27_015 Stormwater Repair_ Maintenance_ and In.pdf

PDF 514 KB Posted

Attached to
27-015 Stormwater Repair, Maintenance, and Inspection Services
Solicitation number
PE-66098-NONST-2027-000000159
Issued by
Fulton County, Georgia

About this file

This is a Request for Statements of Qualification (RFQC) issued by the City of Sandy Springs, Georgia, for stormwater repair, maintenance, and inspection services. The City seeks qualified contractors to provide scheduled maintenance, upkeep, and operation of city-owned stormwater facilities, including storm system maintenance, storm system inspections, and pond vegetation cutting and removal services. Services include line washing of drainage piping and culverts, vacuuming of storm structures, inspection of storm pipes and structures using pole cameras, and vegetation management at detention ponds up to four times annually. The City must inspect 20 percent of its infrastructure annually (approximately 2,500 pipes and structures or over 200 per month) to comply with its state MS4 permit. Phase I qualifications responses are due December 15, 2026, at 2:00 PM EST, with Phase II bid submission due January 20, 2027. The anticipated award recommendation date is January 27, 2027. The contract term is one year with the option to renew for an additional four years, with services commencing July 1, 2027. The City may terminate the contract for convenience upon thirty days' prior written notice.

No pricing information shall be submitted in Phase I; pricing will be evaluated in Phase II. No specific set-asides are identified in this solicitation. Respondents must meet mandatory minimum qualifications including at least five years of comparable firm experience, current GDOT prequalification in Drainage Rehabilitation, Repair, Replacement, and Miscellaneous Maintenance, valid Georgia licenses, and submission of three to five relevant reference projects demonstrating completion of at least one maintenance project within the past five years with a total project cost exceeding $500,000. Contractors must possess or have documented contractual access to specified equipment including a 75 HP backhoe, vacuum trailer, pole camera, and other operational resources. The contractor shall provide a 24-hour on-call emergency response service with a maximum two-hour response time and shall maintain Automatic Vehicle Location (AVL) tracking devices on all project vehicles. Insurance requirements include Workers' Compensation, Commercial General Liability ($1,000,000/$3,000,000), Automobile Liability ($1,000,000), and Umbrella coverage ($3,000,000). Contractors must comply with E-Verify requirements and drug-free workplace certifications. All responses must be submitted electronically through the Bonfire procurement platform; no other submission format will be accepted.

View the file

Other files

File Type Posted
Vendor Responsibility Questionnaire (VRQ).docx DOCX document
Required Forms.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR STATEMENTS OF QUALIFICATION FROM

QUALIFIED CONTRACTORS

RFQC #27-015

STORMWATER REPAIR, MAINTENANCE AND INSPECTION SERVICES

RESPONSE DUE DATE: DECEMBER 15, 2026, 2:00 PM EST

The City of Sandy Springs (“City”) uses a procurement portal powered by Bonfire Interactive (“Bonfire”) for accepting and evaluating bids, statements of qualification, responses and proposals digitally, found by using the link below:

https://sandysprings.bonfirehub.com/projects/260074/details

A response submitted (“Response”) in any other format (e-mail, paper, fax, mail, etc.) will not be accepted for any reason.

Please contact Bonfire at Support@GoBonfire.com for technical questions related to your registration or submissions. You can also visit Bonfire’s help forum at bonfirehub.zendesk.com/hc.

There is no pre-submittal conference for this Request for Qualifications (“RFQC”). Questions should be directed in writing to Andre Jefferies, City of Sandy Springs, Senior Buyer for this procurement, via e-mail at AJefferies@SandySpringsGA.gov or via the QA function in Bonfire. The deadline for submitting questions will be no later than 5:00 PM on November 30, 2026.

Information concerning this solicitation may be found electronically at:

The Bonfire website will contain this RFQC, any addenda, clarifications, schedule changes and other important information regarding solicitation. Contractors submitting Responses (“Respondents”) should check these electronic pages daily.

The City reserves the right, among others, to reject all Responses and to waive technicalities and informalities, to make award in the best interest of the City, or to cancel this solicitation at any time for any reason.

All Offerors are hereby notified that any digital content, applications, websites, or technology services provided under this solicitation must comply with the accessibility standards established under the Americans with Disabilities Act (ADA) and Web Content Accessibility Guidelines (WCAG) 2.1 Level AA.

https://sandysprings.bonfirehub.com/projects/260074/details mailto:Support@GoBonfire.com http://bonfirehub.zendesk.com/hc mailto:AJefferies@SandySpringsGA.gov

Offerors must demonstrate their ability to deliver products and/or services that are accessible to individuals with disabilities, including compatibility with assistive technologies such as screen readers, keyboard navigation, and voice recognition tools.

QUALIFICATIONS LETTER AND CERTIFICATION

(FAILURE TO INCLUDE THIS SIGNED QUALIFICATIONS LETTER AND CERTIFICATION MAY RESULT IN

THE REJECTION OF YOUR RESPONSE.)

By submitting a Response, the undersigned proposes to furnish and deliver any and all of the deliverables and services named in the attached RFQC #27-015 Stormwater Repair, Maintenance and

Inspection Services (“Project”) for the City of Sandy Springs (“City”).

It is understood and agreed that the Response constitutes an offer, which when accepted in writing by the Purchasing Division of the City’s Finance Department, and subject to the terms and conditions of such acceptance, will constitute a valid and binding contract between the undersigned and the

City.

It is understood and agreed that the undersigned has read the City’s specifications shown or referenced in the RFQC and that this statement is made in accordance with the provisions of such specifications. By written signature on this Response, the undersigned guarantees and certifies that all items included in this Response meet or exceed any and all such City specifications described in this RFQC. The undersigned further agrees, if awarded a contract, to deliver goods and services which meet or exceed the specifications. The City reserves the right to reject any or all Responses, waive technicalities, and informalities, and to make an award in the best interest of the City.

CERTIFICATION

The undersigned certifies that this Response is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a statement for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. The undersigned understands that collusive bidding is a violation of state and federal law and can result in fines, prison sentences, and civil damage awards. The undersigned agrees to abide by all conditions of the RFQC and certifies that he/she is authorized to sign this Response for the Respondent. The undersigned further certifies that the provisions of O.C.G.A. § 45-10-20, et seq., have not been violated and will not be violated in any respect.

Authorized Signature for Respondent:

Date:

Print/Type Name and Title of Person Signing for Respondent:

Print/Type Respondent Name Here:

Critical Things to Keep in Mind When Responding to an RFQC for the City of Sandy Springs

1. Read the entire document. Note critical items such as: supplies/services required; submittal dates; number of copies required for submittal; contract requirements (e.g. bonding and insurance requirements); etc.

2. Note the Procurement Manager's name, address, phone numbers and e-mail address. This is the only person you are allowed to communicate with regarding the RFQC and is an excellent source of information.

3. Attend the pre-submittal conference, if one is offered. These conferences provide an opportunity to ask clarifying questions, obtain a better understanding of the Project, or to notify the City of any ambiguities, inconsistencies, or errors in the RFQC.

4. Take advantage of the “question and answer” period. Submit your questions to the Procurement Manager by the due date listed in the Schedule of Events and view the answers given in the formal “addenda” issued for the RFQC. All addenda issued for an RFQC are posted on the City’s website and will include all questions asked and answered concerning the RFQC.

5. Follow the format required in the RFQC when preparing your Response.

Provide point-by-point responses to all sections in a clear and concise manner.

6. Provide complete answers/descriptions. Read and answer all questions and requirements. Don’t assume the City will know what your company’s capabilities are or what items/services you can provide, even if you have previously contracted with the City. Responses are evaluated based solely on the information and materials provided in your Response.

7. Use the forms provided, e.g. cover page, standard forms, etc.

8. Review the RFQC document again to make sure that you have addressed all requirements. Your original Response must be complete.

9. Submit Response on time. Note all the dates and times listed in the Schedule of Events and within the document, and be sure to submit all required items on time. Late Responses will not be accepted.

This checklist is provided for assistance only and should not be submitted with the Response.

SCHEDULE OF EVENTS

All dates are subject to change at the discretion of the City through written addendum or platform notice, as applicable.

Event Date

Phase I: Qualification

RFQC Issue Date November 16, 2026

Deadline for Phase I Questions November 30, 2026

Deadline for Posting Phase I Answers/Addendum

December 8, 2026

Phase I Qualifications Submission Due Date December 15, 2026

Anticipated Notice of Qualified Firms/Finalists December 30, 2026

Phase II: Solicitation

Phase II Advertisement Date December 30, 2026

Phase II Questions Due Date January 6, 2027

Deadline for Posting Phase II Answers/Addendum

January 13, 2027

Phase II Bid Submission Due Date January 20, 2027

Anticipated Award Recommendation January 27, 2027

SECTION 1: RFQC INSTRUCTIONS

1.1 Single Point of Contact

From the date this RFQC is issued until award or cancellation, Respondents shall not communicate regarding this procurement with any City employee, official, contractor, consultant, or evaluation team member other than the Procurement Manager identified below. Unauthorized communications may result in disqualification if the City determines the communication compromised the competitive process.

Procurement Agent Andre Jefferies

Address 1 Galambos Way, Sandy Springs, GA 30328

Telephone 770 206-1489

Email andrejefferies@sandyspringsga.gov

Procurement Platform: Bonfire https://sandysprings.bonfirehub.com/projects/260074/details

1.2 Required Review

• Respondents shall carefully review this RFQC, including all instructions, evaluation criteria, submission requirements, terms, conditions, forms, and attachments.

• Respondents shall promptly submit written questions concerning any ambiguity, inconsistency, restrictive requirement, or error by the question deadline stated in the Schedule of Events.

• The City may revise this RFQC by written addendum. Addenda become part of the procurement documents and must be acknowledged as required by the procurement platform or this RFQC.

• Only written answers issued by the City through addendum or the procurement platform are binding.

1.3 Pre-Submittal Conference

• There is no pre-submittal conference scheduled for this solicitation

1.4 Submitting a Sealed Response

This RFQC uses a two-phase procurement process. Phase I evaluates contractor qualifications on a Pass/Fail basis without pricing. Phase II will be an Invitation to Bid (ITB) limited to contractors determined responsive and responsible under Phase I.

1.4.1 Phase I Qualifications Submission

Phase I Responses shall not include price, cost, fee schedules, hourly rates, or other cost information. Inclusion of pricing in Phase I may result in disqualification.

Each Response shall be prepared simply and economically, providing straightforward, concise delineation of the Respondent’s capabilities to satisfy the requirements of this RFQC. To expedite the evaluation of Responses, it is essential that Respondents follow the format and instructions contained herein.

Phase I Responses must be submitted electronically through Bonfire by the deadline stated in the Schedule of Events. No physical package or envelope labeling is required.

mailto:andrejefferies@sandyspringsga.gov

Request for Qualified Contractor #27-015 RFQC Closing Date: December 15, 2026

RFQC Closing Time: 2:00 PM EST

• Qualifications Letter and Certification – Respondent’s authorized representative(s) shall complete and sign the Qualifications Letter and Certification on page 3 of this RFQC and return it with the Response.

• Statement of Qualifications – Respondent shall respond comprehensively and clearly to the requirements of Section 4 and shall include all documents, information, exceptions, clarifications, etc., as requested therein.

• Supporting Information – Respondent shall include all requested documents and information.

• Addenda – if any addenda have been issued, complete, sign and return the Addendum Acknowledgement (for each addenda issued) with the Response.

1.4.2 Failure to Comply with Instructions

The City may choose not to evaluate, may deem non-responsive, or may disqualify from further consideration any Response that does not follow the required format, is difficult to understand, is difficult to read, includes prohibited pricing in Phase I, or is missing requested information.

1.4.3 Deadline for Receipt of Submissions

All Phase I and Phase II Responses must be received through the City’s designated procurement platform by the applicable due date and time stated in the Schedule of Events or subsequent written addendum. Any Response submitted in any other format (e-mail, paper, fax, mail, etc.) will not be accepted for any reason.

1.4.4 Late Submissions, Withdrawals, and Corrections

Late Responses will not be accepted, will remain unopened, and will be rejected regardless of cause.

A Respondent may withdraw its Response before the applicable due date and time by submitting a written withdrawal request signed by an individual authorized to legally bind the Respondent.

If an obvious clerical error is discovered after a Response has been opened, the Respondent may submit a written correction request to the Procurement Manager within two business days of opening. The request must be on Respondent letterhead, signed by an authorized representative, and supported by clear and convincing evidence that the error was unintentional. The City will review the request consistent with the Purchasing Policy. Modifications to opened Responses for reasons other than obvious clerical errors are not permitted.

1.5 Respondent Certification

By submitting a Response, Respondent acknowledges that it understands and agrees to comply with the requirements of this RFQC, including all addenda, required forms, applicable laws, and the City’s Purchasing Policy.

All signatures required by this RFQC shall be provided by an individual authorized to legally bind the Respondent. Proof of signature authority shall be furnished upon request.

Unless otherwise stated in this RFQC or permitted by applicable law, Responses shall remain valid for one hundred twenty (120) days after the applicable submission deadline.

1.6 Cost of Preparing a Response

All costs incurred in preparing, submitting, clarifying, presenting, or negotiating a Response are the sole responsibility of the Respondent, and the City shall not be liable for any such costs.

All timely submitted materials become the property of the City and may be retained in the official procurement file in accordance with applicable law and records retention requirements.

SECTION 2: RECEIPT OF RESPONSES AND PROCUREMENT PROCESS

2.1 Authority

This RFQC is issued under the authority of the City of Sandy Springs and the City’s Purchasing Policy.

2.2 Public Records and Confidential Information

Materials submitted to the City may be subject to disclosure under the Georgia Open Records Act unless expressly exempt. Respondents claiming confidentiality must clearly mark and separate the specific information claimed as confidential and provide any affidavit or documentation required by law or this RFQC.

2.3 Responsiveness and Responsibility Review

The City may classify Responses as responsive or non-responsive at any time during the procurement process. Responses may be found non-responsive if required information is not provided or if the Response does not comply with the material requirements of this RFQC.

The City may determine whether a Respondent is responsible based on information submitted, information discovered during evaluation, references, licenses, certifications, financial capacity, debarment status, and any other responsibility related information relevant to the procurement.

2.4 City Rights Reserved

Upon determination such actions would be in its best interest, the City, in its sole discretion, reserves the right to:

• Cancel or terminate this procurement at any time if the City determines it is in its best interest.

• Reject any or all Responses received.

• Waive technicalities, informalities, or minor irregularities consistent with the Purchasing Policy.

• Request clarification of information submitted in a Response when permitted by the RFQC and Purchasing Policy.

• Proceed with interviews, presentations, demonstrations, discussions, or negotiations only as authorized in this RFQC.

• Make no award if doing so is in the City’s best interest.

SECTION 3: BACKGROUND AND PROJECT OVERVIEW

3.1 Background

The City is seeking submissions from highly qualified contractors to provide Stormwater Repair, Maintenance, and Inspection Services throughout the City, as directed. The successful Respondent

(“Contractor”) will provide scheduled maintenance, upkeep, and operation of City owned facilities.

To comply with the City’s state MS4 permit, the City or its designee must inspect 20% of the City’s infrastructure each year. That is approximately 2,500 pipes and structures or over two hundred

(200) per month. Inspections will be tracked monthly with the total completed reported in a monthly report.

3.2 Project Overview

The Contractor shall employ and appropriately train enough employees to provide efficient and timely services on behalf of the City. The Contractor shall assume responsibility for the cost of employing the workforce to maintain the City's facilities.

Contractor shall Develop Standard Operating Procedures (SOP's) for all tasks performed under this scope of work for use by the staff and be made available to the Director of Public works or his designee, for review, comment and approval.

The Contractor shall utilize a computerized work order management system, such as Lucity or the

City’s current system, provided by the City, to document all maintenance activities for the workforce. The City and their representatives shall have the right to inspect these records during normal business hours. The City shall provide one tablet per crew; in addition the City shall provide the data service plan for each tablet.

The Contractor shall perform task planning and scheduling for the workforce utilizing the maintenance management system and document the completion of those work tasks in the form of completed work orders that detail the date and time tasks are completed, address/location of task, labor and equipment resources utilized and any other relevant data or as requested by the City;

these documents and any others are to be turned in on a weekly basis. Work shall include the preventive and corrective maintenance of the City's property and equipment consistent with current practice. These reports shall be made available for inspection to the City, upon request.

Contractor shall work within the guidelines of the City's Emergency Response Plan in the event of a natural disaster.

Contractor shall perform other services; including assistance to other entities within the City as directed by the Director of Public Works or his designee and the contractors available certain resources including but not limited to equipment and labor the contractors scheduling and performance requirements. Such services must be preauthorized by the City and the cost of the services will be negotiated, if needed, between the City and the contractor prior to any work being performed. Any additional cost that may be incurred as a result of this request is to be quoted and approved prior to commencing with said work.

If there is an emergency requiring the Contractor to purchase a repair part and incur an expense on behalf of the City, the Contractor will be responsible to document and immediately notify the City's representative of the occurrence. Any repair parts purchased on behalf of the City under an emergency condition will be reimbursed to the Contractor upon presentation of a proper receipt or copy of an invoice with appropriate justification of the purchase. Reimbursement will be the direct cost.

On a "best efforts" basis during any facility rehabilitation effort, the Contractor shall comply with all

State and Federal Permit requirements. This clause does not relieve the Contractor from any negligent acts on the part of its staff. Upon completion of any facility rehabilitation, the Contractor's liability under this clause shall resume.

Perform other professional services that are incidental to the Scope of Services as directed by the

City. Such services must be pre-authorized by the City and additional compensation to the

Contractor will be negotiated on a case by case basis.

On a monthly and annual basis provide sufficient reporting of both work in progress and work completed, by individual elements, on behalf of the City. The format of these reports will be developed in coordination with the City. At a minimum these reports will include a listing of work orders outstanding, the plan and schedule for completion of that work and work orders completed to date.

3.2.1 Scope of Services

Storm System Maintenance

A. Provide the equipment and labor to maintain the storm drain system in Sandy Springs in accordance with agreed upon schedules and frequencies with the City. Typical maintenance may include but is not limited to replacing catch basin tops, grouting storm structures, minor storm pipe repairs, installing access to a junction box, etc.

B. Line washing of drainage piping and culverts, vacuuming of storm structures including curb inlets, catch basins, drop inlets and junction boxes.

C. Maintain adequate traffic safety control while performing storm drain system maintenance tasks. Lane closures may be required.

D. Verify with the City all ROW and easement parameters to insure that work is not performed on private property, unless approved by the City.

E. Collect and properly dispose of all solids and debris washed and vacuumed from the storm drain system in accordance with federal, state and local disposal regulations. Disposal costs of the waste shall be forwarded to the City for payment.

Storm System Inspections

A. Inspect storm pipes and structures the City is responsible for maintaining. To comply with the City’s state MS4 permit, the City or its designee must inspect 20% of the City’s infrastructure each year. That is approximately 2,500 pipes and structures or over two hundred (200) per month. Inspections will be tracked on a monthly basis with the total completed reported in a monthly report.

B. Utilize a pole camera for the inspections. A picture of each pipe and structure inspected is required. The pole camera shall be wireless and be adjustable to a minimum depth of fifteen feet (without extensions). It shall have a touchscreen tablet interface that allows viewing, annotation and playback along with a clamp-on bipod to allow hands-free operation to maximize image stability.

C. Notify the City of any deficiencies found during the inspections that require repair after the work order is completed. Maintain daily log of issues. Include a copy of the log in the monthly report.

D. Inspect pipes and structures as required ahead of roadway paving projects. Utilize a pole camera for the inspections. A picture of each pipe and structure inspected is required.

Provide real-time summary of any deficiencies or issues using a written collaborative software reporting format such as Asana.

Pond Vegetation Cutting and Removal

Provide vegetation cutting and removal services up to four (4) times a year based on the list of the City’s detention ponds that will be provided during the ITB process. Services shall include all equipment and labor required to complete the scope of services. The scope includes performing work as follows:

A. Cut all vegetation present inside the pond within the fenced area so that it is no higher than three (3) inches tall immediately after it is cut.

B. Remove all vines, kudzu, etc., on fences, walls, storm structures, etc.

C. Overseed with dominant grass as required.

D. Provide a time stamped daily report of equipment usage, personnel, and tasks performed

Performance

All work performed shall be in accordance with Georgia Department of Transportation Standard Specifications for Construction. The contractor will adhere to all current State and Federal construction safety regulations, including OSHA regulations. The Contractor will conform to the MUTCD and the State of Georgia Department of Transportation standards for traffic control. The contractor shall, at the request of the City, submit a proposed Traffic Control Plan for approval by the Technical Representative before beginning work. All construction signs and devices will be maintained in good condition and meet the latest GDOT and MUTCD requirements. All flaggers must be certified for flagging and maintain proof of that certification on their person during flagging operations. Traffic control will include flagging, lane closures, lane shifts, and provide safe areas and/or adequate safety for pedestrians through the work zone. The Contractor must always maintain a safe work zone for their employees, for pedestrians, and vehicular traffic. All contractor vehicles used onsite shall have each respective City logo on each side of the vehicle. It is the responsibility of the contractor to acquire such logos from the City. All water used on the project must be from a metered source. It is the responsibility of the contractor to obtain a meter from the operator of the water system they are drawing from, either City of Atlanta, Fulton, DeKalb and/or Gwinnett County.

Contractor Service Priority Schedule

The contractor shall perform services in accordance with the following priority schedule. The City and contractor shall mutually agree upon the priority level assigned to each work order.

• Priority 1: At least eighty-five percent (85%) of Priority 1 requests shall be resolved within twenty-four (24) hours.

• Priority 2: At least eighty-five percent (85%) of Priority 2 requests shall be resolved within seventy-two (72) hours.

• Priority 3: At least eighty-five percent (85%) of Priority 3 requests shall be resolved within seven (7) to ten (10) days after initiation of the work order.

• Priority 4: Requests shall be scheduled to maximize material utilization and operational efficiency.

Emergency Response Services

The contractor shall provide crews on a twenty-four (24)-hour, on-call basis to respond to incidents, emergencies, and weather-related emergencies within the City of Sandy Springs. The maximum response time shall be two (2) hours.

The work may be required during normal business hours, evenings, weekends, and holidays. A minimum of four (4) hours shall be paid for each call-out. Crew size shall be agreed upon by the City's designated representative and the contractor's supervisor.

Vehicle Tracking

The contractor shall provide Automatic Vehicle Location (AVL) tracking devices for all vehicles associated with the scope of work. The contractor shall be responsible for the maintenance, protection, and continued operation of the devices whenever the vehicles are being used for project services.

At a minimum, the AVL system shall provide:

• Real-time vehicle location data.

• Historical vehicle data, including speed and idle time.

• Data updates at intervals not exceeding thirty (30) seconds.

• Login access for the City's Director of Public Works or designee, as determined by the City.

Scheduled Equipment List

Respondents must possess and maintain access to the equipment and operational resources identified in the Scheduled Equipment List to perform the required services. All required equipment must be available for scheduled operations five (5) days per week and during emergency operations. Respondents shall provide an equipment inventory identifying the required equipment and confirming its availability. The City reserves the right to request supporting documentation and verify equipment availability during the Phase I qualifications evaluation.

o 1 - 75 HP rubber tire backhoe or equivalent o 1 vacuum trailer o 1 Ford F250 or equivalent o 2 Stihl quick cut saws (chop saws) or equivalent with fuel o 1 plate or jumping jack tamp with fuel for compaction o (As Required) Gloves, earphones, eye protection, logoed safety vests, safety boots, hard hats, rain suits, or other safety Equipment required by law.

o Required shovels, picks, lutes, rakes, brooms, and other tools as needed.

o Reflective portable safety signs of the non-permanent type (MUTCD compliant) o Reflective safety cones and traffic barrels (MUTCD compliant) o An appropriate assortment of barricades and traffic delineators (MUTCD compliant) o Cell phones or units with similar wireless capability to adequately communicate with the crew(s) o 1 Commercial grade chainsaw with appropriate personal protective equipment for pond vegetation cutting o 1 Commercial grade power blower o 1 Push mower o Equipment required for pond vegetation cutting and removal o 1 Arrow board (MUTCD compliant) o 1 pole camera (Enviro-sight or equivalent) o 1 additional pickup truck o Parking, labor, material and equipment staging area o 30 yard roll off and debris dumping transfer facility

All motor vehicles and mobile machinery shall be equipped with the appropriate strobe lights and warning placards, and all equipment shall be maintained to a clean and professional standard, reflecting the City's high standards.

Project Manager for the City

The contractor shall report to the City's designated Public Works Project Manager, referred to as the City Project Manager (CPM). The CPM shall serve as the City's primary point of contact for communications with the contractor and the City's consultants.

The CPM shall have the authority specified in the contract to act on behalf of the City with respect to contract performance, timely completion of work, changes to the work, and quality of services.

Staffing and Training

All contractor employees shall complete National Incident Management System (NIMS) training appropriate to their job functions within sixty (60) days after the contract start date.

The contractor shall provide sufficient qualified personnel and supervision to perform scheduled maintenance, inspection, pond vegetation work, traffic control, and emergency response services in accordance with the City's requirements.

The contractor shall coordinate all assigned work with the CPM or the CPM's designee, comply with applicable work order instructions, maintain required records, promptly communicate deficiencies and service issues, and submit reports in the format and frequency required by the City.

3.3 Project Specific Minimum Qualifications

Respondents must meet the minimum qualifications stated below to be considered for further evaluation. The City may request documentation to verify qualifications.

Mandatory minimum qualifications for Phase I are as follows:

• Valid and current licenses required to conduct business and perform the applicable services in Georgia, with copies provided as required by Section 4.3.1(F).

• At least five (5) years of firm experience on projects of similar scope and complexity; and at least five (5) years of comparable experience for each proposed Superintendent, Project Manager, and Project Director, as required by Section 4.3.2.

• Current GDOT prequalification in Drainage Rehabilitation, Repair, Replacement, and Miscellaneous Maintenance, supported by documentation.

• Submission of no fewer than three (3) and no more than five (5) relevant reference projects containing the information required by Section 4.3.2(B).

o The Respondent firm must demonstrate completion of at least one (1) maintenance project within the past five (5) years with a total project cost exceeding $500,000.

• The Respondent shall submit the required signed Qualifications Letter and Certification and other applicable mandatory forms identified in Section 4.3.3. Financial disclosures, litigation history, and prior contract history will be reviewed for responsibility and are not automatic

Pass/Fail disqualifiers absent a stated requirement or supported responsibility determination.

• Scheduled Equipment List: Respondents must possess and maintain access to the equipment and operational resources identified in the Scheduled Equipment List to perform the required services. All required equipment must be available for scheduled operations five (5) days per week and during emergency operations. Respondents shall provide an equipment inventory identifying the required equipment and confirming its availability. The City reserves the right to request supporting documentation and verify equipment availability during the Phase I qualifications evaluation.

The Contractor will have the equipment listed below available for use five (5) days a week and during emergency operations. The City logo shall be on all ride vehicles.

3.4 No Limit to Competition

No specification, qualification, or requirement is intended to unnecessarily limit competition.

Requirements are intended to describe the City’s minimum needs and evaluation priorities while preserving fair and open competition.

SECTION 4: RESPONDENT QUALIFICATIONS AND SUBMITTAL REQUIREMENTS

4.1 City Right to Investigate

The City may conduct investigations as deemed necessary to determine the ability, responsibility, responsiveness and qualifications of a Respondent to perform the work or services required by this

RFQC.

4.2 Page Limit and Format

Phase I Responses are limited to thirty (30) pages and Phase II Responses are limited to thirty (30) pages, excluding the transmittal letter, required forms, affidavits, addenda acknowledgements, cost forms, and other City provided forms unless otherwise stated in this RFQC.

Responses shall use a minimum 11-point font, be organized in the order requested, and provide clear, concise, complete, and relevant information.

4.3 Response Submittal and Evaluation Criteria

The Respondent shall submit the following information as its Response:

4.3.1 Description and Resources of Respondent Firm

A. Provide basic information: Firm name, address, name of primary contact, telephone number, fax number, e-mail address, and company website (if available). If the firm has multiple offices, the qualification statement shall include information about the parent company and branch office separately. Identify office from which Project will be managed and this office’s proximity to the Project site. Provide form of ownership, including state of residency or incorporation, and number of years in business. Is the Respondent a sole proprietor, partnership, corporation, limited liability corporation (LLC), joint venture, or other structure.

For joint venture entities that have not undertaken at least two (2) projects together, each firm should submit its qualifications separately. Joint submittals are subject to the same submittal page limit.

B. Briefly describe the history and growth of Respondent firm(s). Provide general information about the firm's personnel resources, including disciplines and numbers and classifications of employees, and locations and staffing of offices.

C. List the firm’s annual average revenue for the past five (5) years, provide the firm’s current ratio (current assets/current liabilities) or supply a letter from a bank, bank statement, or income statement from within the last six months.

D. Has the firm been involved in any litigation in the past five (5) years? Describe the firm’s experience with litigation with owners, subcontractors and/or architects. List any active or pending litigation and explain. List any claims against Respondent firm or against owners where your firm is named.

E. Has the firm or member thereof ever been removed from a contract or failed to complete a contract as assigned? Has the firm ever refused to sign a contract at the original bid amount submitted?

F. The Respondent firm MUST have all the necessary, valid and current licenses to do business in the State of Georgia as issued by the respective state boards and government agencies responsible for regulating and licensing the services to be provided and performed.

Applicable copies should be attached.

4.3.2 Experience and Qualifications

A. Provide professional qualifications and description of experience for proposed Project team including, at a minimum, the following: Superintendent, Project Manager and Project

Director. Firm’s Superintendent, Project Manager and Project Director shall have at least five

(5) years’ experience on projects of similar scope and complexity as the Project described in this RFQC. (At this stage, firms may list more than one person qualified and available for the

Project Manager Position).

B. Describe no more than five (5) and no fewer than three (3) projects, in order of most relevant to least relevant, which demonstrate the firm's capabilities to perform the Project described in this RFQC. The firm shall have at least five (5) years’ experience on projects of similar scope and complexity as this Project. For each project, the following project information shall be provided:

• Project name, location, dates during which services were performed, and photograph of project.

• Brief description of project and physical description including delivery method, site area, environmental issues, traffic impediments, etc.

• Project owner’s contact name, phone number and e-mail address.

• Provide any written letters of reference/recommendation about the firm’s performance on the reference project, including statements addressing the level of service and the quality of the construction.

• List the names and roles of proposed team members identified in 4.3.2A above, if any, who participated in these projects.

• Maintenance Work or project performed within the past five (5) years with a total project cost exceeding $500,000.

C. The Contractor shall conduct background checks, ensure driver’s license, perform drug testing and provide flagger training, and all other OSHA required training for staff. The

Contractor shall provide documentation of staff requirements upon request.

4.3.3 Required Forms and Attachments

• Certification of Sponsor Drug Free Workplace

• Georgia Security and Immigration Compliance Act Affidavit

• Notice to Contractors Compliance with Electrical Safety Provisions

• Affidavit Verifying Status for City Public Benefit Application

• Contractor Affidavit and E-Verify Documentation

• Corporate Certificate

• List of Subcontractors

• Reference Form

• Qualifications Letter and Certification

• Vendor Responsibility Questionnaire

• Georgia Business License

• Addendum Acknowledgement Form.

• GDOT Prequalification in Drainage Rehabilitation, Repair, Replacement, and Miscellaneous Maintenance.

• Schedule Equipment List Inventory: Respondents shall submit an equipment inventory identifying all required equipment and operational resources listed in Section 3.2.1. The inventory shall identify each equipment item, quantity, ownership or contractual access status, and availability for scheduled and emergency operations.

4.3.4 Phase I: Qualifications Evaluation

The City will evaluate Phase I Statements of Qualifications on a Pass/Fail basis against the mandatory minimum qualifications stated in Sections 3.3 and 4.3.1-4.3.2. Other requested information will support the City’s responsibility review. A disclosure of litigation, a financial ratio, or prior contract history is not an automatic failure unless a stated mandatory requirement is unmet. No price information shall be submitted in Phase I.

Category / Criteria (Pass/Fail) What the City is Looking For

Description and Resources of Firm

Firm identity, organizational structure, personnel resources, financial disclosures, litigation and contract history, and required Georgia licenses as specified in Section 4.3.1; disclosures are reviewed for responsibility.

Experience and Qualifications

At least five (5) years of comparable firm experience; five

(5) years of comparable experience for each proposed Superintendent, Project Manager, and Project Director;

and three (3) to five (5) relevant reference projects under Section 4.3.2.

GDOT

Prequalification and Licensing

Current GDOT prequalification in Drainage Rehabilitation, Repair, Replacement, and Miscellaneous Maintenance, along with applicable valid Georgia licenses and supporting documentation as required by Sections 3.3 and 4.3.1(F).

Required Forms and Attachments

Completed and signed required forms, applicable certifications, acknowledgements.

Scheduled Equipment List

Demonstrated possession of, or documented contractual access to, the required equipment and operational resources identified in Section 3.2.1, including confirmation of availability for scheduled and emergency operations.

4.3.5 Phase II: Bid Submission

Only firms determined qualified under Phase I and invited by the City may submit Phase II bids. The

City anticipates issuing an Invitation to Bid (ITB). Phase II will assess bid responsiveness, bidder responsibility and price in accordance with the subsequent ITB; Phase I qualifications will not be assigned numerical points or combined with price to create a subjective ranking.

Category / Criteria (Pass/Fail) What the City is Looking For

Bid Submission Complete, responsive bid and required pricing forms consistent with the Phase II ITB scope, specifications and instructions.

Phase II award recommendation, if any, will be to the lowest responsive and responsible bidder under the pricing evaluation method stated in Phase II ITB, subject to the City’s reserved rights and

Purchasing Policy.

SECTION 5: EVALUATION PROCESS

5.1 Initial Administrative Review

Purchasing will conduct an initial administrative review of each Phase I and Phase II submission, as applicable, to determine whether required documents, signatures, forms, and material submission requirements have been provided.

5.2 Phase I Evaluation and Qualified Pool

The Evaluation Committee will evaluate Phase I Responses on a Pass/Fail basis against the mandatory minimum qualifications stated in Sections 3.3, 4.3.1, and 4.3.2. The City will separately consider financial, litigation, contract-performance, equipment and other submitted information as relevant to bidder responsibility. All Respondents meeting the mandatory qualifications and found responsible will be eligible for the Phase II qualified pool; no numerical ranking or limited shortlist is established by this RFQC.

The qualified pool or finalist list shall be reviewed by the Using Agency and Purchasing before Phase II is opened to qualified Respondents.

5.3 Phase II Invitation

Only Respondents determined to be qualified and responsible under Phase I and invited by the City may submit a Phase II response. The City will issue Phase II instructions, deadlines, question procedures, addenda and submission requirements through the procurement platform or written notice.

5.4 Phase II Evaluation

The Evaluation Committee will evaluate Phase II bids submitted by qualified Respondents in accordance with the requirements, specifications, and pricing evaluation methodology established in the Phase II Invitation to Bid (ITB). Award recommendation, if any, will be made to the lowest responsive and responsible bidder, subject to the City's Purchasing Policy and reserved rights.

5.5 Interviews, Presentations, or Demonstrations

Interviews, presentations, or demonstrations will not be conducted during Phase I. If authorized in this RFQC and deemed necessary after Phase II evaluation, the City may conduct interviews, presentations, or demonstrations.

5.6 Negotiations

Negotiations may occur only if expressly authorized in this RFQC and shall be conducted by or through Purchasing in accordance with the Purchasing Policy.

5.7 Award Recommendation

The award recommendation, if any, will be based on the evaluation process stated in this RFQC, responsiveness results, responsibility findings, department concurrence, and the best interest of the City. Awards exceeding applicable approval thresholds require approval by the appropriate authority, including City Council when required.

SECTION 6: TERMS AND CONDITIONS

6.1 Additional Contract Provisions and Terms

This RFQC, all addenda, the successful Response, clarifications, negotiated terms if applicable, and the City’s contract or purchase order documents may be incorporated into the resulting agreement or purchasing instrument.

6.2 Performance Prior to Contract Execution

No Respondent shall begin performance before the City issues a fully executed contract, purchase order, notice to proceed, or other written authorization required by the City.

6.3 Contract Term

The contract term under this procurement shall be for one (1) year with the option to renew for an additional four (4) years, in accordance with the requirements of the contract. Services under the contract will commence on July 1, 2027.

6.4 Contract Termination

The City may terminate any resulting contract for convenience upon thirty (30) days' prior written notice to the Contractor.

6.5 Subcontractors

The successful Respondent shall be responsible for all work performed by subcontractors.

Subcontractors must be identified as required by this RFQC and are subject to City review and approval when applicable.

6.6 General Insurance Requirements

Within (10) days of notice of contract award, and at all times that a contract is in force, the Contractor shall obtain, maintain and furnish the City certificates of insurance from licensed companies doing business in the State of Georgia with an A.M. Best Rating A-10 or higher and acceptable to the City covering:

A. Workers’ Compensation and Employer’s Liability Insurance. Workers’ Compensation Insurance in compliance with the applicable Workers’ Compensation Act(s) of the state(s) wherein the work is to be performed or where jurisdiction could apply in amounts required by statutes. Employer’s Liability Insurance, with limits of liability of not less than $3,000,000 per accident for bodily injury or disease.

B. Commercial General Liability Insurance, including contractual liability insurance, product and completed operations, personal and advertising injury, and any other type of liability for which the contract applies with limits of liability of not less than $1,000,000 each occurrence / $3,000,000 policy aggregate for personal injury, bodily injury, and property damage. Commercial General Liability Insurance shall be written on an “occurrence” form.

C. Automobile Liability Insurance with limits of liability of not less than $1,000,000 per accident for bodily injury and property damage if automobiles are to be used in the delivery of or in the completion of services and work or driven onto the City’s property.

Insurance shall include all owned, non-owned and hired vehicle liability.

D. Umbrella Insurance with limits of liability excess of Employer’s Liability Insurance, Commercial General Liability Insurance and Automobile Liability Insurance in the amount of not less than $3,000,000.

E. Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability and/or Errors and

Omissions (if project involves environmental hazards) with limits not less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate.

F. Professional (Errors and Omissions) Insurance for Professional Services and for all

Design/Build Projects with limits of liability of not less than $3,000,000 per occurrence or claim / $3,000,000 policy aggregate. Such policy shall also include coverage for losses arising from the breach of information security or cyber liability (including Errors and Omissions, Security and Privacy Liability and Media Liability), whether combined with the Professional Liability policy or placed as a separate policy, but carrying the same limits of liability. Such coverage shall insure damage, injury and loss caused by error, omission or negligent acts, including all prior acts without limitation, related to the professional services to be provided under the contract. The policy shall be amended to include independent contractors providing professional services on behalf of or at the direction of the contractor. The definition of Contractual Liability shall be amended to state that liability under a contract of professional services is covered. Further, coverage shall be afforded for fraudulent acts, misappropriation of trade secrets, internet professional services, computer attacks, personal injury, regulatory actions, wrongful acts, contractual liability, privacy policy, and insured versus insured. The Contractor shall ensure that coverage under this policy continues for a period of thirty-six (36) months after completion of services.

All such insurance shall remain in effect until final payment is made and the Project is accepted by the City. If the Contractor receives notice of non-renewal or material adverse change of any of the required coverages, it shall promptly advise the City in writing.

Failure of the Contractor to promptly notify the City on non-renewal or material adverse change of any of the required coverages terminates the contract as of the date that the contractor should have given notification to the City. The insurance policies shall contain or be endorsed to contain, the following provisions:

A. A provision that coverage afforded under such policies shall not expire, be canceled or altered without at least thirty (30) days prior written notice to the City.

B. Workers’ Compensation and Employer’s Liability and Property insurance policies shall contain a waiver of subrogation in favor of the City and the City’s boards, officials, directors, officers, employees, representatives, agents, and volunteers.

C. Commercial General Liability, Automobile Liability Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability and/or Errors and Omissions (if Project involves environmental hazards) insurance policies shall include an endorsement making the City and the City’s boards, officials, directors, officers, employees, representatives, agents, and volunteers Additional Insureds under such policies.

A copy of these endorsements shall be provided to the City.

Certificates of Insurance showing that such coverage is in force shall be filed under the contract by the Contractor to the City.

The obligations for the Contractor to procure and maintain insurance shall not be construed to waive or restrict other obligations, and it is understood that insurance in no way limits liability of the contractor whether same is covered by insurance.

6.7 Compliance with Illegal Immigration Reform and Enforcement Act When applicable, Respondents shall comply with O.C.G.A. § 13-10-91 and all E-Verify requirements for contracts involving the physical performance of services within the State of Georgia.

6.8 Compliance with Laws

Respondents and any resulting contractor shall comply with all applicable federal, state, and local laws, rules, regulations, ordinances, and City policies applicable to the procurement and resulting work or services.

6.9 Drug Free Workplace

Respondents shall certify compliance with applicable drug free workplace requirements when required by law, policy, or this RFQC.

6.10 Substitutions, Staffing Changes, and Change Orders

Substitutions of proposed key staff, subcontractors, materials, scope, schedule, or other evaluated elements are not permitted after award without prior written approval by the City.

6.11 Invoicing and Payment

The City agrees to pay the Contractor in current funds for the performance of the contract. Upon completion of work and acceptance of the items, the Contractor shall submit an invoice detailing…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .