27-13-TAP IFB Manual - Temporary Shoring Museum Place Garage.pdf

PDF 1 MB Posted

Attached to
Temporary Shoring at Museum for the Museum Place Garage
Solicitation number
27-13-TAP
Issued by
Essex County, Massachusetts

About this file

Summary

This is an Invitation for Bid (IFB) manual for temporary shoring work at the Museum Place Garage, issued by the Commonwealth of Massachusetts. The project scope includes installation of temporary structural shoring at specified locations, temporary blocking of parking spaces to facilitate shoring installation, determination of required shoring based on field-verified demand loads and locations, and removal of loose concrete in designated areas. The work will be performed under a single prime contract, with all general bidders required to maintain DCAMM (Division of Capital Asset Management and Maintenance) certification for general construction. The project manual contains contract documents including drawings and specifications that define the complete scope of work requirements.

The procurement process requires responses from qualified general contractors meeting state certification requirements. Specific information regarding pricing terms, bid submission deadlines, site visit requirements, pre-bid conferences, contract award timeline, and contract term details should be referenced within the complete project manual and associated bidding documents. All prospective bidders must review the contract documents thoroughly to understand technical requirements, shoring specifications, and project conditions prior to submission of their bids.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Salem, MA

Invitation for Bids

27-13-TAP

for

Temporary Shoring for the Museum Place Garage

August 19, 2026

PROPOSALS DUE:

11:00 AM, September 10, 2026

Late Bids Will Be Rejected

DELIVER COMPLETED SUBMISSIONS TO:

City of Salem Purchasing Department Attn: Anthony Delaney

93 Washington Street, Salem, MA 01970

(978) 619-5695 adelaney@salem.com

INSTRUCTIONS TO BIDDERS

BID NO. 27-13-TAP

1.01 - PROPOSAL

1. Sealed bids will be received at the time and place as designated by the Owner in the “Invitation For

Bid.”

2. Proposal envelopes shall be clearly marked “Sealed Bid” and addressed to: City of Salem, Purchasing

Department, Salem City Hall, 93 Washington Street, Salem, MA 01970.

3. Bids shall be submitted in duplicate. Bid envelopes shall have bidder’s company name and address on the outside.

4. No claims for immunity or exceptions predicated upon misunderstanding or failure to correctly interpret the “Invitation for Bid” or the contract Documents will be allowed.

1.02 - BID SETS

1. Bid sets will be available at the Purchasing Office, Salem City Hall, 93 Washington Street, Salem, Massachusetts as well as on www.salem.com/bids. There is no cost for copies of the bid sets.

1.03 – PRE-BID CONFERENCES AND SITE VISITS

1. A mandatory pre-bid meeting/site visit is scheduled for this project for August 27 at 10:00am at the

Museum Place (Downtown) Garage located at 1 New Liberty Street, Salem, Massachusetts.

1.04 - QUALIFICATION AND LICENSING

1. All General Bidders are notified that they must have a Certificate of Eligibility for GENERAL

CONSTRUCTION work from the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in accordance with Massachusetts General Laws Chapter 149-Section 44D and as amended by Section 46 of Chapter 48 of the Acts of 1984 when specified in the Invitation to Bid.

A. General Bidders shall submit with their bid proposal a Certificate of Eligibility and an Update

Statement as issued by the Division of Capital Asset Management. Failure to submit this information may result in the rejection of the bid.

2. All Bidders are notified that they must be licensed under prevailing state and local laws and regulations governing the proposed work.

3. All work and materials shall comply in every respect with the building laws, state and town regulations, and the directions of the inspector of buildings and such building laws, regulations and directions are to be considered as a part of the Contract to which it relates.

1.05- BID WITHDRAWAL

1. Withdrawal or modifications to bids will be allowed only if written notice of a Bidder’s desire to http://www.salem.com/ withdraw or modify his/her bid is filed prior to the time of bid opening and at the place specified in the request for bids. A notice of a Bidder’s desire to withdraw or modify a bid must be signed by the Bidder or his/her designated representative.

2. No bid may be withdrawn for a period of thirty (30) days after the scheduled closing time for the receipt of bids. The Owner reserves the right to accept or reject in whole or in part any or all bids, or take whatever other action that may be deemed to be in its best interest.

1.06 - LOCATION OF SITE

1. The project location is the Museum Place (Downtown) Garage located at 1 New Liberty Street, Salem, Massachusetts.

1.07 – BID/CONTRACT DOCUMENTS

1. The Contract Documents consist of the following:

1. Specifications/Scope of Services.

2. All the terms and conditions as contained and outlined in this IFB.

3. Drawings as indicated in the Specifications, if applicable.

4. Addenda to Specifications and drawings, if any.

5. The sample construction contract agreement.

6. The City issued Purchase Order.

1.06- OWNER

1 Where the term Owner is used in these Specifications, and other Contract Documents, same refers to

City of Salem, Massachusetts, or its authorized representative.

1.09 – ENGINEER/ARCHITECT

1. Where the term Engineer/Architect appears in these Specifications, same refers to FRENCH &

PARRELLO ASSOCIATES, PA.

1.07- CONTRACTOR

2 Where the term Contractor or General Contractor is used in the Specifications, it shall mean the Contractor mentioned as such in the Agreement.

3 Where reference is made to Subcontractors, such reference is intended for reasons of clarification and the relationship between the Contractor and said Subcontractors shall be in accordance with the General Conditions.

1.11 - EXPLANATION TO BIDDERS

1. No oral interpretation will be made. Any interpretations made to bidders will be in the form of an addendum to the Specifications and Drawings that will be forwarded to all bidders.

2. Discrepancies, omissions or doubts as to the meaning of Specifications and drawings should be communicated at once to the Chief Procurement Officer for interpretation. This request for clarification must be made in writing, via email (adelaney@salem.com), prior to the bid opening. Bidders should act promptly and allow sufficient time for a reply to reach them before the submission of their bids and any interpretation made by the Chief Procurement Officer and/or the Engineer/Architect prior to receipt of bids shall be made a part of the Contract.

3. Requests for clarifications by a prospective Bidder regarding the specifications, or other bid documents must be presented in writing, via email (adelaney@salem.com), to the Chief Procurement Officer before the bids are opened. Requests shall include the project specification name and date, and shall be directed to the Chief Procurement Officer.

4. Verbal explanations or instructions will not be binding during the bidding process. Only written addenda are binding. Written addenda resulting from requests for clarifications will be delivered to all listed holders of the Bid Documents no later than (3) business days prior to the bid opening. Addenda may be issued after this date if deemed to be in the best interests of the City by the Chief Procurement Officer. All Bidders shall acknowledge the receipt of all addenda when submitting their bids.

5. In the absence of an interpretation by the Chief Procurement Officer and/or Engineer/Architect should the Specifications disagree in themselves or with the drawings, the better quality or the greater quantity of work or materials shall be estimated upon and, unless otherwise ordered, shall be furnished.

1.12- CONDITIONS OF WORK

1. Each bidder shall carefully examine the Contract Documents, shall visit the site, and fully inform himself as to all existing and controlling conditions and limitations. The submission of a bid shall be conclusive evidence that the Bidder is familiar with all such conditions, including the nature, amount, and location of the work, the type of facilities needed preliminary to and during the execution of the work, the general and local conditions, labor conditions, and all other matters which might in any way affect or have a bearing on the work or its cost.

2. The Contractor shall include all charges for labor, material, tools, staging, equipment and supervision that he/she deems necessary in order to complete, in a thoroughly professional and expeditious manner, all the work described hereafter. All work shall be according to code and approved by the proper authority. Material having salvage value shall become the property of the City of Salem. All other material and debris accumulated as a result of this operation shall become the property of the contractor and shall be removed from the premises by him/her. The premises are to be clean and neat, to the satisfaction of the City of Salem and/or designated Consultant.

1.13 - PERMITS, FEES AND NOTICES

1. The successful bidder shall secure all permits and licenses necessary for the proper execution and completion of the work.

mailto:adelaney@salem.com

2. The Owner will waive or pay for, as applicable, fees for all necessary permits.

1.14 - COOPERATION AND COORDINATION

1. The Owner has entered, or may enter, into separate contracts for work related to the work under this specification.

2. The successful bidder shall cooperate with said contractors and coordinate his work with the work of other trades so that construction will proceed in a rapid and orderly fashion.

1.15 - TIMELY COMPLETION AND LIQUIDATED DAMAGES

1. The Contractor shall start the work under this Contract on written notice on or around September 14, 2026. The Contractor shall start the work on the date set by the Owner and shall continue, without interruption, to completion with all the practical dispatch and regularity. The project shall reach substantial completion no later than October 16, 2026.

2. Liquidated damages in the amount of $500 per day may be enforced should the Contractor not complete the work in full by the dates stated.

1.16 - CONTRACT FORM

1. The successful Bidder will be notified of the award of the Contract in writing, and shall properly execute a contract in accordance with the construction contract agreement within five (5) working days after receipt of such notification.

1.17 - ADDENDA

1. The Owner may, during the bidding period, advise the Bidders by addenda of additions, omissions, or alterations in the Specifications and drawings. All such changes shall become a part of the contract and shall be included in the work covered by the Proposal.

2. No addenda will be issued later than three (3) days prior to the date set for receipt of bids, unless deemed to be in the public’s best interest to do so by the Chief Procurement Officer.

1.18 - TAXES

1. The Owner is exempt from all purchaser taxes. Tax Exempt Number will be supplied to the successful bidder.

1.19 - PROPOSAL SECURITY

1. Each Bidder shall submit with his bid a Bid Security in the amount of five percent (5%) of the total bid price. The Bid Security shall consist of Cash, Certified Check, or Bidder’s Bond.

1.20 – LABOR/MATERIALS PAYMENT BOND & PERFORMANCE BOND

1. Before Contract signing, the Contractor shall furnish the Owner with a Labor/Materials Payment Bond and a Performance Bond both in the amount of one hundred percent (100%) of the Contract price, to insure completion of work and payment for all labor and materials furnished on the project.

2. The bonds shall be written in conformance with Massachusetts General Laws, Chapter 149, Section 29, as amended.

1.21– CONTRACTOR’S LIABILITY INSURANCE

1. See the insurance requirements and minimum coverage amounts listed in the attached Contract.

1.22 – COMPETENCY OF BIDDERS AND REFERENCES

1. No contract will be awarded to any person, firm, or corporation that is in arrears or is in default to the

Owner upon any debt or contract, or that is a defaulter, as surety or otherwise, upon any obligation to the Owner, or has failed to perform faithfully any previous contract with the Owner.

2. All Bidders must supply a list of references for similar projects performed over the last three years providing names, addresses and contract person with telephone number on each project. This reference list is to be submitted with the bid.

1.23 - AWARD & EXECUTION OF CONTRACT

1. This contract shall be awarded to the lowest responsible and eligible bidder based upon the grand total as indicated on the bid price sheet and as in accordance with MGL Ch. 149. Such a bidder must possess the skill, ability and integrity necessary for the faithful performance of the work and shall establish his ability to comply with the schedule of work outlined in the Contract section. The term “lowest responsible and eligible bidder” as used herein shall mean the bidder whose bid is the lowest of those bidders possessing the skill, ability and integrity necessary for the faithful performance of the work within the time limit allowed.

2. Subcontracts other than those for which Sub-Bids are required shall be negotiated by the General Contractor who shall furnish a list of all Subcontractors to the Owner, through the Architect, upon request. The receipt of such list, and the approval or absence of approval of any subcontractor on such list, shall not be interpreted as, and shall not constitute, an approval of any such subcontractor by the Awarding Authority under G.L. c. 30, § 39F.

3. The selected General Bidder must agree to commence work within five (5) days of execution of a

General Contract and to substantially complete all Work in accordance with the phasing schedule contained in the Contract Documents.

1.24 – PAYMENT OF MA PREVAILING WAGE

1. Attached copies of Prevailing Wage Rates and the Statement of Compliance forms from Mass. Dept. of Labor and Industries shall apply to the labor required to perform all work. Those rates must be reviewed and complied with. Certified Weekly Payroll documents shall be sent to the Purchasing Office, 93 Washington Street, 2nd Floor, Salem, MA 01970 or emailed directly to adelaney@salem.com. They shall be sent Three (3) business days after the close of the previous workweek.

1.26. CORI

1. Within one week upon request by the City of Salem, the company shall submit, in writing, the names of all persons authorized to perform the work as described in the Scope of Services under this contract.

Accompanying each name shall be a completed CRIMINAL OFFENDER RECORD INFORMATION (CORI) ACKNOWLEDGEMENT FORM (See Attached) and a photocopy of the driver’s current appropriate license. Only those persons submitted to the City may perform the work as needed.

1.27 PREPARATION OF GENERAL BIDS

A. Each General Bid shall be submitted on the prescribed FORM FOR GENERAL BID.

B. Each General Bid shall submit one original copy of their bid to the City.

C. Every bid which is not accompanied by a bid deposit, in the amount of five percent (5%) of the total bid price, or which does not otherwise conform to sections 44A-44H, inclusive, of Chapter 149 of the General Laws, or which is on a form not completely filled in, or which is incomplete, conditional or obscure, or which contains any addition not called for, will be rejected. All blank spaces on the bid form shall be filled in, in ink or type- written, in words and figures, without alterations or erasures. Use figures alone only where no space is provided for words. Every bid shall be signed in longhand by the Bidder and shall give the Bidder’s business address.

D. All bids for this Project are subject to the provisions of Massachusetts General Laws (Ter. Ed.), Chapter 30, Section 39M as amended and Chapter 149, Sections 44A through 44L inclusive and Chapter 149, Sections 26 through 27D inclusive.

1.28 SUBMISSION OF GENERAL BIDS

A. Each General Bid shall be submitted on the FORM FOR GENERAL BID furnished by the Owner, or copied from the bound Project Manual. All blank spaces shall be filled in, in ink or typewritten, in words or figures without alterations or erasures. Use figures alone only where no space is provided for words.

The FORM FOR GENERAL BID must be signed in longhand by the General Bidder and shall give the general bidder’s business address. The Form for General Bid, including the Bid Security, shall be enclosed in a sealed envelope with the following plainly marked on the outside:

GENERAL BID FOR:

TEMPORARY SHORING FOR MUSEUM PLACE (DOWNTOWN) GARAGE

If the Bid is mailed, the Bidder shall enclose his sealed Bid in an outer envelope, addressed as follows:

FROM: General Bidder's Name and Business Address

To: Anthony P. Delaney Salem City Hall

93 Washington St.

Salem, MA 01970

1. Each General Bidder shall include the following with their Bid:

a. Form for the General-Bid

b. Bid Security

c. DCAMM Certificate of Eligibility

d. Contractor Update Statement, DCAMM Form

B. As required by M.G.L., c. 149, Section 44D, every General Bid must be accompanied by a Certificate of Eligibility issued by the Division of Capital Asset Management. Each General Bid shall also be accompanied by an updated statement on the form prescribed by said Division. Any General Bid submitted without the appropriate Certificate and update statement shall be invalid.

C. All bidders are cautioned to allow ample time for transmittal of Bids. Bids received after the specified time and date will not be accepted nor recognized. The time of receipt will determine the acceptability of mailed bids, regardless of postmark.

D. Any bid may be withdrawn prior to the time scheduled for the opening of such bids or authorized postponement thereof. No bid may be withdrawn for thirty (30) days, Saturdays, Sundays and legal holidays excluded, after opening of General Bids. No telephone or telegraphic bid, change in bid or withdrawal of bid will be received nor recognized.

FORM FOR GENERAL BID

To: City of Salem, Massachusetts, Awarding Authority

From: ___________________________________________________________________ Contractor

A. TEMPORARY SHORING FOR MUSEUM PLACE (DOWNTOWN) GARAGE:

1. BASE BID: The undersigned proposes to furnish all labor and materials required for Project located in Salem, Massachusetts, in accordance with the accompanying plans and specifications prepared by French & Parrello Associates, PA, specified below, subject to additions and deductions, if applicable, according to the terms of the specifications, for the lump sum price of

____________________________________________________________________ Dollars

(Total contract price in words, which governs)

(Total contract price amount in numbers)

B. ADDENDA: This Bidder has received, and this bid includes, the following addenda of which receipt is hereby acknowledged:

Date Number

C. CONTRACT: The undersigned agrees that, if he is selected as general contractor, he will within ten

(10) days, Saturdays, Sundays and legal holidays excluded, after presentation thereof by the awarding authority, execute a contract in accordance with the terms of this bid and furnish a performance bond and also a labor and materials or payment bond, each of a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the awarding authority and each in the sum of the contract price, the premiums for which are to be paid by the general contractor and are included in the contract price.

D. EXAMINED CONDITIONS & DOCUMENTS: The undersigned Bidder hereby declares that he has visited the site, the conditions present, and has carefully examined the Contract Documents, together with all Addenda issued, received and acknowledged below, and has familiarized himself with the legal requirements (federal, state, and local laws, ordinances, and rule and regulations) and other conditions which may affect the cost, progress or performance of Work, and has made independent investigations, deemed necessary by the Bidder.

E. LABOR: The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work and that he will comply fully with all laws and regulations applicable to awards made subject to section forty-four A of Chapter 149 of the Massachusetts General Laws.

F. CERTIFICATE OF ELIGIBILITY: The undersigned has included with this Bid his Certificate of Eligibility and Update Statement as required by the General Laws.

G. NON-COLLUSION CERTIFICATION: The undersigned certifies under the penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this Paragraph, the word "person" shall mean any natural person, joint venture, partnership, corporation, or other business or legal entity.

H. OSHA COMPLIANCE CERTIFICATION: The undersigned agrees that if he is selected as the contractor, he will comply with the provisions of M.G.L. Chapter 30, Section 39S. The undersigned certifies, under penalties of perjury, that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that all employees to be employed in the work subject to this bid have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration.

I. TAXES: As required by MGL, Chapter 62C, s49A, the undersigned certifies that the bidder has complied with all laws of the Commonwealth relating to taxes.

J. DEBARMENT: The undersigned further certifies under penalties of perjury that the said undersigned is not presently debarred from doing public construction work in the Commonwealth under provisions of Section 29F of Chapter 29, or any other applicable debarment provisions of any other Chapter of the General Laws or any rule or regulation promulgated thereunder.

K. TIME OF COMPLETION: If selected Contractor the undersigned agrees to begin and complete the work as specified in the Contract Documents.

L. AUTHORITY RIGHTS: The Bidder understands the Awarding Authorities right to reject any and all bids.

Should the Invitation to Bid, Instruction to Bidders, Form For General Bid, Conditions of the Contract, Plans or Specifications require submission of special data to accompany the Bid, the Awarding Authority reserves the right to rule the bidder’s failure to submit such data an informality and to receive said data subsequently, within a reasonable time as set by the Authority.

The Bidder acknowledges that no proposal may be withdrawn for 30 days, Saturdays, Sundays, and legal holidays excluded, after opening of bids per MGL c. 149, 44A(3).

Date: ____________________________

Name of Bidder: ____________________________

By: ____________________________ ________________________________ (Signature) (Title of Person Signing Bid)

(Business Address)

(City and State)

Telephone Fax E-Mail

SALEM, MA

IFB No. 27-13-TAP

REFERENCES FORM

Bidders Name:_____________________________________________________ Bidders Address:___________________________________________________

Bidder must provide references for similar type projects performed within the past three years.

Attach additional pages if necessary.

Reference:___________________________________ Contact:______________ Address: ____________________________________ Phone: _______________ ____________________________________________ Fax: _________________ Description and date of Project:_________________________________________

Reference:___________________________________ Contact:______________ Address: ____________________________________ Phone: _______________ ____________________________________________ Fax: _________________ Description and date of Project:_________________________________________

Reference:___________________________________ Contact:______________ Address: ____________________________________ Phone: _______________ ____________________________________________ Fax: _________________ Description and date of Project:_________________________________________

Reference:___________________________________ Contact:______________ Address: ____________________________________ Phone: _______________ ____________________________________________ Fax: _________________ Description and date of Project:_________________________________________

USE ADDITIONAL PAGES IF NECESSARY

CORPORATE VOTE

At a duly authorized meeting of the Board of Directors of ______________________________ _______________________________ held on ________________________ at which all the Directors were present or waived notice, it was voted that ______________________________, __________________________ of this company, be and he/she hereby is authorized to execute contracts and bonds in the name and behalf of said company, and affix its Corporate Seal thereto, and such execution of any contract or obligation in this company’s name on its behalf by ___________________________________, shall be binding upon this company.

A TRUE COPY ATTEST:

Clerk, Date of this Contract

I hereby certify that I am the Clerk of ____________________________________, that _________________________________ is duly elected ________________________ of said company, and the above vote has not been amended or rescinded and remains in full force and effect as of the date of this contract.

Clerk Corporate Seal

SWORN TO AND SUBSCRIBED BEFORE ME THIS _________ DAY OF _______________,

Notary Public

If a corporation, complete above or attach to each signed copy of the bid/written request/quotation, a notarized copy of vote of corporation authorizing the signatory to sign this bid/written request/quotation form. If attesting clerk is the same person as the individual executing this contract, have signature notarized above.

1 New Liberty Street City of Salem, Massachusetts 01970

BID SET

Key Project Information

Project Address 1 New Liberty Street, Salem MA 01917 Published Date Wednesday, AUGUST 19, 2026 MANDATORY Pre-Bid Site Visit (at project location)

Thursday, AUGUST 27, 2026, at 10:00 AM EDT

Bidders’ Questions Due Tuesday, SEPTEMBER 1, 2026, at 11:00 AM EDT Responses to Bidders Thursday, SEPTEMBER 3, 2026 BID DUE Thursday, SEPTEMBER 10, 2026 Anticipated Contract Award Monday, SEPTEMBER 14, 2026 Estimated Commencement Monday, SEPTEMBER 14, 2026 Estimated Substantial Completion Friday, OCTOBER 16, 2026 Bid Security 5% of Total Bid Price Payment Bond Requirements 50% of Contract Value

Bid Questions and Information

Purchasing Department Bid Manager Name Anthony P. Delaney, Chief Procurement Officer Bid Manager Email adelaney@salem.com Bid Manager Phone Number (978) 619-5695

Managing Department Information

Managing Department City of Salem Transportation Department Project Manager Name David Kucharsky, Director of Transportation Project Manager Email dkucharsky@salem.com Project Manager Phone Number (978) 619-5697

Engineer of Record Information

Prime Consultant, Engineer French & Parrello Associates, PA Engineer Address 100 Massachusetts Avenue, 5th Floor, Boston MA 02115 Engineer Specialty Structural Engineering Engineer Contact Name Christine McLaughlin Engineer Contact Email Christine.McLaughlin@FPAengineers.com

Minimum General Contractor (GC)’s Requirements to be submitted:

Qualifications and Experience: Previous experience installing temporary shoring, preferably in parking garages. Proof, references, and examples illustrate at least 5 years of recent installation experience with at least 10 installations of similar complexity, size, and cost.

mailto:dkucharsky@salem.com mailto:Christine.Mclaughlin@FPAengineers.com

Temporary Shoring for Museum Place (Downtown) Garage August 18, 2026 BID SET Page 2

TABLE OF CONTENTS

DIVISION 00: PROCUREMENT/ CONTRACTING REQUIREMENTS

Cover Sheet Owner’s “Front End Specifications” Instructions to Bidders Bid No. 27-13-TAP General Bid Form A. Price (Lump Sum)

B. Addenda (if any) C. Alternates (not applicable) D. Unit Prices (chart to be filled in by bidder) N. Authority Rights (signature)

References Form Corporation Vote Contract No. 27-13-TAP City of Salem Contract for Services over $10,000 Certificate of Tax Compliance Certificate of Corporate Authority Attachments: Prevailing Wages

DVISION 01: GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 22 00 Unit Prices 01 31 00 Project Management and Coordination 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 77 00 Closeout Procedures

DIVISION 02: EXISTING CONDITIONS

02 10 00 Shoring

ENCLOSURES:

01 GARAGE PLAN (LEVEL 1 RAMP)

02 GARAGE PLAN (LEVEL 1)

03 GARAGE PLAN (LEVEL 2)

BID SET Page 3

SECTION 01 11 00: SUMMARY OF WORK

PART 1 – GENERAL

1) RELATED DOCUMENTS

a) All Contract Documents, including the conditions and general requirements of the Contract, Divisions 00 and 01, apply to the work under this Section.

b) The contractor shall carefully examine all the Contract Documents for requirements that may affect the exact scope of work and provide all material, labor, and equipment needed to furnish a complete Project.

2) SUMMARY

This Section Includes:

a) Project Information

b) Scope of Work Covered by Contract Documents

c) Owner-Furnished Products

d) Contractor-Furnished and installed remaining Materials

e) Access to Site

f) Coordination with Garage and Facilities

g) Work Restrictions

h) Specifications and Drawing conventions

3) PROJECT INFORMATION

a) Project Identification: “TEMPORARY SHORING FOR MUSEUM PLACE (DOWNTOWN) GARAGE”

i) Project Location: 1 New Liberty Street, Salem MA 01970

ii) Previously known as “Museum Place” Garage

b) Owner: City of Salem

i) Project Management: Transportation Department

(1) David Kucharsky, Director of Transportation

(2) 98 Washington Street, 2nd Floor, Salem, MA 01970

ii) Procurement: Purchasing Department

(1) Anthony Delaney, Chief Procurement Officer

(2) 93 Washington Street, 2nd Floor, Salem, MA 01970

iii) Owner’s Representative: French & Parrello Associates, PA (FPA, Engineer, Prime Consultant)

(1) Christine McLaughlin; Christine.McLaughlin@FPAengineers.com (Project Manager, PE)

(2) 100 Massachusetts Avenue, 5th Floor, Boston MA 02116

4) SCOPE OF WORK COVERED BY CONTRACT DOCUMENTS

a) The scope of work is defined by the Contract Documents (Drawings and Specifications in this Project Manual). Work includes but is not limited to the following:

i) Installation of temporary structural shoring at locations specified in Drawings and Specifications.

ii) Temporary blocking of parking spaces for installation of shoring.

iii) Determination of required shoring based on field-verified demand loads and locations.

iv) Removal of loose concrete in specified locations.

b) The project will be performed under a single prime contract.

i) Shoring inspections shall be performed by a Massachusetts licensed Professional Engineer.

mailto:Christine.McLaughlin@FPAengineers.com

BID SET Page 4

ii) Work on this Project shall commence after September 14, 2026, after the Notice to Proceed by Owner, be substantially completed on October 16, 2026, and be ready for occupancy by October 16, 2026.

c) Before commencing Work, the Contractor shall submit an installation schedule showing the sequence of work, commencement, and completion dates for the Work. A Massachusetts licensed Professional Engineer shall submit delegated shoring calculations and drawings to the Engineer of Record (FPA) for review and approval prior to the start of installation.

5) OWNER-FURNISHED PRODUCTS

a) The Work does not include the use or installation of Owner-furnished products.

6) CONTRACTOR-FURNISHED AND INSTALLED REMAINING MATERIALS

a) The Contractor shall be responsible for furnishing and installing all equipment to complete the Work.

7) ACCESS TO SITE

a) Contractor shall have limited use of Project site for installation operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.

b) Driveways, walkways, entrances, exits and stairways shall be kept clean and free of debris at the end of each workday.

i) Keep driveways, entrances and exits serving premises clear and available to Owner, Owner’s employees, and emergency vehicles at all times. Do not use these areas for parking or storing materials unless approved by the Owner.

(1) Schedule deliveries to minimize the use of driveways and entrances/ exits by installation operations.

(2) Schedule deliveries to minimize space and time requirements for storing materials and equipment on-site.

(3) Any parking spaces that must be restricted to complete the installation shall be approved by the

Owner before Work commences.

(4) Any restrictions to driveways, entrances/ exits and stairways shall be approved by the Owner before Work commences, and

c) Contractor will repair any damage caused by installation operations at the Contractor’s expense and to the original condition it was found.

8) COORDINATION WITH OCCUPANTS AND FACILITIES

a) Contractor shall cooperate with garage users (Occupants) and Owner during construction operations to minimize conflicts and facilitate usage. Perform the Work to avoid interfering with the Occupant’s day-to-day activities.

i) Maintain access to existing driveways, walkways, entrances and exits for usage of garage. Access to a maximum of 50 spaces may be permitted during the installation. Do not close or obstruct lanes or walkways, or more than 50 spaces without written permission from the Owner and approval of authorities having jurisdiction.

ii) Notify the Owner not less than 72 hours before activities that will affect the Occupant’s operations.

b) Owner reserves the right to occupy completed portions of garage after Substantial Completion of the

Work, provided such occupancy does not interfere with the completion of the Work. Such limited occupancy shall not constitute acceptance of the total Work.

i) Owner’s Representative will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied prior to Owner’s acceptance of the completed Work.

BID SET Page 5

9) WORK RESTRICTIONS

a) Work shall be completed no later than November 30, 2026, with substantial completion by October 16, 2026. Any work not completed by this timeframe must be substantially completed and brought up to a safe condition and completed after November 9, 2026.

b) Work Restrictions, General: Comply with restrictions on installation operations.

i) Comply with limitations on the use of public streets and other requirements of authorities having jurisdiction.

c) On-Site Work Hours: 7 a.m. to 7 p.m., Monday through Friday, unless otherwise indicated.

d) Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utilities services according to requirements indicated.

i) Notify Owner and Owner’s Representative not less than two (2) days in advance of proposed utilities interruptions.

ii) Obtain Owner’s written permission before proceeding wit utility interruptions.

e) Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, strong odors, or other disruptions to Owner occupancy with Owner.

i) Notify Owner not less than two (2) days in advance of proposed disruptive operations.

ii) Obtain Owner’s written permission before proceeding with disruptive operations.

f) Controlled Substances: Tobacco products and other controlled substances are not permitted on the Project site and School property.

g) Employee Identification: Provide Owner identification tags for Contractor personnel working on the Project site. Require personnel to use identification tags at all times.

h) Employee Screening: Comply with Owner's requirements for drug and background screening (i.e., CORI forms) of Contractor personnel working on the Project site.

i) Maintain list of approved screened personnel with Owner and Owner's Representative.

10) SPECIFICATIONS AND DRAWING CONVENTIONS

a) Where discrepancies are found between the Project’s Specifications and Drawings, the more stringent of the two will prevail when complying with safety and code requirements unless otherwise noted on the Contractual Drawings.

b) Contractor shall submit a Request for Information (RFI) to resolve discrepancies between Specifications and Drawings. Refer to Section 01 31 00: Project Management and Coordination.

c) Drawings are shown for reference. All dimensions should be measured and verified in field by the Contractor.

BID SET Page 6

PART 2 – PRODUCTS (Not Used)

PART 3 – EXECUTION

1) MEANS AND METHODS

a) The Contractor shall be responsible for performing a site visit to determine the loads to be supported by the temporary shoring.

b) Sequencing of installation shall be submitted to the Owner for approval prior to commencing Work.

c) Shoring is to be placed along the inverted Tee-beam girder line as well as affected double Tee beam ends.

d) Center of shoring supports at double Tee beam ends shall be at least two (2) feet away from the nearest vertical face

e) Shoring shall be continuous through all lower levels to a suitable bearing surface. Shoring installed at upper levels shall be vertically aligned and supported by shoring below, continued to ground. Temporary re-shoring calculations are required for lower-level framing when those members are used to transfer vertically aligned and/or discontinuous construction loads.

2) ENGINEER RECOMMENDATIONS

Temporary Shoring is required to support the following locations:

1. East of Column line 2A-3A – Level 1C

• All double tee beams between columns supporting overhang, install shoring on both ends adjacent to columns.

• Shoring to restore parking to this zone is considered a priority.

2. Column 3C – Level 1C

• Install shoring at double tee beams, adjacent to column.

o Double tee-beam east of Column 3C.

o Double tee-beam at Column 3C.

• Install shoring at inverted Tee support beam immediately below noted double tee beams.

3. Columns 2E-G (West of Stair 1) – Level 1C

• Adjacent to column 2E, install shoring at double tee-beams adjacent to column, and additional tee-beam adjacent to stair.

• At columns 2F and 2G, install shoring at adjacent double tee-beams.

Shoring is to be designed by the contractor. Final design is to be signed and sealed by a MA licensed PE and reviewed by Owner with assistance from Engineer for compliance.

BID SET Page 7

SECTION 01 22 00: UNIT PRICES

PART 1 – GENERAL

1) The Unit Prices set forth herein shall be used to determine any equitable adjustment of the Contract Price in connection with the changes or extra work performed under this Contract as directed by the Owner.

2) It is mutually understood and agreed that such Unit Prices include all items of costs, equipment, taxes, and insurance of every kind, overhead, and profit for the Contractor, and they shall be used uniformly, without modification for addition and deductions. Prices listed under ADDITIONS and DEDUCTIONS are to be the total price billed to and paid by the Owner. There can be no more than fifteen (15) percent difference in price between the additions and deductions.

3) Sufficient prior notice shall be given in accordance with the General Conditions so that proper measurements of materials removed or to be replaced may be taken. All quantities used to determine additions to, or deductions from, the Contract Price due to Unit Prices shall only be those determined and approved by the Owner in advance.

i) The unit price bid shall be taken to include all labor and materials necessary to make the item of work complete in place.

ii) In the case of substituting items shown on the Drawings or called for in the Contract Documents, the change to the Contract Price for both items deleted (Deductions) and items added (Additions), if of the same class of work, shall be based on the addition column.

4) UNIT PRICES FORM

All reference to items shall correspond to work as described in the relevant portions of the Construction Documents, unless otherwise indicated, including all labor and materials for installation.

ITEM DESCRIPTION UNIT ADDITIONS DEDUCTIONS Owner

Approval

1. Temporary Structural Shoring EA. $ $

2. Project Mobilization LS. $ $

END OF SECTION

BID SET Page 8

SECTION 01 31 00: PROJECT MANAGEMENT AND COORDINATION

PART 1 – GENERAL

1) RELATED DOCUMENTS

a) All contract documents, including the general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

i) Related Sections:

(1) Section Related Requirements:

(2) Section 01 33 00 "Submittals"

(3) Section 01 11 00 "Access”, “Coordination with Occupants and Facilities”, and “Execution" for procedures for coordinating general installation and field-engineering services.

(4) Section 01 77 00 "Closeout Procedures" for coordinating closeout of the Contract.

a) This section includes the administrative provisions for coordinating construction operations on the Project, including but not limited to the following:

i) Informational Submittals

ii) Coordination procedures.

iii) Coordination drawings.

iv) Request for Information (RFIs)

v) Project Meetings (Pre-Installation)

3) INFORMATIONAL SUBMITTALS

a) Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those to furnish products or equipment fabricated to a special design. Include the following information in tabular form:

i) Name, address, and telephone number of entity performing subcontract or supplying products.

ii) Number and title of related Specification Section(s) covered by subcontract.

iii) Drawing number and detail references, as appropriate, covered by subcontract.

b) Key Personnel Names: Within 15 days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home, office, and cellular telephone numbers and e-mail addresses. Provide names, addresses, and telephone numbers of individuals assigned as alternates in the absence of individuals assigned to Project.

i) Provide updated copies of the list to the school office, in addition to the Owner and Owner’s

Representative. Keep the list current at all times.

4) COORDINATION PROCEDURES

a) Coordinate installation operations in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate operations in different Sections that depend on each other for proper installation, connection, and operation.

i) Schedule operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

ii) Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

BID SET Page 9

iii) Make adequate provisions to accommodate items scheduled for later installation.

b) Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and ensure the Work's orderly progress. Such administrative activities include, but are not limited to, the following:

i) Preparation of Contractor's Construction Schedule.

ii) Preparation of the Schedule of Values.

iii) Installation and removal of Temporary Facilities and Controls.

iv) Delivery and processing of Submittals.

v) Progress Meetings.

vi) Preinstallation Conferences.

vii) Project Closeout Activities.

c) Conservation: Coordinate construction activities to ensure that operations are carried out considering energy, water, and materials conservation. Coordinate the use of temporary shoring to minimize waste:

i) Salvage materials and equipment involved in performance of, but not incorporated into, the Work.

See other Sections for disposition of salvaged materials designated as Owner's property.

5) COORDINATION DRAWINGS

a) General: Prepare coordination drawings according to requirements in individual Sections, and additionally, where installation is not completely shown on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity:

i) Content: Project-specific information drawn accurately to a scale large enough to indicate and resolve conflicts. Do not base coordination drawings on standard printed data. Include the following information, as applicable:

(1) Use applicable Drawings as a basis for preparation of coordination drawings. (For example, sections, elevations, and details as needed to describe the relationships of various systems and components).

(2) Contractor shall field-verify conditions as needed for preparation of coordination drawings.

(3) Coordinate the addition of trade-specific information to the coordination drawings by multiple contractors in a sequence that best coordinates the information and resolution of conflicts between installed components before submitting for review.

(4) Indicate space requirements for routine maintenance and anticipated replacement of components during the life of the installation.

(5) Indicate required installation sequences.

(6) Indicate dimensions shown on the Drawings. Specifically, note dimensions that conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Owner’s Representative indicating proposed resolution of such conflicts. Minor dimension discrepancies and difficult installations will not be considered changes to the Contract.

b) Review: Owner’s Representative will review coordination drawings to confirm that the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility. If Owner’s Representative determines that coordination drawings are not being prepared in sufficient scope or detail, or are otherwise deficient, Owner’s Representative will so inform Contractor, who shall make changes as directed and resubmit.

c) Coordination Drawing Prints: Prepare coordination drawing prints according to requirements in Section 01 33 00 "Submittal Procedures”.

BID SET Page 10

d) Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements:

i) File Preparation Format: AutoCAD, Version 2018 or newer, operating in Microsoft Windows system.

ii) File Submittal Format: Submit or post coordination drawing files using Portable Data File (PDF) format.

iii) Owner’s Representative may furnish digital files of enclosed Drawings upon request.

iv) Owner’s Representative makes no representations of the accuracy or completeness of digital data files related to field conditions.

v) Digital Data Software Program: Drawings are available in AutoCAD Civil 3D 2025, Windows Operating

System.

6) REQUESTS FOR INFORMATION (RFIs)

a) General: Upon discovering the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit a digital RFI form using Portable Data File (PDF) format.

b) Coordinate and submit RFIs promptly to avoid delays in the Contractor's work or work of Subcontractors.

c) Content of the RFI: Include a detailed, legible description of the item needing information or interpretation and the following:

(1) Project name.

(2) Project number.

(3) Date.

(4) Name of Contractor.

(5) Name of Owner’s Representative.

(6) RFI number, numbered sequentially.

(7) RFI subject.

(8) Specification Section number and title and related paragraphs, as appropriate.

(9) Drawing number and detail references, as appropriate.

(10) Field dimensions and conditions, as appropriate.

(11) Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract

Time or the Contract Sum, Contractor shall state impact in the RFI.

(12) Contractor's signature.

(13) Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

(a) Include dimensions, distances, column grid references, and details of affected materials, assemblies, and structural elements on attached sketches.

d) Owner’s Representative and Owner’s Action: Owner’s Representative will review each RFI, determine the action required, and respond. Allow seven (7) working days for Owner’s Representative response for each RFI. RFIs received by Owner’s Representative after 1:00 p.m. will be considered as received the following working day.

e) Incomplete RFIs or inaccurately prepared RFIs will be returned to the Contractor.

f) Owner’s Representative’s action may include a request for additional information, in which case Owner’s

Representative’s time for response will date from time of receipt of additional information.

g) Owner’s Representative’s action on RFIs that may result in a change to the Contract Time or the Contract

Sum may be eligible for the Contractor to submit a Change Proposal. Contractor shall coordinate with the Owner for Change Proposal format.

h) If Contractor believes the RFI response warrants a change in the Contract Time or the Contract Sum, notify Owner’s Representative and Owner in writing within 10 days of receipt of the RFI response.

BID SET Page 11

i) On receipt of Owner’s Representative’s action, update the RFI log and immediately distribute the RFI response to affected parties. Review the response and notify Owner’s Representative within seven days if Contractor disagrees with a response.

i) Identify related Minor Changes in the Work, Construction Change Directive, and Proposal Request, as appropriate.

ii) Identify related Field Order, Work Change Directive, and Proposal Request, as appropriate.

7) PROJECT MEETINGS

a) General: Schedule and conduct meetings and conferences shall occur at Project site unless otherwise indicated by Owner.

b) Pre-construction meeting: within 5 days following Notice to Proceed or per Owner’s requirements, a pre-construction conference will be scheduled before starting construction at a time convenient to Owner and Owner’s Representative.

i) The pre-construction conference shall review responsibilities and personnel assignments.

ii) Attendees: Authorized representatives of Owner (Owner's Commissioning Authority); Owner’s

Representatives (Engineer of Record); Contractor and its superintendent; major subcontractors; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with the Project and authorized to conclude matters relating to the Work.

iii) Agenda: discuss items of significance that could affect progress, including the following:

(1) Tentative construction schedule.

(2) Phasing.

(3) Critical work sequencing and long-lead items.

(4) Designation of key personnel and their duties.

(5) Lines of communications.

(6) Procedures for processing field decisions and Change Orders.

(7) Procedures for RFIs.

(8) Procedures for testing and inspecting.

(9) Procedures for processing Applications for Payment (Pay Apps).

(10) Distribution of the Contract Documents.

(11) Submittal procedures.

(12) Sustainable design…