27-034 US Rt 40 Bike Path RFP - Posted.pdf

PDF 2 MB Posted

Attached to
US 40 Shared Use Path-Aberdeen Train Station to Havre De Grace
Solicitation number
BPM057916
Issued by
Harford County, Maryland

About this file

Summary

This is a Request for Proposals (RFP) issued jointly by Harford County, Maryland and the State of Maryland Department of Transportation for engineering and design services to develop a shared-use path for bicycles and pedestrians along US Route 40 between Aberdeen and Havre de Grace. The project encompasses preliminary investigation design services for a 10-foot-wide, ADA-compliant path separated from the roadway, with design based on the Westbound Option and Combined Option alignments identified in the Baltimore Metropolitan Council Concept Plan. The path will span approximately 5.1 miles along US 40, a four-lane principal arterial carrying over 30,000 vehicles daily. A pre-proposal meeting is scheduled for August 4, 2026, at 9:00 AM EST via Microsoft Teams. Written questions must be submitted by August 28, 2026, at 1:00 PM EST, and technical proposals are due October 16, 2026, at 1:00 PM EST through the eMaryland Marketplace Advantage (eMMA) platform. The contract duration will not exceed one year from the Notice to Proceed, with completion anticipated within 16 weeks (8 weeks for initial submission and 8 weeks for final submission of the Preliminary Investigation Report).

The total funding authority for this contract shall not exceed $700,000.00, with no minimum amount of work or funds guaranteed. Funding sources include Federal Transportation Alternatives Program (TAP) grant funds, State MDOT Kim Lamphier Bikeways Network Program grant funds, and County funds, administered through the Federal Highway Administration with Maryland State Highway Administration assistance. The procurement follows qualifications-based selection procedures under the Brooks Act, with pricing to be negotiated separately after technical proposal evaluation. Evaluation criteria weight technical questions at 40 percent, key staff qualifications at 30 percent, and work plan at 30 percent. The selected consultant must maintain professional liability insurance of at least $1,000,000.00, commercial general liability of $1,000,000.00, worker's compensation, and comprehensive automobile liability of $1,000,000.00. Key staff requirements include a Maryland-registered Project Engineer with 10+ years of multi-use trail design experience, Water Resources Engineer, Highway Engineer, Environmental Scientist, and Project Surveyor, each with specified minimum experience and credentials. Disadvantaged business enterprises, women-owned, minority-owned, and veteran-owned firms are encouraged to respond.

View the file

Other files

File Type Posted
27-034 RFP Adm 2 - Posted.pdf PDF
27-034 RFP Adm 3 - Posted.pdf PDF
27-034 IFB Adm 1 - Posted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HARFORD COUNTY MARYLAND

DEPARTMENT OF PROCUREMENT

Robert G. Cassilly County Executive

Director of Procurement Spencer Ebann

HARFORD COUNTY PROCUREMENT

220 S. MAIN STREET, BEL AIR, MD 21014

www.harfordcountymd.gov 410.638.3550

REQUEST FOR PROPOSALS

PROPOSALS RECEIVED AFTER THE DUE DATE AND TIME

WILL BE REJECTED AND RETURNED UNOPENED

Minority, Disadvantaged, Women, Small and Veteran Owned Business Enterprises are encouraged to respond to solicitations. The Maryland Department of Transportation website, www.mdot.maryland.gov/newMDOT/MBE/Index.html, provides important information, including certification, workshops, and other valuable resources to suppliers.

SOLICITATION NUMBER:

SOLICITATION TITLE:

PROCUREMENT AGENT:

PRE-PROPOSAL MEETING:

QUESTIONS DUE DATE AND TIME:

SOLICITATION DUE DATE AND

TIME:

INSURANCE

TIMELY DELIVERY OF

SOLICITATION DOCUMENTS:

DELIVERY METHODS:

27-034

US 40 Shared Use Path-Aberdeen Train Station to Havre de Grace

Karen Post 410-638-3550 kmpost@harfordcountymd.gov

Date August 4 9:00 AM EST via Microsoft TEAMS Join:

https://teams.microsoft.com/meet/228004273510909?p=uEtvfCujzQxopnbOP9 Meeting ID: 228 004 273 510 909 Passcode: ZK3GY7br

August 28, 2026, by 1:00 PM EST Questions must be emailed to the Procurement Agent.

October 16, 2026, by 1:00 PM EST

Architect Engineer and or Consultant

Submittals must be received prior to the solicitation due date and time. Accepted Request for Proposals submittals will not be publicly opened. All submittals should be sealed, labeled with the solicitation number, title, and vendor’s name and directed to the Department of Procurement.

Must be entered into eMaryland Marketplace Advantage (eMMA) online at https://emma.maryland.gov by 1:00 PM of the date due.

http://www.mdot.maryland.gov/newMDOT/MBE/Index.html https://teams.microsoft.com/meet/228004273510909?p=uEtvfCujzQxopnbOP9 https://emma.maryland.gov/

Notice to Potential Proposers

This solicitation is a joint solicitation between Harford County, Maryland and the State of Maryland.

All proposals, questions and addendums will be posted on the State of Maryland platform eMaryland Marketplace Advantage (eMMA) as required by state law. The link is below.

https://emma.maryland.gov

As this is a joint solicitation, there will be documentation that will need to be submitted for both entities. They are listed individually on the Table of Contents.

This is a technical request for proposal only solicitation and pricing will be negotiated with the awarded vendor.

Should you have any questions please contact us at 410-638-3550.

1. INTRODUCTION Page 1

2. PROPOSAL INFORMATION AND REQUIREMENTS Page 2

3. IMPORTANT DATES AND TIMES Page 3

4. PROPOSAL GUIDELINES Page 3

EVALUATION AND SELECTION CRITERIA

1. PROJECT DESCRITION Page 5

2. CONSULTANT SERVICES REQUIRED Page 7

3. CERTIFICATIONS Page 7

4. SAFETY ITEMS Page 8

5. EQUIPMENT Page 8

6. ENGINEERING STANDARDS AND GUIDELINES Page 8

7. GENERAL REQUIREMENTS Page 9

8. EVALUATION CRITERIA Page 9

9. TECHNICAL PROPOSAL REQUIRED INFORMATION Page 10

10. SERVICES / MATERIALS TO BE PROVIDED BY HARFORD COUNTY, MARYLAND Page 19

11. PROGRESS REPORTS Page 19

12. RECORDS, TASKS AND NOTICE TO PROCEED Page 19

13. COMPLETION DATE Page 19

14. PROMPT PAYMENTS Page 19

15. DUE DATE DEADLINE FOR SUBMISSIONS Page 20

ATTACHMENTS:

ATTACHMENT A - SCOPE OF SERVICES

STATE OF MARYLAND DOCUMENTS

ATTACHMENT B - STANDARD FORM 330 (SF330)

ATTACHMENT C - MDOT BID PROPOSAL AFFIDAVIT

ATTACHMENT D - MDOT ISRAEL CERTIFICATION FORM

HARFORD COUNTY, MARYLAND DOCUMENTS

ATTACHMENT E - HARFORD COUNTY GENERAL INFORMATION

ATTACHMENT F - HARFORD COUNTY PROPOSAL AFFIDAVIT

ATTACHMENT G - SAMPLE CONTRACT

ATTACHMENT H - INSURANCE REQUIREMENTS

REQUEST FOR PROPOSALS

RFP NO. 27-034

US ROUTE 40 – IN BETWEEN ABERDEEN AND HAVRE DE GRACE

TABLE OF CONTENTS

TOC-1

PUBLIC NOTICE FOR

Harford County, Maryland and the State of Maryland

27-034

US 40 Shared Use Path-Aberdeen Train Station to Havre de Grace

NOTICE TO ARCHITECTS & ENGINEERS

REQUEST FOR PROFESSIONAL SERVICES

1. Introduction:

Harford County, Maryland is issuing this Request for Proposals (RFP) for developing a shared-use path for Bicycle and pedestrian use along US 40 from the City of Aberdeen to the City of Havre de Grace. The project involves providing the necessary engineering services to develop the shared path. The Preliminary Investigation (PI) design will include preliminary design of a comfortable, convenient, and safe shared-use path along U S 40 that connects to transit and neighborhoods serving bicyclists and pedestrians along the corridor and will be based upon the preferred concept alignments designated as the Westbound Option and Combined Option in the concept plan. The Consultant Firms shall be proficient in the services listed in this RFP and shall bring an experienced and expert staff to the contracts as required. Firms interested in being considered must submit a complete Standard Form (SF) 330 concurrent with the technical proposal.

Harford County, Maryland anticipates awarding one project-specific contract for these services. The duration of the Contract will not exceed one (01) year. The total funding authority for this contract shall not exceed $700,000.00. Harford County, Maryland reserves the right to modify the total funding authority. No minimum amount of work or funds is guaranteed under this Contract. The Contract will be funded with Federal Aid Highway Program (FAHP) grant funds administered by the Federal Highway Administration, with assistance from the Maryland State Highway Administration.

An Offeror, either directly or through its subcontractor(s), must be able to provide all services and meet all the requirements requested in this solicitation and the successful Offeror (the Contractor) shall remain responsible for Contract performance regardless of subcontractor participation in the work. Firms interested in being considered for work on these contracts must submit a Technical Proposal for the contract as set forth herein.

The procurement of engineering and design related services funded by FAHP funds shall be conducted in with competitive negotiation (qualifications-based selection) procedures in accordance with the Brooks Act codified under 40 U.S.C. 1101-1104.

The Contract resulting from this solicitation shall be structured as project-specific and payment methods shall include cost plus fixed fee and unit cost rates. Additional information regarding payment methods will be provided to the selected firm in the Request for Price Proposal.

2. Proposal Information and Requirements:

To standardize the method of proposal submission, and to facilitate distribution of proposal materials, it shall be necessary that all firms observe the following procedures.

All Technical Proposals shall be submitted through eMaryland Marketplace Advantage (eMMA) online at https://emma.Maryland.gov. The submittal will consist of the complete Technical Proposal. The limit to the size of each individual file that is uploaded to eMMA is 300 MB. There is no limit to the number of files that can be uploaded in a single solicitation and no total limit to the size of all files uploaded in a single solicitation.

eMMA accepts zipped files, but each zipped file is limited in size to 300 MB. The following information must be typed in the Response Information box. In the “Project Description,” type “US 40 Shared Use Path-Aberdeen Trail Station to Havre de Grace,” Technical Proposal Due Date and Time, Firm Name, Firm Address and Contact Person for this Submission.

Proposals must be submitted electronically. Proposals will not be opened publicly.

If a Joint Venture (JV) responds to this RFP, Harford County, Maryland will not accept separate Proposals from the JV constituents. A firm will not be permitted to submit on more than one (1) JV for this RFP. Also, a firm that responds to this RFP as a prime or a prime JV constituent may not be included as a designated subcontractor to another firm that responds as a prime to this RFP. Multiple responses under any of the foregoing situations may cause the rejection of all responses of the firms involved. The above does not preclude a firm that has not submitted as a prime from being set forth as a designated subcontractor to more than one (1) prime responding to this RFP.

All proposals received for this contract will be reviewed on a competitive basis. The Firm that submits the highest rated Technical Proposal will be requested to submit a Price Proposal. Salary, Payroll Burden, and Overhead limitations have been eliminated.

Salaries shall be actual per-hour salary rates as supported by Certified Payroll Rosters, while Prime and Subconsultants’ Payroll Burden and Overhead rates shall be supported by either a Maryland Department of Transportation Modes approval letter or by an annual overhead audit performed by an independent Certified Public Accountant in accordance with Federal Acquisition Regulations 48 Code of Federal Regulation 1, Part 31 and applicable MDOT guidelines. The annual overhead audit shall identify separate rates for both home office overhead and field overhead. If negotiations with the Firm is timely and successful, a contract may be awarded to the Firm.

Harford County, Maryland shall comply with procurement requirements established in State and local laws, regulations, policies and procedures that are not addressed by or are not in conflict with applicable Federal regulations, as specified in 2CFR Part 1201.

When state and local procurement laws, regulations, policies, or procedures are in conflict with applicable Federal laws and regulations, a contracting agency shall comply with Federal requirements to be eligible for Federal-Aid reimbursement, as specified in

2CFR200.

3. Important Dates and Times:

A Pre-Proposal meeting will be held on August 4, 2026, at 9:00 am.

Microsoft Teams meeting Join: https://teams.microsoft.com/meet/228004273510909?p=uEtvfCujzQxopnbOP9 Meeting ID: 228 004 273 510 909 Passcode: ZK3GY7br

Written questions from prospective Offerors will be accepted by the Harford County, Maryland Procurement Officer through eMMA only.

All questions concerning submissions and procedures must be submitted via emma.Maryland.gov no later than August 28, 2026, at 1:00 pm. All questions must be posed under the specific solicitations Discussion Q&A tab.

All addenda to this solicitation will be posted only on eMaryland Marketplace Advantage (eMMA) and on the Consultant Services Center page of SHA’s Webpage (https://roads.Maryland.gov/mdotsha/pages/Index.aspx?PageId=767). No other contact to MDOT employees or personal visits will be accepted.

eMMA is an electronic commerce system administered by the Maryland Department of General Services. The solicitation, Offeror questions and the Procurement Officer’s responses, addenda, and other solicitation-related information will be provided via eMMA.

To receive a contract award, a firm must be registered on eMMA. Registration is free. Go to https://emma.Maryland.gov, click on “New Vendor? Register Now” to begin the process, and then follow the prompts.

Each Offeror is requested to indicate its eMMA vendor number in the Transmittal Letter (cover letter) submitted at the time of its Proposal submission to this RFP.

Before a business entity can do business in the State of Maryland, it must be registered with the State Department of Assessments and Taxation (SDAT). SDAT is located at State Office Building, Room 803, 301 West Preston Street, Baltimore, Maryland 21201.

The SDAT website is http://sdat.dat.Maryland.gov/RealProperty/Pages/default.aspx, It is strongly recommended that any potential Offeror complete registration prior to the due date for receipt of Proposals. An Offeror’s failure to complete registration with SDAT may disqualify an otherwise successful Offeror from final consideration and recommendation for contract award.

4. Proposal Guidelines:

Technical Proposals must be submitted in the format outlined within the SHA Standard Request for Proposals guidelines. The SHA Standard Request for Proposals guidelines https://roads.maryland.gov/mdotsha/pages/Index.aspx?PageId=767 https://emma.maryland.gov,/ http://sdat.dat.maryland.gov/RealProperty/Pages/default.aspx can be found on the SHA Web Page at https://roads.Maryland.gov/mdotsha/pages/Index.aspx?PageId=767 by navigating to the Standard Request for Proposals link.

The SHA, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this RFP, Disadvantaged Business Enterprises (DBE) will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin, in consideration for an award.

Consultants interested in submitting a Technical Proposal must comply with the

SPECIAL PROVISIONS, AFFIRMATIVE ACTION REQUIREMENTS, UTILIZATION OF

DISADVANTAGED BUSINESSES, THE SURFACE TRANSPORTATION AND

UNIFORM RELOCATION ASSISTANCE ACT OF 1987, ISTEA OF 1991, MAP 21 OF

2012, FAST ACT 2015, AND INFRASTRUCTURE INVESTMENT AND JOBS ACT OF

2021 located at https://roads.Maryland.gov/mdotsha/pages/Index.aspx?PageId=767 and selecting Standard Request for Proposals link).

Harford County, Maryland hereby notifies all bidders/offerors that regarding any contract entered into pursuant to this RFP, the contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to:

(1) Withholding monthly progress payments;

(2) Assessing sanctions;

(3) Liquidated damages; and/or

(4) Disqualifying the contractor from future bidding as non-responsible.

Technical Proposals received after the deadline will not be accepted, no matter how transmitted, and will be returned unopened to the Consultant.

SHA reserves the right to reject any and all Proposals received in response to this request and is not liable for any cost incurred by any Firm in connection with the preparation and presentation of Proposals.

https://roads.maryland.gov/mdotsha/pages/Index.aspx?PageId=767

Harford County, Maryland

27-034

US 40 Shared Use Path-Aberdeen Trail Station to Havre de Grace

EVALUATION AND SELECTION CRITERIA

1. Project Description Harford County, Maryland is seeking consultant assistance to develope a shared-use path for Bicycle and pedestrian use along US 40 from the City of Aberdeen to the City of Havre de Grace. The project involves providing the necessary engineering services to develop the shared path. The PI design will include preliminary design of a comfortable, convenient, and safe shared-use path along U S 40 that connects to transit and neighborhoods serving bicyclists and pedestrians along the corridor and will be based upon the preferred concept alignments designated as the Westbound Option and Combined Option in the concept plan. The project’s scope of work includes Planning/Preliminary Design services. Harford County may award one project-specific contract for these services. The duration of the contract will not exceed one (01) year. The total funding authority for this contract shall not exceed $700,000.00. No minimum amount of work or funds is guaranteed under this contract. All work performed under this contract must be for services as outlined in the contract scope of work and in conformance with all contract terms and conditions and payment provisions.

2. Consultant Services Required The services to be performed under this contract will provide a preliminary design of a shared-use path. This should include a preliminary horizontal and vertical alignment for both the Westbound Option and the Combined Option, as described in the Baltimore Metropolitan Council Concept Plan. The path shall be separated from the US 40 roadway, shall be 10’ wide with a maximum 2% cross slope, and shall meet ADA requirements. Typical sections provided in the concept plan may be used as a guide, but are expected to evolve during this preliminary design stage. The design shall meet the latest versions of AASHTO Design Specifications, Harford County Road Code, MDOT SHA Standard Specifications and Standard Details, and FHWA-approved standards This project will be funded with Federal (Transportation Alternatives Program (TAP) Grant), State (MDOT Kim Lamphier Bikeways Network Program Grant), and County Funds. The firm may be authorized to subcontract for specialty services with prior approval of Harford County, Maryland. The firm shall be proficient in the services and shall bring an experienced and expert staff to the project.

Listed below are the Scope of Services and Examples of Work, Certifications, and Engineering Standards and Guidelines.

Scope of Services and Examples of Work:

Services to be provided will include:

a. • Survey

b. • Wetland/Tree Delineation

c. • Deed Research

d. • Forest Stand Delineation (FSD)

e. • Utility Designations

f. • Shared Use Path Horizontal and Vertical Alignment

g. • Roadway Design

h. • Drainage Design

i. • MDE Approval of Methodology

j. • Hydrologic and Hydraulic Study

k. • Stormwater Management

l. • Preparation/Coordination of required NEPA Documents

m. • Additional tasks required by the Consultant to fulfill the needs of this project

Examples of the consultant services to be provided may include the following:

a. Street Lighting

b. Traffic Safety

c. Traffic Control

d. Erosion & Sediment Control

e. Structures – Bridge, Boardwalks

Expected Deliverables

a. Preliminary Investigation Report Initial Submission and Concept Plans (70%)

b. Preliminary Investigation Report Final Submission and Plans (100%)

Anticipated Schedule

To prepare the project schedule, the following review time shall be allocated:

Phase 1: Preliminary Investigation Report, Initial Submission 8 weeks Phase 2: Preliminary Investigation Report, Final Submission 8 weeks

Please refer to the Scope of Work in Attachment A.

The Firm selected for contract award may be required to develop a knowledge and project transition plan that outlines a step-by-step process to reach a smooth transition from the current project delivery and support team to the new Firm. The transition plan may include a combination of a series of meetings, documents, checklists, or other means to gather the information and project history and background to move forward effectively and efficiently without delay.

The Firms must use Bentley ProjectWise for data storage and management for all project files or propose an alternative system for Harford County, Maryland consideration and approval.

The Consultants shall, at their own cost, provide industry-standard software applications and platforms to perform all services required in this RFP. These applications and platforms may need to be compatible with Harford County, Maryland systems, and may include, but are not limited to, the following functions:

a. MS Office

b. MicroStation

c. WinTR-20

d. WinTR-55

e. HY-8

f. TIDEROUT2

g. MPADD2

h. Hydraulic Toolbox

i. ArcGIS / ArcGIS Pro

n. GIS Hydro NXT

Periodically, new guidelines, processes, laws, and mandates may require additional activities not clearly cited in the RFP. All activities required to deliver a project or program, whether new or existing, unless otherwise controlled by regulation or statute, will be completed under this contract. If special skills or services are identified that are beyond the expertise of the consultant, then new subconsultants may be required to be added to the contract to support project delivery.

This is not an all-inclusive list as this contract may include other professional services related to the scope outlined above.

There may be instances when Harford County, Maryland requires the consultant to provide emergency response times for a given project. Therefore, the consultant may be required to provide those services within three (03) business days of notification or as otherwise directed by Harford County, Maryland.

3. Certifications

No certification is required by Harford County, Maryland

4. Safety Items

The Consultants shall supply all required personal protective equipment and safety items including, but not limited to, a hard hat and ANSI Class 3, or better, reflective safety vest. All equipment must comply with SHA’s High Visibility Apparel Policy, SHA’s Office of Construction’s Directive on Personal Protective Equipment (PPE), and all OSHA and MOSH regulations.

5. Equipment

The consultant will be required to supply all tools and equipment to perform the scope of work referenced in the solicitation.

6. Engineering Standards and Guidelines

The Consultants shall perform all contract engineering services in accordance with good industry practice, all applicable laws and regulations, and the current editions of the following references, their interim specifications, their successor replacement references, and all other pertinent guidelines and memoranda as released by FHWA, AASHTO, and SHA including, but not limited to the following publications:

a. MDOT “General Conditions for Consulting Services” dated January 1989;

b. SHA “Specifications for Consulting Engineers’ Services” dated April 1986;

c. SHA “Request for Proposal” dated April 2002;

d. SHA Office of Structures, Guidelines and Procedures

e. SHA Office of Structures, Structural Details

f. SHA Standard Specifications for Construction and Materials

g. SHA Special Provisions and Special Provision Inserts to the Standard

Specifications for Construction and Materials

h. SHA Office of Structures Manual on Hydrologic and Hydraulic Design

i. SHA Guide for Completing Structure Asset Management

j. SHA Federal Highway Bridge Program Guidelines for Local Governments

k. AASHTO Manual for Bridge Element Inspection

l. AASHTO Load and Resistance Factor Design (LRFD) Bridge Design

Specifications

m. AASHTO Standard Specifications for Highway Bridges

n. AASHTO D1.5M/D1.5: Bridge Welding Code

o. AASHTO Standard Specifications for Transportation Materials and

Methods of Sampling and Testing

p. AASHTO A Policy on Geometric Design of Highways and Streets, currently adopted edition

q. AASHTO Guide Specification for Horizontally Curved Steel Girder

Highway Bridges

r. AASHTO Guide Specification for Highway Bridge Fabrication with HPS70W Steel

s. AASHTO Manual on Subsurface Investigations

t. AASHTO Manual for Bridge Evaluation

u. ACI Building Code Requirements for Structural Concrete, ACI 318

v. FHWA Memorandum, Bridge Rails

w. FEMA Executive Order 11988

x. CFR Code of Federal Regulations Title 44, Part 9 and 10

y. NFPA 502: Standard for Road Tunnels, Bridges, and Other Limited

Access Highways

z. Harford County Road Code updated version.

aa. SHA Bicycle Policy and Design Guidelines.

7. General Requirements

The Consultants shall not enter onto private property for any purpose until authorized by Harford County, Maryland. The Consultants must notify Harford County, Maryland immediately if damage occurs to property and shall be responsible for any such damage. The Consultants may also be authorized to subcontract for specialties with prior approval of SHA as direct expenses that shall be discussed during the price proposal negotiations for selected awardees. Examples may include drainage study, wetland and tree delineation, forest delineation, forest stand delineation, deed research, utility designation, stormwater management, hydraulic & hydrology study, endangered species identification, NEPA, and field surveys.

No payment for overtime work shall be made without authorization from Harford County, Maryland. When overtime is required and authorized, and when payment therefore may involve premium costs, there shall be no payroll additive.

Premium overtime costs are reimbursable as a direct cost when an employee works more than forty (40) hours per week on Harford County, Maryland projects based upon the Consultant’s work week. Regularly scheduled paid company holidays may be included in the calculation of “hours worked”, but time off for any other leave (e.g.

vacation, personal, compensatory or sick leave) is to be excluded from “hours worked” when calculating premium time reimbursement. The fact that an employee works more than eight (8) hours in a single day does not necessarily mean that premium overtime costs are allowable as a direct cost since reimbursement is determined on a weekly basis. Any premium overtime paid to employees, but not directly billable under this policy, may be allowed as an indirect cost.

8. Evaluation Criteria

The major factors/criteria and their relative weight of importance to be used in evaluating Technical Proposals are:

Item Score Technical Questions 40% Key Staff 30% Work Plan 30%

The following items will be rated as either one of the following:

• (A) Acceptable-Response demonstrates they meet requirements

• (U) Unacceptable-Response fails to demonstrate they meet requirements

• (N) Neutral-Lacks prior SHA experience. Not a barrier to the award

a. Scope of Services;

b. Example Projects;

c. Compatibility of the size of the firm with the size of the proposed project;

d. Past Performance working on Harford County, Maryland task orders when prior work history is available, including Quality and Timeliness. (Lack of prior experience with Harford County, Maryland is in no way considered a barrier to receiving an award);

e. Capacity to accomplish the proposed work in the required time;

f. Insurance;

g. Financial Responsibility; and

h. Measures of protection for the State against errors and omissions.

*Please Note: If an offeror receives a rating of "unacceptable" on three (3) of the rating criteria above, the offeror will not be further considered. The offerors’ proposal will be rejected as “not susceptible of being selected for award."

COMAR 21.06.02.03(2)

9. Technical Proposal Required Information

U.S. Government forms are to be completed with standard-size typing and are not to be photo reduced. Computer-generated forms are acceptable; however, the format and spacing is to be identical to that of the Standard Forms 330.

With the exception of Government forms and the Organizational Chart, all pages included with your Technical Proposal submission are required to be standard 8½ x 11 size paper with a minimum of a one-inch margin on all sides and no smaller than 10-point Times New Roman font. Attachments to the Proposal are unacceptable.

Harford County, Maryland must be notified in writing, by email to Naveed Shah, Project Engineer, Harford County, and copy the Harford County Procurement Agent, Karen Post, of any deletions, additions, and/or substitutions of proposed Subconsultants after Technical Proposals have been submitted.

A. Cover Letter

Cover Letter (1 page) on the Firm’s/JV’s letterhead – which must contain:

i. The names, contact numbers, and email addresses of the Primary Liaison and your firm’s contact person for this procurement process.

ii. The e-mail address of the contact person for this contract. Future correspondence related to this contract, prior to award of a contract, may be transmitted via e-mail.

iii. The information that the Firm/JV has the financial capacity to provide the services and has measures of protection for the State against errors and omissions.

iv. Certification that the Firm/JV has read and fully understands the requirements set forth to be provided for this RFP.

v. Certification that the Firm/JV and proposed team possess the expertise, resources, knowledge, and technical ability to perform all elements of the contract’s scope and deliver all the requirements set forth through its own forces and those of its subcontractors.

vi. Certification that Key Staff individuals meet the education, experience, certification/registration, and expertise requirements set forth in this RFP.

vii. This letter shall be signed by the person or persons able to legally bind the Firm to the proposal.

viii. Corporate Resolutions shall be included if signed by anyone other than the President of the Firm or Executive for the JV.

B. Scope The Consultant must submit a maximum of five (05) page document certifying that the contract’s Scope can be performed in its entirety through its own forces and those of its Subconsultants. This section of the proposal should provide information to confirm the Offeror has a reasonable probability of success in meeting the project’s quantity, quality, and schedule requirements.

C. Work Plan The Consultant must submit a maximum of five (05) page work plan detailing their ability to perform the consultant services required, scope of work, etc. to make up their Work Plan submission. Work Plan shall include, at a minimum, the following information:

i. Has read and fully understands the requirements set forth to be provided for this contract;

ii. The Consultant team possess the experience, resources, knowledge and technical ability to perform and deliver all the requirements set forth in this contract;

iii. Acknowledges this is a project-specific contract and understands the requirements for schedules and/or deadlines to provide deliverables, services, etc.;

iv. Has a detailed work plan in place to ensure schedules and/or deadlines will be met;

v. The work plan includes comprehensive quality assurance and quality control program; and

vi. Other statements are at the discretion of the Consultant as this is not an all-inclusive list.

D. Standard Form 330 Parts I and Parts II

Completed US Government Standard Forms (SF) 330 Parts I and Parts II for the Prime and for each proposed subcontractor. The SF 330 forms must be completed in their entirety paying special attention to the following:

https://roads.maryland.gov/OPCM/Standard%20Form%20330%20%E2%8 0%93%20A%26E%20Qualifications.pdf

i. Outside Key Consultants (Sub-Consultants) should be documented in Part I, Section C of the SF 330.

ii. The Organizational Chart required for Part I, Section D of SF 330 shall be placed within the Standard Form 330 Parts I and Parts II of the Technical Proposal and must contain, at a minimum, the Key Personnel and defining team organization with supplemental support personnel. In addition, for every individual proposed for this contract and shown on the organization chart, the chart shall clearly show their company affiliation and their permanent office location. The Organization Chart shall be limited to an 11 x 17-inch page with Times New Roman Font size 10-point or larger.

In addition, a [two (02)] page matrix style of support personnel shall be included in the Standard Form 330 Parts I and Parts II of the Technical Proposal. Matrix style is defined as names listed on the vertical axis and Relative Experience identified on the horizontal axis. The support personnel descriptions are limited to [ten (10)] lines per individual. The support personnel Matrix shall be limited https://roads.maryland.gov/OPCM/Standard%20Form%20330%20%E2%80%93%20A%26E%20Qualifications.pdf https://roads.maryland.gov/OPCM/Standard%20Form%20330%20%E2%80%93%20A%26E%20Qualifications.pdf to an 11 x 17-inch page with no smaller than 10-point Times New Roman Font size and one-inch margins.

iii. Part I, Section E of the SF 330, Key Staff. A separate Section E form should be completed for each Key Staff individual proposed.

Provide a resume for each of the Key Staff individuals outlined below, limited to one (1) Key Staff per page, not to exceed [five (05)] pages total. The experience for each individual Key Staff as described below shall be recent experience performed within the last [ten (10)] years. Years of experience and applicable licenses and certifications, such as a professional engineer license, professional surveyor or PMP certification, shall be clearly documented on each resume.

The Consultant must document in writing in the SF 330 Section E that the Key Staff individuals meet the following requirements:

Key Staff 1: Project Engineer shall be a Professional Engineer (PE) registered in the State of Maryland with a minimum of 10 years of experience performing design of multi-use trails, including ADA design; shall have a Bachelor of Science (or higher) in Civil Engineering; and the staff member shall be employed by the Prime/ JV or any of the subconsultants.

Key Staff 2: Water Resources Engineer shall be a Professional Engineer (PE) registered in the State of Maryland with a minimum of 10 years of experience in hydraulics and hydrology design and review, erosion and sediment control design and compliance, and expertise in highway-related projects. A Bachelor of Science degree in Civil or Environmental Engineering (or higher) from an ABET-accredited university is preferred, and the staff member should be employed by the Prime/JV or any of the subconsultants.

Key Staff 3: Highway Engineer shall be a Professional Engineer (PE) registered in the State of Maryland with a minimum of 10 years of experience in highway design and expertise in a variety of highway-related projects. Experience with context sensitivity practices, practical design theories and practices, innovative design, project management, alternative project delivery methods, and a Bachelor of Science (or higher) degree in Civil Engineering from an ABET-accredited university is preferred, and the staff member should be employed by the Prime/JV or any of the subconsultants.

Key Staff 4: Environmental Scientist shall have 10 years of experience with tree delineations, wetland delineations, NEPA, and environmental feature identifications, and have a bachelor's degree in environmental science or a closely related field, and shall be employed by the Prime/JV or any of the subconsultants.

Key Staff 5: Project Surveyor shall be a professional surveyor registered in the State of Maryland with a minimum of 10 years of experience with topographic survey and deed-related work and be employed by the Prime/JV or any of the subconsultants.

Where Maryland Registrations are required for the professional Key Staff, the Consultant shall include in Part I Section E 17 of the SF 330 the words "Maryland Registered" and the Maryland License Registration Certificate Number for the individual. Where a Firm proposes an out of state professional engineer or architect, the Firm shall include in Part I Section E 17 of the SF330 the words “Maryland Registration Pending” along with the license registration number, discipline, and the US State where the individual is currently registered. Pending status must be resolved at the time of contract Notice to Proceed. Failure of the Firm to properly document Key Personnel requirements in writing will result in the firm being precluded from further consideration for the contract.

iv. SF 330 Section F – Example Projects Which Best Illustrate Proposed Team’s Qualifications: Limited to [three (03)] example projects [one (01)]example project per page for a total not to exceed [three (3)] pages. Photos are acceptable; however, all photos count in the overall space limitations for the page, and are considered illustrations and are not rated. The Example Projects set forth shall be recent relevant experience performed within the past [five (05)] years. (Information provided in this section shall become part of the rating/evaluation criteria for this project).

v. SF 330 Section H – This section shall be limited to [five (05)] page and must certify that the Key Staff individuals meet the education, experience, registration/licensure, expertise, and all other professional qualifications specified in this advertisement.

Please exclude any confidential personal information.

Additional Information regarding Key Staff replacements after Final Selection:

Key Staff changes may only be requested after final selection if the Key Staff is no longer available to perform on the contract or at the request/agreement of Harford County, Maryland. A letter outlining the reason for the change and the names of the Key Staff involved in the replacement request must be in writing on the firm’s/JV’s letterhead along with a one (1) page resume per the requirements outlined in this RFP.

Substitutions will be evaluated using the same qualifications-based technical rating criteria and the Key Staff replacement’s score must be equal or higher than the original Key Staff’s score in order to be accepted/approved by SHA. All scores will remain confidential by SHA.

Instructions for completing a resume are included in Section 9 D – Standard Forms Part I and II of this RFP.

E. Technical Questions:

Technical question responses shall not exceed a total of six (06) pages, limited to two (02) pages per question.

Reference the question number at the top of each page and use the remainder of the page for the response to the question (for example, “Question A”):

a. Identify the steps you would take in determining and developing the pedestrian and bicycle shared path and its location along the US Route 40 as described in the project description. Please explain in detail all required steps that should be taken, including the coordination efforts with all the agencies involved.

b. Identify the steps you would take in determining the environmental impacts this project may have, and how you would address the permitting/ approvals for NEPA, SWM, and MDE.

c. It is understood that engineering firms may have multiple contractual obligations. How would you ensure that an increased workload does not impact your ability to meet the needs of SHA and Harford County while avoiding unnecessary change orders and delays? Please elaborate on how you would ensure proposed schedules and budgets are met while verifying that all submissions are thoroughly checked for quality assurance and quality control.

F. Subcontractors Commitment – no page limits as this section may vary:

The Technical Proposals are to be explicit with respect to the work to be performed by all subcontractors proposed. A Letter of Commitment is required for each proposed Sub-Consultant. While the format and overall content is at the firm’s discretion, a Letter of Commitment must at a minimum:

• Be on the Sub-Consultant’s letterhead;

• List the services proposed to be provided;

• Certify the firm is able to provide the required resources, services, etc.;

• List the applicable NAICS Codes for the services/work to be performed in support of the contract, and overall percentage of work to be performed for the contract;

• NAICS Codes must be the same as those listed in Section C 11 of the SF 330 for each subconsultant;

• Be signed and dated by the Principal/President of the firm; and

G. Time Distribution – not to exceed three (03) pages consisting of the following:

The Consultant shall include a three (03) page listing of those classifications proposed for services and the percentages of time estimated for each classification. Percentages shall total one hundred percent (100%). The Consultant shall not include man-hour estimates in the Technical Proposal. A column of percentages of time estimated for each classification is to be shown for the Prime Consultant, for each subcontractor proposed, and one (1) column showing totals which add up to 100%. When multiple firms are used, the total for each firm must add up to something less than 100%. These percentages are applicable to the total dollar amount of the Price Proposal to be developed separately by the selected firm(s). The percentages are not applicable to time estimates. The Consultant shall indicate the number of simultaneous project assignments the Consultant and each Subconsultant could handle individually.

The following classifications and estimated percentages of time to be used for the contract assignments are:

Classification Est. Office Est. Field Total Project Manager 5% 0% 5% Project Engineer 10% 5% 15% Highway Engineer 10% 5% 15% Water Resources Engineer 10% 5% 15% Environmental Scientist 10% 5% 15% Project Surveyor 5% 10% 15% Engineering/Drafting Technician 10% 0% 10% Party Chief 0% 10% 10% Total 60% 40% 100%

H. Financial Responsibility and Insurance Requirements:

1. The consultant shall include a letter addressed to SHA setting forth evidence that the consultant has the financial capacity to provide the services and has measures of protection for the State against errors and omissions.

2. The Consultant shall include a copy of the firm’s current certification(s) of insurance, which should contain, at a minimum, the following:

• Carrier (name and address)

• Type of insurance

• Amount of coverage, which must include at a minimum of

$1,000,000.00 per occurrence of Professional Liability

• Period covered by insurance; and

• Any exclusions

Insurance coverage will be one (1) of the areas evaluated when Technical Proposals are reviewed. Failure of the Consultant to submit satisfactorily to these requirements may result in SHA rejecting the proposal(s).

SHA requires the following minimum levels of insurance coverage for this contract:

a. Worker's Compensation and Employer's Liability

The Contractor shall, at all times, maintain and keep in force such insurance as will protect him from claims under the Worker's Compensation Act of the State of Maryland and maintain and keep Employer's Liability Insurance at a limit of $1,000,000.00 Million Dollars ($1,000,000.00). The $1,000,000.00 employer liability can be satisfied by an Umbrella/Excess Policy, as long as it is specific to “Employer’s Liability”.

b. Commercial General Liability Insurance

The Contractor shall maintain Commercial General Liability Insurance in the amount of at least $1,000,000.00 Million Dollars ($1,000,000.00) Combined Single Limit for Bodily Injury Liability and Property Damage Liability Insurance per occurrence, and $1,000,000.00 Million Dollars ($1,000,000.00) in the aggregate.

c. Comprehensive Automobile Liability Insurance

The Contractor shall maintain Comprehensive Automobile Liability Insurance (including all automotive equipment owned, operated, rented, or leased), in the amount of at least $1,000,000.00 Million Dollars ($1,000,000.00). Combined Single Limit for bodily injury and property damage.

d. Professional Liability Insurance

The Contractor shall maintain Professional Liability Insurance in the amount of at least $1,000,000.00 Million Dollars ($1,000,000.00).

I. Proposal Affidavits:

As per State Finance and Procurement Article 17-701 – 17-707 of the Annotated Code of Maryland, a firm engaging in investment activities with companies appearing on the Investment Activities in Iran list is ineligible for bid/proposal/award. The Investment Activities list is located at www.bpw.state.md.us of the Maryland Board of Public Works (BPW) website. As per the BPW Advisory No.: 2013-1, Date Issued January 1, 2013, an officer of the Firm shall provide a signed original certification as per language stated on the BPW Advisory page. If the Firm is a JV, officers from all companies forming the JV shall provide a signed original certification. NOTE – the Investment Activities in Iran certification is included in the bid/proposal affidavit.

In preparing its proposal on this contract, the Offeror has considered all proposals submitted from qualified, potential subcontractors and suppliers, and has not, in the solicitation, selection, or commercial treatment of any subcontractor, vendor, or supplier, refused to transact or terminated business activities, or taken other actions intended to limit commercial relations, with a person or entity on the basis of Israeli national origin, or residence or incorporation in Israel and its territories. The Offeror also has not retaliated against any person or other entity for reporting such refusal, termination, or commercially limiting actions. Without limiting any other provision of the solicitation for proposals for this contract, it is understood and agreed that, if this certification is false, such false certification will constitute grounds for the State to reject the proposal submitted by the Offeror on this contract, and terminate any contract awarded based on the bid/proposal.

All offerors are required to submit the following completed affidavits with their technical proposal within the Proposal Affidavits section. Both documents are available on the SHA OPCM website at https://roads.Maryland.gov/mdotsha/pages/Index.aspx?PageId=767 http://www.bpw.state.md.us/

• Bid / Proposal Affidavit o Form is located under “Affidavits” section of the website

• Certification Regarding Discriminatory Boycotts of Israel o Form is located under the “Certification Regarding

Discriminatory Boycotts of Israel” section of the website

10. Services/Materials to be provided by Harford County, Maryland:

This is not all-inclusive of the scope of work. Harford County, Maryland may provide additional services/materials as appropriate.

11. Progress Reports:

The Consultant must submit monthly progress reports including a detailed account of work performed that is being billed, outstanding issues, summary of additional work requests, percent completed, any anticipated delays, etc.. This report must be submitted with the monthly invoice.

12. Records, Tasks and Notice to Proceed:

The Consultant shall keep accurate records documenting the time, material, and transportation utilized, etc. Contract payment(s) to the Consultant for work completed will be made on this basis only.

The Consultant must be able to provide prompt consultant services within thirty [30] working days of the contract’s Notice to Proceed.

No work shall be performed on contract by the Consultant until a written Notice to Proceed (NTP) is received by the Consultant from Harford County, Maryland.

The Consultant must provide the required services within five (5) working days of the notification for an approved assignment.

13. Completion Date:

The contract will terminate one year after the date of execution.

14. Prompt Payment Pursuant to 49 CFR §26.29, MDOT requires prime contractors to pay subcontractors, at any tier, for satisfactory performance of their contracts no later than 30 days from receipt of each payment that Harford County, Maryland makes to the prime contractor. When Harford County, Maryland. has made an incremental acceptance of a portion of a prime contract, the work of a subcontractor covered by that acceptance is deemed to be satisfactorily completed. To the extent that it is not inconsistent with federal law, all prime contractors shall also comply with all Maryland laws and regulations regarding the prompt payment to subcontractors.

15. Due Date Deadline for Submissions

RESPOND BY October 16, 2026, prior to 1:00 PM EST. Only eMMA submissions of the Technical Proposals submitted through https://emma.Maryland.gov/ will be accepted as described above.

The Procurement Officer and sole point of contact for this solicitation, unless directed otherwise within this solicitation or by SHA, is:

Karen Post NIGP-CPP, CPPB, CPPO Procurement Agent III 220 South Main St Bel Air, MD 21014 kmpost@harfordcountymd.gov mailto:kmpost@harfordcountymd.gov

ATTACHMENT A-1

ATTACHMENT A

SCOPE OF SERVICES

27-034

US ROUTE 40 – IN BETWEEN ABERDEEN AND HAVRE DE GRACE

1. PROJECT DESCRIPTION

Harford County is developing a shared-use path for Bicycle and pedestrian use along US 40 from the City of Aberdeen to the City of Havre de Grace. The project involves providing the necessary engineering services to develop the aforementioned shared path.

This project is situated along US 40 in Harford County, between the cities of Aberdeen and Havre de Grace. US 40 is a four-lane principal arterial that carries over 30,000 vehicles per day. The corridor serves a diverse traffic mix, including local traffic in the Aberdeen/Havre de Grace area, long-distance commuter traffic destined for downtown Baltimore, and regional traffic destined for Elkton. Currently, there are sporadic sidewalks, as well as shoulders, that are used by pedestrians. Along U S 40 in the project area, shoulders are signed for bicycle use.

The project area limits along U S 40 (Pulaski Highway) are between the train station in the City of Aberdeen and Erie Street in the City of Havre de Grace, just west of the Thomas Hatem Bridge over the Susquehanna River. This section of US 40 in the project area is approximately 5.1 miles long with posted speed limits ranging from 30 MPH to 55 MPH and is functionally classified as a Principal Urban Arterial under the County Functional Classification System (2018).

A concept plan for Bicycle and Pedestrian improvements along US 40 (Aberdeen to Havre de Grace) was completed by the Baltimore Metropolitan Council (Appendix B).

This project consists of providing a preliminary investigation engineering (PI) design to accommodate the proposed shared pathway on US Route 40 between Aberdeen and Havre de Grace. The PI design will include preliminary design of a comfortable, convenient, and safe shared-use path along U S 40 that connects to transit and neighborhoods serving bicyclists and pedestrians along the corridor and will be based upon the preferred concept alignments designated as the Westbound Option and Combined Option in the concept plan.

A location map is included in Appendix A.

2. DESIGN CRITERIA

The design shall meet the latest versions of AASHTO Design Specifications, Harford

ATTACHMENT A-2

County Road Code, MDOT SHA Standard Specifications and Standard Details, and FHWA-approved standards

3. SERVICES TO BE PROVIDED BY THE CONSULTANT

The services required of the Consultant include, but are not limited to:

• Survey

• Wetland/Tree Delineation

• Deed Research

• Forest Stand Delineation (FSD)

• Utility Designations

• Shared Use Path Horizontal and Vertical Alignment

• Roadway Design

• Drainage Design

• MDE Approval of Methodology

• Hydrologic and Hydraulic Study

• Stormwater Management

• Preparation/Coordination of required NEPA Documents

• Any additional tasks required by the Consultant to fulfill the needs of this project

4. INSTRUCTIONS

This project will…