27102_Jun_30_25_solicitation_doc.pdf
PDF 15 KB Posted
- Solicitation number
- 27102
- Issued by
- New Haven County, Connecticut
About this file
This is an Invitation to Bid (ITB) document from the South Central Connecticut Regional Water Authority for the Chemical Improvements at the Lake Whitney Water Treatment Plant, solicitation number 27102. The project involves comprehensive upgrades to chemical feed systems, including replacing the sodium hydroxide (caustic) chemical feed system in the Sodium Hydroxide Storage Room and installing a new potassium permanganate chemical feed system in the New Potassium Permanganate Storage Room. The scope includes replacing bulk tanks, day tanks, transfer pumps, metering pumps, piping, valves, and instrumentation, as well as demolishing existing potassium permanganate equipment. Additional building improvements encompass door replacement, new fiberglass platforms and stairs, tempered water systems, safety shower eye wash stations, a dust collection system, powered lift table, concrete landing, chemical-resistant coatings, and electrical improvements. The bid period runs from December 16, 2024, at 12:00 PM EST to January 22, 2025, at 2:00 PM EST, with all vendors eligible to respond.
The solicitation specifies delivery terms as Free On Board Destination with payment terms to be vendor-specified. No specific estimated total value is provided, and there are no apparent set-asides or preferences for disadvantaged business enterprises. The contact person is Brent Domkowski, who can be reached at 203-401-2507 or bdomkowski@rwater.com. Interested bidders will have access to Project Drawings and a Project Manual to support proposal preparation. The comprehensive nature of the upgrades suggests a significant capital investment requiring vendors with specialized expertise in water treatment facility chemical system installations, safety infrastructure improvements, and electrical system modifications.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 27102
Chemical Improvements at the Lake Whitney Water Treatment
Plant
Invitation to Bid (ITB)
So. Central CT Regional Water Auth.
December 16, 2024 - January 22, 2025
Page:2
General Header Information
This bid has no questions defined.
27102
No. 27102 Title: Chemical Improvements at the Lake Whitney Water Treatment Plant Start Date: December 16, 2024 at 12:00:00 PM EST End Date: January 22, 2025 at 2:00:00 PM EST Vendor Q&A Start Date:
Vendor Q&A End Date:
Estimated Total Value:
Who can respond to this bid? : All Vendors Description: The project includes: replacement of sodium hydroxide (caustic) chemical feed system within the Sodium Hydroxide (Caustic Soda) Storage Room including bulk tanks, day tank, transfer pump, metering pumps, piping, valves, and instrumentation; installation of potassium permanganate chemical feed system within the New Potassium Permanganate Storage Room including mix tanks, day tank, transfer pump, metering pumps, piping, valves, and instrumentation; demolition of existing potassium permanganate equipment and components within the Existing Potassium Permanganate Storage Room; and building improvements including replacement of a door, new fiberglass platforms and stairs, new tempered water system and safety shower eye wash stations for the sodium hydroxide and potassium permanganate chemical feed systems, new dust collection system, new powered lift table, new concrete landing, chemical resistant coatings for chemical feed systems, and miscellaneous electrical improvements.
Delivery Terms: Free On Board Destination Payment Terms: Vendor Specified Contact Information: So. Central CT Regional Water Auth.
Brent Domkowski 90 Sargent Drive New Haven CT, 06511 United States Tel: 2034012507 Fax:
bdomkowski@rwater.com
Contact Details: If you have any questions, please contact:
Brent Domkowski 90 Sargent Drive New Haven CT, 06511 United States Tel: 2034012507 Fax:
bdomkowski@rwater.com
Selected Categories:
Page:3
Documents:
Project Drawings - LWWTP Chemical Improvements.pdf
Project Manual - LWWTP Chemical Improvements.pdf
Page:4
Item Specifications Solicitation has been designated as having no line items.
Page:5
File details come from the government source that posted it. Updated .