shall govern. Submit one (1) set of bid forms enclosed.

Bids shall be received in strict accordance with all requirements of the General Statutes of North Carolina. The bid shall be submitted in sealed envelope(s) as noted on the Bid Proposal Form, with the bidder’s name, license number, and project name written on the exterior.

One (1) copy shall be submitted to City of Raleigh’s Facilities and Operation Division.

The Contractor shall fill in the Form of Bid as follows:

A. All bids must be signed by an authorized official of the firm.

B. Each proposal shall include the full name and address, phone number, and e-mail contact of the bidder.

C. All signatures shall be properly witnessed.

D. It shall be the specific responsibility of the Bidder to deliver this bid to: City of Raleigh

Facilities and Operations Division prior to the date and time specified in the invitation to bidders for opening of the Bids. Bidders are encouraged to be prompt as later delivery of a Bid for any reason, including delivery by the United States Postal Service, shall disqualify the Bid.

E. Modifications of previously deposited bids will be acceptable only if delivered to the place of the bid by the specified time.

The City of Raleigh shall not be held responsible for late deliveries. Faxed and/or email submissions will not be accepted. Proposals not received by the designated time will not be accepted.

The bidder shall fill in and sign the bid form correctly. Bids that show any omission, alterations of form, additions not called for, conditional bids, or any irregularities of any kind may be rejected.

Except to the extent allowed by statute, bids shall not be withdrawn and bids shall remain subject to acceptance by the City for a period of Forty-Five (45) days.

It is the City's intention to award a contract for work under this project to the lowest responsive, responsible bidder. The City reserves the right to reject any and all bids and to waive without informalities, including without limitation, nonconforming, non-responsive, unbalanced, or conditional bids. The City of Raleigh further reserves the right to reject the bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible. The City of Raleigh may also reject the bid of any bidder if the City believes that it would not be in the best interest of the Project to make an award to that bidder. The City of Raleigh also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate terms with the successful bidder.

Upon request, bidders must present satisfactory evidence that they have been regularly engaged in the business of constructing such work, such as company work history and references from similar construction projects. And upon request, bidders must show that they are fully prepared with the necessary capital, equipment, etc., to begin the work promptly, and complete the same in accordance with specifications.

The bidder to whom the award is made shall be required to furnish work crews of adequate number, size, and experience to properly perform the work. The Project Manager responsible for the project is required to be on-site during construction. The interpretation of the number of crews, size, and experience will be determined by the City of Raleigh as to their adequacy.

The Contractor will furnish all materials, labor, equipment, supervision, tools, machinery, etc. for complete construction of projects in accordance with plans and specifications of the City of Raleigh.

The City reserves the right to extend the work in this Contract upon the same terms, provided that such extensions shall not exceed in cost fifty per cent (50%) of the original Contract price of the Contract being extended.

The contractor(s) to whom the award is made must carry insurance in the amounts and types outlined in the Insurance Requirements below.

1. Insurance

Contractor agrees to purchase at its own expense insurance coverages to satisfy the following minimum requirements. A certificate reflecting the following minimum coverages shall accompany this Contract:

1.1. Workers’ Compensation Insurance:

Limits:

Workers Compensation: Statutory for the State of North Carolina Employers Liability: Bodily Injury by Accident $1,000,000 each accident Bodily Injury by Disease $1,000,000 policy limit Bodily Injury by Disease $1,000,000 each employee

1.2. Commercial General Liability:

Each Occurrence: $1,000,000 Personal and Advertising Injury $1,000,000 General Aggregate Limit $2,000,000 Products and Completed Operations Aggregate $2,000,000

The aggregate limit must apply per project. The form of coverage must be the ISO CG 00 01 policy as approved by the State of North Carolina Department of Insurance. If a form of coverage other than the CG 00 01 is used it must be approved by the City’s risk manager. Any endorsed exclusions or limitations from the standard policy must be clearly stated in writing and attached to the Certificate of Insurance. Completed Operations coverage must be maintained for the period of the applicable statute of limitations.

1.3. Commercial Automobile Liability:

$1,000,000 combined single limit.

1.4. Additional Insured:

Contractor agrees to endorse the City as an Additional insured on the Commercial General Liability, Auto Liability and Umbrella Liability if being used to meet the minimum liability limits for General Liability and Automobile Liability.

The Additional Insured shall read ‘City of Raleigh is named additional insured as their interest may appear’.

The Certificate Holder address should read:

City of Raleigh Post Office Box 590 Raleigh, NC 27602-0590

1.5. Builders Risk Coverage:

Minimum limit in the amount of total bid price. The Builder Risk policy must be endorsed to increase the limit of insurance for all change orders.

1.6. Policy Form:

Builder Risk coverage must be on a direct physical loss basis and contain no exclusion for theft, collapse or damage to foundations or underground structures, pipes or conduits.

1.7. Named Insured:

The Named Insured shall be The City of Raleigh, the Contractor, and all sub-contractors with a contractual assumption of responsibility for damage to the project.

All insurance companies must be admitted to do business in North Carolina and be acceptable to the City’s risk manager. If the insurance company(s) is a permitted surplus lines insurer, the insurance company name, and NAIC number must be submitted to the City’s risk manager for approval before commencing work. Contractor shall be required to provide the City no less than thirty (30) days’ notice of cancellation, or any material change, to any insurance coverage required by this Contract.

A Certificate of Insurance (COI) must be issued by an authorized representative of the insurance carrier(s). Certificates of Insurance must have the insurance company name and NAIC number clearly identified. The acceptance of or the review of Certificates of Insurance by the City does not relieve Contractor of any requirements in the Contract to provide specific insurance coverage required by the Contract, nor does the acceptance of or review of Certificates of Insurance covenant all insurance requirements have been met.

SITE INVESTIGATION

All bidders shall examine the site before submitting a proposal in order to determine the extent of work involved, size of work, etc., and the conditions under which the work must be staged and performed.

PERMITS AND FEES

The Contractor will need to have the permit issued in its name and provide contact information to the Development Services Department as required for permit issuance. The cost for all related permit fees and final issuance of the permit shall be presented for billing against the Owners Allowance. Markups, profit and overhead are not permissible for permit costs.

NON-COLLUSION IN BIDDING

The Bidder specifically agrees to abide by all applicable provisions of Article 3 of Chapter 133 of the North Carolina General Statutes. By submission of this Bid, each Bidder and each person signing on behalf of any Bidder certifies, and in case of a joint Bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of knowledge and belief:

(1) The prices in this Bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other Bidder or with any competitor.

(2) Unless otherwise required by Law, the prices quoted in the Bid have not been knowingly disclosed by the Bidder and will not knowingly be disclosed by the Bidder prior to opening, directly or indirectly, to any other Bidder or to any competitor; and

(3) No attempt has been made or will be made by the Bidder to induce any other person, partnership, or corporation to submit or not to submit a Bid for the purpose of restricting competition.

FORM OF AGREEMENT

The form of agreement to be entered into shall be the contract included within these specifications.

E-VERIFY COMPLIANCE UNDER G.S. 143-133.3.

The contract will require that the selected Firm/Team and any subcontractors comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes (NCGS) consistent with state law requirements for municipal contracts.

IRAN DIVESTMENT ACT CERTIFICATION.

The Contractor certifies that, if it submitted a successful bid for this contract, then as of the date it submitted the bid, the Contractor was not identified on the Iran List. If it did not submit a bid for this contract, the Contractor certifies that as of the date that this contract is entered into, the Contractor is not identified on the Iran List. It is a material breach of contract for the Contractor to be identified on the Iran List during the term of this contract or to utilize on this contract any subcontractor that is identified on the Iran List. In this Iran Divestment Act Certification section -- “Contractor” means the person entering into this contract with the City of Raleigh; and “Iran List” means the Final Divestment List – Iran, the Parent and Subsidiary Guidance List – Iran, and all other lists issued from time to time by the N.C. State Treasurer to comply with G. S. 143C-6A-4 of the N.C. Iran Divestment Act.

** End of Instructions to Bidders **

CITY OF RALEIGH – INFORMAL BID PROPOSAL FORM

City of Raleigh Date:

Engineering Services Department Raleigh Municipal Building 222 West Hargett Street, Room 605 Raleigh, North Carolina 27601

Bidder agrees to perform all the work included in the Contract as indicated in the Contract Documents within the Raleigh Fire Stations HVAC Replacement scope as it is specified within the bid documents. It is the City's intention to award a contract for all work under this project to the lowest responsive, responsible bidder. The City reserves the right to reject any or all bids and to waive informalities.

The undersigned further agrees to sign a Contract for the work, if offered within ninety (90) days after receipt of Bids, and to furnish surety as specified. The Bidder further agrees to provide and furnish all necessary materials, equipment, machinery, and labor necessary to complete the demolition of the work in full, in complete accordance with the plans and specifications and the contract documents to the full and entire satisfaction of the City of Raleigh and in accordance with these documents within the time limit specified below.

In addition to all other agreements and assurances, the undersigned Bidder understands and hereby agrees as follows:

1. The Bidder represents and agrees to complete the entire project in the following number of Consecutive Calendar Days: One Hundred Eighty (180) days from the date on the Notice to Proceed.

Base Bid: Fire Station #1

Dollars ($) (In Words)

Dollars ($) (In Figures)

Base Bid: Fire Station #8

Base Bid: Fire Station #9

Base Bid: Fire Station #19

Base Bid: Fire Station #23

Base Bid: Fire Station #28

Base Bid: Fire Station #29

Owner’s Site Conditions Allowance: Five Thousand Dollars and zero cents ($5,000.00) (Note that the Owner’s Site Conditions Allowance shall only be used when pre-authorized in writing by the City.)

Total Bid:

(Including Base Bid of Fire Stations #1, 8, 9, 19, 23, 28 and 29 and Owner’s Site Conditions Allowance):

Name of General Contractor and License Number

ACKNOWLEDGMENT OF RECEIPT OF ADDENDA

The undersigned Bidder hereby acknowledges receipt of the following Addenda:

Dated Acknowledge Receipt (initial)

Please check here if no addenda were received:

PROPOSAL SIGNATURE PAGE

Respectfully submitted this day of

By:

(Name of firm or corporation making bid)

WITNESS: By:

Signature

Name:

(Proprietorship or Partnership) Print or type

Title (Owner/Partner/Pres./V.Pres)

Address

ATTEST:

By: License No.

Title: Federal I.D. No.

(Corp. Sec. or Asst. Sec. only) Email Address:

Office Phone Number:

(CORPORATE SEAL)

** END OF CITY OF RALEIGH – BID PROPOSAL FORM

PROCEDURE FOR REPORTING NORTH CAROLINA SALES TAX

EXPENDITURES ON CITY OF RALEIGH CONTRACTS

1. The following procedure in handling the North Carolina Sales Tax is applicable to this project.

Contractors shall comply fully with the requirements outlined hereinafter, in order that the owner may recover the amount of the tax permitted under the law.

2. (a) It shall be the general contractor’s responsibility to furnish the owner documentary evidence showing the materials used and sales tax paid by the general contractor and each of his subcontractors. Any county sales tax included in the contractor’s statements must be shown separately from the state sales tax. If more than one county is shown, each county shall be listed separately.

(b) The documentary evidence shall consist of a certified statement, by the general contractor and each of his subcontractors individually, showing total purchases of materials from each separate vendor and total sales taxes by each county paid each vendor. The certified statement must show the invoice number (s) covered and inclusive dates of such invoices. State sales tax shall be listed separately from county sales tax. If more than one county is shown, each county shall be listed separately.

(c) Materials used from general contractor’s or subcontractor’s warehouse stock shall be shown in a certified statement at warehouse stock prices.

(d) The general contractor shall not be required to certify the subcontractor’s statements.

(e) The documentary evidence to be furnished to owners eligible for sales or use tax refunds covers sales and/or use taxes paid on building materials used by contractors and subcontractors in the performance of contracts with churches, orphanages, hospitals not for profit, educational institutions not operated for profit and other charitable or religious institutions or organizations not operated for profit and incorporated cities, towns and counties in this State. The documentary evidence is to be submitted to the above-named institutions, organizations and governmental units to be included in claims for refunds to be prepared and submitted by them to obtain refunds provided by G.S. 105-164.14 and is to include the purchase of building materials, supplies, fixtures and equipment which become a part of or annexed to buildings or structures being erected, altered or repaired under contracts with such institutions, organizations or governmental units.

3. The contractor or contractors to whom an award is made on this project will be required to follow the procedure outlined above.

4. The contractor is advised that all requests for payment, partial or final, for work completed under this contract must include a sales tax report submitted in accordance with the procedures outlined above.

PROCEDURE FOR REPORTING NC SALES TAX EXPENDITURES ON CITY OF RALEIGH CONTRACTS

Page

CITY OF RALEIGH

Raleigh Fire Stations HVAC Replacement

North Carolina Sales Tax (Paid During This Estimate Period)

Project Project Location County Estimate No.

Contractor Period Ending

Date Vendor Invoice Number

Invoice Amount

State Tax

County Tax

Transit Tax

Total Tax County

TOTALS

I certify that the above listed vendors were paid sales tax upon purchases of building materials during the period covered by the construction estimate, and the property upon which such taxes were paid with or will be used in the performance of this contract. No tax on purchases or rentals of tools and/or equipment is included in the above list. All of the material above became a part of or is annexed to the building or structure being erected, altered or repaired.

County, North Carolina

Signed and sworn to (or affirmed) before this day by (name of principal) (signature of principal)

Date:

Notary Public's Signature

(Notary’s printed or typed name, Notary Public) (Official Seal) My commission expires:

Table 1 Breakdown:

Fire Station #1 – 1 unit Fire Station #8 – 2 units Fire Station #9 – 1 unit Fire Station #19 – 1 unit Fire Station #23 – 1 unit Fire Station #28 – 4 units Fire Station #29 – 5 units

Fire Station #1: 220 S. Dawson Street, Raleigh, NC 27601 – 1 Unit

Fire Station #8: 5001 Western Blvd., Raleigh, NC 27606 – 2 Units

Fire Station #9: 4465 Six Forks Rd., Raleigh, NC 27609 – 1 Unit

Fire Station #19: 4209 Spring Forest Rd., Raleigh, NC 27616 – 1 Unit

Fire Station #23: 8312 Pinecrest Rd., Raleigh, NC 27613 – 1 Unit

Fire Station #28: 3500 Forestville Rd., Raleigh, NC 27616 – 4 Units

Fire Station #29: 12117 Leesville Rd., Raleigh, NC 27613 – 5 Rooftop Units

274-ES-FO-FY27-FireStationsHVACReplacement.pdf
274-ES-FO-FY27-FireStationsHVACReplacement.pdf
CITY OF RALEIGH ENGINEERING SERVICES
INFORMAL BID DOCUMENTS FOR
Raleigh Fire Stations HVAC Replacement
Index
CITY OF RALEIGH – ADVERTISEMENT FOR BID (INFORMAL BID)
Informal Bid #: 274-ES-FO-FY27-FireStationsHVACReplacement
Cost Specifications:
Project Scope:
Time: 2:00 PM
Deliver to the 6th Floor, Suite 605
PROJECT LOCATION
BID SCHEDULE
BID SUBMISSIONS
One (1) copy shall be submitted to City of Raleigh’s Facilities and Operation Division.
SITE INVESTIGATION
PERMITS AND FEES
FORM OF AGREEMENT
E-VERIFY COMPLIANCE UNDER G.S. 143-133.3.
IRAN DIVESTMENT ACT CERTIFICATION.
PROCEDURE FOR REPORTING NORTH CAROLINA SALES TAX EXPENDITURES ON CITY OF RALEIGH CONTRACTS

North Carolina Sales Tax

Table 1.pdf