This is a Scope of Work document for the City of Norwich Department of Public Utilities (NPU) in Connecticut regarding cross connection inspections and backflow prevention testing services for calendar years 2027 through 2033. The contractor shall be responsible for scheduling, conducting initial and re-inspections, performing testing and re-testing, collecting and maintaining data, communicating with customers, issuing notices, and generating the required State Department of Public Health (DPH) report for all applicable water service connections within the Norwich Public Utilities service area. Proposals must include a detailed statement of qualifications and relevant experience, verification of current State inspection and testing certifications, and documented assurance of adequate expertise and manpower to complete all work in a timely manner and in full compliance with DPH requirements.
The document does not specify response dates, due dates, site visits, bidder meetings, or award dates. Pricing terms, funding amounts, and sources are not detailed in this Scope of Work document. No set-asides are identified. The seven-year contract term runs from 2027 through 2033, with no renewal options mentioned. The contractor will be required to maintain comprehensive supporting documentation and demonstrate the capability to manage the full scope of cross connection and backflow prevention activities across the entire service territory.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation for Bid/Proposal
RFP No. 27-38
The Purchasing Agent, City of Norwich, on behalf of Norwich Public Utilities, will receive bids/proposals for Cross Connection Inspections and Backflow Prevention Testing until 2:00 P.M. prevailing time on November 16, 2026, at which time they will be opened on the Procurement website and be available to view. All bids are to be submitted via the City of Norwich Procurement Portal at the following website :
City of Norwich Procurement Portal
The bid documents may be downloaded from the following website:
City of Norwich Procurement Portal
Addenda, if any, will be posted on the website listed above. All bidders, prior to submitting their bids, should check the websites to ensure they have received all issued addenda.
Norwich Public Utilities reserves the right to reject and all bids, in whole or in part, to waive minor irregularities in the bidding and to award the bid to other than the low bidder if deemed in the best interest of the City of Norwich.
No Bidder may withdraw its bid within sixty (60) days of the bid opening date. Should there be reason why the contract cannot be awarded within the specified time, the time may be extended by mutual agreement between Norwich Public Utilities and the designated, qualified low bidder.
All final awards of the bid shall be in compliance with the City of Norwich Code of Ordinances §7-46 – Delinquent Tax Setoff Against Money Due Bidder or Contractor.
By submitting a bid to this RFP, the vendor certifies they are not on a state or federal debarment or suspended list and are not prohibited from performing any state or federal work.
All bidders must submit bids/proposals through the City Procurement Portal.
Responding bidders must ensure that employees and applicant for employment are not discriminated against because of their race, color, religious creed, age, marital status, national origin, ancestry, sex, gender identity or expression, intellectual disability, mental disability or physical disability, including, but not limited to blindness, unless it is shown by such bidder that such disability prevents performance of the work involved.
Karl J. Klein Jr.
Purchasing Agent
City of Norwich Department of Finance – Purchasing Agent Phone: (860)823-3706 100 Broadway, Room No. 105 Fax: (860)823-3812 Norwich, CT 06360 E-mail: kklein@cityofnorwich.org https://norwichct.bonfirehub.com/portal/?tab=openOpportunities https://norwichct.bonfirehub.com/portal/?tab=openOpportunities
Norwich Public Utilities Request for Proposal Cross-Connection Inspections and Backflow Prevention Testing
REQUEST FOR PROPOSAL
FOR CONTRACTED SERVICES
FOR CROSS CONNECTION INSPECTIONS
AND BACKFLOW PREVENTION TESTING
NORWICH PUBLIC UTILITIES WATER SERVICE AREA
The City of Norwich Department of Public Utilities (NPU) requests proposals to perform all work necessary to schedule, inspect and re-inspect, test and re-test, collect data, communicate with customers, issue notices, maintain all supporting documentation, and create the State report for all appropriate water service connections within the Norwich Public Utilities service area for calendar years 2027 through 2033. Included in the proposals shall be a statement of qualifications, experience, verification of current State inspection and testing certifications, and assurance of the expertise and manpower needed to complete the work in a timely fashion and consistent with the State Department of Public Health (DPH) requirements.
1.0 PROJECT BACKGROUND
NPU provides water service to the City of Norwich and portions of the surrounding towns of Bozrah, Franklin, Lebanon, Lisbon, Montville, and Preston. In 2025, there were approximately 300 annually required inspections; 860 five year required inspections (approximately 170 of which were due each year); and 800 testable devices (approximately half of which were tested by NPU or its designated representative and half tested by others under contract to the building owners). All data was submitted for compilation into the State report for review by NPU in advance of the March 1st reporting deadline.
2.0 STATEMENT OF PROPOSAL
NPU is requesting proposals from certified inspectors/testers to perform all functions necessary to meet the inspection, testing, and reporting requirements of Section 19-13-B38a of the Regulations of Connecticut State Agencies (RCSA).
3.0 TERM OF PROPOSAL
The initial contract period shall be for one (1) year, calendar year 2027. Subsequent three (3) year renewals, at the option of the City of Norwich, may be available for two (2) additional three (3) year periods (2028, 2029 and 2030) and (2031, 2032 and 2033). Total contract period, including options for renewals, shall not exceed seven (7) years.
AWARD
The firm(s) whose proposal is accepted by Norwich Public Utilities will be required to furnish all insurance certificates in the amounts specified, within 5 days from the date of the notice of award.
Upon receipt of the certificate, the firm will be required to execute a contract, in substantially the form included in the proposal documents. Once the contract is signed by both parties, the contractor will be issued a Purchase Order for the prices submitted in response to the Bid.
4.0 DETAILED DESCRIPTION OF WORK:
• Compile a list of all properties requiring inspecting and testing (NPU will provide)
• Schedule appointments, including before or after normal business hours for critical customers
• Maintain a means of direct communication for customers to schedule appointments
• Perform all inspections and device tests where private contracts are not in place and to retest/re-inspect as necessary (fire sprinkler device tests are performed under private contract to the property owner – reports must be issued to NPU or its designated representative for inclusion in the annual state report)
• QA/QC data check
• Receive test data from other contractors and incorporation into annual state report
• Issue reminder letters (NPU to provide templates)
• Issue compliance and violation letters (NPU to provide templates)
• Compile all data into State Report form (provide final draft to NPU for review by
February 1) and make corrections as necessary
• Prepare weekly updates showing inspection and testing status and list of devices tested
• Provide NPU with any required cross connection software and license used by
Respondent such that NPU has real-time data and a permanent record of all test data
• Provide monthly reports in Excel format for invoicing by NPU
5.0 PROPOSAL SUBMITTAL REQUIREMENTS
The Proposal shall include the following:
1. Company Organization – Describe the company structure, ownership, size, and history of the firm, including the location of the office where the majority of work will be performed, the location of the company headquarters (if applicable), and the number of years in business
2. Identification of Inspectors and Testers – Include the name and DPH inspector/tester certificate number(s) with expiration date. Include only those of staff that are likely to work on this project. Include a list of testing devices along with the most recent calibration test reports.
3. Inspection/Testing contracts already in place, contact information of client, description of services being provided, number of years contracts have been in place
4. Identification of the Project Manager/Project Team - the Project Manager is the person who will serve as the NPU contact. The balance of the project team will include all inspectors/testers and administrative support for scheduling inspections/tests and recording data.
5. Demonstration of Ability to Complete the Project – Describe the firm’s ability to perform the services as reflected by current workload and the availability of adequate personnel and equipment to perform the service expeditiously.
6. Detailed project approach and scope of services sufficient to demonstrate a sound understanding of the project and required elements for its successful completion.
7. Description of Relevant Experience – Include a minimum of two projects that are similar to that being requested (minimum 300 inspections performed annually – can be a combination of annual and 5-year frequency properties – and minimum 300 devices tested annually). For each project, include the name of the organization for whom the work was performed; contact name, address, and telephone number; total contract fee;
date the project was completed; and a description of the services performed.
8. Other information that the Contractor believes conveys their qualifications and experience.
6.0 CONTRACTOR’S DUTIES AND RESPONSIBILITIES
The Contractor's duties and responsibilities consist of those services performed by the Contractor, the Contractor’s employees, and the Contractor's professional associates. The Contractor's responsibilities shall be performed as expeditiously as is consistent with professional skill and care and the orderly progress of the work.
The Contractor will be communicating and interacting with customers of Norwich Public Utilities and shall, at all times, perform those duties in a professional and courteous manner with customer service as a top priority. Upon request of NPU, the Contractor will remove any individual (or individuals) from the project team should it be identified that the level of professionalism and customer service performed by that (those) individual(s) is not up to the standards/expectations of Norwich Public Utilities.
7.0 GENERAL REQUIREMENTS
1. All requirements identified in the Selection Criteria must be enclosed to be considered.
2. The firm selected from this request for bids will herein be referred to as the
“Contractor”.
3. The selected Contractor will work at the direction of the Norwich Public Utilities Water Integrity Manager.
8.0 MINIMUM REQUIREMENTS FOR CONTRACTOR AND STAFF
Each responding contractor must clearly demonstrate that it and its staff meet or exceeds the following minimum requirements.
1. The Contractor's Project Manager must be a Cross-Connection Survey Inspector and a Backflow Preventer Tester certified by the State of Connecticut.
2. The Contractor shall have demonstrated experience in cross connection inspection and backflow preventer testing.
3. The Contractor shall have the ability to meet the inspection/testing and reporting schedule defined herein and in RCSA19-13-B38a.
4. The Contractor must have provided services, similar to those being requested, for at least two projects. Specific contact references, including scope of project and staff member in charge, must be included in the proposal.
5. The Contractor shall demonstrate the capturing of detail inspection information, and the production of inspection metrics, state reporting, and detail inspection billing information.
9.0 ADDITIONAL REQUIREMENTS
Each proposal should state, and demonstrate where possible, that the Contractor and its staff meet, or will meet, the following additional requirements.
1. The staff assigned to serve NPU must have demonstrable expertise/experience in the cross-connection inspection and backflow prevention testing of public drinking water systems.
2. The Contractor must assign a principal person to NPU from among its senior staff.
Proposals must include resumes of all professional staff members assigned to this project. Only those staff members specifically assigned to the project should be listed. No substitutions will be allowed without the permission, in writing, of NPU.
3. By submitting this request for proposals, the Contractor is attesting that no person(s), officer(s) and/or official(s) employed by or associated with NPU has been employed, retained, induced or directed to solicit or secure this proposal. In the event of any allegation of substance (as determined by NPU) is substantiated, the Contractor shall cooperate fully with NPU in establishing whether or not the allegation is true.
4. The staff assigned to serve NPU should be familiar with the applicable provisions of the Connecticut General Laws, and any other relevant laws and regulations of the state of Connecticut.
10.0 SELECTION CRITERIA
Proposals will be evaluated by Norwich Public Utilities and the award shall be made on the basis of the most responsive qualified firm in the sole discretion of NPU. In addition to cost, the following criteria will be considered in determining the most responsive firm and such information requested below shall be highlighted in the proposal:
1. Competence to perform the services as reflected by technical training and education;
general experience; experience of the assigned staff in providing the required services;
and the qualifications and competence of persons who would be assigned to perform the services in a timely manner;
2. Ability to perform the services as reflected by workload and the availability of adequate personnel and equipment to perform the service expeditiously;
3. Past performance as reflected by the evaluation of private persons and officials of other governmental entities that have retained the services of the firm with respect to such factors as control of costs, quality of work, and ability to meet deadlines.
4. Narrative description of the approach and scope of work to substantiate firm’s understanding of the project objectives;
5. Personnel assigned to perform the tasks. The Project Manager must have demonstrated experience with cross-connection inspections and backflow prevention testing procedures.
6. Services proposed under this proposal;
The work shall be awarded to the most responsive qualified firm. NPU reserves the right to reject any or all proposals or parts thereof; to waive any informality in same, or accept any proposal, including acceptance of other than the lowest cost proposal, as is deemed to be in the best interest of the City.
11.0 LIST OF DOCUMENTS AVAILABLE FOR VIEWING AT NPU
The following information is attached:
2025 Cross Connection Survey Report Forms
BID BOND
KNOW ALL MEN BY THESE PRESENTS: That we, the undersigned, of
(hereinafter called Principal) as Principal, and a corporation organized and existing under the laws of the State of and duly authorized to transact a surety business in the State of Connecticut (hereinafter called Surety), are held and firmly bound unto the City of Norwich as Owner, in the penal sum of in lawful money of the United States of America, for the payment of which sum, well and truly made to the Owner, we bind ourselves, our heirs, successors, and assigns, jointly and severally, firmly by these presents has herewith submitted a bid for the for the contract for the project, bids for which are scheduled to be opened on
THE CONDITION OF THIS OBLIGATION is such, that whereas the Principal has herewith submitted a bid for the contract for the above referenced project
NOW, THEREFORE, if the following conditions are satisfied, this obligation shall become void:
a) the Principal shall not withdraw its bid within days after the bid opening of the same without the consent of the Owner, and
b) the Owner shall award said project to the Principal in writing, and
c) the Principal shall, as required by the Owner pursuant to the bid specifications for the project, execute a contract in writing for the project within the time specified by the Owner, after being notified by the Owner in writing of the award, including all submissions relating to that contract execution as may be required by the bid specifications, to be submitted to the Owner prior to contract execution, and
d) the Principal shall deliver such surety bond as shall be acceptable to the Owner for the performance of the work according to said written agreement (contract) and shall in all other respects perform the agreement created by the acceptance of said bid.
Otherwise, the Principal and Surety hereto agree to pay unto the Owner the difference between the amount of the bid of said Principal, submitted herewith, and the amount for which the Owner may contract with another party to perform the work covered by the said bid of the Principal.
The Surety executing this instrument hereby agrees that its obligation shall not be impaired by any extension(s) of the time for contract execution that the Principal and Owner may agree to, notice of which extension(s) to the Surety being hereby waived;
provided that such waiver of notice shall apply only with respect to extensions aggregating not more than calendar days in addition to the original days allowed for expiration of this bid bond.
IN TESTIMONY WHEREOF, the said Principal and Surety have caused this bond to be signed by their duly-authorized representatives and have caused their names and corporate seals to be affixed on this form on the respective dates of their signatures.
Surety Principal
Print Surety Name Print Name
Agent’s signature and date. Enclose a valid Signature of Authorized Representative and date Power of Attorney
Norwich Public Utilities
NON-COLLUSION AFFIDAVIT OF PRIME BIDDER
State of ) ) ss.
County of )
, being first duly sworn, deposes and says that:
(1) He is (owner, partner, officer, representative or agent) of
, the Bidder that has submitted the attached bid;
(2) He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted or to refrain from Bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit or cost element of the Bid price or the Bid price of any other Bidder or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against the Owner or any person interested in the proposed Contract; and
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant.
(Signed)
(Title) Subscribed and sworn to before me this day of 20
(Title) My Commission expires , 20 .
NONDISCRIMINATION IN EMPLOYMENT
State of )
) ss County of )
, being first duly sworn, deposes and says that:
(1) He/she is (owner, partner, officer, representative, or agent), of
, the vendor that has submitted the attached proposal;
(2) Said vendor (has ) (has not ) previously performed work subject to the President's Executive Order No. 11246, or any preceding similar Executive Order.
Signed
Title
Subscribed and Sworn to before me this day of 20 .
Title
My Commission expires , 20 .
STATE OF CONNECTICUT
DEPARTMENT OF PUBLIC HEALTH
Phone: (860) 509-7333 Telephone Device for the Deaf (860) 509-7191 410 Capitol Avenue - MS # 51WAT P.O. Box 340308 Hartford, CT 06134 An Equal Opportunity Employer
CROSS CONNECTION SURVEY REPORT FORM - INSTRUCTIONS
1. This report is due annually by March 1 for the preceding calendar year pursuant to Section 19-13-B102(f) of the Regulations of Connecticut State Agencies.
2. Fill in the water system name, survey year and page number on each page.
Inspection Summary pages – Annual and Five Year
3. In the “Categories of Concern” column write one or more of the following codes for any of these items that exist on the property:
(1) Any water supply source other than that of the public water system is known to exist.
(2) Toxic or objectionable chemical or biological substances are used in water solution on public, commercial or industrial premises.
(3) Water pressure is raised by pumping on other than residential premises above that furnished by the supplier.
(4) There is a water storage tank, public swimming pool or water filter, for other than residential use.
(5) There is known to be a sprinkler system for either fire protection or irrigation.
4. Under “Violations” in the “Status” column, enter one or more of the following codes:
(a) Correction has been scheduled (include the completion date on the Comments page).
(b) Referred to local director of health for enforcement
(c) Referred to State Department of Public Health for enforcement
(d) Service terminated
(e) Violation letter issued
(f) Other (provide specific information on Comments page)
5. Under “Testable Backflow Preventers”, only list devices that are required to be tested pursuant to Section 19-13-B38a of the Regulations of Connecticut State Agencies.
6. Under “Testable Backflow Preventers”, report numbers for all ANNUAL tests performed during the survey (calendar) year, even if the facility was not surveyed during the year.
7. Use additional pages if all of the inspections do not fit on one page.
Comments page
8. If an inspection was not done or devices were not tested because an account is no longer in service, indicate “Not in service” in the comment section.
This cannot be applied to seasonal customers. All cross connection issues must be resolved prior to the service being restored.
9. If a system changed ownership during the year, list the previous owner’s name on the Comments page.
10. Include information on any enforcement actions taken on the Comments page.
DEPARTMENT OF PUBLIC HEALTH
410 Capitol Avenue - MS # 51WAT
Page ____ of _____
CROSS CONNECTION SURVEY REPORT FORM - GENERAL INFORMATION
Name of Water System ________________________________________________
PWSID ____________
Report for __________ (year)
I certify that the information in this report is substantially correct. (To be signed by the official representative of the water system.)
Print Name ____________________________ Title _______________________
Signature _____________________________ Date ________________________
Telephone Number __________________________________________
Tester(s)/Inspector(s)
Name Category1 Certificate # Expiration Date
1 e.g. General Tester-Inspector, Private Tester
Backflow Prevention Device Test Kit Information 2
Test Kit # Test date Result Calibrated Comment
2 It is recommended that the differential pressure gauge be tested for accuracy and recalibrated, if necessary, every 100 tests or every year, whichever occurs first.
Use copies of this page to list additional testers, inspectors or test kits.
DEPARTMENT OF PUBLIC HEALTH (DPH)
410 Capitol Avenue - MS # 51WAT
DRINKING WATER SECTION p. ___ of ___
CROSS CONNECTION SURVEY REPORT (CCSR) SUMMARY
Public Water System (PWS) Name:
PWS ID: SURVEY YEAR:
I certify that the information in this summary reflects the above listed survey year (January 1st through December 31st) and is substantially correct. (to be signed by an official representative of the above listed PWS)
(print name) (signature) (date) (phone)
Regulatory Reference: Section 19-13-B102(f)(2) and 19-13-B38a.(f)(7) of the Regulations of Connecticut State Agencies (RCSA)
Intent: This form is to be used by Public Water Systems (PWS) who supply water to more than 1,000 persons and is to summarize the information contained in the annually required CCSR for the above listed survey year.
This form is to be included with the annual CCSR, which must be submitted by March 1st of each year.
A. INSPECTIONS FOR CROSS CONNECTIONS:
. (1) Were all inspections for cross connections conducted by individuals who were (yes or no) actively certified by the CT DPH as a Cross Connection Survey Inspector during the survey year?
. (2) total # of violations identified . (3) total # of violations which were not corrected
Annually Required Inspections1 . (4) total # of premises required to have been inspected annually1 . (5) total # of annually required inspections conducted during the survey year
Five Year Required Inspections2
. (6) total # of premises required to have been inspected every five years . (7) total # of five year inspections conducted during the survey year . (8) Were all premises inspected at least once every five years?
(yes or no)
B. TESTS OF BACKFLOW PREVENTION DEVICES3
. (9) Were all tests of backflow prevention devices3 performed by individuals who were (yes or no) actively certified by the CT DPH as Backflow Preventer Tester during the survey year?
. (10) total # of backflow prevention devices3 required to have been tested annually . (11) total # of backflow prevention devices3 tested during survey year . (12) total # of backflow prevention devices3 failing test during survey year . (13) total # of backflow prevention devices3 repaired by December 31 of the survey year
C. CCSR REPORTING REQUIREMENTS
. (14) Were all premises, which were required to be inspected either annually or every five (yes or no) years, listed in the report? 1, 2 . (15) Does the CCSR provide the date of last inspection for each premise listed in (yes or no) the report?
. (16) Does the CCSR provide the number of cross connection violations detected for each premise (yes or no) listed in the report?
DEPARTMENT OF PUBLIC HEALTH (DPH)
cont. CROSS CONNECTION SURVEY REPORT (CCSR) SUMMARY p.___ of ___
. (17) Does the CCSR provide the status of correction for each violation that was not (yes or no) corrected by December 31 of the survey year?
. (18) Are all backflow prevention devices3, which were required to have been tested (yes or no) annually, enumerated in the CCSR?
. (19) Did the CCSR summarize the test results of all backflow prevention devices3?
(yes or no)
Where specific “categories of concern”, as listed in RCSA Section 19-13-B102f(2), are known to exist at a consumer premise served by a PWS, that PWS is required to annually submit a report (i.e. CCSR), which summarizes the inspections for cross connections and the tests of backflow prevention devices3, to the Department of Public Health.
Notations:
1. The PWS shall have annual inspections for cross connection performed at public, commercial or industrial premises where toxic or objectionable or biological substances are used in water solution.
2. The PWS shall have inspections performed every five years at premises where:
a. any water supply source other than that of the PWS is known to exist, or
b. water pressure is raised by pumping on other than residential premises above that furnished by the supplier, or
c. there is a water storage tank, public swimming pool or water filter, for other than residential use, or
d. there is known to be a sprinkler system for either fire protection or irrigation.
3. Backflow Prevention Devices are those required by Section 19-13-B38a.(f)(7) to be tested annually -reduced pressure principle backflow preventer, double check valve assembly and pressure vacuum breaker.
Department of Public Health Drinking Water Division
CROSS CONNECTION SURVEY REPORT FORM - ANNUAL INSPECTION SUMMARY
WATER SYSTEM NAME:_______________________________________________ SURVEY YEAR _________________ PAGE _____ OF ______
Consumer Name Categories Date of Violations2 Testable Backflow Preventers and address of most recent Number Number Status3 Device Number of Devices Comments5 concern1 annual insp. found uncorrected type4 Total Tested Failed Repaired
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
TOTALS6 DCVA
RPD
1 List one or more numbers. See # 3 on Instructions page. Category # 2 requires annual inspections. All other categories must be inspected every 5 years.
2 Provide total numbers of violations, such as no device or wrong device, found during the annual inspection. DO NOT include violations related to testing.
3 Provide code for the status of uncorrected violations (see # 4 on Instructions page). Provide comments if there are multiple violations with different statuses.
4 PVB=Pressure Vacuum Breaker, DCVA=Double Check Valve Assembly, RPD=Reduced Pressure Principle Device 5 If providing additional comments, check this box and put the comments on the last page.
6 If more than one page is used for the annual inspection summary, list totals only on the last page of the annual summary. In the column titled "Date of most recent annual insp.", provide the number of annual inspections performed in the survey year.
s:\wssforms\xcform
USE ADDITIONAL SHEETS AS NECESSARY
CROSS CONNECTION SURVEY REPORT FORM - FIVE YEAR INSPECTION SUMMARY
WATER SYSTEM NAME:_______________________________________________ SURVEY YEAR _________________ PAGE _____ OF ______
Consumer Name Categories Date of Violations2 Testable Backflow Preventers and address of most recent Number Number Status3 Device Number of Devices Comments5 concern1 5 year insp. found uncorrected type4 Total Tested Failed Repaired
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
DCVA
RPD
PVB
TOTALS6 DCVA
RPD
1 List one or more numbers. See # 3 on Instructions page. Category # 2 requires annual inspections. All other categories must be inspected every 5 years.
2 Provide total numbers of violations, such as no device or wrong device, found during the 5 year inspection. DO NOT include violations related to testing.
3 Provide code for the status of uncorrected violations (see # 4 on Instructions page). Provide comments if there are multiple violations with different statuses.
4 PVB=Pressure Vacuum Breaker, DCVA=Double Check Valve Assembly, RPD=Reduced Pressure Principle Device 5 If providing additional comments, check this box and put the comments on the last page.
6 If more than one page is used for the 5 year inspection summary, list totals only on the last page of the five year summary. In the column titled "Date of most recent 5 year insp.", provide the number of 5 year inspections performed in the survey year.
s:\wssforms\xcform
CROSS CONNECTION SURVEY REPORT FORM - COMMENTS
WATER SYSTEM NAME:____________________________SURVEY YEAR ___________ PAGE ____ OF ____
Consumer Name From Page # Comments1
1 Use to provide information such as additional details on uncorrected violations.
If an inspection was not done or devices were not tested because an account is no longer in service, indicate “Not in service” in the comment section.
This cannot be applied to seasonal customers. All cross connection issues must be resolved prior to the service being restored.
If a system changed ownership during the year, provide the previous owner’s name.
5/2/02
Facility Name Physical Address Note
1 Wisconsin Ave, LLC 1 Wisconsin Ave Failed to provide test report for 2025 testing.
1 Wisconsin Ave, LLC 1 Wisconsin Ave Failed to provide test report for 2025 testing.
387 North Main St (multi bldgs) 387 North Main St Failed to provide test report for 2025 testing.
387 North Main St (multi bldgs) 387 North Main St Water has been shut off to this facility
American Systems 243 Vergason Avenue Failed to provide contractor test for 2025
Artspace Norwich 35 Chestnut Street Failed to provide contractor report for 2025
Artspace Norwich 35 Chestnut Street Failed to provide contractor report for 2025
Artspace Norwich 35 Chestnut Street Failed to provide contractor report for 2025
BIG Y STORE 30 222 SALEM TPKE Failed to provide contractor report for 2025
BIG Y STORE 30 222 SALEM TPKE Failed to provide contractor report for 2025
BIG Y STORE 30 222 SALEM TPKE Failed to provide contractor report for 2025
BIG Y STORE 30 222 SALEM TPKE Failed to provide contractor report for 2025
BIG Y STORE 30 222 SALEM TPKE Failed to provide contractor report for 2025
Board of Education (Huntington Elementary) 80 WEST TOWN ST Check valve#2 failed to register min PSID of 1+
Board of Education (John M. Moriarty Elementary School)20 Lawler Lane Relief valve discharging continuously when water is turned on, device needs to be repaired or replaced and retested. Please call when ready to schedule retest, 978-595-1533
Board of Education (Stanton) 386 NEW LONDON TPKE Failed to provide contractor test for 2025
BOSWELL SOULOR LLC 575 BOSWELL AVE HSE BLDG 1 Failed to hold
Briar Hill Village Associates Inc 20 Briar Lane Relief valve failed to open during testing, needs to be repaired or replaced and retested. Please call when ready to schedule retest, 978-595-1533
City of Norwich (Chelsea Monuments Irrigation) 230 Washington Street Incorrect device installed, RPZ device required for current degree of hazard. DCVA is currently installed
City of Norwich (Clinton Ave Garage) 50 Clinton Avenue Second check failed to hold above 1psi
City of Norwich (Clinton Ave Garage) 50 Clinton Avenue schedule retest 03/25 at 11am
City of Norwich (Dodd Stadium) 14 Stott Ave Failed to provide contractor test for 2025
COLLINS & JEWELL CO INC. 5 Rachel Drive 2nd check failed Second check valve failed to hold for state required 1 psid, must be repaired or replaced to retest
Comfort Suites 275 OTROBANDO AVE Relief valve failed to open during testing, needs to be repaired or replaced and retested. Please call when ready to schedule retest, 978-595-1533
Comfort Suites 275 OTROBANDO AVE Failed to provide contractor test for 2025
Computer Sciences Corporation 100 Winnenden Road Failed to provide contractor test for 2025
Connecticut GI (Main) 105 Wawecus Street Failed to proved contractor report for 2025
Connecticut GI (Main) 105 Wawecus Street Failed to proved contractor report for 2025
CVS Pharmacy 372 West Main Street Failed to provide contractor test for 2025
Davita (Great Plains Plaza) 113 Salem Turnpike Failed to provide contractor test for 2025
Dept Of Edu Three Rivers (School) 574 New London Tpke Failed to provide contractor test for 2025
Dept Of Edu Three Rivers (School) 574 New London Tpke Failed to provide contractor test for 2025
Falls Mill Condominium 150 Yantic Street Failed to provide contractor report for 2025
Falls Mill Condominium 150 Yantic Street Failed to provide contractor report for 2025
Fitchville Home, Inc. 187 FITCHVILLE RD Failed to provide contractor test for 2025
FIVE GUYS OPERATIONS LLC 15 SALEM TPKE In-person attempt Device still installed upside down, spoke to district manager and explained it would keep failing until installed correctly
FOUR SEASONS NORWICH LLC (CHIPOTLE) 30 SALEM TURNPIKE UNIT 1 Relief vent failed to open at state required 2psid or higher, must be replaced or repaired to retest
Frama Realty Group 40 Connecticut Avenue Failed to provide contractor test for 2025
Gilman Corporation 1 POLLY LN Failed to provide contractor test for 2025
Girard Ford 450 West Thames St Failed to provide test report for 2025 testing.
Glass Enterprises Northeast 40 Wisconsin Ave Failed to provide contractor report for 2025
Glass Enterprises Northeast 40 Wisconsin Ave Failed to provide contractor report for 2025
Godere Funeral Home 21 North Second Ave Failed to provide contractor test for 2025
Gorins Furniture (Warehouse) 30 Haughton Rd Failed to provide contractor test for 2025
Gorins Furniture (Warehouse) 30 Haughton Rd Failed to provide contractor test for 2025
Hartford Healthcare (Joshua Center Thames Valley) 11A Stott Ave Failed to provide contractor report for 2025
Hartford Healthcare (Joshua Center Thames Valley) 11A Stott Ave Failed to provide contractor report for 2025
Hartford Healthcare (Joshua Center Thames Valley) 11A Stott Ave Failed to provide contractor report for 2025
Holiday Inn 10 Laura Blvd Failed to send 2025 contractor report
Holiday Inn 10 Laura Blvd Failed to send 2025 contractor report
Joann (Great Plains Plaza) 113 Salem Turnpike Failed to provide contractor report for 2025
Joann (Great Plains Plaza) 113 Salem Turnpike Failed to provide contractor report for 2025
Konover Commercial (Campbell) 401 West Thames St Relief valve failed to open
LITTLE LEAGUE OF NORWICH 180 OTROBANDO AVE repaired, waiting until back on to test
NPU Minimum Insurance Requirements
The Contractor shall comply with every condition herein. The Contractor shall provide and maintain the insurance coverage set forth below during the term of its agreement with NPU. Any Subcontractor(s) hired by the Contractor shall maintain insurance coverage equal to that required of the Contractor. It is the responsibility of the Contractor to assure compliance with this provision. NPU accepts no responsibility arising from the conduct, or lack of conduct, of the Subcontractor. The insurance requirements contained herein supersede any other insurance requirements referenced in the bid documents.
Exceptions to the above requirements are subject to the sole discretion of Norwich Public Utilities, based on the size and scope of the project and associated risk exposures to Norwich Public Utilities.
With reference to the foregoing insurance requirements, Contractor shall specifically endorse applicable insurance policies as follows:
A. NPU shall be included as an additional insured with respect to General Liability, Automobile Liability, and if applicable, Pollution Liability and excess/umbrella liability, all on a separate endorsement (s).
B. A waiver of subrogation in favor of NPU shall be contained in the Workers’ Compensation and all liability policies (except on the Professional Liability policy) and must be provided through a separate endorsement.
C. All insurance policies shall be endorsed to the effect that NPU will receive at least thirty (30) days' written notice prior to cancellation or non-renewal of the insurance. Contractor is ultimately responsible for notice of cancellation should its carrier be unable to comply with the above requirement.
D. All insurance policies, which include NPU as an additional insured, must be endorsed to read as primary and non-contributory coverage regardless of the application of other insurance.
E. All insurance policies shall be endorsed to require the insurer to immediately notify NPU of any material change in the insurance coverage that would cause non-compliance with the specific provisions required herein, as well as exhaustion of any aggregate limits.
F. All liability policies shall contain no cross-liability exclusions or insured versus insured restrictions.
G. Required limits may be satisfied by any combination of primary and umbrella liability insurances.
H. Contractor may maintain reasonable and customary deductibles, subject to approval by NPU.
I. Insurance must be purchased from insurers having a minimum A.M. Best rating of A- / VIII.
J. Contractual Liability under the General Liability policy must be maintained covering the Contractor’s obligations contained in the contract. Certificates of Insurance shall be prepared and executed by the insurance company or its authorized agent and shall contain provisions representing and warranting the required endorsements and insurance coverages according to requirements and instructions contained herein.
K. A valid Certificate of Insurance verifying each of the coverages required above shall be issued directly to NPU within ten (10) business days after contract award and prior to starting any work by the successful contractor’s insurance agent of record or insurance company. Also, prior to the start of any work and at the same time that the Certificate of Insurance is issued and sent to NPU, all required endorsements identified in sections A, B, C and D, above shall be sent to NPU.
Contractor shall, at its own expense, maintain on all of its operations, the following coverage and limits of insurance:
The following types of insurance shall be provided before starting and until final completion and acceptance of the Work and expiration of the guarantee period provided for in the Agreement.
The limits of liability for insurance required shall provide coverage for not less than the following amounts or greater where required by Laws and Regulations:
1. Workers’ Compensation, Employers’ Liability, and related coverages:
a. State: Statutory
b. Voluntary Compensation Same as State Workers’ (by any exempt entities) Compensation
c. Employer’s Liability: $1,000,000 Each Accident
$1,000,000 Disease, Policy Limit $1,000,000 Disease, Each Employee
d. The policy must contain a waiver of subrogation in favor of NPU, executed by the insurance company. If there is an exposure of injury to Contractor’s employees under the U.S. Longshoremen’s and Harbor Workers' Compensation Act, the Jones Act or under laws, regulations or statutes applicable to work on, next to, or above water, coverage shall be included for such injuries or claims.
2. General Liability coverage, including bodily injury, personal injury, sickness, disease or death, injury to or destruction of property, including loss of use resulting therefrom, damage for premises/operations, products/completed operations, independent contractors and contractual liability (specifically covering the indemnity), broad-form property damage, and underground, explosion and collapse hazard. The policy or policies must be on “an occurrence” basis (“claims made” coverage is not acceptable”.
a. Bodily Injury:
$1,000,000 Each Occurrence $2,000,000 Aggregate
b. Property Damage:
$1,000,000 Each Occurrence $2,000,000 Aggregate
c. Personal/Advertising Injury, (with Employment Exclusion deleted if applicable):
$1,000,000 Each Occurrence $2,000,000 Aggregate
d. If General Liability policy includes a General Aggregate, such General Aggregate shall not be less than $2,000,000.
Per Project Aggregate shall also apply.
The policy must contain a waiver of subrogation in favor of NPU, executed by the insurance company.
3. Commercial Automobile Liability (owned, non-owned, or hired autos):
a. Bodily Injury and Property Damage: $1,000,000 combined single limit
4. Umbrella/Excess Liability coverage (over commercial general liability, commercial automobile liability, and employer liability): This may be satisfied by having the underlying liability limits that equal or exceed the combined amount of the underlying liability limits that equal or exceed the combined amount of the underlying liability limits and umbrella coverage.
NPU shall have discretion in determining or increasing the Umbrella/Excess Liability coverage requirements depending on the scope and/or size of the work performed by Contractor with the review and approval of the Contractor.
$2,000,000 Over Primary Insurance $10,000 Retention
5. Professional Liability coverage:
$1,000,000 per claim $1,000,000 annual aggregate
6. Property Insurance: Contractor shall be responsible for maintaining any and all property insurance on their own equipment and shall require all subcontractors to do likewise.
7. Pollution Liability, if applicable;
If Contractors or their Subcontractors are required to perform hazardous material operations such as asbestos containing materials, containing soil, etc., they must, in addition to the above requirements, carry a "Contractor's Pollution Liability" policy with limits not less than $1,000,000 per occurrence and not less than $1,000,000 aggregate for bodily injury, personal injury and property damage, naming Contractor as additional insured. If Contractor or their subcontractors haul, hazardous waste they must carry Automobile Liability insurance with $1,000,000 combined single limit per occurrence for bodily injury and property damage applicable to all hazardous waste hauling vehicles and include the MCS 90 endorsement.
NPU shall have sole discretion in increasing the Pollution Liability coverage requirements depending on the scope and/or size of the work performed by Contractor.
CONTRACT FOR SERVICES
THIS AGREEMENT, made and entered into this __________________, by and between, _________________, hereinafter called Contractor or Vendor, and Norwich Public Utilities, 16 South Golden Street, Norwich, CT 06360, hereinafter called “NPU.”
WHEREAS NPU desires to enter a contract for services, and the Contractor represents itself as competent and qualified to accomplish the specific requirements of this contract to the satisfaction of NPU, therefore this contract is entered into under the following terms and conditions:
1. The Contractor agrees to perform the services referenced in their proposal for RFP 27-02. The terms and conditions as contained in this Contract for Services shall take precedence over any conflicting terms as may be attached hereto.
2. Term of the Contract:
3. Contract Price
4. Liquidated Damages: In the event the Contractor fails to complete the work within the time limit or extended time limit agreed upon, as more particularly set forth in the Contract Documents, liquidated damages shall be paid to NPU in the amount of $ 0 per calendar day.
5. Contract Documents:
The Contract Documents are complementary and what is called for by anyone shall be as binding as if called for by all. In the event of any conflict or inconsistency between the provisions of this Agreement and the provisions of any of the other Contract Documents, the provisions of this Agreement shall prevail.
Reference to standard specifications, manuals or codes of any technical society, organization or association, or to the laws or regulations of any governmental authority, whether such reference be specific or by implication, shall mean the edition of the standard specification, manual, code or laws or regulations identified in the reference. In the event a particular edition is not identified, the reference shall mean the latest edition in effect at the time of receipt of the bid. However, no provision of any referenced standard specification, manual or code (whether or not specifically incorporated by reference in the Contract Documents) shall change the duties and responsibilities of the City, the Contractor or any of their consultants, agents or employees from those set forth in the Contract Documents.
6. Obligations And Liability Of The Contractor: The Contractor shall, as herein specified, do all the work and perform and furnish all the labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies and all other things (except as otherwise expressly provided herein) necessary for the proper performance and completion of the work in the manner and within the time hereinafter specified, in strict accordance with the Drawings, Specifications and other Contract Documents, in conformity with the directions and to the satisfaction of NPU, and at the prices herein agreed upon therefor.
All parts of the work and all fixtures, equipment, apparatus and other items indicated on the Drawings and not mentioned in the Specifications, or vice versa, and all work and material usual and necessary to make the work complete in all its parts, including all incidental work necessary to make it complete and satisfactory and ready for use and operation, whether
City of Norwich
Norwich Public Utilities 16 South Golden Street Contract No.
or not it is indicated on the Drawings or mentioned in the Specifications, shall be furnished and executed the same as if it is called for both by the Drawings and by the Specifications.
The Contractor shall coordinate its operations with those of any other contractors who may be employed on other work of for NPU, shall avoid interference therewith, and shall cooperate in the arrangements for storage of materials and equipment.
The Contractor shall conduct its work so as to interfere as little as possible with private business and public travel. Wherever and whenever necessary or required it shall maintain fences, furnish watchmen, maintain lights, and take such other precaution as may be necessary to protect life and property.
To the extent provided by law, the Contractor shall indemnify and save harmless NPU and its officers, agents, servants and employees, from and against any and all claims, demands, suits, proceedings, liabilities, judgments, awards, losses, damages, costs and expenses, including attorneys' fees, on account of bodily injury, sickness, disease or death sustained by any person or persons or injury or damage to or destruction of any property, directly or indirectly arising out of, relating to or in connection with the work, whether or not due to or claimed to be due in whole or in part to the active, passive or concurrent negligence or fault of the Contractor, its officers, agents, employees, any of its subcontractors, NPU or any of their respective officers, agents, employees and/or any other person or persons, and whether or not such claims, demands, suits or proceedings are just, unjust, groundless, false or fraudulent; and the Contractor shall and does hereby assume and agrees to pay for the defense of all such claims, demands, suits and proceedings, provided, however, that the Contractor shall not be required to indemnify NPU, its officers, agents, or employees, against any such damages occasioned solely by acts or omissions of NPU other than supervisory acts or omissions of NPU in the work.
The Contractor shall have complete responsibility for the work and the protection thereof, and for preventing injuries to persons and damage to the work and property and utilities on or about the work, until final completion and final acceptance thereof. It shall in no way be relieved of its responsibility by any right of NPU to give permission or directions relating to any part of the work, by any such permission or directions given, or by failure of NPU to give such permission or directions. The Contractor shall bear all costs, expenses, losses and damages on account of the quantity or character of the work or the nature of the land (including but not limited to subsurface conditions) in or under or on which the work is done being different from that indicated or shown in the Contract Documents or from what was estimated or expected, or on account of the weather, elements, or other causes.
The Contractor shall conduct its operations so as not to damage existing structures or work installed either by it or by other contractors. In case of any such damage resulting from its operations, it shall repair and make good as new the damaged portions at its own expense with the consent of the damaged party. In the event that consent is not given, the Contractor shall continue liable for the damage caused.
The Contractor…