27-012 Congestion Mitigation RFQ.pdf

PDF 2 MB Posted

Attached to
Transportation Engineering Design– Rte 174 Congestion Mitigation/Safety Imprvmt
Solicitation number
27-012
Issued by
Hartford County, Connecticut

About this file

Summary

This is a Request for Qualifications (RFQ) issued by the City of New Britain, Connecticut, Department of Public Works, seeking transportation engineering design services for the Route 174 Congestion Mitigation and Safety Improvements Project. The City is soliciting Statements of Qualifications from experienced engineering consulting firms to provide land surveying and mapping, National Environmental Policy Act (NEPA) compliance, property easement and acquisition support, transportation and traffic engineering, roadway design, and related professional services necessary to advance the project through final design toward construction. The project is located on Route 174, an urban arterial on New Britain's east side, and involves realigning the Route 174/East Street intersection from an offset, signalized "Z-curve" intersection into a conventional signalized T-intersection with appropriate turning lanes and incidental improvements. The RFQ was issued November 3, 2026, with a mandatory site meeting scheduled for November 19, 2026, at 12:00 p.m. at the former New Britain Public Works Operations Center, 55 Harvard Street, New Britain, Connecticut. Qualifications packages must be submitted electronically in PDF format to Mark Moriarty, Director of Public Works, at mark.moriarty@NewBritainCT.gov by December 3, 2026, at 12:00 p.m. EST. The City anticipates selecting the firm whose qualifications and demonstrated capabilities best meet project needs and may conduct interviews, request clarifications, and negotiate final scope, schedule, and compensation with the highest-ranked firm.

The City has been awarded a $14,696,050 grant through the Federal Highway Administration's Better Utilizing Investments to Leverage Development (BUILD) Grant Program for this project, which has a total estimated cost of $14.7 million inclusive of design and construction. The project is subject to an FHWA fund obligation deadline of September 30, 2030, which the City identifies as a critical project requirement. The selected consultant must demonstrate familiarity with federally funded transportation projects and possess the technical expertise, staffing capacity, and project management capabilities to meet applicable federal and state requirements and maintain the project schedule. Minimum qualifications include demonstrated expertise in transportation and traffic engineering, working knowledge of Connecticut Department of Transportation (CTDOT) design standards and procedures, NEPA compliance and environmental documentation, land surveying and property coordination, federal-aid transportation project administration, and project management with proven ability to deliver complex projects within established budgets and deadlines. The prime consultant must maintain a valid Connecticut Professional Engineer license for personnel serving in responsible charge of engineering work, and specialized subconsultants may be proposed where appropriate. The project involves coordination with multiple stakeholders including CTDOT, FHWA, the selected development partner Day Brothers LLC, and other entities to minimize delays and maintain schedule adherence.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of New Britain, Connecticut Request For Qualifications (RFQ) 27-012

Transportation Engineering Design Services – Route 174 Congestion Mitigation and Safety Improvements

The City of New Britain (“the City”) is seeking Statements of Qualifications from experienced engineering consulting firms to provide professional services for the Route 174 Congestion Mitigation and Safety Improvements Project. The selected consultant will provide land surveying and mapping, National Environmental Policy Act (“NEPA”) compliance, property easement and acquisition support, transportation and traffic engineering, roadway design, and related services necessary to advance the project through final design and toward construction.

There will be an opportunity to meet with City staff to discuss the project on November 19, 2026, at 12:00 pm at the site previously used as the New Britain Public Works Operations Center, 55 Harvard Street, New Britain CT.

Proposal submission documents are available at no charge by downloading from the City of New Britain website via the document link noted below.

Qualifications will be accepted by the Purchasing Department until December 3, 2026, at 12:00 pm; submissions received after this date and time will not be considered. The City reserves the right to waive any informalities in any submission, to reject any and/or all submissions, and to accept the proposal that in its judgment is in its best interest. Interested firms are required to submit their qualifications to the Purchasing Department no later than the date and time noted above. The City does not assume responsibility for the failure of submissions to be received by the City by the date and time noted above.

Mark Moriarty, Director of Public Works City of New Britain 27 West Main Street New Britain, CT 06051 mark.moriarty@newbritainct.gov

27 West Main Street ▪ Room 501 - New Britain, CT 06051 ▪ Phone (860) 826-3350 Fax (860) 826-3353

C I T Y O F N E W B R I T A I N est. 1871 Department of Public Works www.newbritainct.gov

REQUEST FOR QUALIFICATIONS (RFQ)

TRANSPORTATION ENGINEERING DESIGN SERVICES

RFQ Issue Date: November 3, 2026 Submission Deadline: Thursday, December 3, 2026, at 12:00 PM

INTRODUCTION AND PURPOSE

The City of New Britain, Connecticut (the “City”), is seeking Statements of Qualifications from experienced engineering consulting firms to provide professional services for the Route 174 Congestion Mitigation and Safety Improvements Project. The selected consultant will provide land surveying and mapping, National Environmental Policy Act (NEPA) compliance, property easement and acquisition support, transportation and traffic engineering, roadway design, and related services necessary to advance the project through final design and toward construction.

The City has been awarded a grant of $14,696,050 through the Federal Highway Administration’s (FHWA) Better Utilizing Investments to Leverage Development (BUILD) Grant Program. The selected consultant must be familiar with federally funded transportation projects and demonstrate the technical expertise, staffing capacity, and project management capabilities necessary to meet applicable federal and state requirements and maintain the project schedule.

PROJECT BACKGROUND AND DESCRIPTION

The project is located on New Britain’s east side along Route 174, an urban arterial that serves as a primary east-west connection between downtown New Britain and the Town of Newington.

The project focuses on the Route 174/East Street intersection, which is currently configured as an offset, signalized “Z-curve” intersection. The existing alignment and substandard geometric conditions contribute to confusing traffic movements, operational inefficiencies, and increased crash risk for motorists, pedestrians, and other roadway users. The Capital Region Council of Governments’ (CRCOG) 2026 Safety Action Plan also identifies the Route 174/Newington Avenue corridor as one of the region’s Top 30 Regional Priority Corridors.

The principal project improvement involves realigning the existing intersection into a signalized T-intersection, incorporating appropriate turning lanes and associated roadway, traffic signal, and other incidental improvements. The anticipated limits of roadway improvements include approximately:

Newington Avenue (Rt 174): 480 linear feet

RFQ Pedestrian Signal Safety Improvements

East Street: 390 linear feet East Main Street (Rt 174): 622 linear feet

The project has undergone substantial preliminary planning and coordination with the Connecticut Department of Transportation (CTDOT), including completion of a Purpose and Needs Study and a NEPA-based alternatives analysis. The selected consultant will be expected to build upon this prior work, confirm applicable approvals and outstanding requirements, and advance the project efficiently through the remaining environmental, design, property, and federal authorization processes.

The proposed roadway realignment will require the use of a portion of a City-owned, approximately 4.6-acre redevelopment property. The City is coordinating the roadway project with the property's redevelopment, which already involves a developer and ongoing building demolition and environmental remediation activities. Effective coordination among the City, CTDOT, FHWA, the developer, and other stakeholders will be essential to avoiding conflicts, minimizing delays, and maintaining the overall project schedule.

PROJECT SCHEDULE AND DELIVERY REQUIREMENTS

The project is subject to the FHWA BUILD Grant Program’s September 30, 2030, fund obligation deadline. Meeting this deadline is a critical project requirement.

Given the project's technical complexity, environmental requirements, property considerations, and coordination needs, the City places significant importance on the consultant’s demonstrated ability to establish and maintain realistic project schedules, identify and resolve potential delays, coordinate effectively with reviewing agencies, and deliver required project milestones within the available timeframe.

Responding firms must demonstrate their capacity to provide qualified personnel, manage concurrent work activities, and proactively address project risks. Qualifications should include examples of comparable projects successfully delivered within demanding schedules and budgets, particularly projects involving FHWA funding and CTDOT review and approval.

ANTICIPATED SCOPE OF SERVICES

The selected consultant will be expected to provide the professional services necessary to advance the project through applicable environmental approvals, design, property coordination, and preparation for construction and federal fund obligation. Anticipated services include, but are not necessarily limited to, the following:

A. Land Surveying and Mapping B. NEPA and Environmental Compliance C. Property, Easement, and Acquisition Support D. Transportation, Traffic, and Roadway Design E. Project Management and Federal/State Coordination

MINIMUM QUALIFICATIONS AND DESIRED EXPERIENCE

The City seeks a consulting firm with demonstrated expertise and a strong record of successful delivery on complex transportation infrastructure projects. Firms should possess substantial experience in the following areas:

Transportation and traffic engineering, roadway geometry, and signalized intersection design.

Working knowledge of CTDOT design standards, procedures, review processes, and project delivery requirements.

NEPA compliance and environmental documentation for federally funded transportation projects, including coordination with FHWA and CTDOT.

Land surveying, mapping, property easements, acquisition support, and coordination of roadway projects with private or municipal redevelopment activities.

Federal-aid transportation project administration, documentation, and compliance.

Project management, schedule control, cost estimating, risk management, and delivery of projects within established budgets and deadlines.

The prime consultant must have sufficient organizational capacity and access to qualified personnel to perform the assignment within the required timeframe. Specialized subconsultants may be proposed where appropriate; however, the prime consultant will be expected to demonstrate overall responsibility for project coordination, quality control, schedule management, and delivery.

Personnel serving in responsible charge of the engineering work must possess and maintain a valid Connecticut Professional Engineer license, as applicable to their assigned responsibilities.

QUALIFICATIONS PACKAGE REQUIREMENTS

Interested firms shall submit a Qualifications Package demonstrating their understanding of the project, relevant experience, technical capabilities, staffing resources, and ability to meet the project schedule. Packages shall address the following:

A. Firm Overview and Relevant Experience B. Understanding of the Project and Proposed Approach C. Project Organization and Key Personnel D. Project Schedule and Resource Capacity E. Past Performance and References F. Subconsultants

EVALUATION AND SELECTION

Qualifications Packages will be evaluated by the City based on the following considerations:

1. Project Understanding and Proposed Approach

2. Relevant Experience and Qualifications

3. Technical Competence and Quality of Services

4. Project Management and Schedule Performance

5. Organizational Capacity and Staffing

6. Past Performance and References

7. Knowledge of Applicable Requirements

The City may consider other factors relevant to the successful completion of the project. The City anticipates selecting the firm whose qualifications and demonstrated capabilities best meet the City's needs and project objectives. The City may conduct interviews, request clarifications or supplemental information, and negotiate the final scope of services, schedule, and compensation with the highest-ranked firm, subject to applicable procurement requirements.

8. SUBMISSION REQUIREMENTS AND DEADLINE

Qualifications Packages shall be submitted electronically in PDF format by email to:

Mark Moriarty, Director of Public Works City of New Britain Email: Mark.moriarty@NewBritainCT.gov

Submission Deadline: Thursday, December 3, 2026, at 12:00 PM.

City of New Britain CT – Request for Qualifications 27-012 Route 174 Congestion Mitigation and Safety Improvements Project

2026 BUILD Grant Application – Project Description

The City of New Britain, Connecticut (“the City”) respectfully submits the Route 174 Congestion Mitigation and Safety Improvements Project (“the Project”) for consideration under the Better Utilizing Investments to Leverage Development (BUILD) Grant Program.

The Project consists of a critical intersection realignment and functions as a stand-alone transportation improvement even though this project is intricately tied together with a transit-oriented development project on a 4.6-acre, City-owned parcel that is located adjacent the Eastmain Street CTfastrak BRT Station and located in our densely populated Eastside Neighborhood Revitalization Zone (NRZ).

From a transportation standpoint the project addresses well documented and studied traffic safety and congestion issues related to the poorly aligned existing Route 174 at East Street intersection.

The project has a total cost of $14.7 million which includes project design and construction costs. The redevelopment of the City parcel is well underway, with a developer, Day Brothers, LLC, selected and a $6 million State of Connecticut Community Investment Fund (CIF) grant awarded for environmental remediation and demolition activities at the existing development site.

Together, the transportation and redevelopment investments will be transformative for the City’s East Side neighborhoods, and this project directly advances multiple BUILD statutory and merit-based objectives, including:

RFQ 27-012 Route 174 Congestion Mitigation and Safety Improvements

1. Safety – Improves safety on a High Crash Corridor identified in two FHWA-funded Safe Streets for All (SS4A) Safety Action Plans by converting an offset intersection into a single, conventional four-leg intersection, reducing conflict points and crash risk for all users.

2. Quality of Life and Community Well-Being – Enhances neighborhood livability by reducing congestion, noise, and crash exposure, while incorporating streetscape amenities, two pocket parks, and gateway features that improve the public realm and community identity.

3. Mobility and Community Connectivity – Removes a long-standing barrier between the East Side and downtown by realigning Route 174 with East Street, providing safer and more direct access to the CTfastrak East Main Street BRT Station, downtown New Britain, Chamberlain Elementary School, the Town of Newington, and regional corridors including Routes 9 and 72 and I-84.

4. Economic Competitiveness – Serves as the transportation partner to redevelopment of a strategically located 4.6-acre City-owned site adjacent to high-capacity transit, unlocking underutilized land and supporting transit-oriented development and private investment.

5. State of Good Repair – Replaces deteriorated and non-compliant infrastructure, including pavement, traffic signals, sidewalks, and ADA curb ramps.

6. Partnership and Collaboration – Demonstrates strong coordination among the City of New Britain, the Connecticut Department of Transportation, the Connecticut Department of Community and Economic Development, the City’s Eastside NRZ, and the City’s selected development partner.

7. Innovation – Advances an integrated, corridor-level approach that aligns transportation, safety, redevelopment, and placemaking investments to catalyze long-term revitalization of New Britain’s East Side.

Project Location

The City’s Route 174 Congestion Mitigation and Safety Improvements Project is located in the City’s eastside, on an urban arterial that serves as the primary east-west connector connecting downtown New Britain to the Town of Newington. The project involves an intersection realignment involving a portion of three roadways: Newington Avenue (480’), East Street (390’), and East Main Street (622’). A project location map consistent with BUILD Grant requirements has been submitted along with the City of New Britain’s application. The project is located in an Area of Persistent Poverty and Historically Disadvantaged Community as indicated on the BUILD Grant Project Location Verification webpage.

Existing Conditions and Transportation Deficiencies

New Britain CT is currently the 9th most economically disadvantaged community in the State of Connecticut. The City has a strong track record of leveraging transportation investments in the City’s road network to promote transit-oriented development and revitalize neighborhoods in New Britain.

Route 174 is a minor urban arterial that serves as the primary eastern gateway to downtown New Britain, providing access to State Routes 9 and 72 and regional connectivity to Interstate 84.

Within the Project limits, Route 174 includes portions of Newington Avenue, East Main Street, and East Street. The corridor is a two-lane roadway with an average 30-foot curb-to-curb width and has average daily traffic volumes of approximately 8,000 VPD. The roadway lacks dedicated turning lanes at the Newington Avenue/East Street intersection, and has sidewalks that are generally in poor condition and include gaps. Route 174 intersects the CTfastrak Bus Rapid Transit (BRT) corridor and East Main Street Station at the project’s western limit.

The Route 174/East Street intersection is configured as an offset, signalized “Z-curve” intersection with poor alignment and substandard geometry. This configuration creates confusing traffic movements, operational inefficiencies, and elevated crash risk for all users, including motorists, transit riders, vulnerable roads users, and emergency responders.

Safety concerns at this location have been thoroughly documented through two FHWA-funded Safe Streets and Roads for All (SS4A) Safety Action Plans. The City completed its first Safety Action Plan in June 2025, and a second regional plan is being finalized by the Capital Region Council of Governments (CRCOG). Both plans analyzed five years of crash data (2019–2023) and independently identified this intersection as a high-priority crash location.

CRCOG’s Safety Action Plan further identified the Route 174/Newington Avenue corridor as one of the Top 30 Regional Priority Corridors within a region that includes approximately 976,000 residents and more than 5,100 miles of roadway underscoring the regional significance of this project.

Project Planning and Design

The Project has been thoroughly vetted through the City’s June 2023 Needs and Deficiencies Study, NEPA-related analysis including a full alternatives evaluation, and two SS4A Safety Action Plans.

From a design standpoint, high-level preliminary engineering is complete, including detailed cost estimates. The preferred roadway realignment was selected after evaluating multiple configurations. The vertical geometry has been refined to increase sight distances while minimizing vertical cuts and associated impacts to underground utilities. Design work addressing walkability, connectivity, livability, and placemaking has also been completed and documented through renderings. The City has coordinated with its selected development partner to preserve the necessary right-of-way for the realigned intersection.

The total project cost is $14.7 million, inclusive of design and construction, and the project is well positioned to meet the BUILD Grants federal fiscal year constraints of having funds obligated by September 30, 2030, and expended by September 30, 2035.

The primary historical constraint has already been resolved. The project required right-of-way impacts to the City’s former Public Works Yard located on the 4.6-acre redevelopment site.

Beginning in 2023, the City invested $20 million in local funds to relocate the Public Works Operations Center, fully clearing the site and eliminating this constraint.

Project Safety Benefits

The Route 174/Newington Avenue corridor was recently identified as one of the Top 30 Regional Priority Corridors in the Capitol Region Council of Governments (CRCOG) FHWA SS4A Safety Action Plan.

The City’s project directly addresses the safety and congestion issues that led to this designation. To underscore the regional significance of this investment, the CRCOG region encompasses approximately 976,000 residents and more than 5,100 miles of roadway.

The Project realigns the intersection of Route 174 and East Main Street from an offset configuration to a traditional four-way signalized intersection. This improves safety by simplifying traffic movements, reducing conflict points, and improving driver decision-making.

Key Traffic Safety Benefits

Fewer Conflict Points: Consolidates multiple offset conflicts into a single, controlled intersection, reducing angle, left-turn, and crossing crashes.

Reduced Driver Confusion: Improves driver expectancy and predictability, reducing hesitation and improper movements.

Improved Visibility: Enhances intersection geometry and sight lines for vehicles, pedestrians, and bicyclists.

Lower Crash Severity: Eliminates unexpected stopping between intersections and reduces congestion-related driver frustration.

Improved Signal Operations: Enables simpler phasing, protected turns, and improved pedestrian safety.

Emergency and Transit Benefits: Improves emergency response efficiency, bus operations, and overall traffic flow.

FHWA Alignment: Intersection realignment is an FHWA Proven Safety Countermeasure and directly addresses documented crash patterns.

Congestion Mitigation and Operational Benefits

In addition to safety improvements, the Project significantly reduces congestion, particularly on the Newington Avenue approach during peak periods. The June 2023 Needs and Deficiencies Study documented the following improvements:

Newington Avenue PM Peak Hour: LOS D to LOS B Newington Avenue AM Peak Hour: LOS E to LOS C Reduced Delay and Improved Reliability: Improved LOS shortens delays, improves travel time reliability for commuters, freight, transit, and emergency vehicles, and reduces aggressive driving behavior.

Lower Emissions and Improved Air Quality: Reduced idling and fewer stop-and-go conditions lower GHGs, NOx, PM emissions, and neighborhood cut-through traffic impacts.

Right-of-Way Impacts

The realignment of the Route 174 intersection involves a four full and one partial property takes.

Our Needs and Deficiencies Study and NEPA alternatives analysis work ensured that our selected realignment minimized these impacts.

Full Property Takes

685 East Street 688 East Street 691 East Street 788 East Street

Partial Project Take

38 Newington Avenue

The realigned roadway will also need to utilize a portion of the City owned 4.6-acre redevelopment site which is being coordinated in advance of the project.

City of New Britain, Connecticut Request for Qualifications 27-012

Acknowledgment of Receipt for Solicitation Documents

Please take a moment to acknowledge receipt of the attached documents. Your compliance with this request will help us to maintain proper follow-up procedures (e.g. issuance of addenda or other information) while ensuring that all vendors have the opportunity to submit qualifications.

Please complete this page, and return as soon as practical, to the following email address:

pt.finance@newbritainct.gov

Thank you for your interest in this project.

Date issued: November 3, 2026

Date received by your firm: _____/_____/________

Do you plan to make submission? Yes _____ No _____

Print or type the following information:

Company name: ________________________________________________

Address: ________________________________________________

City or Town: ________________________________________________

Phone: ________________________________________________

Email: ________________________________________________

Received by: ________________________________________________