This is a Justification and Approval (J&A) document for contract award on a sole source basis.
The Naval Sea Systems Command, Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), Everett Detachment is awarding a contract action to Integrated Marine Services, Inc. as a sole source addition of one Work Specification to existing delivery order N4523A26F0513 dated September 30, 2026, for Continuous Maintenance Availability (CMAV) work. The work must be completed at Naval Station Everett before the availability's execution end date. The contract is justified under FAR 6.103-2 for unusual and compelling urgency and 10 U.S.C. 3204(a)(2) due to emergent repair requirements. The scope of work includes providing an on-site Original Equipment Manufacturer (OEM) Technical Representative to supply technical assistance, parts, special tools, and guidance for disassembly, inspection, repairs, assembly, installation, testing, and adjustment of the GTG #1 Permanent Magnet Alternator (PMA) unit. Additional work includes removing the Exciter and PMA Frame Assembly, Rotor PMA Assembly, and Rotating Resistor Assembly; removing and disposing of system fluids in accordance with federal, state, and local regulations; and conducting initial visual inspection of the generator sump for structural integrity, deterioration, pitting, cracks, damage, or distortion per RCC 1N requirements. The work is associated with Category 3 Casualty Reports (CASREPs) and is mission-critical for maintaining the ship's ability to meet operational requirements. The Contracting Officer determined the anticipated cost to be fair and reasonable in accordance with FAR 15.404. The document was certified and signed by Meagan Moralez (Contracting Officer) on November 5, 2026, with a phone number of 360-731-7222.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
PUGET SOUND NAVAL SHIPYARD
AND INTERMEDIATE MAINTENANCE FACILITY
1400 FARRAGUT AVENUE STOP 2090
BREMERTON WASHINGTON 98314-2090 IN REPLY REFER TO:
J&A No. 27-01JA
JUSTIFICATION AND APPROVAL
FOR USE OF OTHER THAN FULL AND OPEN COMPETITION
1. Contracting Activity.
The Naval Sea Systems Command, Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), Everett Detachment, Contracts Division Code 451.
2. Description of the Action Being Approved.
Award of a contract action on a sole source basis for the addition of one (1) Work Specification to delivery order N4523A26F0513 awarded to Integrated Marine Services, Inc. on 30 September 2026 for the Continuous Maintenance Availability (CMAV). All work must be accomplished at Naval Station Everett before the availability's execution end date of .
In accordance with FAR 6.103-2(d), due to the unusual and compelling nature of the work, this Justification and Approval determination is being completed due to the emergent work requirement to remove the GTG#1 Permanent Magnet Alternator (PMA) unit and provide to the under Work Item 331-31-001. This work will run in parallel to like work being executed under Work Item 311-30-001, Ship Service Gas Turbine Generator (SSGTG#1) Reduction Gear and Gas Turbine (GTRB) Lube Oil Cooler;
mechanical clean.
3. Description of Supplies/Services.
Provide all services required to:
Provide the services of a qualified on-site Original Equipment Manufacturer (OEM) Technical Representative to provide technical assistance, parts, special tools and guidance for disassembly, inspection, repairs, assembly, installation, testing and adjustment of equipment GTG #1 Permanent Magnet Alternator.
Remove Exciter and PMA Frame Assembly, Piece No. 230-38052-65, Rotor PMA Assy, Piece No. , Rotating Resistor Assy, Piece No. , remove and dispose of system fluids in accordance with federal, state, and local laws, codes, ordinances, and regulations. Accomplish an initial visual inspection of generator sump for structural integrity, deterioration, pitting, each crack and damage or distortion.
as required per RCC 1N;
The Independent Government Estimates total utilizing FY26 OPN funds.
4. Statutory Authority Permitting Other Than Full and Open Competition.
10 U.S.C. 3204(a)(2); FAR 6.103-2, Unusual and compelling urgency; Agencies may contract without providing for full and open competition when the agency's need for the supplies or services is of such an unusual and compelling urgency that the Government would be seriously injured, financially or otherwise, unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that are mission critical and the routine processing time would result in injury to the Government. In accordance with Class Deviation 2026-O0017 Revision 2, DFARS PGI 206.103-270(b)(1) allows for urgent and compelling need when essential equipment or repair is needed at once to comply with orders for a ship.
5. Rationale Justifying Use of Cited Statutory Authority.
All work on RCC 1N is associated with Category 3 Casualty Reports (CASREPs). A Category 3 CASREP applies to those systems or equipment that, by their failure alone, would result in a major degradation to the Ship�s ability to meet its mission requirements, resulting in a high criticality of failure consideration. Considering the any delay in addressing repairs related to Category 3 CASREPs during this CMAV availability would be expected to cause harm to the Government by directly impacting the ship�s performance of its mission. Additionally, it is noted that the Congressional Budget Office (CBO) has estimated the value of having a ship of this class
, representing harm to
The workload forecast for FY27 for Navy West Coast is robust and continues to grow. The Navy is committed to performing market research while monitoring and evaluating the ship repair industrial base and providing fair opportunity to all capable contractors.