27-8712_Bid_Schedule.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Tamiami Wells 6, 23 & 25 MCC Replacement
- Solicitation number
- 27-8712
- Issued by
- Collier County, Florida
About this file
This is a Bid Schedule for Invitation to Bid (ITB) No. 27-8712 issued by the state of Florida for the Tamiami Wells 6, 23, and 25 Motor Control Center (MCC) Replacement Construction project. The project involves the removal and replacement of existing Motor Control Centers, power and lighting panels, transformers, utility meters, and main disconnects at three well locations, along with installation of new conduit, cabling, motor disconnects, surge protection devices, circuit breakers, and related equipment. The scope of work is divided into six line items on a lump-sum basis: Mobilization (not to exceed 5% of total contract price), Demolition, Project Coordination, Installation of New Equipment (including well houses 6, 23, and 25 with associated electrical components and training), Testing, and Final Documentation. Project Coordination requirements include providing an initial project schedule with weekly and monthly updates, monthly progress reports, and scheduling all progress meetings with agendas and minutes; payment applications will not be processed without these deliverables.
The bid schedule does not specify unit prices for individual line items but requires submission of a total bid amount. Florida has allocated a $200,000 Owner's Allowance for use at the Owner's direction to address unforeseen conditions, though inclusion of this allowance in the contract price does not guarantee payment of any portion of it. Expenditures from the Owner's Allowance will be authorized only through Change Order with supporting documentation of time and materials. The file does not indicate any set-asides, incumbent information, specific response or due dates, site visit requirements, or bidder's conference details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Vendor: | ||||||
| Tamiami Wells 6, 23, & 25 MCC Replacement | ||||||
| Construction ITB No. 27-8712 | ||||||
| Bid Schedule | ||||||
| Item No. | Description | Units | QTY | Total | ||
| 1 | Mobilization: The lump sum price for this Bid Item shall not exceed 5% of the Total Contract Price excluding this Bid item. | 1 | LS | |||
| 2 | Demolition: Include labor and materials to remove all existing equipment shown on the contract drawings and identified in the project specifications. Include disposal fees as required. | 1 | LS | |||
| 3 | Project Coordination: Coordinate and oversee the project including contractor and subcontractors for all aspects of the project. Provide an initial project schedule and weekly/monthly project schedule updates. Provide monthly project progress reports. Schedule all progress meetings, provide agendas for each meeting, and meeting minutes for every meeting. Pay Applications will not be reviewed without updated project schedule, progress reports, and progress meeting minutes each month. | 1 | LS | |||
| 4 | Installation of New Equipment: Include all labor and material including but not limited to the new equipment as shown on the contract drawings and identified in the project specifications. The new equipment includes but is not limited to: | |||||
| a. | Well House 6 MCC, power/lighting panel, transformer, utility meter, main disconnect, conduit, cabling, motor disconnect. | |||||
| b. | Well House 23 MCC, power/lighting panel, transformer, utility meter, main disconnect, conduit, cabling, motor disconnect. | |||||
| c. | Well House 25 MCC, power/lighting panel, transformer, utility meter, main disconnect, conduit, cabling, motor disconnect. | |||||
| d. | Training: Include all training requirements as outlined in the contract documents. | 1 | LS | |||
| 5 | Testing: Include all testing requirements to verify a completely functional system as required. | 1 | LS | |||
| 6 | Final Documentation: As built drawings, O&M's, and test results. | 1 | LS | |||
| TOTAL BID AMOUNT: | $ - 0 | |||||
| Staff has allocated $200,000.00 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change. |
File details come from the government source that posted it. Updated .