This Addendum #1 document is issued by Bobrek Engineering & Construction, LLC, on behalf of the City of Salem, Massachusetts, for the South River Culvert Rehabilitation project (IFB 27-20 ENG). The addendum addresses questions raised via email and at the pre-bid meeting, providing clarifications on project requirements. The original bid due date was October 28, 2026, at 11:00 AM; the addendum does not specify an updated bid due date. Key clarifications include requirements for temporary shoring system design submittals prepared by Massachusetts-registered engineers to be submitted a minimum of three weeks prior to work performance, and acceptance of precast slab options subject to structural engineer design, submission approval, and detailed specifications addressing variable culvert dimensions, installation methods, wall connections, and project schedule. The scope of work includes site control installation and maintenance, excavation to expose the existing culvert, removal and disposal of the culvert roof, internal culvert repairs, installation of a new reinforced concrete slab during winter conditions, backfill operations, soil disposal, and site restoration. The project is for rehabilitation of an existing culvert structure.
The addendum includes a plan holders and bid holders list with 62 entities that received bid documents as of October 22, 2026, including construction firms, engineering companies, and distribution services. The contract price will include adjustments for diesel fuel, gasoline, liquid asphalt, and portland cement based on established indices. Contract duration may be reduced by one day for each eight hours of work performed outside specified allowable work hours, with associated costs for additional Engineer and Resident Site Representative fees. Liquidated damages are set at $1,500 per calendar day for failure to complete final completion punchlist work within contract time. Progress payments are made at 95 percent of completed work with 5 percent retainage; upon substantial completion, payment increases to 99 percent with 1 percent retainage. Final payment is due upon completion and acceptance. The contract requires compliance with Massachusetts prevailing wage laws, employment documentation, tax compliance certifications, debarment certifications, and OSHA safety training requirements for all employees.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 27-20-ENG IFB Manual - South River Culvert Rehab.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bobrek Engineering & Construction, LLC
100 Conifer Hill Dr. Suite 204, Danvers, MA 01923 www.gobobrek.com 978-406-9619
2026.10.23 South River Culvert Rehab Add. #1.doc Page 1 of 4 October 23, 2026
Date: October 23, 2026
IFB 27-20 ENG
ADDENDUM #1
South River Culvert Rehabilitation
Salem, MA
Date of Addendum: October 23, 2026
Original Bid Due Date: October 28, 2026 11:00AM
Updated Bid Due Date: N/A
As a result of questions raised via email and at the pre-bid meeting, the following is a list of questions and updates to the Bid Documents for the South River Culvert Rehabilitation project (IFB 27-20 Eng).
Q & A:
Question #1: What are the requirements for the temporary shoring system in the culvert for supporting the formwork while the slab cures?
Response: The Contractor shall provide a shoring design submittal with drawings prepared by an engineer registered in the Commonwealth of Massachusetts. Submit the design a minimum of three weeks prior to performing the work for review and approval by
GeoEngineers.
Question #2: Is a precast slab option acceptable?
Response: A precast slab may be an acceptable alternative following design and submission, for review, prepared by a structural engineer licensed in the State of Massachusetts, at the sole cost to the Contractor. The Owner and its Representative(s) will be the sole judge of the acceptability of the proposed alternative. Any proposal shall discuss methods for:
i. Encountering variable dimensions of culvert and/or blocks in the field;
ii. Installation methods;
iii. The connection at the top of the wall;
iv. Schedule to complete.
The Contractor shall submit shop drawings signed and sealed by an engineer registered in the Commonwealth of Massachusetts.
Question #3: Provide the plan holders / bid holders list.
Response: See Attachment No. 1:
www.gobobrek.com 978-406-9619
2026.10.23 South River Culvert Rehab Add. #1.doc Page 2 of 4 October 23, 2026
Changes to the Drawings: N/A
Changes to the Specifications: See Attachment No. 2
Section 00 01 10 - Table of Contents updated per below.
Section 00 52 10 - Agreement Form updated per below
Section 00 70 10 – Statutory Provisions for Massachusetts Public Construction Contracts
BIDDERS ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF ADDENDA WITH THEIR BID.
www.gobobrek.com 978-406-9619
2026.10.23 South River Culvert Rehab Add. #1.doc Page 3 of 4 October 23, 2026
Attachment No. 1: Bid Holders List
ID Submission Date Company Name Contact Name Phone Number Email Address
5467 10/7/2026 8:40 na na 978-778-1234 na@gmail.com
5468 10/7/2026 9:08 Brighter Horizons Environmental Jennifer Laramie 9789700500 JLaramie@bhenv.com
5469 10/7/2026 9:25 N. Granese & Sons, Inc. Steven Granese 781 592-8121 info@ngranese.com
5470 10/7/2026 9:45 New England Civil Engineering William Ross 9787417401 wmr@engineeringcorporation.com
5471 10/7/2026 9:55 P.J. Albert, Inc. Sonya Thomas 9783457828 sonya@pjalbert.com
5472 10/7/2026 10:21 Albanese Brothers Inc. Dave Whitney 9784548850 dwhitney@albanesebros.com
5473 10/7/2026 10:39 bidric Craig Engerman 617-212-6333 craig@bidric.com
5475 10/7/2026 12:42 SumCo Eco-Contracting, LLC Tim Feliciano 9787441515 estimating@sumcoeco.com
5476 10/7/2026 12:56 TEC, Inc Robert Niccoli 4406559515 rniccoli@tecinc.com
5482 10/7/2026 13:48 Tetra Tech Sarah Henderson 5087862353 sarah.henderson@tetratech.com
5483 10/7/2026 14:17 rhdf kirti rathod 2431412412 kirtirathod1425@gmail.com
5484 10/7/2026 14:35 Flynn Enterprise Inc. Paulo Medeiros 9785099310 paulo@flynnwork.com
5485 10/7/2026 14:37 Dellbrook Sean MacKay 7817385653 Smackay@dellbrook.com
5486 10/7/2026 15:26 Onvia Source Management 2063739500 deltekplusonvia@gmail.com
5487 10/7/2026 15:39 On Point Construction Services Douglas Maguire 4133553105 dmaguire@onpointct.com
5488 10/7/2026 15:58 DeFelice Corporation Julie DeFelice 9784526967 engineering@defelicecorp.com
5489 10/7/2026 16:16 S&R Corporation Brett Gallagher 9787718559 bgallagher@sandrcorp.com
5491 10/7/2026 18:30 Manafort Transit Courtney Baro 7813282366 CBaro@Manaforttransit.com
5492 10/7/2026 19:41 E.C.F Construction LLC Elison Fernandes 4135753507 elison@ecfconstructionllc.com
5494 10/7/2026 23:32 Steha Ka Abnoy Ka 369-887-8978 athay654@gmail.com
5495 10/8/2026 1:32 dodge dodge 877) 784-9556 support@construction.com
5496 10/8/2026 1:57 Deltek Source 2063739500 sourcemanagement@deltek.com
5497 10/8/2026 5:47 Lucianos Excavation Keith Hastings 5083717328 khastings@l-einc.com
5498 10/8/2026 6:19 B. L.Johnson Masonry ,INC. Bruce johnson 9782909404 stonemasonone@aol.com
5499 10/8/2026 8:54 BEC Greg St. Louis 6175129027 gregs@gobobrek.com
5500 10/8/2026 9:02 Silktown Roofing, LLC. Kayla Green 860-647-0198 bids@silktownroofing.com
5501 10/8/2026 9:48 Bidnet Bid Net 8666771997 gbs@bidnet.com
5502 10/8/2026 10:07 Maverick Construction Sue Belville 9785039185 sbelville@maverick-cm.com
5503 10/8/2026 10:38 National Water Main Cleaning Company New England John Tate 7818280863 jtate@nwmcc-bos.com
5504 10/8/2026 12:32 DeLucca Fence Company, Inc. Janet J DeLucca 9786882877 jjdelucca@deluccafence.com
5509 10/8/2026 13:03 Onvia Source Management 2063739500 deltekplusonvia@gmail.com
5511 10/8/2026 17:29 William Gear William Gear 7817605382 unifiedcon@aol.com
5512 10/9/2026 2:28 Construct Connect Michael Stubbs 800-364-2059 content@constructconnect.com
5513 10/9/2026 8:21 T Ford Company, Inc. Bill Peach 9789955787 bill@tford.com
5514 10/9/2026 8:30 Structural Preservation Systems LLC Rishikesh 2033035191 rishikesh@structural.net
5515 10/9/2026 8:38 D & M Civil, INC Craig Sickler 9787394414 csickler@dm-civil.com
5516 10/9/2026 12:20 Kodiak Corporation Denise Steed 9786850777 dsteed@kodiakcorporation.com
5517 10/9/2026 13:19 werqr q3r323r32 617 555-0001 adfwe@yahoo.com
5518 10/10/2026 15:14 Projectdog, Inc. Project Leads Manager 9784999014 addenda@projectdog.com
5519 10/12/2026 1:19 Constructconnect Morgan 800-364-2059 content@constructconnect.com
5522 10/12/2026 13:53 PWXPress Mary Miller 4086768941 bids@pwxpress.com
5524 10/13/2026 8:28 Greener Group LLC Michael Ruggiero 9786549475 mruggiero@greenergroupllc.com
5525 10/13/2026 9:52 North America Procurement Council Inc., PBC Eric Johnson 302-450-1923 sourcemanagement@napc.me
5527 10/13/2026 14:42 ALMAR LLC Alex Green 5088132275 agreen@almarllc.com
5528 10/13/2026 14:50 Albanese D&S, Inc. Pietro Ciano 6177199422 pciano@albaneseds.com
5529 10/13/2026 14:57 Blue Diamond Equipment Co CC MAHONEY 5085433711 bluediamondcc@comcast.net
5530 10/14/2026 5:26 GovSpend Harsh shah 9544209900 gsbids@govspend.com
5536 10/14/2026 10:42 North Shore CDC Bill Brauner 7816329466 bbrauner@northshorecdc.orf
5542 10/14/2026 13:16 2323 2342 3611514444 qew@yahoo.com
5547 10/14/2026 14:51 E.T.& L. Corp. Jamie Lee 9788974353 jlee@etlcorp.com
5560 10/15/2026 6:53 North America Procurement Council, Inc. PBC Eric Johnson 3024501923 Karen@buildcentral.com
5562 10/15/2026 7:57 Construct Connect Michael Stubbs 800-364-2059 content@constructconnect.com
5563 10/15/2026 7:57 Construct Connect Michael Stubbs 800-364-2059 content@constructconnect.com
5564 10/15/2026 7:57 Construct Connect Michael Stubbs 800-364-2059 content@constructconnect.com
5568 10/15/2026 8:39 Bobrek Engineering & Construction John Bobrek 9784069619 john@gobobrek.com
5570 10/15/2026 9:01 New England Infrastructure, Inc. Annie Aubrey 9782933535 aaubrey@neinfrastructure.com
5579 10/16/2026 8:03 Unified Contracting, Inc Bill Gear (781) 760-5382 bill@unifiedcon.com
5588 10/16/2026 13:56 Source Management Source Management 2063739500 deltekplusonvia@gmail.com
5605 10/21/2026 2:49 North America Procurement Council Inc., PBC Eric Johnson 302-450-1923 sourcemanagement@napc.me
5610 10/22/2026 7:06 T Ford Company Bill Peach Bill Peach 9789955787 bill@tford.com
Issue Date: October 2026 South River Culvert Rehabilitation Project
Rev. per Add. #1 October 23, 2026
City of Salem, MA Specifications TABLE OF CONTENTS
Bobrek Engineering & Construction 00 01 10 - 1
SECTION 00 01 10
TABLE OF CONTENTS – Addendum #1
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
INTRODUCTORY INFORMATION
00 01 07 Seals Page
00 01 10 Table of Contents (Rev. per Add. #1)
PROCUREMENT/BIDDING REQUIREMENTS
00 11 16 Invitation to Bid
00 21 13 Instructions to Bidders
00 22 13 Supplementary Instructions to Bidders
00 31 00 Available Project Information
00 41 01 Bid Form
00 43 13 Bid Bond – Penal Sum Form
00 43 93 Bid Submittal Checklist
00 45 05 Bidder’s Representations and Certifications
00 45 13 Bidder's Qualifications
00 45 19 Non-Collusion Affidavit
CONTRACTING REQUIREMENTS
00 51 00 Sample Notice of Award
00 52 10 Agreement Form (Rev. per Add. #1)
00 54 00 Agreement Form Supplements
Performance Bond Form (C-00 61 13.13)
Payment Bond Form (C-00 61 13.16)
00 55 00 Sample Notice to Proceed
00 60 00 Project Forms (listing):
Application for Payment Form (C-00 62 76)
Request for Interpretation/Information Form (C-00 63 15)
Field Order Form (C-00 63 36)
Work Change Directive Form (C-00 63 49)
Change Request Form (C- 00 63 60)
Change Order Form (C-00 63 63 MA)
Notice of Substantial Completion Form (C-00 65 15)
Certificate of Substantial Completion Form (C-00 65 16)
Notice of Completion Form (C-00 65 18)
00 70 10 Statutory Provisions for Massachusetts Public Construction Contracts
(Rev. per Add. #1)
00 72 05 Standard General Conditions of the Construction Contract (EJCDC C-700, 2007)
00 73 00 Supplementary Federal Requirements
City of Salem, MA Specifications TABLE OF CONTENTS
Bobrek Engineering & Construction 00 01 10 - 2
00 73 05 Supplementary Conditions (listing)
00 73 10 Project Specific Requirements
00 73 19 Health and Safety Requirements
00 73 43 Wage Rate Requirements
00 73 46 Wage Determination Schedule
00 73 73 Statutory Requirements
TECHNICAL SPECIFICATIONS
DIVISION 01 - GENERALREQUIREMENTS
01 11 00 Summary of Work
01 15 00 Specific Project Requirements & Procedures
01 15 30 Payment and Administrative Procedures and Quality Requirements
01 20 25 Measurement and Payment
01 50 00 Temporary Facilities and Controls
01 60 00 Product Requirements
01 70 00 Execution and Closeout Requirements
DIVISION 02 - SITE
02 41 00 Site Demolition
DIVISION 03 - CONCRETE
03 20 00 Concrete Reinforcing
03 30 01 Cast-In-Place Concrete
03 64 00 Polyurethane Grout
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 26 Self-Adhering Sheet Waterproofing
DIVISION 31 – EARTHWORK
31 00 00 Earthwork
31 23 19 Dewatering and Drainage
31 25 00 Erosion Control
31 41 00 Shoring & Bracing
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 00 00 Bituminous Concrete Pavement, Curbing and Edging
DIVISION 33 – UTILITIES
33 42 11 Storm Drain Utility Piping
33 49 00 Drainage Manholes and Catch Basins
ATTACHMENT A – Project Permits
ATTACHMENT B – Culvert Inspection
ATTACHMENT C – Existing Conditions Photos
ATTACHMENT D – Project Drawings
ATTACHMENT E – Deeds
City of Salem, MA Specifications AGREEMENT FORM
Bobrek Engineering & Construction 00 52 10 - 1
SECTION 00 52 10
AGREEMENT FORM – Addendum #1
SALEM, MA
STANDARD CONTRACT
THIS AGREEMENT is by and between the City of SALEM, Massachusetts (“Owner”) and ________________________________________ (“Contractor”). Owner and Contractor hereby agree as follows
ARTICLE 1 – WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents.
The Scope of Work includes, but is not limited to the following principal features and all materials, equipment, services and construction inherent to the Work.
1. Install & maintain site controls;
2. Excavate to expose existing culvert to complete the work;
3. Remove & dispose of the roof of the existing culvert;
4. Perform repairs within existing culvert as shown or directed to accomplish the work;
5. Install new reinforced concrete slab culvert roof during winter conditions;
6. Backfill over new culvert roof;
7. Transport & dispose of excess soils; and
8. Restore areas disturbed by construction.
ARTICLE 2 – THE PROJECT
2.01 The Project under the Contract Documents is generally described as “South River Culvert
Rehabilitation Project”
ARTICLE 3 – ENGINEER
3.01 Bobrek Engineering & Construction, LLC (Engineer) is to act as Owner’s representative, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.
ARTICLE 4 – CONTRACT TIMES
4.01 Time of the Essence
City of Salem, MA Specifications AGREEMENT FORM
Bobrek Engineering & Construction 00 52 10 - 2
A. All time limits for Milestones, if any, Substantial Completion, Final Completion Punchlist completion and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Substantial Completion, Punchlist Completion, and Final Payment
A. The Work is to be completed with final application for payment submitted within four
(4) months of contract execution.
B. The Post Substantial Completion Punchlist shall be complete in accordance with Paragraph 14.07 of the Standard General and Supplementary Conditions.
4.03 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the Standard General and Supplementary Conditions, and Additional Supplementary Conditions, if any. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner as follows.
1. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work (Final Completion Punchlist) within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $1,500 for each calendar day that expires after the time specified in Paragraph 4.02 above.
5.02 Adjustments to the Contract Price
A. Adjustments to the Contract Price will be made for diesel fuel, gasoline, liquid asphalt, and portland cement in cast-in-place concrete based on the Base Prices and index established for adjustments in accordance with price adjustment clauses included in Section 00 73 73, SC-12.01.
B. Adjustments to the Contract Duration (deduction) will be made for each full day of approved hours worked outside the specified allowable Work hours in Section 00 73 10 to cover additional costs incurred by the Owner such as for Engineer and Resident Site Representative (“Additional Work Fee”). Any Work conducted by the Contractor outside of the specified allowable Work hours will be tracked and totaled. For each 8-hours worked outside the allowable work hours will equate to a one-day deduction from the Contract Duration.
ARTICLE 6 – PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
City of Salem, MA Specifications AGREEMENT FORM
Bobrek Engineering & Construction 00 52 10 - 3
A. Contractor shall submit Applications for Payment in accordance with Article 14 of the Standard General Conditions and Supplementary Conditions, if any. Applications for Payment will be processed by Engineer as provided in the Standard General Conditions and Supplementary Conditions, if any, and the General Requirements.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor’s Applications for Payment within 30 days of acceptance/approval of payment requisitions during performance of the Work as provided in Paragraph 6.02.A.1 below. All such payments will be measured by the schedule of values established as provided in Paragraph 2.07.A of the Standard General Conditions and Supplementary Conditions, if any, (and in the case of Unit Price Work based on the number of units completed).
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Engineer may determine or Owner may withhold, including but not limited to liquidated damages, in accordance with Paragraph 14.02 of the Standard General Conditions and Supplementary Conditions, if any, and additional retainage allowed by Laws and Regulations.
a. Progress Payments of 95 percent for Work completed (with the balance of 5 percent being retainage); and
b. 95 percent of cost of materials and equipment not incorporated in the Work (with the balance of 5 percent being retainage).
2. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 99 percent of the Work completed (with the balance of 1 percent being retainage), less such amounts as Engineer shall determine in accordance with Paragraph 14.02.B.5 of the General Conditions and Supplementary Conditions, if any, and less the Engineer’s estimate of the value of Work to be completed or corrected as shown on the tentative list of items to be completed or corrected (Punch List) attached to the certificate of Substantial Completion and subject to Paragraph 14.04 of the General Conditions and Supplementary Conditions, if any.
However, retainage for items planted in the ground shall remain at 5 percent of the cost of such items until Final Payment per Massachusetts General Laws Chapter 30, Section 39G.
6.03 Final Payment
A. Upon final completion and acceptance of the Work in accordance with Paragraph 14.07 of the General and Supplementary Conditions, if any, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 14.07.
City of Salem, MA Specifications AGREEMENT FORM
Bobrek Engineering & Construction 00 52 10 - 4
ARTICLE 7 – INTEREST
7.01 All moneys not paid when due as provided in Article 14 of the General and Supplementary Conditions, if any, shall bear interest at the rate 3 percentage points above the rediscount rate then charged by the Federal Reserve Bank of Boston per Massachusetts General Laws Chapter 30, Section 39G. Interest shall not be accrued on retainage.
ARTICLE 8 – CONTRACTOR’S REPRESENTATIONS AND CERTIFICATIONS
8.01 In order to induce Owner to enter into this Agreement, Contractor makes the following representations:
A. Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.
B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities), if any, that have been identified in Paragraph SC-4.02 of the Supplementary Conditions as containing reliable "technical data," and (2) reports and drawings of Hazardous
Environmental Conditions, if any, at the Site that have been identified in Paragraph SC-
4.06 of the Supplementary Conditions as containing reliable "technical data."
E. Contractor has considered the information known to Contractor; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Contract Documents; and the Site-related reports and drawings identified in the Contract Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Contract Documents; and (3) Contractor’s safety precautions and programs.
F. Based on the information and observations referred to in Paragraph 8.01.E above, Contractor does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract
Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents.
City of Salem, MA Specifications AGREEMENT FORM
Bobrek Engineering & Construction 00 52 10 - 5
G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents.
H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.
I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
8.02 The Contractor certifies, under the penalties of perjury, that:
A. Contractor has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process or in the Contract execution;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner, (b) to establish Bid or Contract prices at artificial non-competitive levels, or
(c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
B. Contractor has complied with all laws of the Commonwealth of Massachusetts relating to taxes, reporting of employees and contractors, and withholding and remitting of child support and, has provided for itself and each Subcontractor, a Certificate of Good
Standing from the Department of Revenue with respect to all returns due and taxes and further, certifies that, to the best of its knowledge and belief, all state tax returns have been filed and all state taxes have been paid as required by Law pursuant to
Massachusetts General Laws Chapter 62C, Section 49A;
C. If a foreign corporation, Contractor has provided for itself and each Subcontractor that is a foreign corporation, a certificate of the state secretary stating that the corporation has complied with requirements of Massachusetts General Laws Chapter 156D, Part 15, Section 15.03 of subdivision A and the date of compliance, and further has filed all annual reports required by Section 16.22 of subdivision B of Part 16 of said Chapter 156D, pursuant to Massachusetts General Laws Chapter 30, Section 39L;
City of Salem, MA Specifications AGREEMENT FORM
Bobrek Engineering & Construction 00 52 10 - 6
D. Contractor is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the Work and further certifies that all employees to be employed at the Work Site will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health
Administration that is at least 10 hours in duration at the time the employee begins Work and shall furnish documentation of successful completion of said course with the first certified payroll report for each employee, all as required by Massachusetts General Laws Chapter 30, Section 39S;
E. Contractor is not presently debarred from entering into a public contract Commonwealth of Massachusetts under the provisions of Massachusetts General Laws Chapter 29, Section 29F, or any other applicable debarment provisions of any other chapter of the
General Laws or any rule or regulations promulgated thereunder; and is not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;
F. Pursuant to Massachusetts General Laws Chapter 30, Section 39R, Contractor has provided a statement by management on internal accounting controls, a statement prepared by an independent certified public accountant regarding management’s statement, and an audited financial statement for the most recent completed fiscal year;
G. Contractor will incorporate the applicable provisions of the Contract Documents into all subcontracts and Purchase Orders so that such provisions will be binding upon each
Subcontractor or Supplier.
9.01 Contents
A. The Contract Documents consist of the following:
1. This Agreement and attachments
2. Items listed in Section 00 54 00
3. Forms listed in 00 60 00
4. Statutory Provisions for Massachusetts Public Construction Contracts 00 70 10
5. Standard General Conditions in Section 00 72 05
6. Supplementary Conditions listed in Section 00 73 05
7. General Requirements, Specifications and Drawings as listed in the table of contents of the Contract Documents
8. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto:
City of Salem, MA Specifications AGREEMENT FORM
Bobrek Engineering & Construction 00 52 10 - 7
a. Notice to Proceed
b. Work Change Directives
c. Change Orders
B. The documents listed in Paragraph 9.01.A are attached to this Agreement and made a part hereof.
C. There are no Contract Documents other than those listed above in this Article 9.
D. The Contract Documents may only be amended, modified, or supplemented as provided in Paragraph 3.04 of the Standard General Conditions and Supplementary Conditions, if any.
ARTICLE 10 – MISCELLANEOUS
10.01 Terms
A. Terms used in this Agreement will have the meanings stated in the Standard General Conditions and Supplementary Conditions, if any.
10.02 Assignment of Contract
A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.
10.03 Successors and Assigns
A. Owner and Contractor each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents.
10.04 Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision.
City of Salem, MA Specifications AGREEMENT FORM
Bobrek Engineering & Construction 00 52 10 - 8
IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement. Counterparts have been delivered to Owner and Contractor. All portions of the Contract Documents have been signed or have been identified by Owner and Contractor or on their behalf.
This Agreement will be effective on ______________________ (which is the Effective Date of the Agreement).
OWNER:___________________________________ CONTRACTOR: ___________________
SALEM, MASSACHUSETTS
By: ___________________________________________By: ____________________________
____________________________________________ Printed Name___________________
City Administrator Title___________________________
Attest: ___________________ Attest: ___________________
Title___________________ Title___________________
Address for giving notices: ___________________ Address for giving notices: __________
Pursuant to MGL c.44, s31C, I certify that an appropriation has been made in the total amount of the Agreement.
City/Accountant (Name) ___________________ Date: ___________________
The following items included in this Section are attached to and are incorporated into the Agreement and made a part thereof.
TO BE COMPLETED AFTER AWARD LISTING ITEMS FROM SUCCESSFUL BIDDER
• Performance Bond
• Payment Bond
• Insurance certificates
END OF SECTION
City of Salem, MA Specifications STATUTORY PROVISIONS FOR MA PUBLIC CONST. CONTRACTS
Bobrek Engineering & Construction 00 70 10 - 1
SECTION 00 70 10
STATUTORY PROVISIONS FOR MASSACHUSETTS
PUBLIC CONSTRUCTION CONTRACTS – Addendum #1
PART 1 - TABLE OF CONTENTS
Paragraph Subject Statute or Executive Order
ARTICLE 1 – PAYMENT, CONTRACT ADMINISTRATION, ETC.
1.1 “or Equal” Clause M.G.L. Chapter 30, Section 39M(b)
1.2 Delays M.G.L. Chapter 30, Section 39O
1.3 Deviations M.G.L. Chapter 30, Section 39I
1.4 Finality of Decisions M.G.L. Chapter 30, Section 39J
1.5 Differing Site Conditions M.G.L. Chapter 30, Section 39N
1.6 Timely Decisions M.G.L. Chapter 30, Section 39P
1.7 Certificate of Appropriation M.G.L. Chapter 44, Section 31C
1.8 Method of Payment M.G.L. Chapter 30, (Public Building projects) Section 39K
1.9 Method of Payment M.G.L. Chapter 30, (Public Works Projects) Section 39G
Bobrek Engineering & Construction 00 70 10 - 2
1.10 Direct Payment M.G.L. Chapter 30, Section 39F
1.11 Discharge or Release of Bonds M.G.L. Chapter 30, Section 40
ARTICLE 2 – WAGES AND EMPLOYMENT PRACTICES
2.1 Preference to Veterans M.G.L. Chapter 149, and Citizens Section 26
2.2 Determination of Wage Rates M.G.L. Chapter 149, Section 27
2.3 Employment Records M.G.L. Chapter 149, Section 27B
2.4 Wages Paid to Operators of M.G.L. Chapter 149, Trucks and Other Equipment Section 37F
2.5 Reserve Police Officers M.G.L. Chapter 149, Section 34B
2.6 Eight-hour Day, etc. M.G.L. Chapter 149, Sections 30 and 34
2.7 Lodging, etc. M.G.L. Chapter 149, Section 25
2.8 Access to Contractor’s Records Executive Order No. 195
2.9 Worker’s Compensation M.G.L. Chapter 149, Insurance Section 34A
ARTICLE 3 – CONTRACTOR’S ACCOUNTING METHODS
3.1-3.5 Contractor’s Accounting M.G.L. Chapter 30, Method Requirements Section 39R
Bobrek Engineering & Construction 00 70 10 - 3
ARTICLE 4 – MISCELLANEOUS
4.1 Weather Protection M.G.L. Chapter 149, Section 44F(1)
4.2 Form for Sub-Contract M.G.L. Chapter 149, Section 44F(4)(c)
4.3 Foreign Corporations M.G.L. Chapter 30, Section 39L
4.4 Shoring M.G.L. Chapter 149, Section 129A
4.5 Compliance with Tax Laws M.G.L. Chapter 62C, Section 49A
PART 2 - STATUTORY PROVISIONS FOR MASSACHUSETTS PUBLIC CONSTRUCTION PROJECTS
The following provisions are required by or are intended to be consistent with requirements of
Massachusetts statutes governing public construction contracts in the Commonwealth of Massachusetts
(hereinafter referred by statute to be included herein shall be deemed to be so included. In addition, the parties recognize that other rights, duties, and obligations with respect to public construction contracts are provided for in the Contract Documents. In case of conflict between the provisions of these Statutory
Provisions and other provisions in the Contract Documents, the provisions of these Statutory Provisions shall govern. In case of conflict between the provisions of these Statutory Provisions and the provisions of any applicable statute, the statutory provisions shall govern. Where the term “awarding authority” appears in the following paragraphs, it shall be taken as meaning the Contracting Authority.
ARTICLE 1 – PAYMENT, CONTRACT ADMINISTRATION, etc.
1.1 “Or Equal” Clause: (Statutory reference: M.G.L. Chapter 30, Section 39M(b))
This Paragraph 1.1 applies to every contract subject to M.G.L. Chapter 30, Section 39M(b).
This Paragraph 1.1 applies to every contract for the construction, reconstruction or repair of any public work or for the purchase of any material by the Commonwealth, any political subdivision thereof, or any county, city, town, district or housing authority (above certain dollar limits, as stated in the statute), and to contracts awarded pursuant to M.G.L. Chapter 149, Sections 44A through 44H. The said Sections 44A through 44H apply to every contract for the construction, Bobrek Engineering & Construction 00 70 10 - 4 reconstruction, installation, demolition, maintenance or repair of any building by a department, agency, board, commission, authority, or other instrumentality or the Commonwealth or political subdivision thereof, or two or more subdivisions thereof, but not including the Massachusetts Bay
Transportation Authority, estimated to cost more than a dollar amount set forth in M.G.L. Chapter
149, Section 44A.
Every such contract shall provide that an item equal to that named or described in the said specifications may be furnished. Where products or materials are prescribed by manufacturer name, trade name, or catalog reference, the words “or approved equal” shall be understood to follow. An item shall be considered equal to the item so named or described if, in the opinion of the awarding authority:
a. It is at least equal in quality, durability, appearance, strength, and design;
b. it will perform at least equally the function imposed by the general design for the public work being contracted for or the material being purchased, and;
c. it conforms substantially, even with deviations, to the detailed requirements for the items as indicated by the specifications. For each item of material the specifications shall provide for either a minimum of three named brands of material or a description of material which can be met by a minimum of three manufacturers or producers, and for the equal of any one of said name or described materials.
Any structural or mechanical changes made necessary to accommodate substituted equipment under this paragraph shall be at the expense of the Contractor or Subcontractor responsible for the work item. See other paragraphs of General and Supplementary Conditions for procedures to be used in determining compliance with the standards of this paragraph.
1.2 Delays: (Statutory reference: Chapter 30, Section 39O). This Paragraph 1.2 applies to every contract subject to M.G.L. Chapter 30, Section 39M and to every contract subject to Chapter 149, Sections 44A through 44H.
In the event a suspension, delay, interruption or failure to act of the awarding authority increases the cost of performance to any subcontractor, that subcontractor shall have the same rights against the general contractor for payment for an increase in the cost of his performance as provisions (a) and (b) give the general contractor against the awarding authority, but nothing in provisions (a) and (b) shall in any way change, modify or alter any other rights which the general contractor or the subcontractor may have against each other.
Except as otherwise provided by law and by this Paragraph 1.2, the Contractor shall not be entitled to damages on account of any hindrances or delays, avoidable or unavoidable; but if such delay
Bobrek Engineering & Construction 00 70 10 - 5 be occasioned by the awarding authority, the Contractor may be entitled to an extension of time only, in which to complete the work, to be determined by the Architect.
(a) The awarding authority may order the general contractor in writing to suspend, delay, or interrupt all or any part of the work for such period of time as it may determine to be appropriate for the convenience of the awarding authority; provided however, that if there is a suspension, delay or interruption for fifteen days or more or due to a failure of the awarding authority to act within the time specified in this contract, the awarding authority shall make an adjustment in the contract price for any increase in the cost of performance of this contract but shall not include any profit to the general contractor on such increase; and provided further, that the awarding authority shall not make any adjustment in the contract price under this provision for any suspension, delay, interruption or failure to act to the extent that such is due to any cause for which this contract provides for an equitable adjustment of the contract price under any other contract provisions.
(b) The general contractor must submit the amount of a claim under provision (a) to the awarding authority in writing as soon as practicable after the end of the suspension, delay, interruption or failure to act and, in any event, not later than the date of final payment under this contract and, except for costs due to a suspension order, the awarding authority shall not approve any costs in the claim incurred more than twenty days before the general contractor notified the awarding authority in writing of the act or failure to act involved in the claim.
1.3 Deviations: (Statutory referenced: M.G.L. Chapter 30, section 39I) This Paragraph 1.3 applies to every contract for the construction, alteration, maintenance, repair or demolition of, or addition to, any public building or public works for the Commonwealth or any political subdivision thereof.
The Contractor shall perform all the work required by this contract in conformity with the plans and specifications contained therein. No willful and substantial deviation from said plans and specifications shall be made unless authorized in writing by the awarding authority or by the
Engineer or Architect in charge of the work who is duly authorized by the awarding authority to approve such deviations. In order to avoid delays in the prosecution of the work required by such contract, such deviation from the plans or specifications may be authorized by a written order of the awarding authority or such Engineer or Architect so authorized to approve such deviation.
Within thirty days thereafter, such written order shall be confirmed by a certificate of the awarding authority stating:
(1) If such deviation involves any substitution or elimination of materials, fixtures or equipment, the reasons why such materials, fixtures or equipment were included in the first instance and the reasons for substitution or elimination, and, if the deviation is of any other nature, the reasons for such deviation, giving justification therefore;
Bobrek Engineering & Construction 00 70 10 - 6
(2) that the specified deviation does not materially injure the project as a whole;
(3) that either the work substituted for the work specified is the same cost and quality, or that an equitable adjustment has been agreed upon between the awarding authority and the
Contractor and the amount in dollars of said adjustment; and
(4) that the deviation is in the best interest of the awarding authority.
Such certificate shall be signed under the penalties of perjury and shall be a permanent part of the file record of the work contracted for.
Whoever violates any provision of this section willfully and with intent to defraud shall be punished by a fine of not more than five thousand dollars or by imprisonment for not more than six months, or both.
1.4 Finality of Decisions by Awarding Authority or Architect: (Statutory reference: M.G.L. Chapter 30, Section 39J) This Paragraph 1.4 applies to every contract for the construction, reconstruction, alteration, remodeling, repair or demolition of any public building or public works by the
Commonwealth or by any county, city, district, board, commission, or other public body, when the amount of the contract exceeds the amount stated in M.G.L. Chapter 30, Section 39J.
Notwithstanding any contrary provision of this contract, a decision by the contracting body or by any administrative board, official or agency, or by any architect or engineer, on a dispute, whether of fact or of law, arising under said contract shall not be final or conclusive if such decision is made in bad faith, fraudulently, capriciously, or arbitrarily, is unsupported by substantial evidence, or is based upon error of law.
1.5 Differing Site Conditions: (Statutory reference: M.G.L. Chapter 30, Section 39N) This Paragraph
1.5 applies to every contract subject to M.G.L. Chapter 30, Section 39M and to every contract subject to M.G.L. Chapter 49, Sections 44A through 44H.
If, during the progress of the work, the Contractor or the awarding authority discovers that the actual subsurface or latent physical conditions encountered at the site differ substantially or materially from those shown on the plans or indicated in the Contract Documents, either the
Contractor or the contracting authority may request an equitable adjustment in the contract price of the contract applying to work affected by the differing site conditions. A request for such an adjustment shall be in writing and shall be delivered by the party making such claim to the other party as soon as possible after such conditions are discovered. Upon receipt of such a claim from a Contractor, or upon its own initiative, the awarding authority shall make an investigation of such physical conditions, and, if they differ substantially or materially from those shown on the plans or indicated in the Contract Documents or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the plans and Contract Documents
Bobrek Engineering & Construction 00 70 10 - 7 and are such a nature as to cause an increase or decrease in the cost of the work, the contracting authority shall make an equitable adjustment in the contract price and the contract shall be modified in writing accordingly.
1.6 Timely Decision by Awarding Authority: (Statutory reference: M.G.L. Chapter 30, Section 39P) This
Paragraph 1.6 applies to every contract subject to M.G.L. Chapter 30, Section 39M, and to every contract subject to M.G.L. Chapter 149, Sections 44A through 44H.
In every case in which this contract requires the awarding authority, any official, its Architect or
Engineer to make a decision on interpretation of the specifications, approval of equipment, material or any other approval, or progress of the work, the decision shall be made promptly and, in any event, no later than thirty days after the written submission for decision; but if such decision requires extended investigation and study, the awarding authority, the official, Architect or
Engineer shall, within thirty days after the receipt of the submission, give the party making the submission written notice of the reasons why the decision cannot be made within the thirty-day period and the date by which the decision will be made.
1.7 Certificate of Appropriation: (Statutory reference: M.G.L. Chapter 44, Section 31C) This
Paragraph 1.7 applies to contracts for construction, reconstruction, alteration, remodeling, repair or demolition of any public building or public work by any city or town costing more than the amount set forth in M.G.L. Chapter 44, Section 31C.
This Contract shall not be deemed to have been made until the auditor or accountant or other officer of the city or town having similar duties has certified thereon that an appropriation in the amount of such contract is available therefor and that an officer or agent of the city, town, or awarding-authority has been authorized to execute said contract and approve all requisitions and change orders. No order to the Contractor for a change in or addition to the work to be performed under a contract subject to this section, whether in the form of a drawing, plan, detail or any other written instruction, unless it is an order which the Contractor is willing to perform without any increase in the contract price, shall be deemed to have been given until the auditor or accountant, or other officer of the awarding authority having similar duties, has certified thereon that an appropriation in the amount of such order is available therefor; but such certificate shall not be construed as an admission by the awarding authority of its liability to pay for such work. The certificate of the auditor or accountant or other officer of the awarding authority having similar duties, that an appropriation in the amount of such contract or order is available shall bar any defense by the awarding authority on the ground of insufficient appropriation; and any law barring payment in excess of appropriations shall not apply to amounts covered by any certificate under this section.
1.8 Method of Payment: (Statutory reference: M.G.L. Chapter 30, Section 39K) This Paragraph 1.8 applies to every contract for the construction, reconstruction, alteration, remodeling, repair or
Bobrek Engineering & Construction 00 70 10 - 8 demolition of any public building by the Commonwealth, or by any county, city, town, district, board, commission or other public body, when the amount is more than two thousand dollars, or the amount set forth in M.G.L. Chapter 30, Section 39K.
1.8.1 Within fifteen days after receipt from the Contractor, at the place designated by the awarding authority if such a place is so designated, of a periodic estimate requesting payment of the amount due for the preceding month, the awarding authority will make a periodic payment to the Contractor for the work performed during the preceding month and for the materials not incorporated in the work but delivered and suitably stored at the site (or at some location agreed upon in writing) to which the Contractor has title or to which a Subcontractor has title and has authorized the Contractor to transfer title to the awarding authority, upon certification by the contractor that he is the lawful owner and that the materials are free from all encumbrances, but less (1) a retention based on its estimate of the fair value of its claims against the Contractor and less (2) a retention for direct payments to Subcontractors based on demands for same in accordance with the provisions of Paragraph 1.10 of these Statutory Provisions, and less (3) a retention not exceeding five percent of the approved amount of the periodic payment. After the receipt of a periodic estimate requesting final payment and within sixty-five days after (a) the Contractor fully completes the work or substantially completes the work so that the value of the work remaining to be done is, in the estimate of the awarding authority, less than one percent of the original contract price, or (b) the Contractor substantially completes the work and the awarding authority takes possession for occupancy, whichever occurs first, the awarding authority shall pay the contractor the entire balance due on the contract less (1) a retention based on its estimate of the fair value of its claims against the Contractor and of the cost of completing the incomplete and unsatisfactory items of work and less (2) a retention for direct payments to
Subcontractors based on demands for same in accordance with the provisions of Paragraph 1.10 of these
Statutory Provisions, or based on the record of payments by the Contractor to the Subcontractors under this contract if such record of payment indicates that the Contractor has not paid Subcontractors as provided in Paragraph 1.10. If the awarding authority fails to make payment as herein provided, there shall be added to each such payment daily interest at the rate of three percentage points above the rediscount rate then charged by the Federal Reserve Bank of Boston commencing on the first day after said payment is due and continuing until the payment is delivered or mailed to the contractor; provided, that no interest shall be due, in any event, on the amount due on a periodic estimate for final payment until fifteen days…after receipt of such periodic estimate from the Contractor, at the place designated by the awarding authority if such a place is so designated. The Contractor agrees to pay to each Subcontractor a portion of any such interest paid in accordance with the amount due each Subcontractor.
1.8.2 The awarding authority may make changes in any periodic estimate submitted by the Contractor, and the payment due on said periodic estimate shall be computed in accordance with the change so made, but such changes or any requirement for a corrected periodic estimate shall not affect the due date for the periodic payment or the date for the commencement of interest charges on the amount of the periodic payment computed in accordance with the changes made, as provided herein; provided, that the awarding authority may, within seven days after receipt, return to the
Contractor for correction, any periodic estimate which is not in the required form or which contains computations not arithmetically correct and, in that event, the date of receipt of such periodic estimate shall be the date of receipt of the corrected periodic estimate in proper form and with arithmetically correct computations. The date of receipt of a periodic estimate received on a Saturday shall be the first working
Bobrek Engineering & Construction 00 70 10 - 9 day thereafter.
1.8.3 All periodic estimates shall be submitted to the awarding authority, or to its designee as set forth in writing to the Contractor, and the date of receipt by the awarding authority or its designee shall be marked on the estimate.