270008 Bid Packet.pdf

PDF 10 MB Posted

Attached to
Design-Build of Transfer Station
Solicitation number
148108
Issued by
Hartford County, Connecticut

About this file

This bid packet is issued by the Town of West Hartford, Connecticut for the design-build of a material transfer station located at 17 Brixton Street, West Hartford, Connecticut (Bid #270008). The project involves the final design, construction plans, and construction of a residential transfer station capable of accepting a wide range of solid waste and recyclable materials, including electronics, batteries, glass, textiles, food waste, rigid plastic, metals, mattresses, carpet, tires, and yard waste. The transfer station will operate Monday through Friday from 8:00 a.m. to 3:00 p.m. and Saturday from 7:00 a.m. to 12:00 p.m., and will include infrastructure such as a scale house, administrative offices, covered recycling areas, tipping floors, utility systems, security cameras, and wayfinding signage. The Town has completed approximately 30 percent of a preliminary design plan prepared by Loureiro Engineering Associates, Inc., which respondents may use as a reference or develop alternative design solutions. The pre-bid conference is scheduled for November 17, 2026, at 11:00 a.m. at the project site. All written questions must be submitted through the Town's Bidding Portal by November 22, 2026. Electronic bids are due December 3, 2026, at 2:00 p.m. EST. The project must achieve final completion by January 1, 2028, with liquidated damages assessed at $500.00 per calendar day for failure to meet this deadline. Bids must remain valid for ninety days following the bid opening.

The Town is open to proposals incorporating a public-private partnership model using the design-build delivery method. Bid evaluation will consider firm ownership and leadership qualifications, financial capabilities, litigation and regulatory compliance history, location and presence in central Connecticut, responsiveness to RFQ/P provisions, evidence of similar design-build infrastructure project success, innovation in design and recycling capabilities, and innovation of the P3 proposal regarding cost and risk containment for the Town. A 10 percent bid surety bond, cashier check, or certified check is required with each submission. For contracts awarded at $50,000 or more, the successful bidder must furnish a performance bond and labor and materials bond in the full amount of the contract with 100 percent security. The contractor must employ a full-time, on-site project superintendent and comply with all Connecticut General Statutes regarding small and minority-owned business set-asides, requiring a minimum of 25 percent of the state-funded contract portion awarded to DAS-certified businesses. Bidders must maintain Commercial General Liability insurance at $1,000,000 each occurrence and $2,000,000 aggregate, Umbrella/Excess Liability at $5,000,000 each occurrence and $10,000,000 aggregate, Professional Environmental Liability at $2,000,000 each occurrence and aggregate, Contractor's Pollution Liability at $2,000,000 per occurrence and aggregate, Business Automobile Liability at $1,000,000 per occurrence, and Worker's Compensation with Employer's Liability minimum limits of $1,000,000. The Town reserves the right to reject any and all bids and to award the contract in the manner most beneficial to the Town.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT BIDDING DOCUMENTS

FOR

TOWN OF WEST HARTFORD

DESIGN-BUILD OF A TRANSFER STATION

BID # 270008

Bid Submission Due Date

December 3, 2026, at 2:00PM EST

1 - 1

INFORMATION

TOWN OF WEST HARTFORD

DESIGN-BUILD OF A TRANSFER STATION

17 BRIXTON STREET

WEST HARTFORD, CT

BID# 270008

ALL QUESTIONS TO

All questions must be submitted in writing through the Town’s Bidding

Portal by November 22, 2026. Please do not call or email the Project

Manager or Purchasing Office with questions.

00101

INVITATION TO BID

Electronic bids for Design-Build of A TRANSFER STATION BID # 270008 will be received electronically until 2:00PM on December 3, 2026.

In order to provide an electronic submission, you must be registered in our vendor database.

Please see the vendor registration instructions. Once registered, you will gain access to the bid and the bid documents. Please follow the prompts when submitting your price structures. Please reference Design-Build of a Transfer Station BID # 270007

There will be a pre-bid conference will be held for this project on 11/17/2026 at 17 Brixton St, West Hartford at 11:00AM EST

No bid may be withdrawn for a period of ninety (90) days after the opening of bids without the approval and written consent of the Town of West Hartford.

The right is reserved to reject any and all bids, to waive any informalities in the bidding and to make awards in any manner that is the most beneficial to the Town.

The work described herein shall be completed as required. Unless otherwise stated, time is of the essence

All prospective Bidders are hereby notified that blasting is not permitted on this project.

Bidder Response Form 2 | P a g e

BIDDER RESPONSE FORM

BOND INFORMATION if applicable

Bid Surety - 10% Bond Attached (yes/no) Cashier Check Attached (yes/no)

Cost of Performance Bond included in base bid (if applicable) $ Per thousand

List up to six past contracts of this type/size your firm has completed within the last three (3) years

Project Date Contact Person Phone No.

PLEASE COMPLETE THE FOLLOWING INFORMATION.

FAILURE TO RESPOND TO ALL ITEMS MAY RESULT IN THE REJECTION OF YOUR RESPONSE.

Vendor Name Trade Name if applicable

Address

Phone # Email Address

Contact Person Tax ID#

Number of years in business: Bid# Project Name:

STATUS OF THE BUSINESS AND ITS CURRENT STANDING WITH THE SECRETARY OF STATE'S OFFICE

Connecticut Businesses Yes No

Are all required filings current with the Secretary of State and will the Secretary of State be able to issue a Certificate of Legal Existence?

Out of State (foreign) Businesses Yes No

Have you filed a Certificate of Authority / Application of Registration with the Connecticut Secretary of State? If so, submit a copy of your filing with your response. If not, submit a copy of your Certificate of Good Standing from your state of incorporation.

DAS CONTRACTOR PREQUALIFICATION if applicable

(required for construction / infrastructure projects only) (non-highway construction projects >$1,000,000)

Circle one

DAS prequalified? (yes/ no) Certificate attached (yes/no) Update Statement attached (yes/no)

You certify that there has been no substantial change in your financial position or corporate structure since your most recent prequalification certificate was issued or renewed, other than those changes noted in the update statement (attached).

Yes No

Bidder Response Form 3 | P a g e

CERTIFICATION

The Undersigned hereby certifies that they are the only duly authorized representative/agent of the vendor and have the authority to sign this form and make these certifications on behalf of the vendor.

Vendor acknowledges receipt of all bidding documents and addenda, if applicable during the bidding period, issued during the bidding period and understands that they are a part of the bidding documents.

The undersigned hereby declares that they are thoroughly familiar with the specifications, the various sites, the Town’s requirements, and the objectives for each element of the project item or service and understands that in signing this proposal all right to plead any misunderstanding regarding the same is waived. The undersigned further understands and agrees that they will furnish and provide all the necessary material, machinery, implements, tools, labor, services, and other items of whatever nature, and to do and perform all the work necessary under the aforesaid conditions, to carry out the term of the agreement and to accept in full compensation therefore the amount agreed to by the vendor and the Town of West Hartford.

The undersigned further declares that these bidding documents are made without any connection with any other person or persons making any proposal for the same work and made without collusion or fraud; that no person acting for or employed by the Town of West Hartford is directly or indirectly interested therein, or in the supplies or works to which it relates, or will receive any part of the profit or any commission there from in any manner which is unethical or contrary to the best interest of said Town of West Hartford.

The undersigned additionally declares that they are not debarred or suspended, or otherwise excluded from, or ineligible for, participation in Town of West Hartford, State of Connecticut or federally funded projects. The vendor agrees that by affixing their signature to this request for bids, the authorized signatory grants approval to the Town of West Hartford to obtain third party credit reports for the purposes of assessing the financial capacity of the business entity tendering such bid to the Town

The undersigned certifies under penalty of false statement that the information provided in this response is true.

Submitted by (Signature)

Printed name and title Date

(Authorized Agent of Company)

ORGANIZATIONAL STRUCTURE OF BUSINESS ENTITY (select one)

Limited partnership (LP) General partnership (GP)

Limited liability corporation (LLC) Limited liability partnership (LLP)

Corporation Individual doing business under a trade name (sole proprietor)

BUSINESS AFFILIATIONS if applicable

Indicate the principal place of business of the parent company and the name of agent for service.

Is your local organization an affiliate of a Parent company? Yes No

Parent Company Business Name

Address

City State Zip

Name of Agent

List all Affiliated Businesses if applicable (attach additional sheets as necessary):

Business Name Address Ownership Interest %

SUMMARY OF WORK HISTORY

1. The bidder is required to state in the spaces provided below work that the bidder has performed of a similar character to the work described in the Contract Bidding Documents.

Contract Award

Project Name Project Description Amount Client Contact Person Telephone #

SUMMARY OF WORK HISTORY

2. The bidder is further required to furnish a complete list of all projects for which he has signed a construction contract within the past 36 months.

Contract Project Name Project Description Award Amount Client Contact Person Telephone #

pg. 1

Town of West Hartford Request for Qualification/Proposal: Design-Build of Material Transfer Station

Executive Summary The Town of West Hartford (Town) is seeking qualifications and proposals from experienced, innovative and financially capable firms to deliver final design, construction plans and construction of a residential transfer station that will accept wide range of solid waste and recyclable materials.

Recycling may include batteries, electronics, glass, textiles, food waste, bulky waste, metals, mattresses, yard waste and more.

The Town is open to proposals incorporating Public Private Partnership (P3) model as it applies to the Design-Build method where the design and construction phases can overlap. This non-binding RFQ/P is intended to gauge market landscape, explore the interest in P3 for Design-Build projects, and inform future procurement and contract structures. Submission does not obligate the Town to award or enter into an agreement.

1. Introduction & Background

The Town of West Hartford is a municipality located in the central region of Connecticut, west of the capital city of Hartford. The Town encompasses over 22 square miles with a population approaching 65,000 residents. The Town currently owns a recycling center, located within the complex of the Department of Public Works at 17 Brixton St, West Hartford CT 06110.

The recycling center is available for residential use only. The center is operated by contracted third party for operations and maintenance (O&M) responsibilities. The Town is looking to expand the center in terms of scope and volume to support Town’s sustainability and waste reduction goals.

The overall surface area earmarked for our future transfer station is approximately 12 acres, including the footprint of the existing recycling center. The Town has an approximate 30% completed design plan, produced by Loureiro Engineering Associates, Inc. in 2025. The plan outlines the proposed transfer station and landfill. The top of the landfill will be used by the transfer station to dispose yard waste and snow.

The preliminary 30% design plan is provided as Attachment A for reference purposes only. It is intended solely to convey the Town’s initial thinking and to provide context regarding site constraints and opportunities. The materials are not intended to represent a complete, coordinated, or constructible design, and should not be relied upon as such.

Respondents are encouraged to develop and propose their own design solutions, which may differ from the concepts presented, provided they meet the Town’s programmatic objectives, regulatory requirements, and performance criteria. The selected design-builder will be responsible for advancing the design from its current conceptual state through final design, permitting, and construction.

pg. 2

Source: Google. Visual display of subject location

Existing Recycling

Center

pg. 3

2. Sustainability Focus The Town of West Hartford is issuing this Request for Qualification/Proposal (RFQ/P) to identify and pre-qualify experienced, innovative and financially secured companies that would be in the position to work with the Town in a public, private partnership to design and build a material transfer station that will support the Town’s sustainability goals. They include:

• Reduce solid waste and increase diversion from curbside collection.

• Expand existing programs and introduce new recycling programs to support waste diversion.

• Identify infrastructure to meet future needs (e.g. scale house, offices).

• Enhance the effectiveness of public education and outreach to improve recycling goals.

• Improve the quality of incoming materials through better education and enforcement.

Through the RFQ/P process, the Town will place a higher focus on proposals that speak to sustainability, innovation and technology-forward solutions to minimize the amount of waste requiring disposal.

3. Operational Objectives Proposed acceptable waste streams:

IDENTIFIED SITE FEATURE

# SOLID WASTE TYPE STORAGE

DESCRIPTION

A ELECTRONICS 6’ X 6' DUMPSTER

B BATTERIES 6’ X 6' DUMPSTER

C GLASS 6’ X 6' DUMPSTER

D TEXTILES 12' X 6’ DUMPSTER

E FOOOWASTE 6’ X 6' DUMPSTER

F RIGID PLASTIC 6’ X 6' DUMPSTER

G OIL 275 GALLON TANK

H ANTI-FREEZE 275 GALLON TANK

I RESIDENTIAL BULKY WASTE 40 CY ROLL OFF

J CARDBOARD

40 CY ROLL OFF

WITH COMPACTOR

K METALS

40 CY ROLL OFF

WITH A COVER

L SINGLE STREAM RECYCLABLES 40 CY ROLL OFF

M RESIDENTIAL C&O 40CY ROLL OFF

N MATTRESSES 20' X 8' CONEX

O CARPET 20' X 8' CONEX

P REFRIGERANTS PAVED AREA

Q COOKING OIL 160 GALLON BIN

R PROPANE OPEN AREA

S FILM PLASTICS 95GALLON BIN

T PAINT 95 GALLON BIN

U FLUORESCENT BULBS 95 GALLON BIN

V HOUSEHOLD TRASH COMPACTOR

W TIRES 40 CY ROLL OFF

X WOOD PALLETS 12CY ROLL OFF

Y LEAVES/GRASS/BRUSH DROP OFFZONE

John Phillips Leaves/Grass/Brush - no bib size identify drop zone or provide annual volume we receive norma.maurice Sticky Note Accepted set by norma.maurice norma.maurice Sticky Note Completed set by norma.maurice

pg. 4

For the purpose of this RFQ/P, below are the hours of operation. The schedule is subject to change to reflect demands.

Monday-Friday, 8a to 3p Saturday, 7a to 12p Sunday, CLOSED

Queueing/Turnaround: Design to process peak queues without spilling traffic into public roads.

4. Functional Deliverables

• Provide safe access, circulation, snow storage and emergency egress.

• Include structures such as scale house, administrative offices, covered recycling areas.

• Include observation area for education and outreach.

• Provide 1 inbound and 1 outbound truck scales with certified calibration and integrated data management infrastructure.

• Design tipping floor, processing, drop-off areas and loadout areas with proper materials to withstand climate conditions and truck weights with loads.

• Provide utilities including water, sanitary, power, data communication, standby power for critical operations such as scales, doors and lighting.

• Include cameras for the exterior of the facility, in/egresses, scales and tipping floor.

• Include wayfinding signage directing drivers where to queue, where to tip and where to exit.

5. Environmental & Safety Deliverables Design shall meet and/or exceed federal and Connecticut Transfer Station regulations. We look for design and construction that incorporate principals, techniques and materials selected with environmental impacts in mind for the life cycle of the structures and operations.

• Air emissions, including odor and dust for inside and outside of transfer station.

• Storm water, contact water and leachate management.

• Noise and vibration.

• Litter and vector control.

• Fire protection.

• Weather resiliency.

• Pedestrian/employee walking paths.

• Sustainability such as building materials, energy efficiency in lighting and HVAC systems, ventilation, solar power generation.

6. Finance The Town will entertain all proposals offering public private partnership model. Interested parties are encouraged to exercise their creativity to develop mutually beneficial terms for the Town and the firm to deliver a working transfer station. Proposed terms may include scalability or phasing plan to migrate from the current recycling center to a fully functional transfer station. The right is reserved to reject any and all bids, to waive any informalities in the bidding and to make awards in any manner that is most beneficial to the Town.

John Phillips Subject to change to reflect demand….. Should we make this statement for the purpose of this proposal norma.maurice Sticky Note Completed set by norma.maurice

pg. 5

7. Evaluation Criteria All proposals will be evaluated on the basis of the following criteria:

• Firm ownership and leadership qualifications: Number of years in business, financial capabilities, litigation history, regulatory compliance and violation history.

• Location - Firm’s presence in central Connecticut.

• Responsiveness – Addressing all provisions outlined in the RFQ/P.

• Evidence of similar successes in Design-Build as they apply to infrastructure projects.

• Innovation of design, capacity, diversion/recycling capabilities.

• Innovation of P3 proposal with respect to containment of costs and risks for the Town.

8. Design-Build Criteria

• Design-Build Services – The firm will deliver final design and construction of a material management center to support the Town’s goals in cost containment, solid waste reduction and proliferation of recycling programs.

• Project Management & Administration – The firm will provide a Project Manager to directly oversee the administration and management of the project from design through construction.

• Data Collection, Review and Evaluation – The firm will collect, analyze data and make recommendation to the Town for each phase of the project.

• Construction Plans and Specifications – The firm will conduct necessary investigation to verify 30% design. The firm will prepare subsequent design drawings for review and approval by Towns staff. The firm is responsible for the preparation of detailed construction plans and specifications.

• Obtain Appropriate Approvals – The firm will coordinate and obtain approvals with all appropriate governmental and public utility authorities, prior to the completion of detailed construction plans.

• Construction Management – The firm will manage and perform the construction of the transfer station in compliance with all applicable codes and safety regulations. All Quality Control and Testing will be included in the Design-Build plans, certified by a third party as testing agency.

• Record Construction Drawings – The firm will prepare electronic record drawings that accurately reflect all modifications made in the field.

9. Facility Start up and Project Closeout

• The firm will be responsible for acceptable start-up and testing. Any deficiencies discovered shall be immediately repaired to the satisfaction of the Town.

• The firm will provide final certification for all materials and labors on the project in the form of Release of Liens, and Affidavits of any subcontractors involved.

• The firm will assist the Town to obtain any municipal operating permit(s) required by the state of Connecticut as a pre-requisite of a fully functional transfer station.

BRIXTON STREET

O

AKW

O O

D

AVEN

U E

CT

F

AS

TR

AC

K

DEXTER AVENUE

TROUT BROOK

SOUTH

BRANCH PA

RK RIVER

X

X

X

X

X

X

BRIXTON STREET

SOUTH

BRANCH PA

RK RIVER

TROUT BROOK

DEXTER AVENUE

O

AKW

O O

D

AVEN

U E

LANDFILL

TRANSFER

STATION

25 BRIXTON STREET

WEST HARTFORD, CT 06107

JUNE 18, 2025

WEST HARTFORD TRANSFER STATION

30% DESIGN

V

C T\

W

ES

T H

A R

TF

O R D

\B R

IX

TO

N

S T-

\T

O W

N O

F W

ES

T

H A R

TF

O R D

\T R A N

S

FE

R S

TA

TI

O N

D

ES

IG

N

2W H

4.

\D W

G S \C

IV

IL

\C O

V

ER

S H

EE

T.

D W

G

Ta b:

C O

V

ER

S av ed

7/

/2

5:

P

M P ap er

S iz e:

4" x

6"

Pl ot te d:

/2 8/

:1

PM

SHEET

NO.

NO. OF

SHEETS1 7

PREPARED BY:

ENGINEER:

WEST HARTFORD

TRANSFER STATIONNOT FOR CONSTRUCTION

Loureiro Engineering Associates, Inc.

100 Northwest Drive · Plainville, Connecticut 06062 Phone: 860-747-6181 · Fax: 860-747-8822 An Employee Owned Company · www.Loureiro.com

Loureiro

LOCATION MAP

SCALE: 1"=100'

PROPERTY OWNER / APPLICANT:

TOWN OF WEST HARTFORD

50 SOUTH MAIN STREET

WEST HARTFORD, CT 06110

PROJECT LOCATION

LEA COMMISSION NUMBER 92WH4.04

DRAWING INDEX

SHEET NO. DRAWING TITLE

1 COVER

C-1 SITE LAYOUT PLAN3

C-2 GRADING PLAN4

C-3 UTILITY PLAN5

C-4 SOIL EROSION & SEDIMENT CONTROL PLAN6

C-5 DETAILS7

EXISTING CONDITIONS1 OF 1

X

X X X

X

X

X

X

X X

X

X

X

X

X X

X X

WV

WV

WV

WV

WV

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

G H

Q R

39'

TY

P)

20'

EXISTING CBCL

TF=39.94

FULL OF WATER/MUD

EXISTING CBCL

TF=39.98

FULL OF WATER/MUD

20'

FFE 51

BRIXTON STREET

5'

9' (TYP)

TY

P)

10' (TYP)

TY

P)

16'

16'

VEHICLE TURN AROUND

6' CHAIN LINK FENCE

COMPACTION

TRAILER

END OF BITUMINOUS

CONCRETE LIP CURBING

SCALE

SCALE HOUSE

DOUBLE LEAF CHAIN

LINK SWING GATES (TYP)

EXISTING FENCE

TO REMAIN

ACCESS ROAD TO

YARD WASTE AND

LEAF DISPOSAL AREA

EXISTING CONCRETE BLOCK RETAINING

WALL TO BE REMOVED AND REPLACED

8.5' x 7' SHED

S

CONCRETE PAD

(TYP OF 5)

POST MOUNTED TRAFFIC

CONTROL SIGNAL

STOP SIGN

STOP SIGN

T U

6' x 32' SHED

ADDITIONAL USABLE SPACE

PROPERTY LINE (TYP)

BOLLARD MOUNTED

ACCESSIBLE PARKING SIGN

HEAVY DUTY BITUMINOUS

CONCRETE PAVEMENT

GRASS (TYP)

CONNECT NEW CHAIN LINK FENCE

TO EXISTING CHAIN LINK FENCE

EXISTING CONCRETE

WALL TO REMAIN

EXISTING CONCRETE WALL TO

BE REMOVED AND REPLACED

30' WIDE GATE

CONCRETE RETAINING WALL

J

W

M

K

L

H C

F

B

D

O

P

N

I

E

X

A

C

WEST HARTFORD

LANDFILL LIMIT

(SEE NOTES)

CHAIN LINK FENCE ENCLOSURE

SEGMENT OF EXISTING

FENCE INSIDE OF LANDFILL

BOUNDARY TO BE REMOVED

V

YARD WASTE AND SNOW

DISPOSAL AREA (Y)

CONCRETE SIDEWALK

CROSS WALK

M

IH

N

/2 3/

EC

K

/2

3/

SCALE IN FEET

10 10 20 300

FI

LE

\P R O

JE

C

TS

2\ C T\

W

ES

T H

A R

TF

O R D

\B R

IX

TO

N

S T-

\T

O W

N O

F W

ES

T

H A R

TF

O R D

\T R A N

S

FE

R S

TA

TI

O N

D

ES

IG

N

2W H

4.

\D W

G S \C

IV

IL

\W H

T R A N

S

FE

R S

TA

TI

O N

S

IT

E

LA

YO

U

T.

D

S

IT

E

LA

YO

U T

S av ed

7/

/2

9:

A

M b y C

EG

R A Y

P ap er S iz e:

4" x te d:

/3

0/

0:

A M

PR

EP

A R

ED

F O

R

DRAWING

D R A W

N B

Y D

A

TE

A

PP

R O

V

ED

B Y

S C A

LE

C O

M M

N

O

D A

TE

S

TA

M P

SHEET

NO.

NO. OF

SHEETS

Lo ur ei ro

D

ES

C R

IP

TI

O

N O

F R

EV

IS

IO

N R

EV

D

A

TE

A

PP

R

C-1

W

H 4.

3 7

S

IT

E

LA

Y O

U T

P

LA

N

W

ES

T H

A R

TF

O

R D

T R

A N

S

FE

R S

TA

TI

O N

B R

IX

TO

N S

TR

EE

T, W

ES

T

H A

R

TF

O R

D

C T

TO

W

N O

F W

ES

T

H A

R

TF

O R

D

S

O U

TH

M

A

IN

S

TR

EE

T, W

ES

T H

A R

TF

O

R D

C

T

1"

NOT

FO

R

CO

NST

RU

CT

IO

N.

FO

R

CO

ORD

IN

AT

IO

N O

NLY

7/

/2

:4 5:

A

M

Lo u re ir o En g in ee ri n g

A ss oc ia te s, I n c

N or th w es t

D ri ve ai nv ill e, C on ne ct ic ut

Ph on e:

-7

-6

Fa x:

-7

-8

A n

Em pl oy ee

O w ne d

C om pa ny w w w .L ou re ir o.

co m

Lo ur ei ro E ng in ee ri ng

A ss oc ia te s, I nc

A ll

R ig ht s

R es er ve d

A s R ev is ed

IDENTIFIED SITE FEATURE

# SOLID WASTE TYPE STORAGE

DESCRIPTION

A ELECTRONICS 6' x 6' DUMPSTER

B BATTERIES 6' x 6' DUMPSTER

C GLASS 6' x 6' DUMPSTER

D TEXTILES 12' x 6' DUMPSTER E FOOD WASTE 6' x 6' DUMPSTER F RIGID PLASTIC 6' x 6' DUMPSTER

G OIL 275 GALLON TANK

H ANTI-FREEZE 275 GALLON TANK

I RESIDENTIAL BULKY WASTE 40 CY ROLL OFF

J CARDBOARD 40 CY ROLL OFF

WITH COMPACTOR

K METALS 40 CY ROLL OFF

WITH A COVER

L SINGLE STREAM RECYCLABLES 40 CY ROLL OFF

M RESIDENTIAL C&D 40 CY ROLL OFF

N MATTRESSES 20' x 8' CONEX

O CARPET 20' x 8' CONEX

P REFRIGERANTS PAVED AREA

Q COOKING OIL 160 GALLON BIN

R PROPANE OPEN AREA

S FILM PLASTICS 95 GALLON BIN

T PAINT 95 GALLON BIN

U FLUORESCENT BULBS 95 GALLON BIN

V HOUSEHOLD TRASH COMPACTOR

W TIRES 40 CY ROLL OFF

X WOOD PALLETS 12 CY ROLL OFF

Y LEAVES/GRASS/BRUSH 12' x 24' BIN

NOTES:

1. THE TRANSFER STATION AND LANDFILL ARE

OWNED BY THE TOWN. THE TOP OF THE LANDFILL

WILL BE UTILIZED BY THE TRANSFER STATION FOR

YARD WASTE AND SNOW DISPOSAL. LANDFILL

LIMITS HAVE BEEN CALLED OUT ON THE PLANS.

LEGEND

ADJOINER PROPERTY LINE

SUBJECT PARCEL PROPERTY LINE

SANITARY SEWER

FIRE HYDRANT

WATER VALVE

SANITARY MANHOLE

GAS VALVE

UTILITY POLE

GUY WIRE

15"RCP STORM SEWER

GV

TREE

DRAINAGE MANHOLE

CATCH BASIN TYPE C "CURBED"

CATCH BASIN TYPE CL "CURBLESS"

10"VCP

X

X

EXISTING FENCE

CURB

NEW FENCE

LANDFILL MINOR CONTOURS

LANDFILL MAJOR CONTOURS

EXISTING WALL

NEW WALL

WASTE BIN/ROLL OFF

STOP SIGN/SIGNAL

CONCRETE PAD/SIDEWALK

PAVEMENT

WEST HARTFORD LANDFILL LIMIT

X

X

X

X

X X

X

X X

X X

X

X

X

X

X

N/F

ZYSK ENTERPRISES LLC

30 BRIXTON STREET

VOLUME 2614, PAGE 144

MAP:H14 BLOCK:701 LOT:30

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

MAX SLOPE 9%

M

AX SLO

PE 5%

M A X S

LO

PE 3%

M

AX SLO

PE 7%

EXISTING CBCL-1

TF=39.94

EXISTING CBCL-2

TF=39.98

MAX SLOPE 2% TO

ACCOMMODATE SCALE

52.70

WEST HARTFORD

LANDFILL LIMIT

46.35

46.35

46.20

41.50

42.40

51 50 49 48 47 46

484950

51.10

M

IH

N

/0 2/

EC

K

/0

2/

SCALE IN FEET

10 10 20 300

V

C T\

W

ES

T H

A R

TF

O R D

\B R

IX

TO

N

S T-

\T

O W

N O

F W

ES

T

H A R

TF

O R D

\T R A N

S

FE

R S

TA

TI

O N

D

ES

IG

N

2W H

4.

\D W

G S \C

IV

IL

\G R A D

IN

G

.D

G R A D

IN

ed

7/

/2

5:

P

M b y C

EG

R A Y

P ap er S iz e:

4" x te d:

/2

8/

:2

PM

PR

EP

A R

ED

F O

R

DRAWING

D R A W

N B

Y D

A

TE

A

PP

R O

V

ED

B Y

S C A

LE

C O

M M

N

O

D A

TE

S

TA

M P

SHEET

NO.

NO. OF

SHEETS

Lo ur ei ro

D

ES

C R

IP

TI

O

N O

F R

EV

IS

IO

N R

EV

D

A

TE

A

PP

R

C-2

W

H 4.

4 7

G R

A D

IN

G

P

LA

N

W

ES

T H

A R

TF

O

R D

T R

A N

S

FE

R S

TA

TI

O N

B R

IX

TO

N S

TR

EE

T, W

ES

T

H A

R

TF

O R

D

C T

TO

W

N O

F W

ES

T

H A

R

TF

O R

D

S

O U

TH

M

A

IN

S

TR

EE

T, W

ES

T H

A R

TF

O

R D

C

T

Lo ur ei ro E ng in ee ri ng

A ss oc ia te s, I nc

A ll

R ig ht s

R es er ve d

A s R ev is ed

1"

NOT

FO

R

CO

NST

RU

CT

IO

N.

FO

R

CO

ORD

IN

AT

IO

N O

NLY

7/

/2

5:

:1

PM

Lo u re ir o En g in ee ri n g

A ss oc ia te s, I n c

N or th w es t

D ai nv ill e, C on ne ct ic ut

Ph on e:

-7

-6

Fa x:

-7

-8

A n

Em pl oy ee

O w ne d

C om w w .L ou re ir o.

co m

THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES

IN THE FIELD BEFORE BEGINNING ANY EXCAVATION. CALL AT

LEAST 72 HOURS IN ADVANCE FROM ANYWHERE IN THE STATE

OF CONNECTICUT, "CALL BEFORE YOU DIG": 1-800-922-4455

X

X

X

X

X X

X

X X

X X

WV

WV

WVWV

WV

X

X

X

X

X

40.5 BW

48.6 TW

40.7±

49.6

10"PVC

10"VCP

SMH

TF=50.12

FL=41.82

SMH

TF=50.97

INV.IN=43.22 S

INV.OUT=43.12 E

SMH

TF=51.32

INV.IN=42.65 W

INV.OUT=42.58 E

CONNECT 2" COPPER DOMESTIC

WATER SERVICE TO WATER MAIN.

COORDINATE W/ MDC

LATERAL CONNECTION

TO SANITARY SEWER

MANHOLE; INV=42.7;

COORDINATE W/ MDC

APPROXIMATE WATER

MAIN LOCATION

99.0 LF 6"

SDR 35

S=1.0% MIN

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

EXISTING CBCL

TF=39.94

FULL OF WATER/MUD

EXISTING CBCL

TF=39.98

FULL OF WATER/MUD

UNDERGROUND ELECTRIC SERVICE

FROM UTILITY POLE; COORDINATE

W/ EVERSOURCE

FFE 51

HANDHOLE

CATCH BASIN TO BE REPLACED WITH TYPE

'C-L' CATCH BASIN T.F. = 49.66

UNDERGROUND ELECTRIC SERVICE

FROM UTILITY POLE;

COORDINATE W/ EVERSOURCE

C-3

1"

V

C T\

W

ES

T H

A R

TF

O R D

\B R

IX

TO

N

S T-

\T

O W

N O

F W

ES

T

H A R

TF

O R D

\T R A N

S

FE

R S

TA

TI

O N

D

ES

IG

N

2W H

4.

\D W

G S \C

IV

IL

\U

TI

LI

TY

P

LA

N .D

W G

T ab

U

TI

LI

TY

P

LA

N

S av ed

7/

/2

5:

P

M P lo tt ed

7/

/2

5:

P

M

W

H 4.

04 05 /2

3/

EC

K

/2

3/

5 7

U

TI

LI

TY

P

LA

N

W

ES

T H

A R

TF

O

R D

T R

A N

S

FE

R S

TA

TI

O N

B R

IX

TO

N S

TR

EE

T, W

ES

T

H A

R

TF

O R

D

C T

TO

W

N O

F W

ES

T

H A

R

TF

O R

D

S

O U

TH

M

A

IN

S

TR

EE

T

PR

EP

A R

ED

F O

R

DRAWING

D R A W

N B

Y D

A

TE

A

PP

R O

V

ED

B Y

S C A

LE

C O

M M

N

O

D A

TE

S

TA

M P

SHEET

NO.

NO. OF

SHEETS

Lo ur ei ro

SCALE IN FEET

010 10 20 30

M

IH

N

D

ES

C R

IP

TI

O

N O

F R

EV

IS

IO

N R

EV

D

A

TE

A

PP

R

Lo ur ei ro E ng in ee ri ng

A ss oc ia te s, I nc

A ll

R ig ht s

R es er ve d

A s R ev is ed

NOT

FO

R

CO

NST

RU

CT

IO

N.

FO

R

CO

ORD

IN

AT

IO

N O

NLY

7/

/2

5:

:5

PM

Lo u re ir o En g in ee ri n g

A ss oc ia te s, I n c

N or th w es t

D ai nv ill e, C on ne ct ic ut

Ph on e:

-7

-6

Fa x:

-7

-8

A n

Em pl oy ee

O w ne d

C om w w .L ou re ir o.

co m

NOTES:

1. SUMPS AND PUMPS WILL BE USED AS NECESSARY IF

GROUNDWATER IS ENCOUNTERED DURING CONSTRUCTION.

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

EXISTING CBCL

TF=39.94

FULL OF WATER/MUD

EXISTING CBCL

TF=39.98

FULL OF WATER/MUD

LIMIT OF

DISTURBANCE (TYP)

SILT FENCE (TYP)

SOIL STOCK PILE

INLET PROTECTION

INLET PROTECTION

MAX SLOPE 9%

M

AX SLO

PE 5%

M A X S

LO

PE 3%

M

AX SLO

PE 7%

51 50 49 48 47 46

484950

CONSTRUCTION ENTRANCES PAD,

FINAL LOCATION TO BE DETERMINED

IN THE FIELD

M

IH

N

/0 2/

EC

K

/0

2/

SCALE IN FEET

10 10 20 300

V

C T\

W

ES

T H

A R

TF

O R D

\B R

IX

TO

N

S T-

\T

O W

N O

F W

ES

T

H A R

TF

O R D

\T R A N

S

FE

R S

TA

TI

O N

D

ES

IG

N

2W H

4.

\D W

G S \C

IV

IL

\S

ES

C P

LA

N

.D

S

ES

C ed

7/

/2

5:

P

M b y C

EG

R A Y

P ap er S iz e:

4" x te d:

/2

8/

:1

PM

PR

EP

A R

ED

F O

R

DRAWING

D R A W

N B

Y D

A

TE

A

PP

R O

V

ED

B Y

S C A

LE

C O

M M

N

O

D A

TE

S

TA

M P

SHEET

NO.

NO. OF

SHEETS

Lo ur ei ro

D

ES

C R

IP

TI

O

N O

F R

EV

IS

IO

N R

EV

D

A

TE

A

PP

R

C-4

W

H 4.

6 7

S O

IL

E

R O

S

IO

N

S

ED

IM

EN

T C

O N

TR

O

L P

LA

N

W

ES

T H

A R

TF

O

R D

T R

A N

S

FE

R S

TA

TI

O N

B R

IX

TO

N S

TR

EE

T, W

ES

T

H A

R

TF

O R

D

C T

TO

W

N O

F W

ES

T

H A

R

TF

O R

D

S

O U

TH

M

A

IN

S

TR

EE

T, W

ES

T H

A R

TF

O

R D

C

T ur ei ro E ng in ee ri ng

A ss oc ia te s, I nc

A ll

R ig ht s

R es er ve d

A s R ev is ed

1"

NOT

FO

R

CO

NST

RU

CT

IO

N.

FO

R

CO

ORD

IN

AT

IO

N O

NLY

7/

/2

5:

:3

PM

Lo u re ir o En g in ee ri n g

A ss oc ia te s, I n c

N or th w es t

D ai nv ill e, C on ne ct ic ut

Ph on e:

-7

-6

Fa x:

-7

-8

A n

Em pl oy ee

O w ne d

C om w w .L ou re ir o.

co m

THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES

IN THE FIELD BEFORE BEGINNING ANY EXCAVATION. CALL AT

LEAST 72 HOURS IN ADVANCE FROM ANYWHERE IN THE STATE

OF CONNECTICUT, "CALL BEFORE YOU DIG": 1-800-922-4455

NOTES:

1. ALL DISTURBED AREAS SHALL BE RESTORED AND STABILIZED

2. ALL EXCESS AND/OR UNSUITABLE EXCAVATED MATERIAL SHALL

BE REMOVED AND DISPOSED OF PROPERLY OFF-SITE.

M

IH

N

/0 2/

EC

K

/0

2/

V

C T\

W

ES

T H

A R

TF

O R D

\B R

IX

TO

N

S T-

\T

O W

N O

F W

ES

T

H A R

TF

O R D

\T R A N

S

FE

R S

TA

TI

O N

D

ES

IG

N

2W H

4.

\D W

G S \C

IV

IL

\D

ET

A

IL

S .D

D

ET

A

IL

ed

7/

/2

5:

P

M b y M

IH

N

O R R

IS

Pa pe r

S iz e:

4" x te d:

/2 8/

:1

PM

PR

EP

A R

ED

F O

R

DRAWING

D R A W

N B

Y D

A

TE

A

PP

R O

V

ED

B Y

S C A

LE

C O

M M

N

O

D A

TE

S

TA

M P

SHEET

NO.

NO. OF

SHEETS

Lo ur ei ro

D

ES

C R

IP

TI

O

N O

F R

EV

IS

IO

N R

EV

D

A

TE

A

PP

R

C-5

W

H 4.

7 7

D

ET

A

IL

S

W

ES

T H

A R

TF

O

R D

T R

A N

S

FE

R S

TA

TI

O N

B R

IX

TO

N S

TR

EE

T, W

ES

T

H A

R

TF

O R

D

C T

TO

W

N O

F W

ES

T

H A

R

TF

O R

D

S

O U

TH

M

A

IN

S

TR

EE

T, W

ES

T H

A R

TF

O

R D

C

T ur ei ro E ng in ee ri ng

A ss oc ia te s, I nc

A ll

R ig ht s

R es er ve d

A s R ev is ed

N O

T

TO

S C A

LE

NOT

FO

R

CO

NST

RU

CT

IO

N.

FO

R

CO

ORD

IN

AT

IO

N O

NLY

7/

/2

5:

:4

PM

Lo u re ir o En g in ee ri n g

A ss oc ia te s, I n c

N or th w es t

D ai nv ill e, C on ne ct ic ut

Ph on e:

-7

-6

Fa x:

-7

-8

A n

Em pl oy ee

O w ne d

C om w w .L ou re ir o.

co m

10" PROCESSED AGGREGATE BASE COURSE

CT DOT FORM 819 M.05.01

3" BITUMINOUS CONCRETE BINDER COURSE

CT DOT FORM 819 M.04, S1

2" BITUMINOUS CONCRETE WEARING COURSE

CT DOT FORM 819 M.04, S0.5

NOTES:

1) PROCESS AGGREGATE BASE COURSE SHALL BE PLACED IN 2

EQUAL LIFTS AND ACHIEVE 95% MINIMUM COMPACTION.

2) EACH BITUMINOUS CONCRETE PAVEMENT COURSE SHALL

ACHIEVE 92% MINIMUM AND 96% MAXIMUM COMPACTION.

3) APPLY TACK COAT TO ALL VERTICAL EDGES OF SITE FEATURES

ABUTTING PERIMETER OF NEW PAVEMENT SECTION.

4) APPLY BITUMINOUS SEALANT ALONG ALL INTERFACES OF

EXISTING AND NEW PAVEMENT.

5) INDICATED PAVEMENT SECTION THICKNESS REPRESENTS THE

FINISHED, COMPACTED THICKNESS.

UNIFORM AND FULL-COVERAGE TACK COAT

COMPACTED SUITABLE SUBGRADE

OR UNDISTURBED MATERIAL

NOTES:

1) CURBING SHALL BE MACHINE-FORMED TO FULLEST EXTENT

PRACTICABLE.

2) APPROPRIATE MOLD SHALL BE USED ON CURB MACHINE TO

ACCOUNT FOR WEARING COURSE THICKNESS AND TO PROVIDE

INDICATED REVEAL UPON INSTALLATION OF WEARING COURSE.

3) APPLY TACK COAT TO ALL VERTICAL EDGES OF SITE FEATURES

ABUTTING TRANSVERSE LIMITS OF NEW CURBING.

2" RADIUS

TACK COAT (RECEIVING SURFACE SHALL BE

CLEANED OF SAND AND SILT DEBRIS BEFORE

APPLYING)

NEW BINDER COURSE

RECEIVING SURFACE

(SEE PAVEMENT DETAILS)

NEW WEARING COURSE

ABUTTED AGAINST CURB

(SEE PAVEMENT DETAILS)

3"

48°

6" PROCESSED AGGREGATE BASE COURSE

CT DOT FORM 819 M.05.01

2" BITUMINOUS CONCRETE SIDEWALK

CT DOT FORM 819 M.04, S0.375

NOTES:

1) PROCESS AGGREGATE BASE COURSE SHALL ACHIEVE 95%

MINIMUM COMPACTION.

2) BITUMINOUS CONCRETE SIDEWALK SHALL ACHIEVE 92%

MINIMUM AND 96% MAXIMUM COMPACTION.

3) APPLY TACK COAT TO ALL VERTICAL EDGES OF SITE FEATURES

ABUTTING PERIMETER OF NEW SIDEWALK SECTION.

4) APPLY BITUMINOUS SEALANT ALONG ALL INTERFACES OF

EXISTING AND NEW PAVEMENT.

5) INDICATED PAVEMENT SECTION THICKNESS REPRESENTS THE

FINISHED, COMPACTED THICKNESS.

COMPACTED SUITABLE SUBGRADE

OR UNDISTURBED MATERIAL

2.0% MAX

CROSS-SLOPE

NOTES:

1) SIGN GRAPHICS SHALL CONFORM TO THE REQUIREMENTS OF

THE CURRENT CONNECTICUT GENERAL STATUTES.

2) BOTTOM OF SIGN SHALL BE 60" MINIMUM FROM FINISH GRADE

OF PARKING SURFACE.

3" 3"

TELEPHONE CABLE

WARNING TAPE

OR TAMPED.

MATERIAL PUDDLED

SUITABLE BACKFILL

SAND/CONCRETE

24"

(MIN.)

GROUND OR

24"

3"

3"

FINISH GRADE

(IF REQUIRED)

NOTE: NUMBER AND TYPE OF CONDUITS VARY

ELECTRICAL CONDUIT

PAVEMENT

3' M

IN

D

EP

TH

O F

C O

VE

R

1'

8" MIN IN ROCK

LOAM

FINISHED GRADE

C OF PIPEL

W=D+(8" TO 24")

DIAMETER (D)

TYPE B

GRAVEL

TYPE C

GRAVEL

PIPE BEDDING

MATERIAL

DRIVEWAY SURFACE

18"

42"

42"

18" DIA. CONCRETE FOOTING

BITUMINOUS PAVEMENT

8" DIA. SCHEDULE 40 GALVANIZED/

STEEL PIPE CONCRETE FILLED

60"

1"

4"

4" 1" 4"

8"

3"

* NO PRECAST BUMPER

* NO SEPARATE SIGNAGE

HIGH INTENSITY REFLECTIVE TAPE

WHITE COLOR

MOUNT SIGN WITH

TAMPER PROOF

HARDWARE

1-

/3 2"

3-1/8"

ROLLED HIGH TENSILE STEEL

WITH 3/8" DIAMETER HOLES

SPACED 1" ON CENTER

1-1/4"

SECTION A-A

CHANNEL POST

GALVANIZED FLANGED

AA

COMPACTED BANK RUN

GRAVEL

PAINTED (YELLOW) OR

PAINTED (BLUE) FOR ACCESSIBLE SIGNS

4" COMPACTED PROCESSED AGGREGATE BASE

8" COMPACTED SUBBASE

COMPACTED SUBGRADE OR SUITABLE

BACKFILL / EMBANKMENT

BITUMINOUS

PAVEMENT

(SEE PLAN)

2"

NOTES:

1. ALL COMPACTION TO BE 95% STANDARD PROCTOR DENSITY.

2. CONCRETE TO BE 3500 PSI COMPRESSIVE STRENGTH AT 28 DAYS.

1'-5" R 11" R

6" R

3" R

3" R

1'-4" 3" R

0'-11"

3" R

45°

79°

1'-7"

1'-7"

1'-0"

9"

6" MINIMUM

FILTER FABRIC

2" STONE

SEE PLAN

EDGE OF PAVEMENT

50' MIN

SEDIMENT CONTROL

BAG "SILT SACK" OR

EQUAL

1" REBAR FOR

BAG REMOVAL

FROM INLET

DUMP LOOP

EXPANSION RESTRAINT

(1/4" NYLON ROPE,

2" FLAT WASHERS)

WIDTH

LENGTH

D

EP

TH

NOTES:

1. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING THE CORRECT SIZE DEVICE FOR EACH INLET.

FOR NON-STANDARD CATCH BASINS AND INLETS, THE CONTRACTOR SHALL MEASURE DIMENSIONS

IN THE FIELD AND ORDER THE APPROPRIATE SIZE(S).

2. THE INLET SEDIMENT CONTROL DEVICE SHALL BE OF HIGH FLOW DESIGN (200 GAL/MIN/FT), AS

PER THE MANUFACTURER'S SPECS.

3. THE SEDIMENT CONTROL DEVICE SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND CLEANED

AND MAINTAINED A MINIMUM ONCE PER MONTH OR WITHIN THE 48 HOURS FOLLOWING A STORM

EVENT. THE FILTER SHALL BE REPLACED OR CLEANED WHEN THE BAG BECOMES HALF FULL. THE FILTER SHALL BE CLEANED IN A MANNER WHICH ENSURES THAT ALL SEDIMENT REMAINS ON SITE.

4. SUBSTITUTION OF A SHEET OF FILTER FABRIC PLACED OVER THE OPENING OF THE INLET IS NOT

APPROVED.

5. RECESSED CURB INLET CATCH BASINS MUST BE BLOCKED WHEN USING FILTER FABRIC INLET

SACKS, SIZE OF FILTER INLET SACK TO BE DETERMINED BY MANUFACTURER.

6. THE FILTER DEVICE SHALL BE MANUFACTURED BY ACF ENVIRONMENTAL OR APPROVED EQUAL.

SECTION

DUMP LOOPS

PERSPECTIVE VIEW

BAG DEPTH TO

TOP OF PIPE

2 EACH

DUMP STRAPS

EXPANSION RESTRAINT

(1/4" NYLON ROPE,

2" FLAT WASHERS)

BAG DETAIL

INSTALLATION DETAIL

2' -3

6"

6"1' -9

NOTE: PREMANUFACTURED FENCE MAY BE USED.

0°

References: City of New Haven Eng. Stnd. Details March 2005 and CDOT 2017 standards.

RAMP

7.1%

CURBING

CURBING

4' M

IN

2' WIDE

DETECTABLE

WARNING STRIP

CAST WITH

RAMP

SIDEWALK CURBING

(OPTIONAL) SEE PLAN

1.

5%

SIDEWALK

APPROACH

NOTE:

SEE PLAN FOR SIZE AND LOCATION OF SIDEWALK.

STOP SIGN:

MUTCD R1-1; 30"

STOP

DO NOT ENTER SIGN:

MUTCD R5-1; 30"

SOIL STOCKPILE

LIMIT OF STOCKPILE

2 (MAX)

SILT FENCE

TEMPORARILY SEED OR MULCH

STOCKPILE SLOPES IF TO BE

LEFT FOR MORE THAN 15 DAYS

SOIL STOCKPILE

4' 2'

2' 4'

SECTION A-A

A

A

NOTE:

1. RETAINING WALL TO BE DESIGNED BY STRUCTURAL ENGINEER AS

SHOP DRAWING SUBMITTAL. APPROPRIATE REBAR SIZE AND SPACING

TO BE SPECIFIED.

2. CONCRETE RETAINING WALLS TO BE UTILIZED ON ALL INTERIOR SITE

WALLS.

3. HANDRAIL SYSTEM TO BE INSTALLED WHERE DESIGNATED ON PLANS

STONE VENEER TO BE PLACED ON WALL,

VENEER SHALL MATCH EXISTING VENEER

1"X1" BEVEL

STIRRUPS

#4 @ 12"

GRADE

GEOMEMBRANE (TYP)

BATTON ATTACHMENT

#5 @ 9"#5 @ 12"

HORIZONTAL BARS

7 - #5 EQUALLY SPACED

ON EACH SIDE

VERTICAL BARS

#5 @ 1'-6"

2'X2'X2'

STONE AT EACH

WEEPHOLE

FILTER FABRIC

4" WEEPHOLES @ 10'

O.C. PITCH 1" TO DRAIN

PAVEMENT/GRADE

2 - #5

LONGITUDINALLY

#5 @ 9"

5 - #5

#5 IN BEND

6" COMPACTED GRAVEL

20"

3" COVER

8"

6" (MIN)

1' (MAX)

3'-6"

1'-9"

2'-0"

1'-9"

6'-6"

3"

TYPICAL RETAINING WALL SECTION

NOT TO SCALE

TEMPORARY SOIL STOCKPILE DETAIL

NOT TO SCALE

SIGN DETAILS

NOT TO SCALE

CONCRETE PAD

NOT TO SCALE

SINGLE DIRECTION SIDEWALK RAMP

NOT TO SCALE

BITUMINOUS CONCRETE SIDEWALK DETAIL

NOT TO SCALE

HEAVY DUTY BITUMINOUS CONCRETE

PAVEMENT DETAIL

NOT TO SCALE

BITUMINOUS CONCRETE LIP CURB DETAIL

NOT TO SCALE

CATCH BASIN FILTER (SILT SACK) DETAIL

NOT TO SCALE

SILT FENCE

NOT TO SCALE

WATER LINE TRENCH

NOT TO SCALE

TEMPORARY CONSTRUCTION ENTRANCE

NOT TO SCALE

ELECTRICAL LINE TRENCH

NOT TO SCALE

BOLLARD MOUNTED SIGNAGE

NOT TO SCALE

DYNAMIC ACCESSIBILITY PARKING SYMBOL

NOT TO SCALE

ACCESSIBLE PARKING SIGN DETAIL

NOT TO SCALE

MATERIAL

UNDISTURBED

12"

MIN

NOTES

18"-24"

MIN

12"

EXISTING PAVING

ROCK-FREE

BACKFILL

TRENCH WALL

6"MIN.

6"MIN.

EXISTING GRASS AREA

6 MIL. POLY GEOTEXTILE

FABRIC BETWEEN SAND &

STONE LAYER

3/4" CRUSHED STONE

OR PROCESSED

GRAVEL FOUNDATION

STORM/SANITARY

SEWER PIPE

CONTINUOUS COLORED

WARNING TAPE FOR

APPROPRIATE UTILITY

(INCLUDING DRAINAGE)

COMPACTED SAND

PLACED IN 6" LAYERS

1. SEE STATE AND/OR LOCAL HIGHWAY DEPARTMENT SPECIFICATIONS FOR

ADDITIONAL PAVING REQUIRED WHEREVER APPLICABLE.

2. DEEP FOUNDATIONS: WHERE SPECIAL DEEP FOUNDATIONS ARE REQUIRED,

BECAUSE OF VERY SOFT SOIL FOUNDATION, CRUSHED STONE OR PROCESSED

GRAVEL SHALL BE USED TO A POINT 24" DEEPER THAN FLOW LINE OF PIPE.

ADDITIONAL FOUNDATION DEPTH BELOW THIS POINT MAY BE OTHER SELECTED

MATERIAL, AS SPECIFIED AND AS REQUIRED BY THE ENGINEER IN THE FIELD.

UNDISTURBED

MATERIAL9" PROCESSED GRAVEL

OR CRUSHED STONE AS

REQUIRED

PAVEMENT REPLACEMENT

(REFER TO DETAIL)

6" SEEDED LOAM

AS SPECIFIED

SANITARY LINE TRENCH

NOT TO SCALE

NOTE:

PRIOR TO IMPLEMENTATION, THE CONTRACTOR SHALL PROVIDE SHOP

DRAWINGS CONFIRMING THE DESIGN OF ALL UNIT RETAINING WALLS

MEET OR EXCEED MANUFACTURER SPECIFICATIONS.

FINISH GRADE, LOW SIDE (BW

ELEV.) PER GRADING PLAN.

TECHO-BLOC PRIMA 14" CAP DOUBLE

SIDED COPING UNIT AT TOP OF WALL.

MASONRY ADHESIVE, DOUBLE BEAD

FINISH GRADE, HIGH SIDE (TW ELEV.) SEE

GRADING PLAN. HOLD SURFACE 1" TO 2" BELOW

TOP OF WALL TO PREVENT OVERFLOW -TYP.

6" TOPSOIL

GEOGRID REINFORCING MATS PER

MANUFACTURER'S RECOMMENDATION

TECHO-BLOC BALTIMORE UNIT RETAINING WALL SYSTEM.

SEE MANUFACTURER INSTALLATION SPECIFICATIONS.

2" FREE DRAINING CRUSHED STONE

GEOTEXTILE FABRIC SOIL SEPARATOR

3" FLEXIBLE PERFORATED DRAIN IN FILTER SOCK. PROVIDE

1.5% TO 2% DIRECTIONAL PITCH, EXTEND PAST END OF

WALL, TURN, AND DAYLIGHT IN DISCREET LOCATION.

(OUTFALL TO BE PROTECTED BY 1-CY OF 3" CRUSHED STONE.

AS NEEDED TO PREVENT EROSION.)

BASE COURSE AGGREGATE

UNDISTURBED SUBGRADE

GEOTEXTILE PER REMEDIAL CAP DESIGN

H

EI

G H

T V A R

IE

S (S

EE

G

R A D

IN

G

P

LA

N

6" 6"

6" 6" 6"

SEGMENTAL BLOCK RETAINING WALL

NOT TO SCALE

2.02-1

2.02 INSTRUCTIONS TO BIDDERS

TABLE OF CONTENTS

2.02.01 Time for Opening bids

2.02.02 Form of Bid

2.02.03 Submission of Bid

2.02.04 Quantities

2.02.05 Duties of Bidder

2.02.06 Underground Objects, Soils, etc

2.02.07 Bid Surety

2.02.08 Performance, Labor and Material Bonds

2.02.09 Rejection of Bids

2.02.10 Bidder to Furnish Information

2.02.11 Award of Contract

2.02.12 Execution of Contract and Bond

2.02.13 Time

2.02.14 Sales Tax

2.02.15 Out of State Contractors

2.02.16 Address of Contractor

2.02.17 Scope and Term of Insurance

2.02.18 Reserved

2.02.19 Withdrawal of Offer

2.02.20 Limitations on Surety Bond

2.02.21 Reference Specifications

2.02.22 Public Acts Related to Working Near Gas Mains and

Public Acts Related to Working Near Power Lines

2.02.23 Equal Opportunity

2.02.24 Engineering and Inspection Charges

2.02.25 Federal Requirements

2.02.26 State Requirements

2.02-2

2.02 INSTRUCTIONS TO BIDDERS

2.02.01 TIME FOR OPENING BIDS For this bid, we are requiring electronic submission to be submitted through the Town’s bidding portal. The Town maintains the right to reject any bid that does not meet these criteria. Electronic copies are to be received no later than 2:00 PM on December 3, 2026.

2.02.02 FORM OF BID Each bid must be made in and on the form prepared therefore and attached hereto and the proposal form must be submitted complete and unchanged as furnished, except for the insertion of names, addresses, prices and other required data in the blank spaces provided therefore. All appropriate blanks must be filled out. Any changes to, or material deviations from the form provided, shall render such bid voidable at the Town's sole option.

2.02.03 SUBMISSION OF BID Bids shall be sealed in an envelope marked "Sealed Bid" with the bid proposal number and the vendor's name and address. Late bids will not be accepted.

2.02.04 QUANTITIES Bids will be compared on the basis of the Engineer's estimate of quantities as set forth in the Schedule of Bids.

These quantities are given solely as a basis for the comparison of bids. The Town does not expressly, or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any item or portion of the work as may be required.

Attention is particularly called to the fact that some items may be largely dependent on soil or foundation conditions and therefore, may vary widely from the estimated quantities or may even be omitted. An increase or decrease in the quantity for any item shall not be regarded as sufficient grounds for an increase or decrease in the unit price, unless otherwise governed by Form 817.

Bidders must satisfy themselves, by personal examination and by such other means as they may prefer, as to the actual conditions and requirements of the work and the accuracy of the estimate of the Engineer, and shall not, at any time after the submission of a bid, dispute or complain of such statement or estimate of the Engineer nor assert that there was any misrepresentation or misunderstanding in regard to the nature or amount of work to be done.

The work has been divided into items in order to enable the Bidder to bid for the different portions of the work in accordance with his estimate of their costs individually and to provide for payment respective of quantity variations.

Bidders are especially cautioned not to submit bids, which are unbalanced. If, in the opinion of the Town, any bid submitted appears unbalanced, this action may be sufficient cause for the rejection of the entire bid or it may result in a monetary loss to the Contractor if certain portions of the work are increased or decreased as provided in the Contract.

2.02-3

2.02.05 DUTIES OF BIDDER The Bidder is required to examine carefully the site of the work, the project drawings, if any, the Notice to Contractor, Information for Bidders, General Conditions, General Specifications, Technical Specifications, Wage Rates and Certification and Bid Proposal hereinafter referred to from time to time as the Contract Bidding Documents. Bidder must satisfy themselves as to the actual conditions and requirements of the work to be performed and the materials to be furnished and shall make himself familiar with all federal, state and local laws, ordinances and regulations which in any manner affect the work or its conduct. No plea of misunderstanding or ignorance of such laws, etc., will be considered as an excuse for failure to comply with any of the requirements hereof or as reason for any additional compensation or waiver of any requirements of Contract Bidding Documents.

Every bid submitted must be based upon the Contract Bidding Documents, if any, described herein and upon the written, typed or printed texts of the Contract Bidding Documents. Oral statements by any officer or employee of the Town will not be binding. Questions shall be submitted in writing to the Division of Purchasing Services Manager at least seven (7) working days before the established date for receipt of bids. If the question involves the equality or use of products or methods, it must be accompanied by drawings, specifications or other data in sufficient detail to enable the Engineer to determine the equality or suitability of the product or method. In general, the Town will neither approve nor disapprove particular products prior to the opening of the bids; such products will be considered when offered by the Contractor for incorporation into the work.

2.02.06 UNDERGROUND OBJECTS, SOILS, ETC If any Contract Bidding Document or drawing or similar source of information furnished to prospective Bidders or to awarded Contractors purports to show underground objects or conditions or pipes, ducts or similar structures or observations or indications of soils, rock, ground water, etc., made from borings, test pits or prior excavations, such information must be considered as only advisory and not necessarily correct and complete, having been obtained, made and plotted for the benefit of the Engineer.

Bidders and awarded Contractors must recognize that, by reason of the methods commonly used for obtaining and expressing such data, this information and data is limited and subject to error or misunderstanding. The terms used to describe soils, ground water, etc. are subject to local usage and to the individual opinion of the person making the records. Ground water conditions vary from time to time. The locations, sizes, depths, etc. of underground pipes, ducts and structures are usually obtained from records of others and such data, when shown on plans of the Town, are subject to possible errors in the source of the information and also errors in transcription. The Town, together with its agents, does not warrant or represent that the indications on Contract Drawings or other documents of underground conditions, objects, etc., as described above, are either approximately correct or complete, and any party making use of such indications or basing estimates of proposals thereon must agree that they shall have no claim or right of action against either the Town or any person or party acting for or under it for the consequences, delays, expense or losses which may occur or have occurred in event that such indications shall be found to have been

2.02-4 incomplete, incorrect or misleading. Bidders must make such investigations as they deem necessary and form their own opinions of the materials, conditions and difficulties or obstacles likely to be encountered.

Contractors, as required by state law, are required to notify the utilities coordinating agency for field locations of existing underground utilities. A town permit is required for each project location. Prior to the issuance of a town permit for work within Town rights of way, the awarded Contractor shall secure a "Call Before You Dig" number and this number shall appear on the permit.

2.02.07 BID SURETY Each bid must be accompanied by a Bid Bond, Certified Check or Treasurer's Check in the amount of ten percent (10%) of the total base bid and made payable to the "Town of West Hartford". Failure to provide the bid surety will result in rejection of the bid. All surety checks shall be returned to the respective Bidders when the Contract is awarded.

2.02.08 PERFORMANCE, LABOR AND MATERIAL BONDS If the amount of the Contract to be awarded is Fifty Thousand Dollars ($50,000) or more, the successful Bidder shall furnish and pay for the required bonds in favor of the Town of West Hartford in the full amount of the estimated total base bid as determined by extending the unit prices by the estimated quantities. This bond shall provide 100% security for faithful performance and for payment of all persons performing labor or furnishing materials in connection with this Contract and shall be executed by a company authorized to transact business within the State of Connecticut.

The Bidder shall deliver the required bonds to the Town not later than five (5) days from notice of the Town's intent to award the Contract to the Bidder and prior to execution of a Contract.

2.02.09 REJECTION OF BIDS The Town shall not award this Contract to a Bidder who does not furnish evidence satisfactory to the Town that he has ability, equipment and experience in this class of work, that he has satisfactorily completed work of similar character, magnitude and importance, and that he has sufficient capital and capacity to enable him to prosecute the same successfully within the time limit stated herein. Prospective Bidders who cannot fully satisfy these requirements are requested not to submit bids. Failure to qualify in this respect may be considered sufficient cause to reject any bid whatsoever.

The Town reserves the right to reject any one or more bids as it may deem to be in the best interests of the Town, and this right to reject is not limited to the specific reasons mentioned herein. A bid may, but does not have to be rejected:

(a) If it is incomplete, conditional or obscure, or if it contains additions not called for, erasures, alterations, obvious errors or irregularities of any kind, or if it does not conform in every respect to the requirements stated in these Contract Bidding Documents, or if it is on sheets removed from this pamphlet;

2.02-5

(b) If the individual unit prices bid are considered by the Town to be unbalanced in a manner likely to be detrimental to the Town;

(c) If the Town shall be of the opinion that it was prepared without adequate care or knowledge of the conditions relative to the work, or under a misunderstanding of the requirements of the Town, or if it is for work other than that shown on applicable Drawings or specified;

(d) For failure to furnish information promptly as required herein.

(e) If the Bidder has failed to satisfactorily complete prior contracts.

(f) If the Bidder has not performed work of a similar size or type in the past.

2.02.10 BIDDER TO FURNISH INFORMATION In order that the Town may have information to guide it in the award of the Contract, the Bidders whose bids are being considered shall, on request of the Town, submit the following information within four working (4) days after the receipt of such a request;

(a) A list of previous work of similar character and magnitude which has been performed or furnished by the Bidder, or by the principals to the bid, together with information as to each such job, its character, magnitude, date, location and that it was carried forward and completed in a matter entirely satisfactory to the party under whose supervision it was done.

(b) A statement of the capacity, equipment and forces of the Bidder which are or will be available to the Bidder together with a statement as to whether things are owned by the Bidder, or under lease or contract to the Bidder.

(c) A brief statement of the methods and order of work the Bidder proposes to perform and the rate of progress on the several parts of the same which the Bidder expects to accomplish.

(d) A sworn copy of the latest statement of the financial condition of the Bidder together with sworn statements as to any and every important change which may have occurred to alter the said financial condition since the date of the above statement, with supporting evidence if and as requested.

(e) References showing that the Bidder undoubtedly has ample capital, credit and other resources to finance the work throughout and without being dependent on release of portions of retained percentage before completion of work, and without having estimates for payment made more often than once each month and at such times as will conform to payment practices of the Town.

2.02.11 AWARD OF CONTRACT It is the intent of the Town to award a Contract to the Bidder providing the lowest responsible bid and is in accordance with the requirements of the Contract Bidding Documents and does not exceed available

2.02-6 funds. The Town shall have the right to waive informalities or irregularities in a bid received.

2.02.12 EXECUTION OF CONTRACT AND BONDS The Bidder to whom the Contract is awarded shall execute the Contract and required Performance and Labor and Materials Bond(s) within five (5) working days (not including Saturdays, Sundays, or holidays) from the date upon which the Town issues notice to the Bidder, that the Contract is ready for signature. If the Contractor fails to execute the Contract within said time period, the Town may determine that the Bidder has abandoned the Contract. Thereupon the acceptance of the bid and the award shall be null and void and the bid surety accompanying the bid shall be forfeited to the Town.

The Contractor shall increase the principal amount of the Performance and Labor and Materials Payment Bond(s) in direct proportion to any increase in the value of the Contract resulting from change orders.

2.02.13 TIME See Section 5.13 of the General Conditions.

2.02.14 SALES TAX Under the terms of the regulations referring to contractors and subcontractors, issued by the State Tax Commission in administration of the State Sales and Use Tax, to which the Bidder is referred, the Contractor may purchase such materials and supplies as are to be physically incorporated in and become a permanent part of the project being performed under this Contract without payment of tax and shall not include in his bid nor charge any use or sales tax thereon.

2.02.15 OUT-OF-STATE CONTRACTORS The Contractor, if not a resident of the State of Connecticut, or, in the case of a partnership, the partners, if not residents, shall appoint an approved person having permanent local residence as his or their attorney, upon whom all lawful processes, proceedings or notices may be served.

The Contractor, if a corporation not organized under the laws of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .