Moore Square Garage Storage - Informal Bid Documents

This informal bid document is issued by the City of Raleigh, Engineering Services Department, Facilities and Operations Division for the purchase and installation of a secure fencing and gate system at the Moore Square Parking Deck located at 233 S. Wilmington Street, Raleigh, North Carolina. The project scope includes furnishing all labor, materials, equipment, and coordination necessary to install approximately 565 linear feet of chain link privacy fencing within the existing parking garage, along with vehicular swing gates (one primary 10-foot-tall entry gate and one double swing secondary access gate), and two man gates measuring 4 feet wide by 8 feet tall. The fencing specifications require 9 gauge galvanized steel with 3-inch diameter corner posts and 2.5-inch diameter line posts spaced no more than 8 feet apart, supported by three horizontal rails with flange plates secured to the concrete deck. A mandatory pre-bid meeting is scheduled for March 3, 2026, at 10:00 a.m. at the project site. The questions deadline is March 10, 2026, by 3:00 p.m., and sealed bids are due on Thursday, March 26, 2026, by 3:00 p.m. Bidders must complete the entire project within 21 consecutive calendar days from the Notice to Proceed. Proposals shall be submitted as a single lump sum with an Owner's Site Conditions Allowance of $5,000.00.

Bidders must be current and active North Carolina licensed general contractors with a minimum of five consecutive years of commercial construction experience and must utilize a commercial fencing company as a first-tier subcontractor. All bids must include the cost of a North Carolina licensed engineer or architect for structural coordination, permitting fees, utility locating, and all other associated costs. The City of Raleigh has established an aspirational goal of 15 percent minority and women-owned business enterprise (MWBE) participation on construction projects of $300,000 or more and projects of $100,000 or more with state funding. Bidders must submit completed Acknowledgment of MWBE Policy and Identification of MWBE Participation forms with their bids or risk rejection. Required insurance includes workers' compensation, commercial general liability ($1,000,000 per occurrence/$2,000,000 aggregate), commercial automobile liability ($1,000,000 combined single limit), and builders risk coverage equal to the total bid price. All warranties and guarantees shall be for a minimum of one year from acceptance. Bids may not be withdrawn for 45 days after opening, and no public opening will be held in accordance with informal bidding rules. The City reserves the right to reject any or all bids and to waive informalities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF RALEIGH ENGINEERING SERVICES

DEPARTMENT FACILITIES AND OPERATIONS DIVISION

Raleigh Municipal Building 222 West Hargett Street, Suite 605

Raleigh, NC 27601

INFORMAL BID DOCUMENTS FOR

Moore Square Garage Storage

Date of Issue: February 24, 2026

CITY OF RALEIGH

Index

• Index .............................................................................................. Page 2

• Advertisement For Bid .................................................................... Page 3-10

• Instructions to Bidders .................................................................... Page 11-16

• Bid Proposal Form .......................................................................... Page 17-19

• Procedure for reporting NC Sales Tax Expenditures ....................... Page 20-21

• Minority and Women-Owned Business Enterprise Program

(MWBE) ........................................................................................... Page 22-24

• Acknowledgment of MWBE Policy ..................................................... Page 25

• Identification of MWBE ...................................................................... Page 26

CITY OF RALEIGH – ADVERTISEMENT FOR BID (INFORMAL BID)

PROJECT: Moore Square Garage Storage

PROJECT LOCATION: 233 S. Wilmington St. Raleigh, NC 27601

Informal Bid #: 274-ES-FO-FY26-MooreSqGarageStorage

Owner and Contact: City of Raleigh, Facilities and Operations Division

Raleigh Municipal Building

1027A N West St. Raleigh, North Carolina 27601

Project Manager Contact: Skylar Herring e-mail: Skylar.Herring@raleighnc.gov

Additional Contact: Susan Barrameda e-mail: Susan.Barrameda@raleighnc.gov

NOTE: Do not refer or use previously published bid documents.

Pursuant to the General Statutes of North Carolina, Section 143-128 et. seq, contractors are invited to submit Sealed Single Prime Construction bids providing labor, material, and equipment for entering into a Single Prime Contract. The scope of work includes but is not limited to the following:

The City of Raleigh, Engineering Services Department, Facilities / Operations Division is seeking bids for the purchase and installation of a secure fencing and gate system in a specific area of the Moore Square Parking Deck located at 233 S. Wilmington St. Raleigh, N.C.

The project consists of furnishing all labor, materials, equipment, and coordination necessary to install chain link privacy fencing within an existing parking garage. Work includes fencing, gates, man doors, structural coordination, and all associated components required for a complete and functional installation.

The contractor shall be responsible for field verification, proper installation, coordination with the Structural Engineer of Record as required, and compliance with all applicable codes, standards, and project requirements.

Cost Specifications:

Total cost of this project will be included within the bid package. All labor, materials, equipment and permitting fees in relation to the purpose of this project are to be included. Bid proposals shall be for a single lump sum.

mailto:Susan.Barrameda@raleighnc.gov

Project Scope:

1. Bidders shall have a minimum of five (5) consecutive years prior experience with this type of commercial construction demo and installation.

2. Bidder shall be a current and active North Carolina Licensed General Contractor

3. General Contractor shall utilize a Commercial Fencing Company as part of the fencing installation for this project

4. General Contractor shall include the following as part of their total bid pricing (1) Fencing Contractor (2) the use of a North Carolina Licensed Engineer and/or Architect described in “Contractor Requirements”, (3) all other fees (i.e. permitting, locating, etc)

5. Bidders shall continuously adhere to all manufacturer installation requirements.

6. The Bidder shall require his / her employees to comply with the instructions pertaining to conduct and building regulations issued by duly appointed officials such as the building managers, guards, inspectors, etc.

7. The Bidder shall adhere to security and safety standards.

8. Bidder must provide three (3) references for representative projects including, names, titles, addresses, and telephone numbers for everyone within these client companies who may be contacted.

Company Name Address

Name of Authorized Personnel

Phone Number Time Period of

Project

9. Bidders shall have adequate facilities, tools and equipment to provide the services both properly and expeditiously.

10. Bidders shall have local support to address all discrepancies throughout the warranty period of (1) year upon acceptance of final installation.

11. Bidders shall ensure that a trained representative is always present at the site of the project at any time the Contractor is performing work.

12. Bidders shall keep all work areas clean and free from all debris and rubbish to the most reasonable extent possible. The Bidder shall remove all debris and rubbish from the work area on each visit.

13. Bidders shall provide all necessary equipment / signage / material required to ensure a safe and protected worksite is maintained from pedestrian and vehicular traffic during the entirety of this project

14. Bidders shall provide a visual inspection of the work area to ensure that no equipment or safety hazards exist.

15. All work shall be completed in a workmanlike manner according to standard practices and any additional specifications provided by City of Raleigh.

16. All parts, materials and supplies used by Bidder shall be new and free of defects; and Bidder shall warrant that all components provided as part of the installation shall be free of defects in materials and workmanship for a period of one-year from the date of completion and / or acceptance.

17. Bidder shall furnish all labor, equipment, transportation, and materials to perform the installation.

18. Project completion timeline shall not exceed 3 weeks. Completion timeline is defined in this project as:

▪ All construction completed by Contractor and accepted by Owner,

▪ All invoices submitted and approved for payment by Owner

▪ All documentation, manuals, O&Ms (if applicable) submitted to Owner and proof of Final Inspection (if applicable) submitted to Owner

19. All site work / installation shall be continuous until completed once Notice to Proceed is given by Owner

Contractor Requirements

1. General Contractor will be responsible for locating all underground utilities.

Note – A number of underground appurtenances (utility conduits piping, cabling, etc.) may be present in the area. It shall be the responsibility of the contractor to locate and protect all features from damage during the installation of the posts and fencing. Any damage to underground features will be promptly repaired at the contractor’s expense.

2. The General Contractor (GC) shall coordinate with the Structural Engineer of Record to review fence spans, loading, and attachment conditions.

3. For large or extended fence spans, the GC shall determine, in coordination with the structural engineer, whether additional steel support or framing are required.

4. Any additional steel or support required shall be included as part of the contractor’s means and methods, unless otherwise noted. Awarded contractor shall provide a copy of the sealed

Engineer drawings to the Owner prior to “Notice to Proceed”

5. Contractor shall provide all necessary shop drawings, calculations, and submittals related to fence support and submittals related to fence support and anchorage.

6. Contractor shall verify all field dimensions and existing conditions prior to fabrication and installation.

7. All anchorage to concrete decks, walls, or structural elements shall be performed using approved methods and materials.

8. Installation shall not compromise existing structural elements, waterproofing, or fire-rated assemblies.

9. All work shall comply with applicable building codes, fire codes, ADA requirements (if applicable), and local regulations.

Installation Instructions

1. There is approximately 565’ linear feet of line fencing for this project.

2. System should be designed to provide full-height coverage of deck openings, including 20-foot-tall entrance opening. Fence shall be installed such that the maximum gap between the top of the fence and the concrete deck above, and between the bottom of the fence and the concrete deck below, does not exceed 3 inches.

3. All new fencing and gate fencing shall be 9 gauge galvanized.

4. All fencing, hardware and associated material shall be made of rustproof material.

5. Vertical post shall be minimum 3” in diameter for all corners supporting line fencing.

6. Contractor shall determine the size of the corner post for supporting all swing gates to ensure stability and support of swing gate.

7. Vertical line post shall be minimum 2.5” in diameter.

8. Vertical post spacing shall be no more than 8ft apart.

9. Fencing shall be supported by (3) three horizontal rails (1-top rail, 1-mid rail and 1 – bottom rail). Mid rail shall be placed in middle section of the fencing. Horizontal rails shall be consistently placed at top and bottom of fencing.

10. All vertical post shall include caps.

11. All fencing line post shall be mounted to concrete surface using flange plates. Flange plates shall be a minimum of 8”X8” by 3/8” to ½” thick galvanized steel. Flange plates shall be secured to concrete with (4) concrete anchor bolts. Larger line post may require larger steel plates

12. Fence shall be installed such that the maximum gap between the top of the fence and the concrete deck above, and between the bottom of the fence and the concrete deck below, does not exceed 3 inches.

13. All flange plates shall be welded to the line post and painted with rust proof paint to withstand exterior elements.

14. All corner and mid vertical post shall be secured to concrete parking deck structure. This can be achieved by using post and plate adapters secured by concrete anchors and bolts

15. A support post shall be installed every 12’ to the horizontal top rail or top of line post to secure the fencing to the concrete decking. This shall be done with (1) hardware to secure to the post and (2) hardware and flange plates to secure to the concrete. All flange plates shall be secured with (4) anchor bolts to concrete (see example of support post).

Gates

Vehicular Main Entry – Wilmington Street

1. Furnish and install one (1) swing gate for vehicle entry at the main entrance off Wilmington

Street.

2. Location of swing gate to be identified at Mandatory Pre-Bid meeting

3. Fencing shall include horizontal / vertical rail post to support fencing surrounding entrance gate.

4. Height: 10 feet

5. Gate shall include:

▪ Wheel assembly for load support and ease of operation

▪ Hinges, latches, and locking provisions as specified

▪ Alignment to ensure smooth operations and durability

▪ Gate shall be constructed of galvanized tubular steel post with welded joints and cross bracing. All joints are to be protected with metal exterior paint to prevent rusting.

▪ Include locking hardware and stops as required. A surface mounted gate latch to be installed and mounted to concrete to secure gate in open position and allow release by foot.

6. Provide and install a Knox Key box to be used by Raleigh Fire Department. Knox Box shall be mounted on the exterior of the entrance gate. A steel plate shall be mounted and secured to the concrete structure located at the entrance gate to support the Knox Box. Knox Box Key shall be given to owner immediately upon installation.

Secondary Vehicular Access (located adjacent to primary access next to elevator corridor

1. Furnish and install one (1) double swing gate at the secondary access location.

2. Double swing gate shall:

▪ Be properly supported and aligned.

▪ Include locking hardware and stops as required. A surface mounted gate latch to be installed and mounted to concrete to secure gate in open position and allow release by foot.

▪ Meet clearance and operational requirements.

▪ Gate shall be constructed of galvanized tubular steel post with welded joints and cross bracing.

▪ All welded joints are to be protected with metal exterior paint to prevent rusting

Man Gates

1. Furnish and install one (1) man gate at the stairwell / elevator landing (south exposure).

▪ South exposure man gate shall be located (secured) on the parking surface of the deck. Gate shall be located in front of handicap ramp.

▪ Gates to include privacy slats.

▪ Gate size – 4ft wide x 8ft tall.

2. Furnish and install one (1) man door on the east wall exposure of the parking deck. This man gate will be utilized as a service entrance gate and will swing into existing parking space area

▪ East exposure man gate (service gate) shall be located on the raised curbing.

▪ Gates to include privacy slats.

▪ Gate size – 4ft wide x 8ft tall.

Man Gate Hardware

3. Man gate shall include:

▪ Framing, hinges, latches, and locking hardware.

▪ All gate framing shall be welded at each joint with protective paint to avoid rusting.

All man gates shall have “Strong Arm Double Gate Latch capable of utilizing a padlock for security.

▪ Self-closing and crash bar hardware is required on man gates located at stairwell / elevator landing. Crash bar hardware and closure latch shall include large metal plate to allow crash bar to be mounted as well as secured strike cover plate. Crash bar plate shall be a minimum of 18” tall X full width of main gate fencing.

Specifications

1. Fencing / Gates (Color) – Galvanized steel / Black coated

2. Slats – Black vinyl

3. Man Gate Hardware – Strong hold double gate latch (double gate) / Strong hold gate latch for single gate – Black coated

4. Crash bar with key entry opposite side (Medeco key cylinder provided by Contractor /

Medeco key cylinder vendor – Marshall’s Locksmith, Raleigh, N.C. attn: Paul Atkinson ph.

919.231.8017)

5. All posts include line post, horizontal post and vertical support post to be black coated galvanized steel.

6. All steel flanges for post supports shall be black coated

Exclusions (Unless Specifically Included)

1. Electrical work (access control, powered gates, etc.)

2. Fire alarm modifications

3. Security systems beyond mechanical locks

4. Work outside the defined fence and gate areas

Warranties

All warranties shall commence at the time of acceptance by the City of Raleigh Inspector and upon all final permit approvals. It shall continue for a period of not fewer than 12 months and shall include labor and materials.

Guarantees

Bidders shall provide a minimum of a one-year guarantee for all work performed and all materials provided to the covered system(s). The guarantee shall include any and all defective workmanship.

Bidders shall provide City of Raleigh with a written statement of guarantee for the covered system(s)

Sealed bids: Bidders are responsible for ensuring delivery of bids before the deadline.

(No faxed or emailed bids accepted) Bids will be received by:

Time: 3:00pm

Date: Thursday, March 26, 2026

Mail Delivery: City of Raleigh, Engineering Services Dept.

Attn: Skylar Herring

P.O. Box 590

Raleigh, NC 27602

Drop off Times: 9:00 am – 5:00 pm

1027A N West St.

Raleigh, NC 27603

MANDATORY Pre-Bid meeting will be held at each project site. Attendance is mandatory.

Pre-bid attendance may be used to validate bid submissions. Attendance to the pre-bid will be documented by the City.

Date: March 3, 2026

Time: 10:00am

Location: 233 S. Wilmington St.

Questions Deadline: Tuesday, March 10, 2026 by 3:00pm

Paper hard copy sealed bids are required and digital submissions are not allowed. Bidders have two (2) options for delivery of their bid documents:

• Early delivery via in person/hand delivery on the day of the bid opening during the time shown above. The City of Raleigh, Facilities and Operations Division project manager or representative will be onsite at that time to receive bids. Envelopes must be addressed and sealed and will be securely held.

• Mail-in / drop-off bids in accordance with the address and times shown above.

No public opening will be held in accordance with informal bidding rules.

Contractors are responsible for distributing documents to all sub-contractors.

Information related to this solicitation, including any addenda, will be posted to the Vendor Portal (https://evp.nc.gov/).

https://evp.nc.gov/

Bidders will be required to show evidence that they are licensed, if bid is over $40,000 to perform the work in the Bidding Documents as required by North Carolina General Statute, Chapter 87.

Pursuant to North Carolina General Statutes §143-128.2 et seq. and §143-131, and in accordance with City policy, the City of Raleigh encourages and provides equal opportunity for certified Minority and Women-Owned Business Enterprise (MWBE) businesses to participate in all aspects of the City’s contracting and procurement programs to include: Professional Services, Goods and Other Services, and Construction. The prime contractor will be required to identify participation of MWBE businesses in their proposal and demonstrate how that participation will be achieved.

The City’s goal is to contract and sub-contract fifteen percent (15%) of the total contract amount to Certified MWBEs on construction projects of $300,000 or more, or contracts of $100,000 or more that include any State funding.

No Bid may be withdrawn for Forty-Five (45) days after opening time.

The City reserves the right to reject any or all bids and to waive informalities.

END OF ADVERTISEMENT FOR BID

INSTRUCTIONS TO BIDDERS

GENERAL

The project consists of furnishing all labor, materials, equipment, and coordination necessary to install chain link privacy fencing within an existing parking garage. Work includes fencing, gates, man doors, structural coordination, and all associated components required for a complete and functional installation. This includes all inspection/permitting fees. All bid proposals shall be for a single lump sum.

PROJECT LOCATION

Moore Square Parking Deck

233 S. Wilmington Street

Raleigh, NC 27603

BID SCHEDULE

Pre-Bid Conference: Tuesday, March 3, 2026, at 10:00am

Questions Deadline: Tuesday, March 10, 2026, by 3:00pm

Bids Due: Thursday, March 26, 2026, by 3:00pm

BID DOCUMENTS

Project Manager Contact: Skylar Herring e-mail: Skylar.Herring@raleighnc.gov phone: (919)996-3420

City of Raleigh, Facilities and Operations Division 1027A N. West St., Raleigh, North Carolina 27601

Additional Contact: Susan Barrameda e-mail: Susan.Barrameda@raleighnc.gov phone: (919) 996-3420

Vendor Portal website will post all addenda. The City of Raleigh is not responsible for the accuracy of documents anyone may obtain from any other source.

mailto:Susan.Barrameda@raleighnc.gov

BID SUBMISSIONS

The submission of a bid will assume that the Contractor has fully examined the site and knows the existing conditions and has made every provision for operating under the existing conditions, and has included all necessary items, and has read and understands the Bidding Documents. No consideration shall be given to any claim for extra compensation or extension of contract time because of failure to comply with this provision.

Bids must be made in strict accordance with the “Bid Form” provided hereto and all blank spaces for Unit Prices shall be properly filled in. If no price increase, assign “$0”. When requested alternates (if applicable) or Unit Prices have no entry, the bid may be considered incomplete and the bid may be rejected as non-responsive. All bids must be submitted on the BID PROPOSAL FORM included herein. Prices given shall be both in writing and figures and the complete form shall be without any lineation, alterations, or erasures. In case of conflicting prices, the written prices shall govern. Submit one (1) set of bid forms enclosed.

Bids shall be received in strict accordance with all requirements of the General Statutes of North Carolina. The bid shall be submitted in sealed envelope(s) as noted on the Bid Proposal Form, with the bidder’s name, license number, and project name written on the exterior.

One (1) copy shall be submitted to City of Raleigh’s Facilities and Operation Division.

The Contractor shall fill in the Form of Bid as follows:

A. All bids must be signed by an authorized official of the firm.

B. Each proposal shall include the full name and address, phone number, and e-mail contact of the bidder.

C. All signatures shall be properly witnessed.

D. Enclose required MWBE forms 1) Acknowledgement of MWBE Policy 2) Identification of MWBE Participation for Informal Project Bids

E. It shall be the specific responsibility of the Bidder to deliver this bid to: City of Raleigh

Facilities and Operations Division prior to the date and time specified in the invitation to bidders for opening of the Bids. Bidders are encouraged to be prompt as later delivery of a Bid for any reason, including delivery by the United States Postal Service, shall disqualify the Bid.

F. Modifications of previously deposited bids will be acceptable only if delivered to the place of the bid by the specified time.

The City of Raleigh shall not be held responsible for late deliveries. Faxed and/or email submissions will not be accepted. Proposals not received by the designated time will not be accepted.

The bidder shall fill in and sign the bid form correctly. Bids that show any omission, alterations of form, additions not called for, conditional bids, or any irregularities of any kind may be rejected.

Except to the extent allowed by statute, bids shall not be withdrawn and bids shall remain subject to acceptance by the City for a period of Forty-Five (45) days.

The bids will be evaluated, and the contract awarded in accordance with statutory public contract requirements as supplemented by the City of Raleigh’s MWBE information supplied with the bid documents.

It is the City's intention to award a contract for work under this project to the lowest responsive, responsible bidder. The City reserves the right to reject any and all bids and to waive without informalities, including without limitation, nonconforming, non-responsive, unbalanced, or conditional bids. The City of Raleigh further reserves the right to reject the bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible. The City of Raleigh may also reject the bid of any bidder if the City believes that it would not be in the best interest of the Project to make an award to that bidder. The City of Raleigh also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate terms with the successful bidder.

Upon request, bidders must present satisfactory evidence that they have been regularly engaged in the business of constructing such work, such as company work history and references from similar construction projects. And upon request, bidders must show that they are fully prepared with the necessary capital, equipment, etc., to begin the work promptly, and complete the same in accordance with specifications.

The bidder to whom the award is made shall be required to furnish work crews of adequate number, size, and experience to properly perform the work. The Project Manager responsible for the project is required to be on-site during construction. The interpretation of the number of crews, size, and experience will be determined by the City of Raleigh as to their adequacy.

The Contractor will furnish all materials, labor, equipment, supervision, tools, machinery, etc. for complete construction of projects in accordance with plans and specifications of the City of Raleigh.

The City reserves the right to extend the work in this Contract upon the same terms, provided that such extensions shall not exceed in cost fifty per cent (50%) of the original Contract price of the Contract being extended.

The contractor(s) to whom the award is made must carry insurance in the amounts and types outlined in the Insurance Requirements below.

1. Insurance

Contractor agrees to purchase at its own expense insurance coverages to satisfy the following minimum requirements. A certificate reflecting the following minimum coverages shall accompany this Contract:

1.1. Workers’ Compensation Insurance:

Limits:

Workers Compensation: Statutory for the State of North Carolina Employers Liability: Bodily Injury by Accident $1,000,000 each accident Bodily Injury by Disease $1,000,000 policy limit Bodily Injury by Disease $1,000,000 each employee

1.2. Commercial General Liability:

Each Occurrence: $1,000,000 Personal and Advertising Injury $1,000,000 General Aggregate Limit $2,000,000 Products and Completed Operations Aggregate $2,000,000

The aggregate limit must apply per project. The form of coverage must be the ISO CG 00 01 policy as approved by the State of North Carolina Department of Insurance. If a form of coverage other than the CG 00 01 is used it must be approved by the City’s risk manager. Any endorsed exclusions or limitations from the standard policy must be clearly stated in writing and attached to the Certificate of Insurance. Completed Operations coverage must be maintained for the period of the applicable statute of limitations.

1.3. Commercial Automobile Liability:

$1,000,000 combined single limit.

1.4. Additional Insured:

Contractor agrees to endorse the City as an Additional insured on the Commercial General Liability, Auto Liability and Umbrella Liability if being used to meet the minimum liability limits for General Liability and Automobile Liability.

The Additional Insured shall read ‘City of Raleigh is named additional insured as their interest may appear’.

The Certificate Holder address should read:

City of Raleigh Post Office Box 590 Raleigh, NC 27602-0590

1.5. Builders Risk Coverage:

Minimum limit in the amount of total bid price. The Builder Risk policy must be endorsed to increase the limit of insurance for all change orders.

1.6. Policy Form:

Builder Risk coverage must be on a direct physical loss basis and contain no exclusion for theft, collapse or damage to foundations or underground structures, pipes or conduits.

1.7. Named Insured:

The Named Insured shall be The City of Raleigh, the Contractor, and all sub-contractors with a contractual assumption of responsibility for damage to the project.

All insurance companies must be admitted to do business in North Carolina and be acceptable to the City’s risk manager. If the insurance company(s) is a permitted surplus lines insurer, the insurance company name, and NAIC number must be submitted to the City’s risk manager for approval before commencing work. Contractor shall be required to provide the City no less than thirty (30) days’ notice of cancellation, or any material change, to any insurance coverage required by this Contract.

A Certificate of Insurance (COI) must be issued by an authorized representative of the insurance carrier(s). Certificates of Insurance must have the insurance company name and NAIC number clearly identified. The acceptance of or the review of Certificates of Insurance by the City does not relieve Contractor of any requirements in the Contract to provide specific insurance coverage required by the Contract, nor does the acceptance of or review of Certificates of Insurance covenant all insurance requirements have been met.

SITE INVESTIGATION

All bidders shall examine the site before submitting a proposal in order to determine the extent of work involved, size of work, etc., and the conditions under which the work must be staged and performed.

PERMITS AND FEES

The Contractor will need to have the permit issued in its name and provide contact information to the Development Services Department as required for permit issuance. The cost for all related permit fees and final issuance of the permit shall be presented for billing against the Owners Allowance. Markups, profit and overhead are not permissible for permit costs.

NON-COLLUSION IN BIDDING

The Bidder specifically agrees to abide by all applicable provisions of Article 3 of Chapter 133 of the North Carolina General Statutes. By submission of this Bid, each Bidder and each person signing on behalf of any Bidder certifies, and in case of a joint Bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of knowledge and belief:

(1) The prices in this Bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other Bidder or with any competitor.

(2) Unless otherwise required by Law, the prices quoted in the Bid have not been knowingly disclosed by the Bidder and will not knowingly be disclosed by the Bidder prior to opening, directly or indirectly, to any other Bidder or to any competitor; and

(3) No attempt has been made or will be made by the Bidder to induce any other person, partnership, or corporation to submit or not to submit a Bid for the purpose of restricting competition.

FORM OF AGREEMENT

The form of agreement to be entered into shall be the contract included within these specifications.

E-VERIFY COMPLIANCE UNDER G.S. 143-133.3.

The contract will require that the selected Firm/Team and any subcontractors comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes (NCGS) consistent with state law requirements for municipal contracts.

IRAN DIVESTMENT ACT CERTIFICATION.

The Contractor certifies that, if it submitted a successful bid for this contract, then as of the date it submitted the bid, the Contractor was not identified on the Iran List. If it did not submit a bid for this contract, the Contractor certifies that as of the date that this contract is entered into, the Contractor is not identified on the Iran List. It is a material breach of contract for the Contractor to be identified on the Iran List during the term of this contract or to utilize on this contract any subcontractor that is identified on the Iran List. In this Iran Divestment Act Certification section -- “Contractor” means the person entering into this contract with the City of Raleigh; and “Iran List” means the Final Divestment List – Iran, the Parent and Subsidiary Guidance List – Iran, and all other lists issued from time to time by the N.C. State Treasurer to comply with G. S. 143C-6A-4 of the N.C. Iran Divestment Act.

** End of Instructions to Bidders **

CITY OF RALEIGH – INFORMAL BID PROPOSAL FORM

City of Raleigh Date:

Engineering Services Department 1027A N West St.

Raleigh, North Carolina 27601

The undersigned bidder has carefully examined the Form of Contract, the General Conditions, the Supplemental

Conditions and Specifications, all of which are acknowledged to be part of the proposal and the Proposal Form, and the Bidder has also examined the site of the proposed work. Bidder agrees to perform all the work included in the Contract as indicated in the Contract Documents within the Moore Square Garage Storage scope as it is specified within the bid documents. It is the City's intention to award a contract for all work under this project to the lowest responsive, responsible bidder. The City reserves the right to reject any or all bids and to waive informalities.

The undersigned further agrees to sign a Contract for the work, if offered within ninety (90) days after receipt of Bids, and to furnish surety as specified. The Bidder further agrees to provide and furnish all necessary materials, equipment, machinery, and labor necessary to complete the demolition of the work in full, in complete accordance with the plans and specifications and the contract documents to the full and entire satisfaction of the City of Raleigh and in accordance with these documents within the time limit specified below.

In addition to all other agreements and assurances, the undersigned Bidder understands and hereby agrees as follows:

1. The Bidder represents and agrees to complete the entire project in the following number of Consecutive Calendar Days: Twenty-One days from the date on the Notice to Proceed.

2. The Bidder agrees to comply with the City’s policy to encourage bidders to use Certified MWBE businesses as specified in Division 00 MWBE Requirements.

Base Bid:

Dollars ($) (In Words)

Dollars ($) (In Figures)

Owner’s Site Conditions Allowance: Five Thousand Dollars and zero cents ($5,000.00) (Note that the Owner’s Site Conditions Allowance shall only be used when pre-authorized in writing by the City.)

Total Bid:

(Including Base bid and Owner’s Site Conditions Allowance):

Dollars ($) (In Words)

Dollars ($) (In Figures)

Name of General Contractor and License Number if project is over $40,000

ACKNOWLEDGMENT OF RECEIPT OF ADDENDA

The undersigned Bidder hereby acknowledges receipt of the following Addenda:

Dated Acknowledge Receipt (initial)

Please check here if no addenda were received:

PROPOSAL SIGNATURE PAGE

Respectfully submitted this day of

By:

(Name of firm or corporation making bid)

WITNESS: By:

Signature

Name:

(Proprietorship or Partnership) Print or type

Title

(Owner/Partner/Pres./V.Pres)

Address

ATTEST:

By: License No.

Title: Federal I.D. No.

(Corp. Sec. or Asst. Sec. only)

Email Address:

Office Phone Number:

(CORPORATE SEAL)

** END OF CITY OF RALEIGH – BID PROPOSAL FORM

PROCEDURE FOR REPORTING NORTH CAROLINA SALES TAX

EXPENDITURES ON CITY OF RALEIGH CONTRACTS

1. The following procedure in handling the North Carolina Sales Tax is applicable to this project.

Contractors shall comply fully with the requirements outlined hereinafter, in order that the owner may recover the amount of the tax permitted under the law.

2. (a) It shall be the general contractor’s responsibility to furnish the owner documentary evidence showing the materials used and sales tax paid by the general contractor and each of his subcontractors. Any county sales tax included in the contractor’s statements must be shown separately from the state sales tax. If more than one county is shown, each county shall be listed separately.

(b) The documentary evidence shall consist of a certified statement, by the general contractor and each of his subcontractors individually, showing total purchases of materials from each separate vendor and total sales taxes by each county paid each vendor. The certified statement must show the invoice number (s) covered and inclusive dates of such invoices. State sales tax shall be listed separately from county sales tax. If more than one county is shown, each county shall be listed separately.

(c) Materials used from general contractor’s or subcontractor’s warehouse stock shall be shown in a certified statement at warehouse stock prices.

(d) The general contractor shall not be required to certify the subcontractor’s statements.

(e) The documentary evidence to be furnished to owners eligible for sales or use tax refunds covers sales and/or use taxes paid on building materials used by contractors and subcontractors in the performance of contracts with churches, orphanages, hospitals not for profit, educational institutions not operated for profit and other charitable or religious institutions or organizations not operated for profit and incorporated cities, towns and counties in this State. The documentary evidence is to be submitted to the above-named institutions, organizations and governmental units to be included in claims for refunds to be prepared and submitted by them to obtain refunds provided by G.S. 105-164.14 and is to include the purchase of building materials, supplies, fixtures and equipment which become a part of or annexed to buildings or structures being erected, altered or repaired under contracts with such institutions, organizations or governmental units.

3. The contractor or contractors to whom an award is made on this project will be required to follow the procedure outlined above.

4. The contractor is advised that all requests for payment, partial or final, for work completed under this contract must include a sales tax report submitted in accordance with the procedures outlined above.

PROCEDURE FOR REPORTING NC SALES TAX EXPENDITURES ON CITY OF RALEIGH CONTRACTS

Page

North Carolina Sales Tax (Paid During This Estimate Period)

Project Project Location County Estimate No.

Contractor Period Ending

Date Vendor Invoice Number

Invoice Amount

State Tax

County Tax

Transit Tax

Total Tax

County

TOTALS

I certify that the above listed vendors were paid sales tax upon purchases of building materials during the period covered by the construction estimate, and the property upon which such taxes were paid with or will be used in the performance of this contract. No tax on purchases or rentals of tools and/or equipment is included in the above list. All of the material above became a part of or is annexed to the building or structure being erected, altered or repaired.

County, North Carolina

Signed and sworn to (or affirmed) before this day by (name of principal) (signature of principal)

Date:

Notary Public's Signature

(Notary’s printed or typed name, Notary Public) (Official Seal) My commission expires:

Page

INFORMATION FOR BIDDERS REGARDING COMPLIANCE WITH THE CITY OF RALEIGH'S

MINORITY AND WOMEN-OWNED BUSINESS ENTERPRISE (MWBE) PROGRAM

Policy

In accordance with North Carolina law, the City of Raleigh encourages and provides an equal opportunity for

Certified Minority and Women-Owned Business Enterprises (MWBE) to participate in all aspects of the City's contracting and procurement programs.1 The prime contractor or a first-tier subcontractor on a construction manager at risk (CMAR) project (collectively, "Bidder") shall be required to identify participation of MWBE businesses in its proposal, and document how that participation will be achieved. Bidders are subject to the City's

MWBE subcontracting requirements (including good faith efforts as applicable), regardless if a Bidder is itself a

Certified MWBE. 2

The City has an aspirational goal of 15% of the total contract amount to be performed by MWBE businesses in contracts awarded by the City for: (i) construction and building projects of $300,000 or more; and (ii) construction and building projects of $100,000 or more that have any state funding.

Definitions

Certified Minority Business (MWBE)

A business which:

a. At least fifty-one percent (51%) is owned by one or more Minority Persons or Socially and Economically

Disadvantaged Individuals; or in the case of a corporation, in which at least fifty-one percent (51%) of the stock is owned by one or more Minority Persons or Socially and Economically Disadvantaged Individuals;

b. The management and daily business operations are controlled by one or more Minority Persons or Socially and Economically Disadvantaged Individuals; and

c. Is certified in one of the MWBE categories as defined by the NC Department of Administration/Historically

Underutilized Business (HUB) and the NC Department of Transportation/Disadvantaged Business

Enterprise (DBE).

Minority Person

A person who is a citizen or lawful permanent resident of the United States and who is:

a. Black, that is, a person having origins in any of the black racial groups in Africa;

b. Hispanic, that is, a person of Spanish or Portuguese culture with origins in Mexico, South or Central

America, or the Caribbean Islands, regardless of race;

c. Asian American, that is, a person having origins in any of the original peoples of the Far East, Southeast

Asia, Asia, the Indian subcontinent, or the Pacific Islands;

d. American Indian, that is, a person having origins in any of the original peoples of North America; or

e. Non-minority Female.

Socially and Economically Disadvantaged Individual

Socially disadvantaged individuals are those who have been subjected to racial or ethnic prejudice or cultural bias because of their identity as a member of a group without regard to their individual qualities. Economically disadvantaged individuals are those socially disadvantaged individuals whose ability to compete in the free enterprise system has been impaired due to diminished capital and credit opportunities as compared to others in the same business area who are not socially disadvantaged.3

1 See, N.C.G.S. §§ 143-128.2, 143-128.4, 143-129, and 143-131.

2 See, City of Raleigh SOP 505-2.

3 See, 15 U.S.C. 637.

Bidder Responsibilities

Bidders agree to comply with all the terms and conditions of the City of Raleigh's Minority and Women-

Owned Business Enterprise (MWBE) Program. Bidders must use good faith efforts (if applicable) to meet participation goals through the award of subcontracts to certified MWBE businesses consistent with City policy and North Carolina law.

Pre-Bid Opening

The City's Solicitation Documents include forms that: (a) capture information about MWBEs and any other subcontractors or suppliers that a Bidder intends to use on a contract ("Identification of

MWBE Participation") and (b) affidavits to be completed by the Bidder.

Identification of MWBE Participation

The "Identification of MWBE Participation" must be completed by the Bidder on the City's form and submitted with its bid. If the project work is to be self-performed by the Bidder, the Bidder must so designate by checking the appropriate box on the form. For all Bidders which will not be self-performing the project work, the "Identification of MWBE Participation" form must be completed in its entirety. The Bidder must list on the City's form all MWBE businesses which will be construction subcontractors, vendors, or suppliers (collectively, "Subcontractors") on the project, and the total dollar value of its bid that will be performed by MWBEs. The failure to complete the "Identification of MWBE Participation" form in its entirety, or the failure to submit a completed "Identification of

MWBE Participation" form with its bid, will render the bid non-responsive and the Bidder's bid will not be considered for award. The City will only credit MWBE participation for those Subcontractors listed on the "Identification of MWBE Participation" form.

Affidavit A: Listing of Good Faith Efforts

If the Bidder intends to subcontract any portion of the project work on a contract, an Affidavit A must be properly executed and submitted with its bid, listing the good faith efforts the Bidder made to achieve

MWBE subcontracting goals for the contract prior to submitting its bid. The Affidavit A must be completed using the City's form. A minimum of fifty (50) good faith efforts points is required, the failure to achieve at least 50 points is grounds for rejection of a bid.

Affidavit B: Intent to Perform Contract with Own Workforce

In lieu of an Affidavit A, a Bidder that intends to perform 100% of the project work on a contract with its own current workforce may submit an Affidavit B with its bid. In submitting an Affidavit B, a Bidder certifies that the Bidder does not customarily subcontract elements of this type of project, and normally performs, has the capability to perform, and will perform all elements of the project work on the contract with its own current workforce. The Affidavit B must be completed using the City's form.

The failure to submit a properly executed Affidavit A or Affidavit B with a bid will render the bid non-responsive and the bid will not be considered for award.

Bid Opening

At the project bid opening, the total MWBE participation for each bid will be recorded. Upon being named the apparent low bidder, the Bidder must comply with the following:

a. If the Bidder submitted an Affidavit B with its bid indicating its intent to perform 100% of the project work on the contract with its own current workforce, then the Bidder is not required to resubmit its

Affidavit B or to submit any additional affidavits (i.e., Affidavit C or Affidavit D). The City, in its discretion, may request that the Bidder submit additional information or documentation, including, but not limited to, information relating to the Bidder's subcontracting history and its ability to perform all elements of the project work on the contract with its own current workforce.

b. If the Bidder submitted an Affidavit A with its bid and the amount of MWBE participation as a percentage of the total contract price meets or exceeds the applicable goal, then the Bidder must submit to the City an Affidavit C within three (3) business days after being notified by City Staff that it is the apparent low bidder. The Bidder must complete the Affidavit C in its entirety using the City's form.

c. If the Bidder submitted an Affidavit A with its bid and the amount of MWBE participation as a percentage of the total contract price does not meet the applicable goal, then the Bidder must submit an Affidavit D to the City within three (3) business days after being notified by City Staff that it is the apparent low bidder. The Bidder must complete Affidavit D in its entirety on the City's form. In conjunction with the

Affidavit D, the Bidder must include supplemental documentation of the good faith efforts made to meet the applicable goal. The City, in its discretion, may request that the Bidder submit additional information or documentation, including, but not limited to, information or documentation relating to any good faith efforts claimed by the Bidder, and completion of the City's Good Faith Negotiation Form and Solicitation

Form. Good faith efforts can be demonstrated using, among other factors, the following:

i. Attending pre-solicitation or pre-bid meetings that are scheduled by the City to inform MWBE firms of contracting, subcontracting, and supply opportunities.

ii. Advertising in general circulation, trade association, or minority-focus media concerning subcontracting opportunities.

iii. Providing written notice, to a reasonable number of specific MWBE firms that their interest in the contract is being solicited, at least 10 days before bids are due, to allow MWBE firms time to participate.

iv. Following up initial solicitation of interest by contacting MWBE firms to determine with certainty whether the MWBE firms are interested.

v. Identifying and selecting portions of the work to be performed by MWBE firms in order to increase the likelihood of MWBE participation (including where appropriate, breaking down contracts into economically feasible units to facilitate MWBE participation).

vi. Providing interested MWBE firms with equal access to plans, specifications, and requirements of the contract.

vii. Negotiating fairly with interested MWBE firms, not rejecting MWBE firms as unqualified without sound reasons based on a thorough investigation of their capabilities.

viii. Using the services of the City's MWBE office; available minority community organizations; minority contractors' groups; local, state, and federal minority business offices; and other organizations that provide assistance in the recruitment and placement of MWBE firms.

ix. Assisting interested MWBE firms in need of equipment, loan capital, lines of credit or joint pay agreements to secure loans, supplies or letters of credit, including waiving credit that is ordinarily required.

x. Assisting interested MWBE firms in obtaining bonding, insurance, or providing alternatives to bonding or insurance for Subcontractors.

xi. Negotiating joint venture and partnership arrangements with minority businesses to increase the opportunities for minority participation when possible.

xii. Provide for quick pay agreements and policies to enable minority contractors and suppliers to meet cash flow demands.

For each unmet MWBE participation goal, for which an Affidavit D is submitted, a Bidder must earn at least fifty

(SO) good faith efforts points. The failure to achieve at least fifty (SO) points is grounds for rejection of a bid. All actions necessary to earn good faith efforts points must occur prior to bid opening. In determining whether a Bidder has made good faith efforts, the City will evaluate the efforts made by the Bidder and will determine compliance with regard to quantity, intensity, and results of these efforts prior to recommendation of award.

Post-Award Payment For purposes of this section the word "Contractor'' means both the prime contractor and the CMAR for CMAR projects. The Contractor must submit a completed Payment Affidavit - Subcontractor/ Supplier Utilization Form with each payment application, including periodic payments and final payment.

Payment applications will not be processed by the City until a completed Payment Affidavit - Subcontractor/ Supplier Utilization Form is submitted. Within seven (7) days of receipt by the Contractor of a periodic or final payment from the City, the Contractor must pay each first-tier Subcontractor based on work completed or services provided under each subcontract. If the Contractor has made a quick pay commitment with any MWBE Subcontractor, they must comply with the provisions of their quick pay commitment.

Changing a Certified MWBE Subcontractor

If the situation arises that it becomes necessary to terminate, replace, or reduce the work of a MWBE Subcontractor counted toward a committed MWBE subcontracting goal, the Contractor must submit a completed Request to Change MWBE Subcontractor form to the applicable department project manager and the City's MWBE Program Manager. Any change in the work of a MWBE Subcontractor, including its termination and/or replacement, must first be approved by the City based upon good cause shown. Any further explanation or detail to the City in addition to what is identified in the Request to Change MWBE Subcontractor form must be on company letterhead. Good faith efforts shall apply to the selection of any substitute Subcontractor.

Updated 6.02.2025

ACKNOWLEDGMENT OF MWBE POLICY [PURSUANT TO N.C.G.S. §

143-128.2]

The City’s policy is to encourage bidders in the participation of MWBE businesses. A presentation of that policy has been made at the pre-bid or pre-proposal conference. By submission of a bid or proposal in response to this solicitation, the Bidder consents to all the terms and conditions of the City of Raleigh Minority and Women-Owned Business Enterprise (MWBE) Policy. A copy of the policy may be provided upon request by the Business Engagement & Opportunities Division, or online at www.raleighnc.gov.

Bidder recognizes that the City of Raleigh encourages and provides equal…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .