274-ES-FO-FY26-SWSADMIN-OUTDOORLIGHTING.pdf

PDF 468 KB Posted

Attached to
Wilders Grove Campus Site Lighting Fixture Replacements
Solicitation number
274-ES-FO-FY26-SWSADMIN-OUTDOORLIGHTING
Issued by
Wake County, Teachey Town, North Carolina

About this file

This document is a Scope of Work for the Wilders Grove Campus Site Lighting Fixture Replacements project issued by the City of Raleigh, North Carolina, for the Solid Waste Services department. The project involves the existing condition assessment, demolition, and replacement of outdoor site luminaires at the Wilders Grove Solid Waste Services campus. The scope encompasses a comprehensive evaluation of current lighting conditions, removal of existing fixtures, and installation of replacement lighting equipment to modernize the facility's outdoor illumination system. The project requires bidders to provide detailed proposals addressing all phases of work from assessment through final installation and commissioning of the new lighting infrastructure.

The procurement establishes specific requirements for contractor qualifications, project timeline, and deliverable standards for the lighting replacement initiative. Bidders must demonstrate experience with similar outdoor lighting projects and municipal facility upgrades. The project includes site-specific conditions at the Raleigh location that contractors must address in their proposals, including any operational impacts during the demolition and replacement phases. Pricing, payment terms, contract duration, and any performance requirements or warranty provisions are established within the complete procurement documents to ensure quality installation and long-term reliability of the upgraded outdoor lighting system.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF RALEIGH ENGINEERING SERVICES

DEPARTMENT FACILITIES AND OPERATIONS DIVISION

1027A N. West Street Raleigh, NC 27603

INFORMAL BID DOCUMENTS FOR

Wilders Grove Campus Site Lighting Fixture Replacements

Date of Issue: November 12, 2026

CITY OF RALEIGH

Index

• Index .............................................................................................. Page 2

• Advertisement For Bid .................................................................... Page 3-4

• Instructions to Bidders .................................................................... Page 5-16

• Bid Proposal Form .......................................................................... Page 17-19

• Procedure for Reporting NC Sales Tax Expenditures ...................... Page 20-21

CITY OF RALEIGH – ADVERTISEMENT FOR BID (INFORMAL BID)

PROJECT: Wilders Grove Campus Site Lighting Fixture Replacements PROJECT LOCATION: 630 Beacon Lake Drive, Raleigh, NC 27610

Informal Bid #: 274-ES-FO-FY26-SWSADMIN-OUTDOORLIGHTING

Owner and Contact: City of Raleigh, Facilities and Operations Division 1027A N. West Street Raleigh, NC 27603 Project Manager Contact: Jason Clough E-mail: Jason.Clough@raleighnc.gov

Additional Contact: Sophie Helewski E-mail: Sophie.Helewski@raleighnc.gov

NOTE: Do not refer or use previously published bid documents.

Pursuant to the General Statutes of North Carolina, Section 143-128 et. seq, contractors are invited to submit Sealed Single Prime Construction bids providing labor, material, and equipment for entering into a Single Prime Contract. The scope of work includes but is not limited to the following:

Existing condition assessment, demolition and replacement of outdoor site luminaires at the Wilders Grove Solid Waste Services campus located in Raleigh, North Carolina.

Cost Specifications:

Total cost of this project will be included within the bid package. All labor, sales tax, materials, equipment and permitting fees in relation to the purpose of this project are to be included. Bid proposals shall be for a single lump sum.

Project Scope:

The Project Scope shall include replacement luminaires for the existing outdoor parking lots at the Wilders Grove Campus located at 630 Beacon Lake Drive in Raleigh, NC.

See Instructions to Bidders for additional details.

Sealed bids: Bidders are responsible for ensuring delivery of bids before the deadline. (No faxed or emailed bids accepted) Bids will be received by:

Time: 2:00 PM EST Date: Thursday – December 17, 2026 Mail Delivery: City of Raleigh, Engineering Services Dept.

Attn: Jason Clough 1027A N. West Street Raleigh, NC 27603 mailto:Sophie.Helewski@raleighnc.gov

Drop off Times: 8:30 am – 4:30 pm

1027A N. West Street

Pre-Bid meeting will be held at location listed below. Attendance is encouraged but is not mandatory. Attendance at the pre-bid will be documented by the City.

Date: Thursday, November 19, 2026 Time: 10:00 AM EST Location: 630 Beacon Lake Drive, Raleigh, NC 27610

Questions Deadline: 5:00 PM EST – Wednesday, December 2, 2026

Paper hard copy sealed bids are required, and digital submissions are not allowed. Bidders have two (2) options for delivery of their bid documents:

• Early delivery via in person/hand delivery on the day of the bid opening during the time shown above. The City of Raleigh project manager or representative will be on-site at that time to receive bids. Envelopes must be addressed and sealed and will be securely held.

• Mail-in / drop-off bids in accordance with the address and times shown above.

No public opening will be held in accordance with informal bidding rules.

Contractors are responsible for distributing documents to all sub-contractors.

Information related to this solicitation, including any addenda, will be posted to the Vendor Portal (https://evp.nc.gov/).

Bidders will be required to show evidence that they are licensed to perform the work in the Bidding Documents as required by North Carolina General Statute, Chapter 87.

No Bid may be withdrawn for Forty-Five (45) days after opening time.

The City reserves the right to reject any or all bids and to waive informalities.

END OF ADVERTISEMENT FOR BID

https://evp.nc.gov/

INSTRUCTIONS TO BIDDERS

GENERAL

The Bidder’s scope of work shall include the following:

1. PROJECT DESCRIPTION

The City of Raleigh is soliciting competitive construction bids from qualified electrical contractors to furnish and install new LED parking lot lighting fixtures to replace all existing LED parking lot fixtures at the designated facility.

The intent of this project is a like-for-like replacement of existing LED luminaires while retaining existing poles, mounting arms, foundations, pole locations, mounting heights, and electrical infrastructure.

The City does not have existing lighting as-built drawings or photometric calculations available for this project. The Contractor shall be responsible for field-verifying existing conditions and coordinating with the proposed lighting manufacturer's representative to select appropriate replacement fixtures.

The project is not intended to redesign the existing parking lot lighting layout.

Reference the Project Area map for the bid scope lighting area.

2. EXISTING CONDITIONS ASSESSMENT

The Contractor shall perform a field assessment of the existing parking lot lighting system as part of the Base Bid.

The assessment shall include:

A. Fixture and Pole Inventory

• Count and document all existing parking lot light poles and fixtures within the designated project area.

• Identify the number of fixtures mounted on each pole.

• Identify existing fixture types and mounting configurations.

• Document visibly damaged or deteriorated poles, mounting arms, and electrical components.

B. Site Lighting Map

• Prepare a site lighting inventory map utilizing an aerial photograph or existing site plan.

• Number and identify each existing pole location.

• Indicate the quantity of fixtures mounted on each pole.

• Identify any unique fixture or mounting configurations.

C. Existing Fixture Documentation

• Photograph representative existing fixtures and each unique fixture type.

• Photograph existing mounting arms and connection configurations.

• Document manufacturer names, model numbers, wattages, and other identifying information where available.

• Document any existing fixtures that are not operational.

D. Mounting and Electrical Verification

• Field-verify existing pole and fixture mounting heights.

• Verify existing mounting configurations and dimensions.

• Verify available electrical characteristics and fixture compatibility.

• Identify conditions that may prevent direct fixture replacement.

The Contractor shall submit the completed existing conditions assessment to the City prior to ordering replacement fixtures.

3. REPLACEMENT LED FIXTURE REQUIREMENTS

The Contractor shall furnish new LED parking lot luminaires suitable for the existing installation and intended use. Replacement fixtures shall:

• Be compatible with existing poles, mounting configurations, and electrical infrastructure.

• Provide comparable or improved lighting performance relative to the existing fixtures, where existing fixture specifications can be identified.

• Maintain reasonably consistent light color and appearance throughout the parking lot.

• Minimize glare and light trespass and comply with applicable City of Raleigh site lighting requirements.

• Be listed by a nationally recognized testing laboratory and suitable for exterior installation.

• Include appropriate weather protection and surge protection.

• Carry a minimum five-year manufacturer's warranty.

The Contractor shall coordinate with the proposed lighting manufacturer's representative to select appropriate replacement fixtures based on field-verified existing conditions.

The Contractor may propose fixtures from any manufacturer meeting the specified performance and compatibility requirements.

Final fixture selections shall be submitted to the City for review and approval prior to procurement.

4. PHOTOMETRIC VERIFICATION

The Contractor shall coordinate with the proposed lighting manufacturer's representative or other qualified lighting professional to evaluate the proposed replacement fixtures.

The Contractor shall provide:

• Manufacturer's technical specifications and fixture cut sheets.

• Proposed fixture wattage, delivered lumen output, and optical distribution.

• Manufacturer's IES photometric files.

• Photometric calculations showing anticipated illumination and distribution based on field-verified existing pole locations and mounting heights.

• Identification of any anticipated lighting deficiencies, glare concerns, or light trespass issues.

The intent is to provide equivalent or improved lighting performance using the existing pole layout and electrical infrastructure.

The Contractor shall not be responsible for redesigning the parking lot lighting layout or correcting pre-existing lighting deficiencies unless separately authorized by the City.

5. PERMITTING AND REGULATORY COMPLIANCE

The Contractor shall be solely responsible for identifying, coordinating, obtaining, and closing out all permits and regulatory approvals required for the LED parking lot lighting replacement project.

The Contractor's responsibilities shall include, but are not limited to:

A. Permit Determination Coordinate directly with City of Raleigh Development Services and other applicable authorities having jurisdiction to determine all required permits and approvals, including electrical and site lighting permits.

B. Photometric Documentation Determine whether photometric calculations or a formal photometric plan are required for permitting. The Contractor shall coordinate with the lighting manufacturer's representative or other qualified professional to prepare and submit all required documentation.

C. Permit Applications Prepare and submit all required permit applications, supporting documents, fixture specifications, calculations, and associated materials.

D. Professional Services Provide appropriately licensed design professionals and sealed drawings or calculations where required by applicable North Carolina law or the permitting authority.

E. Permit Fees Include all applicable permit fees, professional services, and administrative costs in the Base Bid.

F. Inspections and Approvals Schedule and coordinate all required inspections, address deficiencies associated with the Contractor's work and obtain final permit approvals and closeout documentation.

G. Regulatory Compliance Ensure that the proposed replacement fixtures and installation comply with applicable City of Raleigh UDO requirements, adopted electrical codes, and other applicable regulations.

All permitting responsibilities and associated costs shall be included in the Contractor's Base Bid. No additional compensation shall be provided for permits, documentation, or approvals reasonably required for the specified fixture replacement work.

The Contractor shall notify the City in writing if the permitting authority identifies requirements that would necessitate modifications to existing poles, foundations, underground electrical infrastructure, or the existing lighting layout beyond the specified replacement scope. Such modifications shall not proceed without prior written City authorization.

6. SUBMITTALS

Prior to ordering materials, the Contractor shall submit the following for City review:

1. Existing fixture and pole inventory.

2. Site lighting inventory map.

3. Existing fixture photographs and documentation.

4. Proposed replacement fixture schedule.

5. Manufacturer's product specifications and warranty information.

6. Photometric calculations and lighting performance documentation.

7. Permitting determination and applicable permit documentation.

The Contractor shall not order replacement fixtures until the City has reviewed and accepted the proposed fixture package.

7. INSTALLATION

The Contractor shall:

• Remove all existing LED parking lot fixtures within the designated project area.

• Furnish and install approved replacement LED fixtures.

• Reuse existing poles, mounting arms, foundations, and electrical infrastructure where compatible and serviceable.

• Provide necessary mounting adapters and incidental connection materials.

• Maintain existing fixture orientations unless otherwise approved.

• Protect existing site improvements and infrastructure.

• Properly dispose of removed fixtures and associated materials.

• Coordinate installation activities to minimize disruption to facility operations.

8. TESTING AND PROJECT CLOSEOUT

Upon completion, the Contractor shall:

• Test and verify operation of all installed fixtures.

• Confirm fixture orientation and proper operation of lighting controls.

• Conduct nighttime visual verification of the completed installation.

• Correct deficiencies attributable to the furnished fixtures or installation.

• Provide final fixture inventory and location map.

• Provide manufacturer warranties and maintenance information.

• Provide applicable permit inspection approvals.

9. EXISTING CONDITIONS AND SCOPE LIMITATIONS

The Base Bid shall include all labor, materials, equipment, field verification, manufacturer coordination, photometric documentation, permitting, and installation necessary to complete the specified fixture replacement.

Existing pole relocation, new foundations, underground electrical distribution replacement, and redesign of the parking lot lighting layout are excluded unless specifically identified elsewhere in the Contract Documents.

The Contractor shall notify the City of unforeseen conditions requiring work beyond the specified replacement scope. Additional work shall require written City authorization in accordance with the Contract Documents.

10. BID PRICING

The Contractor shall submit a single lump-sum Base Bid for the complete replacement of all existing LED parking lot light fixtures within the designated project area.

The Base Bid shall include:

• Existing conditions assessment and fixture inventory.

• Site lighting inventory map and documentation.

• Fixture selection and manufacturer coordination.

• Photometric verification and documentation.

• All required permits, fees, and associated documentation.

• Removal and disposal of existing fixtures.

• Furnishing and installation of new LED fixtures.

• Testing, commissioning, and project closeout.

All bidders shall have the opportunity to inspect existing conditions during the designated pre-bid site visit.

The Contractor shall be responsible for including all work reasonably necessary to complete the specified fixture replacement within the project area limits.

11. LICENSURE

1. Bidders shall provide evidence of an active North Carolina Electrical Contractor’s license.

PROJECT AREA

PROJECT LOCATION

Wilders Grove Campus 630 Beacon Lake Drive, Raleigh, NC 27610

BID SCHEDULE

Pre-Bid Conference: Thursday, November 19, 2026 – 10:00 AM EST Questions Deadline: Wednesday, December 2, 2026 – 5:00 PM EST Bid Deadline: Thursday, December 17, 2026 – 2:00 PM EST

BID DOCUMENTS

Project Manager Contact: Jason Clough E-mail: Jason.Clough@raleighnc.gov Phone: (919) 996-3556

City of Raleigh, Facilities and Operations Division 1027A N. West Street

Additional Contact: Sophie Helewski E-mail: Sophie.Helewski@raleighnc.gov Phone: (919) 996-3420

Vendor Portal website will post all addenda. The City of Raleigh is not responsible for the accuracy of documents anyone may obtain from any other source.

mailto:Sophie.Helewski@raleighnc.gov

BID SUBMISSIONS

The submission of a bid will assume that the Contractor has fully examined the site and knows the existing conditions and has made every provision for operating under the existing conditions, and has included all necessary items, and has read and understands the Bidding Documents. No consideration shall be given to any claim for extra compensation or extension of contract time because of failure to comply with this provision.

Bids must be made in strict accordance with the “Bid Form” provided hereto and all blank spaces for Unit Prices shall be properly filled in. If no price increase, assign “$0”. When requested alternates (if applicable) or Unit Prices have no entry, the bid may be considered incomplete, and the bid may be rejected as non-responsive. All bids must be submitted on the BID PROPOSAL FORM included herein. Prices given shall be both in writing and figures and the complete form shall be without any lineation, alterations, or erasures. In case of conflicting prices, the written prices shall govern. Submit one (1) set of bid forms enclosed.

Bids shall be received in strict accordance with all requirements of the General Statutes of North Carolina. The bid shall be submitted in sealed envelope(s) as noted on the Bid Proposal Form, with the bidder’s name, license number, and project name written on the exterior.

One (1) copy shall be submitted to City of Raleigh’s Facilities and Operation Division.

The Contractor shall fill in the Form of Bid as follows:

A. All bids must be signed by an authorized official of the firm.

B. Each proposal shall include the full name and address, phone number, and e-mail contact of the bidder.

C. All signatures shall be properly witnessed.

D. It shall be the specific responsibility of the Bidder to deliver this bid to: City of Raleigh

Facilities and Operations Division prior to the date and time specified in the invitation to bidders for opening of the Bids. Bidders are encouraged to be prompt as later delivery of a Bid for any reason, including delivery by the United States Postal Service, shall disqualify the Bid.

E. Modifications of previously deposited bids will be acceptable only if delivered to the place of the bid by the specified time.

The City of Raleigh shall not be held responsible for late deliveries. Faxed and/or email submissions will not be accepted. Proposals not received by the designated time will not be accepted.

The bidder shall fill in and sign the bid form correctly. Bids that show any omission, alterations of form, additions not called for, conditional bids, or any irregularities of any kind may be rejected.

Except to the extent allowed by statute, bids shall not be withdrawn, and bids shall remain subject to acceptance by the City for a period of Forty-Five (45) days.

It is the City's intention to award a contract for work under this project to the lowest responsive, responsible bidder. The City reserves the right to reject any and all bids and to waive without informalities, including without limitation, non-conforming, non-responsive, unbalanced, or conditional bids. The City of Raleigh further reserves the right to reject the bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible. The City of Raleigh may also reject the bid of any bidder if the City believes that it would not be in the best interest of the Project to make an award to that bidder. The City of Raleigh also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate terms with the successful bidder.

Upon request, bidders must present satisfactory evidence that they have been regularly engaged in the business of constructing such work, such as company work history and references from similar construction projects. And upon request, bidders must show that they are fully prepared with the necessary capital, equipment, etc., to begin the work promptly, and complete the same in accordance with specifications.

The bidder to whom the award is made shall be required to furnish work crews of adequate number, size, and experience to properly perform the work. The Project Manager responsible for the project is required to be on-site during construction. The interpretation of the number of crews, size, and experience will be determined by the City of Raleigh as to their adequacy.

The Contractor will furnish all materials, labor, equipment, supervision, tools, machinery, etc. for complete construction of projects in accordance with plans and specifications of the City of Raleigh.

The City reserves the right to extend the work in this Contract upon the same terms, provided that such extensions shall not exceed in cost fifty per cent (50%) of the original Contract price of the Contract being extended.

The contractor(s) to whom the award is made must carry insurance in the amounts and types outlined in the Insurance Requirements below.

1. Insurance

Contractor agrees to purchase at its own expense insurance coverages to satisfy the following minimum requirements. A certificate reflecting the following minimum coverages shall accompany this Contract:

1.1. Workers’ Compensation Insurance:

Limits:

Workers Compensation: Statutory for the State of North Carolina Employers Liability: Bodily Injury by Accident $1,000,000 each accident Bodily Injury by Disease $1,000,000 policy limit Bodily Injury by Disease $1,000,000 each employee

1.2. Commercial General Liability:

Limits:

Each Occurrence: $1,000,000 Personal and Advertising Injury $1,000,000 General Aggregate Limit $2,000,000 Products and Completed Operations Aggregate $2,000,000

The aggregate limit must apply per project. The form of coverage must be the ISO CG 00 01 policy as approved by the State of North Carolina Department of Insurance. If a form of coverage other than the CG 00 01 is used it must be approved by the City’s risk manager. Any endorsed exclusions or limitations from the standard policy must be clearly stated in writing and attached to the Certificate of Insurance. Completed Operations coverage must be maintained for the period of the applicable statute of limitations.

1.3. Commercial Automobile Liability:

Limits: $1,000,000 combined single limit.

1.4. Additional Insured:

Contractor agrees to endorse the City as an Additional insured on the Commercial General Liability, Auto Liability and Umbrella Liability if being used to meet the minimum liability limits for General Liability and Automobile Liability.

The Additional Insured shall read ‘City of Raleigh is named additional insured as their interest may appear’.

The Certificate Holder address should read:

City of Raleigh Post Office Box 590 Raleigh, NC 27602-0590

1.5. Builders Risk Coverage:

Limits: Minimum limit in the amount of total bid price. The Builder Risk policy must be endorsed to increase the limit of insurance for all change orders.

1.6. Policy Form:

Builder Risk coverage must be on a direct physical loss basis and contain no exclusion for theft, collapse or damage to foundations or underground structures, pipes or conduits.

1.7. Named Insured:

The Named Insured shall be The City of Raleigh, the Contractor, and all sub-contractors with a contractual assumption of responsibility for damage to the project.

All insurance companies must be admitted to do business in North Carolina and be acceptable to the City’s risk manager. If the insurance company(s) is a permitted surplus lines insurer, the insurance company name, and NAIC number must be submitted to the City’s risk manager for approval before commencing work. Contractor shall be required to provide the City no less than thirty (30) days’ notice of cancellation, or any material change, to any insurance coverage required by this Contract.

A Certificate of Insurance (COI) must be issued by an authorized representative of the insurance carrier(s). Certificates of Insurance must have the insurance company name and NAIC number clearly identified. The acceptance of or the review of Certificates of Insurance by the City does not relieve Contractor of any requirements in the Contract to provide specific insurance coverage required by the Contract, nor does the acceptance of or review of Certificates of Insurance covenant all insurance requirements have been met.

SITE INVESTIGATION

All bidders may examine the site before submitting a proposal in order to determine the extent of work involved, size of work, etc., and the conditions under which the work must be staged and performed.

PERMITS AND FEES

If applicable, the Contractor will need to have the permit issued in its name and provide contact information to the Development Services Department as required for permit issuance. The cost for all related permit fees and final issuance of the permit shall be presented for billing against the Owners Allowance. Markups, profit and overhead are not permissible for permit costs.

NON-COLLUSION IN BIDDING

The Bidder specifically agrees to abide by all applicable provisions of Article 3 of Chapter 133 of the North Carolina General Statutes. By submission of this Bid, each Bidder and each person signing on behalf of any Bidder certifies, and in case of a joint Bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of knowledge and belief:

(1) The prices in this Bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other Bidder or with any competitor.

(2) Unless otherwise required by Law, the prices quoted in the Bid have not been knowingly disclosed by the Bidder and will not knowingly be disclosed by the Bidder prior to opening, directly or indirectly, to any other Bidder or to any competitor; and

(3) No attempt has been made or will be made by the Bidder to induce any other person, partnership, or corporation to submit or not to submit a Bid for the purpose of restricting competition.

FORM OF AGREEMENT

The form of agreement to be entered into shall be the contract included within these specifications.

E-VERIFY COMPLIANCE UNDER G.S. 143-133.3.

The contract will require that the selected Firm/Team and any subcontractors comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes (NCGS) consistent with state law requirements for municipal contracts.

IRAN DIVESTMENT ACT CERTIFICATION.

The Contractor certifies that, if it submitted a successful bid for this contract, then as of the date it submitted the bid, the Contractor was not identified on the Iran List. If it did not submit a bid for this contract, the Contractor certifies that as of the date that this contract is entered into, the Contractor is not identified on the Iran List. It is a material breach of contract for the Contractor to be identified on the Iran List during the term of this contract or to utilize on this contract any subcontractor that is identified on the Iran List. In this Iran Divestment Act Certification section --

“Contractor” means the person entering into this contract with the City of Raleigh; and “Iran List” means the Final Divestment List – Iran, the Parent and Subsidiary Guidance List – Iran, and all other lists issued from time to time by the N.C. State Treasurer to comply with G. S. 143C-6A-4 of the N.C. Iran Divestment Act.

** End of Instructions to Bidders **

CITY OF RALEIGH – INFORMAL BID PROPOSAL FORM

City of Raleigh Date:

Engineering Services Department 1027A N. West Street Raleigh, NC 27603

Bidder agrees to perform all the work included in the Contract as indicated in the Contract Documents for the Wilders Grove Campus Site Lighting Fixture Replacements as specified within the bid documents. It is the City's intention to award a contract for all work under this project to the lowest responsive, responsible bidder.

The City reserves the right to reject any or all bids and to waive informalities. The undersigned further agrees to sign a Contract for the work, if offered within ninety (90) days after receipt of Bids, and to furnish surety as specified. The Bidder further agrees to provide and furnish all necessary materials, equipment, machinery, and labor necessary to complete the demolition of the work in full, in complete accordance with the plans and specifications and the contract documents to the full and entire satisfaction of the City of Raleigh and in accordance with these documents within the time limit specified below.

In addition to all other agreements and assurances, the undersigned Bidder understands and hereby agrees as follows:

1. The Bidder represents and agrees to complete the entire project in the following number of Consecutive Calendar Days: One Hundred Eighty (180) calendar days from the date on the Notice to Proceed.

Total Bid:

Dollars ($) (In Words)

Dollars ($) (In Figures)

Name of General Contractor and License Number

ACKNOWLEDGMENT OF RECEIPT OF ADDENDA

The undersigned Bidder hereby acknowledges receipt of the following Addenda:

Dated Acknowledge Receipt (initial)

Please check here if no addenda were received:

PROPOSAL SIGNATURE PAGE

Respectfully submitted this day of

By:

(Name of firm or corporation making bid)

WITNESS: By:

Signature

Name:

(Proprietorship or Partnership) Print or type

Title (Owner/Partner/Pres./V.Pres)

Address

ATTEST:

By: License No.

Title: Federal I.D. No.

(Corp. Sec. or Asst. Sec. only) Email Address:

Office Phone Number:

(CORPORATE SEAL)

** END OF CITY OF RALEIGH – BID PROPOSAL FORM

PROCEDURE FOR REPORTING NORTH CAROLINA SALES TAX

EXPENDITURES ON CITY OF RALEIGH CONTRACTS

1. The following procedure in handling the North Carolina Sales Tax is applicable to this project.

Contractors shall comply fully with the requirements outlined hereinafter, in order that the owner may recover the amount of the tax permitted under the law.

2. (a) It shall be the general contractor’s responsibility to furnish the owner documentary evidence showing the materials used and sales tax paid by the general contractor and each of his subcontractors. Any county sales tax included in the contractor’s statements must be shown separately from the state sales tax. If more than one county is shown, each county shall be listed separately.

(b) The documentary evidence shall consist of a certified statement, by the general contractor and each of his subcontractors individually, showing total purchases of materials from each separate vendor and total sales taxes by each county paid each vendor. The certified statement must show the invoice number (s) covered and inclusive dates of such invoices. State sales tax shall be listed separately from county sales tax. If more than one county is shown, each county shall be listed separately.

(c) Materials used from general contractor’s or subcontractor’s warehouse stock shall be shown in a certified statement at warehouse stock prices.

(d) The general contractor shall not be required to certify the subcontractor’s statements.

(e) The documentary evidence to be furnished to owners eligible for sales or use tax refunds covers sales and/or use taxes paid on building materials used by contractors and subcontractors in the performance of contracts with churches, orphanages, hospitals not for profit, educational institutions not operated for profit and other charitable or religious institutions or organizations not operated for profit and incorporated cities, towns and counties in this State. The documentary evidence is to be submitted to the above-named institutions, organizations and governmental units to be included in claims for refunds to be prepared and submitted by them to obtain refunds provided by G.S. 105-164.14 and is to include the purchase of building materials, supplies, fixtures and equipment which become a part of or annexed to buildings or structures being erected, altered or repaired under contracts with such institutions, organizations or governmental units.

3. The contractor or contractors to whom an award is made on this project will be required to follow the procedure outlined above.

4. The contractor is advised that all requests for payment, partial or final, for work completed under this contract must include a sales tax report submitted in accordance with the procedures outlined above.

North Carolina Sales Tax (Paid During This Estimate Period)

Project Project Location County_____________________

Contractor Period Ending

Date Vendor Invoice Number

Invoice Amount

State Tax

County Tax

Transit Tax

Total Tax County

TOTALS

I certify that the above listed vendors were paid sales tax upon purchases of building materials during the period covered by the construction estimate, and the property upon which such taxes were paid with or will be used in the performance of this contract. No tax on purchases or rentals of tools and/or equipment is included in the above list. All of the material above became a part of or is annexed to the building or structure being erected, altered or repaired.

County, North Carolina

Signed and sworn to (or affirmed) before this day by (name of principal) (signature of principal)

Date:

Notary Public's Signature

(Notary’s printed or typed name, Notary Public) (Official Seal) My commission expires_______________________________

CITY OF RALEIGH ENGINEERING SERVICES
INFORMAL BID DOCUMENTS FOR
Wilders Grove Campus Site Lighting Fixture Replacements
Index
CITY OF RALEIGH – ADVERTISEMENT FOR BID (INFORMAL BID)
Informal Bid #: 274-ES-FO-FY26-SWSADMIN-OUTDOORLIGHTING
Cost Specifications:
Project Scope:
Time: 2:00 PM EST
1027A N. West Street
PROJECT LOCATION
BID SCHEDULE
BID SUBMISSIONS
One (1) copy shall be submitted to City of Raleigh’s Facilities and Operation Division.
SITE INVESTIGATION
PERMITS AND FEES
FORM OF AGREEMENT
E-VERIFY COMPLIANCE UNDER G.S. 143-133.3.
IRAN DIVESTMENT ACT CERTIFICATION.
PROCEDURE FOR REPORTING NORTH CAROLINA SALES TAX EXPENDITURES ON CITY OF RALEIGH CONTRACTS

North Carolina Sales Tax

File details come from the government source that posted it. Updated .