27_07 Engineering Design Services for SR 42 P.pdf
PDF 522 KB Posted
- Solicitation number
- PE-67500-NONST-2027-000000169
- Issued by
- Henry County, Georgia
About this file
This is a Request for Qualifications (RFQ) issued by Henry County, Georgia for engineering design services through the Georgia Department of Transportation (GDOT) for State Route 42 improvements. Henry County seeks qualified consultant firms to provide comprehensive design services for approximately 5.48 miles of road improvements on State Route 42 from Bill Gardner Parkway to SR 155 (GDOT PI #0021214, RFQ-27-07). The scope of work encompasses concept development documentation, environmental studies, traffic analysis, utility coordination, and preliminary engineering services through the construction phase. Statements of Qualifications are due by 3:00 PM on September 15, 2026, with a deadline for written questions by August 27, 2026. The solicitation follows a two-phase selection process: Phase I evaluates Statements of Qualifications based on project manager and key team leader experience and qualifications (30%), and resources and workload capacity (20%); Phase II requests technical approaches (40%) and past performance information (10%) from three to five shortlisted finalists. The final contract will be awarded as a Multi-Phase, Project Specific agreement to one firm and is anticipated to remain in effect through successful completion of construction engineering and inspection services.
The contract amount will be determined through negotiations with the County and may be structured as a Lump Sum, Cost Plus Fixed Fee, Cost per Unit of Work, or Specific Rate of Compensation arrangement. The prime consultant must be prequalified by GDOT in Two-Lane or Multi-lane Rural Roadway Design (3.01) and Two-Lane or Multi-lane Urban Roadway Design (3.02) area classes. The team must collectively maintain prequalification in numerous additional area classes including NEPA, environmental studies, traffic analysis, surveying, hydraulics, utilities, and erosion control. All respondents must comply with the Georgia Security and Immigration Compliance Act and provide notarized certifications regarding audit and accounting systems, conflict of interest, and historical performance. Firms must demonstrate adequate accounting systems meeting 48 CFR Part 31 requirements, maintain current CPA overhead audits if aggregate contract amounts exceed $250,000, and provide proof of required insurance coverage including workers compensation, commercial general liability ($2,000,000 aggregate), professional liability ($1,000,000), and umbrella coverage ($2,000,000). Communication regarding the solicitation is restricted until award announcement, with all inquiries directed to the Henry County Purchasing Department.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Posted: 8/13/2026
Request for Qualifications
To Provide
Engineering Design Services
GDOT PI #0021214
State Route 42 (from Bill Gardner Parkway to SR 155)
RFQ-27-07
Qualifications Due: September 15, 2026
Henry County Government 140 Henry Parkway
McDonough, GA 30253
v. 9-18-19
REQUEST FOR QUALIFICATIONS
27-07
Engineering Design Services
I. General Project Information
A. Overview Henry County is soliciting Statement of Qualifications (SOQs) from qualified firm(s) or organization(s) to provide consultant services for Design Services for P.I. # 0021214 State Route 42 (from Bill Gardner Parkway to SR 155).
This Request for Qualifications (RFQ) seeks to identify potential providers for the Scope of Services for the project/contract listed in Exhibit I. Firms that respond to this RFQ, and are determined by Henry County to be sufficiently qualified, may be deemed eligible, and invited to offer a technical approach and/or possibly present and/or interview for these services. All respondents to this RFQ are subject to instructions communicated in this document, and are cautioned to completely review the entire RFQ and follow instructions carefully. GDOT reserves the right to reject any or all Statements of Qualifications or Technical Approach, and to waive technicalities and informalities at the discretion of Henry County.
B. IMPORTANT- A RESTRICTION OF COMMUNICATION IS IN EFFECT FOR THIS PROJECT.
From the advertisement date of this solicitation until successful respondents are selected and the award is made official and announced, firms are not allowed to communicate about this solicitation or scope with any staff or officials outside of the Purchasing Department. The submission of questions as instructed in the RFQ, should be directed to the Purchasing Department as stated in RFQ Section VIII.C. For violation of this provision, Henry County reserves the right to reject the submittal of the offending respondent.
C. RESERVED
D. Scope of Services
Under the terms of the resulting Agreement, the selected consultant will provide Design Services for P.I. #0021214, State Route 42 (Bill Gardner Parkway to SR 155). The anticipated scope of work for the project/contract is included in Exhibit I.
In addition, Henry County desires that the Consultant have the ability to provide, either with its own forces or through a sub-consultant team member, comprehensive services necessary to fulfill all preliminary engineering services which may arise during the project cycle.
E. Contract Term and Type
Henry County anticipates one (1) Multi-Phase, Project Specific contract to be awarded to one (1) firm, for the project/contract identified. Henry County anticipates that the Contract Type may be Lump Sum, Cost Plus Fixed Fee, Cost per Unit of Work or Specific Rate of Compensation. As a Project Specific contract, it is the Henry County’s intention that the Agreements will remain in effect until successful completion of the construction engineering and inspection services phase of the projects.
F. Contract Amount
The Multi-Phase, Project Specific contract amount will be determined via negotiations with the County. If the County is unable to reach a satisfactory agreement and at reasonable rates to be paid for the services to be provided, the County reserves the right to terminate negotiations with the highest scoring finalist and begin negotiations with the next highest scoring finalist.
II. Selection Method
A. Method of Communication
All general communication of relevant information regarding this solicitation will be made via the Georgia Procurement Registry (GPR) and through the County’s eProcurement Portal at (https://procurement.opengov.com/portal/henryga). All firms are responsible for checking these sites on a regular basis for updates, clarifications, and announcements. Henry County reserves the right to communicate via electronic-mail with the primary contact listed in the Statements of Qualifications. Other specific communications will be made as indicated in the remainder of this RFQ.
B. Phase I - Selection of Finalists
Based on the Statements of Qualifications submitted in response to the projects/contracts listed in this RFQ, the Selection Committee will review the Experience and Qualifications and Resources and Workload Capacity listed in Section IV. Selection Criteria for Phase I. The Selection Committee will discuss the top submittals and the final rankings of the top submittals will be determined. From the final rankings of the top submittals, the Selection Committee will identify three (3) to five (5) firms which will be shortlisted.
All firms must meet the minimum requirements as listed in Section IV.A. below.
C. Finalist Notification for Phase II
Firms selected and shortlisted as finalists will receive notification and final instructions from GDOT regarding the Phase II – Technical Approach response.
D. Phase II - Finalists Response on Technical Approach and Past Performance
Henry County will request a Technical Approach of the three (3) to five (5) finalist firms for the project/contract.
Henry County reserves the right to request a presentation/interview on any project/contract as determined in its best interests; however, this additional requirement shall typically be reserved for the most complex projects. Each finalist firm shall be notified in writing and informed of the Technical Approach due date. Any additional detailed Technical Approach instructions and requirements, beyond that provided in Section V. Selection Criteria for Phase II, for the finalists will be provided in the Finalist Notification. All members of the Selection Committee will review the Technical Approach (and will attend the presentation/interview if so chosen). Firms shall not address any questions, prior to the award announcement, to anyone other than the designated contact.
E. Final Selection
Final selection will be determined by carrying the scores from Phase I forward for each Finalist and by evaluating the Technical Approach and Past Performance criteria for Phase II. The Selection Committee will discuss the Finalist’s Phase II Responses and the final rankings will be determined.
Negotiations will then be initiated with the top-ranked firm(s) to finalize the terms and conditions of the contract(s), including the fees to be paid. In the event a satisfactory agreement cannot be reached with the highest-ranking firm(s), Henry County will formally terminate the negotiations and possibly enter into negotiations with the second highest-ranking firm, and so on in turn until a mutual agreement is established and GDOT awards a contract. The final form of the contract shall be developed by GDOT.
III. Schedule of Events
The following Schedule of Events represents Henry County’s best estimate of the Schedule that will be followed. All times indicated are prevailing times in Atlanta, Georgia. Henry County reserves the right to adjust the Schedule as Henry County deems necessary.
https://procurement.opengov.com/portal/henryga
IV. Selection Criteria for Phase I - Criteria for Evaluation of Statements of Qualifications
A. Area Class Requirements and Certification
Presented teams must be prequalified in the indicated Area Class(es) in order to be evaluated. Required proof of prequalification shall be submitted as indicated in Section VI.B.4. below. All Submittals will be pre-screened to verify that the Prime consultant has the required Area Class(es) and that the overall team has the required Area Class(es). Any submittal in which the Prime consultant or the overall team area class requirements are not met will be disqualified from further consideration.
Each submittal will require a certification to allow the County to analyze risks in determining if any Firm should be ineligible for award. The certification shall cover a wide variety of information. Any firm which responds in any potentially concerning manner must provide additional information as directed herein for consideration by GDOT to determine if Firm is eligible for award.
B. Project Manager, Key Team Leader(s) and Prime’s Experience and Qualifications – 30%
The Selection Committee will evaluate all firms on their Experience and Qualifications, which shall account for a total of thirty (30%) percent of the total evaluation. The following criteria for scoring Phase I of the evaluation will be utilized to determine which firms are shortlisted:
1. Project Manager education, registration, relevant engineering experience, relevant project management experience, experience in utilizing GDOT specific processes, manuals, or guidance.
2. Key Team Leaders’ education, registration, relevant technical experience, and relevant experience in utilizing
GDOT specific processes, manuals, or guidance.
3. Prime Consultant’s experience in delivering projects of similar complexity, size, scope, and function.
C. Project Manager, Key Team Leader(s) and Prime’s Resources and Workload Capacity – 20%
The Selection Committee will evaluate all firms on their Resources availability and Workload Capacity which shall account for a total of twenty (20%) percent of the total evaluation. The following criteria for scoring the Resources and Workload Capacity will be utilized to determine which firms are shortlisted:
1. Project Manager Workload
2. Workload capacity of Key Team Leader(s)
3. Resources dedicated to delivering project
PHASE I DATE TIME
a. Henry County issues public advertisement of RFQ-27-07 8/13/2026 ----------
b. Deadline for submission of written questions and requests for clarification 8/27/2026 3:00 PM
c. Deadline for addendum publication 9/3/2026 3:00 PM
d. Deadline for submission of Statements of Qualifications 9/15/2026 3:00 PM
e. Henry County completes evaluation and issues notification and other information to finalist firms
TBD TBD
PHASE II
f. Deadline for submission of written questions from finalists TBD TBD
g. Phase II Response of Finalist firms due TBD TBD
4. Ability to Meet Project Schedule
V. Selection Criteria for Phase II - Criteria for Evaluation of Technical Approach and Past Performance
A. Technical Approach – 40%
The Selection Committee will evaluate the shortlisted firms (Finalists) on their Technical Approach, which shall account for a total of forty (40%) percent. The Selection Committee shall utilize the following additional criteria for scoring Phase II of the evaluation to determine the highest ranked/most qualified (NOTE: Scores from Phase I will be carried forward and combined with the scores from the Phase II to determine the final ranking of Finalists):
1. Provide any unique technical approaches your firm offers relative to addressing anticipated design concepts, use of any alternative methods for delivery (if applicable), and/or management of the project.
2. Identify any unique challenges of the project and how your firm intends to mitigate these challenges, including quality control, quality assurance procedures.
3. Provide any specific qualifications, skills, knowledge of the project and project area which may uniquely benefit the firm and project, and your ability and willingness to meet time requirements.
B. Past Performance – 10%
The Selection Committee may consider information provided via references provided for relevant projects, knowledge any selection committee member has of performance on relevant projects, and performance evaluations or knowledge presented on GDOT projects. The Selection Committee will consider all factors in their totality and score from 0 to 10 when arriving at a final score for the Past Performance.
VI. Instructions for Content and Preparation of Statements of Qualifications – Phase I Response
The Statements of Qualifications submittal must be submitted in accordance with the instructions provided in
Section VIII, and must be organized, categorized using the same headings (in red), and numbered and lettered exactly as outlined below, and must be responsive to all requested information.
For the sections in which page number limits are stated, each section with a stated limit must begin on a new page and end on the last page allowed for the section. It is not allowed to begin new sections on a page allowed for a previous section, if applicable. This will enable the County to ensure compliance with the page limitations.
Cover page – Each project/contract submittal must have a separate cover page for each copy of each submittal for each project/contract and each must list the RFQ#, RFQ Title, proposing firm’s full legal name and the specific project contract being submitted on to include the Project Numbers, PI Numbers, County(ies), and Description.
A. Administrative Requirements
It is required to submit the information below for each copy of each submittal. This is general information and will not be scored but may be used to determine eligibility for selection. Under Administrative Requirements section, only submit the information requested; additional information will be subject to disqualification of your firm.
1. Basic company information:
A. Company name.
B. Company Headquarter Address.
C. Contact Information - Name and all contact information (telephone number(s) and e-mail address) of primary proposing contact (this will be the individual with whom the County will direct all communications).
D. Company website (if available).
E. Georgia Addresses - Identify and provide addresses for the offices located in the State of Georgia.
F. Staff - List the number and disciplines of staff members employed in each office in the State of Georgia.
G. Ownership - Provide form of ownership, including state of residency or incorporation, and number of years in business. Is the Offeror a sole proprietorship, partnership, corporation, limited liability Corporation, or other structure?
2. Certification Form - Complete the Certification Form (Exhibit “II” enclosed with RFQ), and provide a notarized original within the firm’s Statement of Qualifications. This is to be submitted for the Prime ONLY.
3. Georgia Security and Immigration Compliance Act Affidavit – Complete the form (Exhibit “III” enclosed with RFQ), and provide a notarized original within the firm’s Statement of Qualifications. This is to be submitted for the Prime ONLY.
4. Addenda - Signed cover page of any Addenda issued for the Prime ONLY.
B. Experience and Qualifications
1. Project Manager - Provide information pertaining to the project manager, including but not limited to:
a. Education.
b. Registration (if necessary and applicable.)
c. Relevant engineering experience.
d. Relevant project management experience for projects of similar complexity, size, scope, and function.
e. Relevant experience utilizing GDOT specific processes, manuals, or guidance (Plan Development Process, Design Policy, Environmental Procedures Manual, etc.).
This information is limited to two (2) pages maximum.
2. Key Team Leaders - Provide experience of Key Team Leaders (defined as those individuals who oversee project areas determined as particularly important to each specific project, refer to the Project Description in Exhibit I, specifically Section 7 for the list of Key Team Leaders for each Project). For each Key Team Leader identified provide:
a. Education.
b. Registration (if necessary and applicable.)
c. Relevant experience in the applicable resource area of the most relevant projects.
d. Relevant experience utilizing GDOT specific processes, manuals, or guidance (PDP, Design Policy, Environmental Procedures Manual, etc.) which are specific to the key team leader’s area.
This information is limited to one (1) page maximum for each Key Team Leader identified in Section 7 of each Exhibit I. Respondents submitting more than one (1) page for each Key Team Leader identified will be subject to disqualification. Respondents who provide more Key Team Leaders than what is outlined in the requirement will be subject to disqualification as this would provide an advantage over firms who complied with the requirement and had the required number of Key Team Leaders.
Respondents who do not provide the required Key Team Leaders will be subject to disqualification as this does not meet the requirements of the project and therefore would deem the respondent and its team unqualified for the award.
3. Prime Experience - Provide information on the prime’s experience and ability in delivering effective services for projects of similar complexity, size, scope, and function, which demonstrate the firm's capabilities to provide services for GDOT. For each project, the following information should be provided:
a. Client name, project location and dates during which services were performed.
b. Description of overall project and services performed by your firm.
c. Duration of project services provided by your firm, and overall project budget.
d. Experience utilizing GDOT specific processes, manuals, or guidance (PDP, Design Policy, Environmental
Procedures Manual, etc.)
e. Client(s) current contact information including contact names, telephone numbers and email address.
f. Involvement of Key Team Leaders on the projects.
This information is limited to two (2) pages maximum.
4. Area Class Summary Form and Notice of Professional Consultant Qualifications - Prime Consultants are defined as the firm submitting the Statement of Qualifications and the firm with whom Henry County will contract.
The Team is defined as the Prime Consultant and their sub-consultants, who are considered team members.
Prime Consultants and their sub-consultant team members must meet the Area Class requirements listed in Exhibit I for each project on which they apply. In regards to the required Area Classes, for each project/contract on which they apply, respondents should submit a summary form (example provided in Exhibit IV) which details the required area classes for the Prime Consultant and all sub-consultants or joint-venture of consultants on the team listed in the Statement of Qualifications. The area classes and firm’s meeting the area classes listed on the summary form must meet all required area classes or the team will be disqualified. If a team member’s prequalification will expire prior to the due date of the SOQs, documentation must be provided which shows that the firm has submitted its application for prequalification prior to the SOQ due date. The team must maintain its prequalification certification in order to be considered eligible for award if selected. Additionally, respondents should submit the Notice of Professional Consultant Qualifications (for the Prime Consultant and all sub-consultants for each project) issued by Henry County and attach after the Area Class summary form.
This information is limited to the one (1) page for the Area Class table (unless the project needs require an extensive list of area classes) and the required Notice of Professional Consultant Qualifications.
C. Resources/Workload Capacity
1. Overall Resources - Provide information regarding the overall resources dedicated to delivering the specific project, including:
a. Organizational chart which identifies the project manager, prime, Key Team Leaders, support personnel, and reporting structure. This chart may be submitted on a 11” x 17” page. (Excluded from the page count)
b. Primary Office - Identify and discuss the primary office which will be responsible for handling the specific project and the number and types of staff within the office and how this office could benefit the project and promote efficiency. This information to be included on the one (1) page with the Narrative on Additional Resource Areas and Ability.
c. Narrative on Additional Resource Areas and Ability – Respondents are to provide information regarding additional resource areas identified as important to the project, to discuss how the key areas will integrate and work together on the project, to discuss any information which is pertinent to these areas, to provide a narrative regarding how the organization of the team, including the PM and Key Team Leaders can deliver the project on schedule given their workload capacity. (Henry County recognizes that some individuals may be able to meet the schedule while carrying heavier project loads.) Respondents may discuss the advantages of your team and the abilities of the team members which will enable the project to meet the proposed schedule as identified in Exhibit I (where applicable). If there is no proposed schedule, discuss the advantages of the team and the abilities of the team members which will enable the project to move as expeditiously as possible. Respondents submitting more than the one (1) page allowed (combined for C1.b. and C1.c.) will be subject to disqualification.
d.
2. Project Manager Commitment Table - Provide a list of ALL projects (GDOT, other governments and private contracts – Information may be validated and any firm determined not to be listing all projects may be subject to disqualification) on which the proposed project manager is currently committed, to enable the County to ascertain the project manager’s availability. Utilize a table similar to the following format with a minimum of all criteria indicated to provide the requested information:
Project Manager
PI/Project # for GDOT Projects/Name of Customer for Non-GDOT Projects
Role of PM on Project
Project Description
Current Phase of Project
Current Status of Project
Monthly Time Commitment in Hours
3. Key Team Leader Project Commitment Table - Provide a table similar to the below, with a minimum of all criteria indicated, which identifies ALL projects the Key Team Leaders (refer to the Project Description in Exhibit I, specifically Section 7 for the list of Key Team Leaders for each Project) are committed on to enable the County to ascertain the available capacity.
Key Team
Leader
PI/Project # for GDOT Projects/Name of Customer for Non-GDOT Projects
Role of Key Team Leader on Project
Project Description
Current Phase of Project
Current Status of Project
Monthly Time Commitment in Hours
This information is limited to the organization chart (excluded from page count), [one (1) page of text to include both C1.b. Primary Office and C1.c. Narrative on Additional Resource Areas and Ability], and the tables.
VII. Instructions for Preparing Technical Approach and Past Performance Response – Phase II Response
The following information will only be requested of the shortlisted firms. The Selection Committee will evaluate the shortlisted firms using the information provided as requested below (NOTE: Scores from Phase I will be carried forward to Phase II):
The Phase II response must be submitted in accordance with the instructions provided in Section IX, and must be organized, categorized using the same headings (in red), and numbered and lettered exactly as outlined below, and must be responsive to all requested information. For the sections in which page number limits are stated, each section with a stated limit must begin on a new page and end on the last page allowed for the section. It is not allowed to begin new sections on a page allowed for a previous section, if applicable. This will enable the County to ensure compliance with the page limitations.
Phase II Cover page – Each submittal must have a separate cover page for each copy of each Phase II submittal and each must indicate the response is for Phase II, list the RFQ#, RFQ Title, proposing firm’s full legal name and the specific project contract being submitted on to include the Project Numbers, PI Numbers, County(ies), and Description.
A. Technical Approach
1. Provide any unique technical approaches your firm offers relative to addressing anticipated design concepts, use of any alternative methods for delivery (if applicable), and/or management of the project.
2. Identify any unique challenges of the project and how your firm intends to mitigate these challenges, including quality control, quality assurance procedures.
3. Provide any specific qualifications, skills, knowledge of the project and project area which may uniquely benefit the firm and project, and your ability and willingness to meet time requirements.
This information will be limited to a maximum of three (3) pages.
B. Past Performance
No additional information should be submitted to fulfill this requirement. Information from the relevant projects listed as well as information on file with the County will be used to fulfill this requirement.
Past performance may be evaluated through the checking of project references for the proposed project manager as well as the firm. The County will check these references at random. For this reason, attention should be paid to the references provided to ensure that the contact information provided is accurate and the individual references are reachable. Other past performance information which may be utilized includes GDOT consultant performance ratings as well as knowledge that any member of the Selection Committee has pertaining to the past performance of the firm on any project.
VIII. Instructions for Submittal for Phase I - Statements of Qualifications
A. Submittals must be typed on standard (8½” x 11”) paper. The pages should be numbered; however, submittal pages will be counted by section to determine compliance with page limits. Responses are limited to the page counts indicated in each section using a minimum of size 11 font. Page counts will be determined by pages with print on them, not by the physical piece of paper. Each Statement of Qualifications shall be prepared simply and economically as indicated above. Colored displays and promotional materials are not desired. Emphasis must be on completeness, relevance, and clarity of content.
NOTE: Additional pages other than what has been specified above in each section should not be included and will be grounds for disqualification. Submittals are limited to the information requested in Section VI.
Instructions for Content and Preparation of Statements of Qualifications – Phase I Response only. Hyperlinks or embedded video are not allowed.
B. These instructions will bind firms to terms and conditions herein set forth, except as specifically stated otherwise in special contract terms with any individual qualifications. These instructions are to be considered an integral part of the submittals.
Qualification documents may be submitted electronically, by mail, common carrier or delivered in person. Electronic proposals are to be submitted through the County’s eProcurement Portal at (https://procurement.opengov.com/portal/henryga). Emailed or faxed submittals are not acceptable. It shall be the duty of each proposer to ensure that their qualification documents are delivered within the time and at the place prescribed in this document. Qualifications received prior to the time fixed in this document will be securely kept unopened. A date/time stamp will be affixed to the envelope/package immediately upon its arrival to the Purchasing Department. Any submittals received at the office designated in this document after the exact time and date specified, will not be considered. If a late submittal is received via carrier, it will be marked “late” and will not be opened. If a late submittal is hand delivered, it will be returned unopened to the presenter. At the date and time specified for the opening of the qualifications, the submittals shall be publicly opened and the list of respondents will be read aloud. Hand delivered documents must be submitted in a sealed envelope/parcel and mailed or delivered on or before the date and time stated in this document to:
Henry County Purchasing Department 140 Henry Parkway
McDonough, Georgia 30253
RFQ #27-07
Engineering Design Services for State Route 42 (from Bill Gardner Parkway to State Route 155)
Attachment 1 must be reviewed and the Proposer is to comply with the order of the submittal of documents. This document along with a cover page is to be included with the qualification documents.The following items are to be included if proposals are submitted by mail, common carrier or delivered in person:
• One (1) unbound clearly marked “Original,” of the qualification documents
• One (1) digital version in PDF format on a USB flash drive identical to the original qualification documents. The USB flash drive should be labeled with the RFQ number and proposer’s name.
All qualification documents must be manually signed and filled out legibly (typewritten or printed in ink) with all changes or corrections initialed by the person signing the proposal.
If descriptive literature is attached to the qualifications, your firm’s name must be on all sheets submitted.
All qualifications submitted shall be deemed to have been made with full knowledge of all terms, conditions, and requirements contained in this request. The failure or omission of any firm to examine any form, instrument or document shall in no way relieve any firm from obligations in respect to the submittal or the compliance of the terms, conditions and requirements of the submittals.
Individual consultants shall provide their Social Security number and proprietorships, partnerships and corporations shall provide their Federal Employer Identification number on a completed W9 form and is to be submitted with the qualification documents.
The authorized representative whose signature will appear on the documents submitted certifies that the firm has carefully examined the instructions of this request for qualifications and the terms and specifications applicable to and made a part of this submittal.
Any documentation submitted with or in support of a firm’s qualifications shall become subject to public inspection under the Georgia Open Records Act. Labeling such information “Confidential”, “Proprietary”, or in any other manner shall not protect this material from public inspection upon request. All records become subject to public inspection only after award of the contract or purchase order.
Statements of Qualifications must be received by Henry County prior to the deadline indicated in the Schedule of Events (Section III of RFQ).
No submittals will be accepted after the time and date set for receipt.
All expenses for preparing and submitting responses are the sole cost of the party submitting the response. Henry County is not obligated to any party to reimburse such expenses. All submittals upon receipt become the property of Henry County. Labeling information provided in submittals “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until final award.
Henry County reserves the right, in its sole discretion, to waive any technicalities associated with this submittal if deemed in the best interest of the County.
C. Questions and Requests for Clarification
Questions about any aspect of the RFQ, or the project, shall be submitted in writing via e-mail to: Shawnviez Lilly, e-mail: slilly@henrycountyga.gov. The deadlines for submission of questions relating to the RFQ are the times and dates shown in the (Schedule of Events- Section III). From the issue date of this solicitation until a successful proposer is selected and the award is made official and announced, respondents are subject to the Restriction of Communication in Section I.B.
IX. Instructions for Submittal for Phase II – Technical Approach and Past Performance Response
THESE INSTRUCTIONS ARE INTENDED SOLELY FOR THOSE FIRMS IDENTIFIED AND NOTIFIED AS FINALISTS. Final Instructions will be provided to the Finalists in the notification.
Please note that each project/contract will follow an individual schedule which meets the availability of each Selection Committee. For this reason, the Notice to Selected Finalists and resulting Phase II responses may be on different schedules for each project/contract.
A. There is one (1) digital version on a USB flash drive required. The Submittal must follow the format and meet the content requirements identified in Section VII, entitled Instructions for Preparing Technical Approach and Past Performance Response - Phase II Response. See Attachment 1 for a summary of how the submittals should be prepared.
B. Submittals must be typed on standard (8½” x 11”) paper. The pages should be numbered; however, submittal pages will be counted by section to determine compliance with page limits. Responses are limited to the page counts indicated in each section using a minimum of size 11 font. Page counts will be determined by pages with print on them, not by the physical piece of paper. Each Statement of Qualifications shall be prepared simply and economically as indicated above. Colored displays, and promotional materials are not desired. Emphasis must be on completeness, relevance, and clarity of content.
NOTE: Additional pages other than what has been specified above in each section should not be included and will be grounds for disqualification. Submittals are limited to the information requested in Section VII.
Instructions for Preparing Technical Approach and Past Performance Response-Phase II Response only.
Hyperlinks or embedded video are not allowed with ditigal version.
C. Technical Approach submittal must be a PDF document for each project/contract. Each PDF document must follow the naming convention for electronic records as follows: the proposing firm’s full legal name, RFQ#, RFQ Title and the specific project contract being submitted on.
Technical Approach must be received by Henry County prior to the deadline indicated in Notice to Selected Finalists.
All expenses for preparing and submitting responses are the sole cost of the party submitting the response. Henry County is not obligated to any party to reimburse such expenses. All submittals upon receipt become the property of Henry County. Labeling information provided in submittals “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until final award.
Henry County reserves the right, in its sole discretion, to waive any technicalities associated with this submittal if deemed in the best interest of the State.
Responses submitted via facsimile or e-mail will be rejected. All expenses for preparing and submitting responses are the sole cost of the party submitting the response. Henry County is not obligated to any party to reimburse such expenses. All submittals upon receipt become the property of Henry County. Labeling information provided in submittals “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until final award.
Henry County reserves the right, in its sole discretion, to waive any technicalities associated with this submittal if deemed in the best interest of the State.
D. Questions and Requests for Clarification
Questions about any aspect of the Phase II Response for Finalists, shall be submitted in writing via e-mail to Shawnviez Lilly, e-mail: Slilly@henrycountyga.gov. or as directed in the Notice to Selected Finalists, if different. The deadlines for submission of questions relating to the Phase II Response will be identified in the Notice to Selected Finalists. From the issue date of this solicitation until a successful proposer is selected and the award is made official and announced, respondents are subject to the Restriction of Communication in Section I.B.
X. Henry County’s Terms and Conditions
A. Statement of Agreement
With the submission of a SOQ, the respondent agrees that he/she has carefully examined the Request for Qualifications, and agrees that it is the respondent’s responsibility to request clarification on any issues in any section of the Request for Qualifications with which the respondent disagrees or needs clarified. The respondent also understands that failure to mention these items during the question period or in the SOQ will be interpreted to mean that the respondent is in full agreement with the terms, conditions, specifications and requirements in the therein. With submission of a SOQ, the respondent hereby certifies: (a) that this SOQ is genuine and is not made in the interest or on behalf of any undisclosed person, firm, or corporation; (b) that respondent has not directly or indirectly included or solicited any other respondent to put in a false or insincere SOQ; (c) that respondent has not solicited or induced any person, firm, or corporation to refrain from sending a SOQ.
The respondent also understands that failure to provide required information may result in disqualification. Failure to provide administrative information may not result in disqualification. At the County’s discretion, the County may notify the respondent that administrative information is not provided or there was an error in the information provided, and the County will allow a respondent to provide an update to the administrative information. However, the exception to this is the provision of the required GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT, which by Georgia Law requires disqualification of the response. The above changes mentioned to administrative information would be considered allowable as these would be limited to changes which do not affect the information which the evaluators use to score the respondents. Failure of a respondent to provide the specific administrative information as required in the notice will result in disqualification. Any respondent who provides changes in addition to the information requested in the notice shall be subject to disqualification. Failure of a respondent’s SOQ to provide any information pertaining to a respondent and its teams qualifications, of any type, will subject the SOQ to disqualification. The County will not allow updates to qualifications to be provided to avoid disqualification as this would allow a respondent to modify its SOQ and alter the information which evaluators would score. The above changes related to qualifications would not be allowable as these would allow changes which do affect the information which the evaluators use to score the respondents SOQ.
B. Joint-Venture Proposals, Sub-Consultants, and Vendors
Henry County does not generally desire to enter into “joint-venture” agreements with multiple firms. In the event two or more firms desire to “joint-venture”, it is strongly recommended that one incorporated firm propose and maintain status as the Program Management firm with the remaining firms participating as major firms. Any joint-venture, proposed and established as a separate business entity, should have its own set of books and supporting documentation sufficient for an audit trail. Transactions should be recorded consistent with the joint-venture agreement, and care must be taken to ensure that the joint-venture bears its equitable share of the costs. Therefore, “unpopulated joint-ventures” would not have an adequate accounting system suitable for cost reimbursement contracts.
However more traditional “populated joint-ventures” are welcomed. A populated joint-venture is where an alliance is brought to life by infusing it with working capital, employees, and control systems. The alliance implements all necessary business systems, including payroll processing, purchasing, property control, etc. The alliance will develop its own indirect rate structure and calculates its own indirect cost rates, based on the direct and indirect costs it incurs.
Sub-Consultants shall generally be considered any team member which is performing any service which typically requires prequalification, which is subject to the Audit and Accounting System Requirements, and whose services are billed as costs. Sub-Consultant Team Members must be written into the resulting Agreement and are subject to all terms and conditions in the Agreement. Vendors shall be considered any team member which is performing any service which typically does not require prequalification, which is not subject to the Audit and Accounting System Requirements, and whose services are billed as direct expenses. Vendors may not be written into the resulting Agreement and may not be subject to all terms and conditions in the Agreement.
C. Non-Discrimination
Henry County in accordance with Title VI of the Civil Rights Act of 1964 and 78 Stat. 252, 42 USC 2000d--42 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, part 21, Nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all proposers that it will affirmatively ensure that any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award.
D. Audit and Accounting System Requirements
Henry County reserves the right to reject any proposal with firms that do not meet the following requirements:
1. Firm(s) should have an accounting system in place to meet requirements of 48 CFR Part 31 and, in the case of non-profit organizations, OMB Circular A-122.
2. Any firm that currently has an aggregate contract amount exceeding $250,000 should have submitted their yearly CPA overhead audit.
3. Firm(s) should have no significant outstanding deficient audit findings from previous contracts with Henry
County that have not been resolved.
4. The prime is responsible for being reasonably assured that all sub-consultant(s) presented as a part of the proposed team are similarly in compliance with the above requirements.
E. Submittal Costs and Confidentiality
All expenses for preparing and submitting responses are the sole cost of the respondent submitting the response.
Henry County is not obligated to any respondent to reimburse such expenses. All submittals upon receipt become the property of the County. Labeling information provided in submittals as “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until a final award.
F. Award Conditions
This request is not an offer to contract or a solicitation of bids. This request and any proposal submitted in response, regardless of whether the proposal is determined to be the best proposal, is not binding upon the County and does not obligate the County to procure or contract for any services. Neither the County nor any respondent submitting a response will be bound unless and until a written contract mutually accepted by both parties is negotiated as to its terms and conditions and is signed by the County and a respondent containing such terms and conditions as are negotiated between those parties. The County reserves the right to waive non-compliance with any requirements of this Request for Qualifications and to reject any or all proposals submitted in responses. Upon review of responses, the County will determine the respondent(s) proposal that in the sole judgment of the County is in the best interest of the County (if any is so determined), with respect to the evaluation criteria stated herein. The County then intends to conduct negotiations with such respondent(s) to determine if an acceptable contract may be reached.
G. Debriefings
In lieu of Pre-Award and Post-Award debriefings, it shall be Henry County’s policy to provide the “Selection Package” at the time of the Selection Announcement (also referred to as the Announcement of Entering into Negotiations). The “Selection Package” will include the scores and comments of phases for all firms who responded and will typically be provided as a PDF file and e-mailed. Previously, pre-award debriefings only provided the scores and comments of the firm. It shall be the policy of the County that all debriefings will typically be conducted in writing.
H. Right to Cancel or Change RFQ
Henry County Government reserves the right to cancel any and all Request for Qualifications where it is determined to be in the best interest of the County to do so. Henry County Government reserves the right to increase, reduce, add or delete any item in this solicitation as deemed necessary.
It is the responsibility of all firms interested in submitting Statement of Qualifications (SOQs) for this advertisement to routinely check the posting on Henry County’s eProcurement Portal at (https://procurement.opengov.com/portal/henryga) for any revisions to this RFQ. Communication will also be posted to the Georgia Procurement Registry as well.
I. Substitutions, Alternates, Exceptions, and Extensions
No substitutions or alternates will be accepted for this solicitation. Any respondent submitting substitutions or alternates will be considered non-responsive and will not be considered for award.
J. Henry County Code of Conduct Pertaining to Conflict of Interest in the Award and Administration of Contracts
Pursuant to GDOT Policy 3A-17, any GDOT employee who leaves the employment of the Department and subsequently becomes employed with a consultant firm and whose duties while employed with the Department included the direct involvement with the negotiation, administration, or management of a contract in which the firm is either the primary consultant or a sub-consultant SHALL NOT be authorized to work on that contract as an employee of that firm for a period of one (1) year after their employment ends.
Additionally, on July 1st of each year, any consultant firm that is under contract with the Department as a prime or sub consultant shall provide to the Department's Chief Procurement Officer (CPO) a current list of all former Department employees employed by the firm and a document that certifies the responsibilities of those employees as it relates to the current contracts with the Department. This certification document shall attest to the fact that over the last year no former Department employee that is employed by their firm has worked on a contract between the Department and their firm where that employee, when employed by the Department, had direct involvement with the selection, award and/or administration of the consultant contract. Any consultant firm entering into a contract with the Department for the first time as a prime or sub consultant shall provide the initial required list of former Department employees and certification prior to the contract effective date. If the Department's CPO determines at any point during a contract that an actual conflict exists as it relates to the above paragraph, then the CPO shall have the authority to issue a stop work order on that contract.
K. Insurance
General insurance requirements shall be applicable to the Firm and any authorized subcontractor. Insurance requirements shall be based on conditions in place as of the date of the Contract's execution. Insurance companies must be licensed by the Georgia Department of Insurance and the Georgia Secretary of State to do business in the State of Georgia. The County reserves the right to require adjustments in the level of coverage or waive any or all requirements based on information pertinent to this Contract.
The following requirements shall also be applicable to the Contractor:
a. Evidence of insurance must be provided to the Purchasing Department, 140 Henry Parkway, McDonough, Ga. 30253, within five days of execution of this contract and prior to commencing operations under this Contract;
The certificate holder is to be issued to:
Henry County Board of Commissioners Henry County, Georgia but delivered to:
Henry County Purchasing Department 140 Henry Parkway McDonough, Georgia 30253
The solicitation number and project name should be referenced in the description of operations.
The certificates may be faxed to the Purchasing Department at 770-288-6027.
b. The insurance policy required herein shall include a Project-specific endorsement incorporating the indemnification obligations assumed by the Contractor under the terms of this Agreement.
c. Any change in coverage or insurance carrier must be reported to the County’s Purchasing Office in writing within five business days of the change.
d. Failure of any Contractor to procure and maintain the required insurance shall not relieve the Contractor of any liability under the Contract, nor shall these requirements be construed to conflict with the obligation of the Contractor concerning indemnification;
e. Any and all insurance required by this Contract shall be maintained during the entire term of this Contract;
f. The County shall, without exception, be given no less than thirty (30) days notice prior to cancellation for any and all reasons other than non-payment of premium; and
g. The County shall, without exception, be given immediate notification in the event of cancellation for reasons of non-payment of premium.
h. The Contractor shall procure and maintain insurance coverage in the following particulars
Workers Compensation Insurance In the amounts of the statutory limits established by the General Assembly of the State of Georgia (A self-insurer must submit a certificate from the Georgia Board of Workers compensation stating that the Contractor qualifies to pay its own workers compensation claims.) In addition, the Contractor shall require that all subcontractors occupying the premises or performing the work under the contract to obtain an insurance certificate showing proof of Worker Compensation Coverage with the following minimum coverage:
Georgia Statutory including Employers Liability Bodily injury by Accident – each employee $100,000 Bodily injury by Disease - each Employee $100,000 Bodily injury by Disease – policy…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .