modified RFQ Highland Terrace-Parking Lot.doc

DOC document 452 KB Posted

Attached to
Parking Lot Replacement - Multi-Family Housing Complex
Solicitation number
26-SO-09-0001
Issued by

About this file

modified Request for Quotes

View the file

Other files

File Type Posted
SF-30.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTINUTATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
PAGE

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED

26-SO-09-0001

NAME OF OFFEROR OR CONTRACTOR

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

This RFQ FORMCHECKBOX is FORMCHECKBOX is not a Small Business Set-Aside

PAGE OF

PAGES

1. REQUEST NO.

26-SO-09-0001

2. DATE ISSUED

10/07/08

3. REQUISITION/PURCHASE REQUEST No.

N/A

4.. CERT. FOR NAT. DEF. UNDER BDSA REG.2 AND/OR DMS REG 1 (
RATING

N/A

5a. ISSUED BY USDA, Rural Development East Lansing, Michigan {See Below for address}

6. DELIVER BY (DATE)

October 22, 2008

5b. FOR INFORMATION CALL (NO COLLECT CALLS)
7. DELIVERY Other

NAME

Greg Stevens

TELEPHONE NUMBER
FORMCHECKBOX

FOB Destination FORMCHECKBOX (See Schedule)

3001 Coolidge Rd.

Suite 200

AREA CODE

(517)

NUMBER

324-5203

9. DESTINATION

East Lansing, Michigan 48823

a. NAME OF CONSIGNEE

8. TO:
Susan Tetil

a. NAME

b. COMPANY

b. STREET ADDRESS

1075 Cleaver Road, P.O. Box 291

c. STREET ADDRESS

c. CITY

Caro

d. CITY

e. STATE
f. ZIP CODE
d. STATE

MI

e. ZIP CODE

48723

10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE

3:00 P.M. on Wednesday, October 22, 2008

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5A. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

Item No.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Labor and materials to complete Parking Lot Replacement as shown in Sections B and C for the Government-owned property(ies)identified below:

Highland Terrace Apartments 625 Rawson Dundee, MI 48131

Job

GRAND TOTAL

12. DISCOUNT FOR PROMPT PAYMENT
a 10 CALENDAR DAYS
b 20 CALENDAR DAYS
c. 30 CALENDAR DAYS
CALENDAR DAYS
(%)
(%)
(%)
NUMBER
PERCENTAGE

NOTE: Additional provisions and representations FORMCHECKBOX are FORMCHECKBOX are not attached.

13. NAME AND ADDRESS OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO
15. DATE OF QUOTATION

a. NAME OF QUOTER

SIGN QUOTATION

b. STREET ADDRESS
16. SIGNER
a. NAME (Type or print)
b. TELEPHONE

c. COUNTY

AREA CODE

d. CITY

e. STATE

f. ZIP CODE

c. TITLE (Type or print)

NUMBER

AUTHORIZED FOR LOCAL REPORDUCTION
FormFlow/Delrina Inc.
STANDARD FORM 18 (REV. 6-95)

Previous edition not usable

Prescribed by GSA AR (48 CFR) 53.215-1(a)

INSTRUCTIONS

The attached is a solicitation form. Please review the information and specifications carefully. If you wish to be considered, you will need to do the following:

1.

Complete Items 8, 11(f), and 12-16 of the SF-18.

2. Furnish the information as itemized on Continuation Sheet(s) 52-59 in Section K, and also the information shown in Section L on Sheets 60-61

3. Submit this information in a sealed envelope with "Offer for Solicitation # 26-SO-09-0001 To Be Opened on October 29, 2008 written on the outside. It must be sent to USDA, Rural Development as identified in Item #5A {Issuing Office} of SF-18, and MUST BE RECEIVED NO LATER THAN 3:00 P.M. on Tuesday October 28, 2008, as this is the deadline for accepting offers. Any offer received after this date and time will be labeled "LATE" and returned unopened. No late offer/proposal will be accepted UNLESS it is sent by certified or registered mail AND mailed at least five (5) days prior to the closing date, OR sent by U.S. Postal Service and express mail AND mailed by 5:00 P.M. at least two (2) days prior to the closing date.

4.

If you have specific questions, please contact the person identified in item 5b on the SF-18.

PART I - THE SCHEDULE

SECTION

TITLE

PAGE NO.

A *
Solicitation/contract form
1
B
Repairs or services and prices/costs
3 – 4
C
Description/specifications/work statement
5 – 6
D
Packaging and marking
N/A
E
Inspection and acceptance
7
F
Deliveries or performance
8
G
Contract administration data
9
H
Special contract requirements
10

PART II - CONTRACT CLAUSES

I
Contract clauses
11 – 12

PART III - LIST OF DOCUMENTS, EXHIBITS,

AND OTHER ATTACHMENTS

J
List of attachments and Exhibits
14 – 51

PART IV - REPRESENTATIONS AND INSTRUCTIONS

K
Representations, certifications, and other statements of offerors or quoters
52 – 59
L
Instructions, conditions, and notices to offerors or quoters
60 – 61
M
Evaluation factors for award
62

* NOTE:

Page 1 of the Solicitation is Standard Form 18.

SECTION B

REPAIRS OR SERVICES AND PRICES/COSTS

B.1

LOCATION:

The repairs are necessary to complete renovations to a multi-family apartment dwelling(s) located at:

ADDRESS:

____Highland Terrace, 625 Rawson _______________

____Dundee, MI 48131 ______________ B.2

ACCESS:

Access to the property can be gained by the method indicated below:

[X ] Contact Susan Tetil at 989-673-8173 ext. 6.

[ ] Keys to be obtained from the Rural Development Local Office identified herein. (Keys shall be returned to the Local Office no later than the following work day after they are signed out.)

[ ] Lock Box is on front or rear entry door. The combination for access can be obtained at the Local Office. The contractor shall maintain the confidentiality of the combination and shall not release it to any other person or firm without the express consent of the Rural Development Local Office having jurisdiction over the property.

B.3 REPAIRS/SERVICES: Contractor to provide a line item price for each numbered paragraph below. Each line item cost shall include all charges for labor and materials. If there is to be no cost involved for the items listed in the numbered paragraph the contractor will indicate "NO CHARGE". All work is to be done in a timely, orderly manner in accordance with industry accepted standards, applicable local and National standards, and Rural Development regulations and policy. (See Section C) All materials used shall be new unless otherwise stated, and of reasonably good quality and must be American made unless exception is given by the Contracting officer in writing.

REQUIREMENTS FOR PROPERTY LOCATED AT 625 Rawson, _ Dundee, MI 48131 ___________________________________________________ Required Repairs:

1. Pulverize or remove the existing pavement for the entire parking lot and driveway.

2. Cut and remove old concrete throughout entire parking lot and driveway.

3. Excavate and add new gravel as necessary throughout entire parking lot and driveway.

4. Must achieve proper drainage on existing lot and driveway.

5. Place a 3” thick asphalt pavement in two courses throughout entire parking lot and driveway.

6. Topsoil, seed and mulch affected areas along the edge of the new pavement as needed to restore to pre-paving condition.

7. Stripe the new lot as required by RD regulations.

8. The work must be completed no later than November 14, 2008.

$_________ TOTAL PRICE PROPOSAL FOR:_625 Rawson, Dundee, MI 48131_

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 The Contractor shall furnish all materials, labor, tools, supplies and other necessary items to renovate the structure(s) listed above. The government has determined that the items listed in the description of work (Section B) must be accomplished on the structure to fully restore the property.

C.2

CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2) (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es): http://www.arnet.gov/far/loadmain52.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER) CLAUSES

CLAUSE

NUMBER DATE TITLE_______________________________

452.236.71 NOV 1996 PROHIBITION AGAINST THE USE OF LEAD-

BASED PAINT

C.3 CODE COMPLIANCE: As appropriate, all work shall be in accordance with applicable

Federal, State and local laws, USDA, Rural Development/FmHA Instructions, the 1992 CABO One and Two Family Dwelling Code, the 1993 National Electrical Code (NEC) (available at the Rural Development State Office) and local City code amendments.

C.4 DUMPING: All trash and rubbish shall be discarded off-site in an approved and lawful manner. Unless otherwise stated, all material scheduled for removal or disposal becomes the property of the Contractor. Burning of rubbish on-site is prohibited.

C.5 WORKMANSHIP/CRAFTMANSHIP: All work shall be performed by skilled craftsmen that are regularly engaged in work to be performed. No drips, flaws, or second rate work will be accepted. If craftsman-ship is lacking, the Contractor shall correct the deficiencies at no additional cost to the Government.

C.6 STORAGE: The Contractor may use the premises of the dwelling on which it is working for storage of equipment, tools, and materials. However, USDA Rural Development assumes no responsibility for any tools, materials, or other equipment stored by the Contractor. No combustible materials, or other fire hazards shall be left or allowed to accumulate.

C.7 SANITARY REQUIREMENTS: If the sanitary facilities contained in the dwelling(s) are inadequate or nonfunctional, the Contractor shall provide, at its own expense, adequate sanitary facilities for its workpeople. All facilities shall be maintained in a clean and hygienic condition at all times and secured during nonworking hours. Facilities shall comply with applicable local, state and federal requirements.

C.8 MINIMUM STANDARDS: Minimum Property (construction and repair) and Federal Standards specified in FmHA Instruction 1924-A.

C.9 SUBSTITUTIONS AND/OR APPROVED EQUAL: Where a particular make, brand, or type of material or equipment is mentioned in this specification, it is to denote quality standard of article desired, but does not restrict Contractor to brand specified. However, any substitution must meet with the approval of the CO or his/her authorized representative (COR).

If after award the Contractor is unable to obtain specified materials, he/she will request approval of such substitution, in writing, to the CO/COR. Submittals for approval of substitute materials must contain sufficient information, descriptive brochures, drawings, samples, or other data as is necessary to provide direct comparison to the specified material.

C.10 SAMPLE SUBMITTALS: If required in Section B, the contractor shall submit for approval by the CO/COR all required submittals as described in Section B. All submittals involving interior finishes shall be submitted at one time to allow for color and texture coordination and selection.

C.11 CHANGES AND CHANGED CONDITIONS: In the performance of the required tasks, the Contractor may encounter unforeseen additional work. In this regard, and as set forth in the clause entitled "Changes and Changed Conditions", made a part of this contract, the Contractor is further required to:

a.

Determine repairs or replacements which should be made.

b.

Recommend additional repairs or replacement which should be made to increase utility or aesthetic value or to meet the federal regulations or thermal standards.

c.

Prepare and deliver to the CO/COR a list of recommendations, in accordance with a or b above, together with the Contractor's line item quotation for performing each work item recommended.

As detailed in FAR Clause 52.243-5, "Changes and Changed Conditions", the Contractor is not authorized to proceed with any of its recommended jobs until so specifically authorized by the Contracting Officer. Upon agreement as to the work actually required and any appropriate equitable adjustment in the cost of, or the time required for performing the work, the Contracting Officer will modify the purchase order accordingly for work deemed to be within the scope of the original requirements of the contract.

SECTION E

INSPECTION AND ACCEPTANCE

E.1 FINAL INSPECTION. A final inspection shall be made only when all the materials have been furnished, all the work has been performed, and all construction provided for by the contract in accordance with the terms has been completed.

The Contractor shall notify the COR a minimum of two (2) calendar days advance notice of the date the work will be fully completed and ready for final inspection. The government must inspect the work within seven (7) days.

The Contractor's responsibility will terminate when all work has been completed, the final inspection made and the work accepted by the CO or COR. The Contractor will then be released from further obligation except as required by the warranty of construction clause of this contract or any other additional warranties offered by the Contractor or its subcontractors and suppliers.

E.2

INSPECTION AND ACCEPTANCE (AGAR 452.246-70) (FEB 1988)

(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection and acceptance will be performed at: 625 Rawson, Dundee, MI 48131

SECTION F

DELIVERIES OR PERFORMANCE

F.l

COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

The Contractor shall be required to

(a) prosecute the work diligently, and

(b) complete the entire work ready for use

(TO BE INSERTED

no later than _________________________

AT TIME OF AWARD)

(30 days from date of “Notice to Proceed” is allowed for completion).

The time stated for completion shall include final cleanup of the premises.

F.2 The completion date is based on the assumption that the successful offeror will receive the notice to proceed by ____________________________.

The completion date will be extended by the number

(TO BE INSERTED

of calendar days after the above date that the

AT TIME OF AWARD)

Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

SECTION G

CONTRACT ADMINISTRATION DATA

G.1 The Contracting Officer designated for this requirement is as follows:

Diana Lesny, C.O.

USDA, Rural Development

3001 Coolidge Rd.

Suite 200 East Lansing, MI 48823 Telephone Number: (517) 324-5203 G.2

DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE

A Contracting Officer's Representative (COR) may be designated after contract award. The contractor will be notified by letter, or form, of the name and duties of the COR, if applicable.

G.3

CONTRACTING OFFICER'S AUTHORITY

The Contracting Officer is the only person authorized to approve changes to any of the requirements under this contract, and notwithstanding any provision contained elsewhere in this contract the said authority remains solely with the Contracting Officer. In the event the contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof.

G.4

SUBMISSION OF INVOICES/PAYMENTS

a.

Payment will be made upon work completion, acceptance of work by the COR, and submission of a proper invoice. Invoices, in substantially the same format as shown by Exhibit A, Section J, will be submitted together with the payroll sheets (if applicable), release of claimants form(s), if required, etc.

b.

Invoices must contain the following information:

1.

Name and Address of the Contractor as shown on AD-838 (Purchase Order) This must be the check mailing address.

2.

Contract (Purchase Order) Number

3.

Invoice Number and date

4.

Description of Services

5. Delivery and payment terms (e.g. prompt payment discount terms)

SECTION H

SPECIAL CONTRACT REQUIREMENTS

H.1

CONDUCT

During the course of this contract, the Contractor will maintain the same high standards of honesty, integrity, impartiality, confidentiality of information, and conduct as Government employees are expected to maintain. The Contractor will not engage in other employment which is incompatible with the duties of this contract. The Contractor will not, directly or indirectly, engage in financial transactions of any kind of business dealings relying on information obtained through the performance of this contract. The Contractor will not have a direct or indirect financial or other interest that conflicts, or appears to conflict, with its responsibilities and duties under this contract.

H.2 The Contractor shall be liable for any loss from, or injury to, any property resulting solely from the Contractor's negligence and/or failure to perform the services provided for herein.

H.3 The Contractor waives, releases, and discharges the Government from any and all claims, demands, and causes for action for damages to person(s)/or property which may arise in any manner incident to the execution of the purchase order, except his/her rightful claim for payment or compensation, as provided herein.

H.4 The Contractor shall obtain the services of qualified employees in all instances, and the

Contractor is responsible for actions or omissions of employees in performance of work under this purchase order. The Contractor shall not commit, nor permit others to commit any waste, or unlawful acts of nuisances upon property assigned.

PART II - CONTRACT CLAUSES

SECTION I

CLAUSES

I.l PREVIOUS CONTRACTS AND COMPIANCE REPORTS (FAR 52.222-22)(FEB 1999)

As prescribed in 22.810(a)(2), insert the following provision:

The offerer represents that –

(a) It { }has, { } has not participated in a previous contract or subcontract subject to the Equal

Opportunity clause of this solicitation;

(b) It { }has, { } has filed all required compliance reports; and Representations indicating submission of required compliance reports, signed by proposed subcontractors, will be obtained before subcontract awards.

I.2 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2) (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es): http://www.arnet.gov/far/loadmain52.html FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER l) CLAUSES

CLAUSE

NUMBER DATE TITLE_________________________________

52.202-l

JULY 2004

DEFINITIONS (JULY 2004)

52.212-1

APRIL 2008

INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS

52.212-2

JAN 1999

EVALUATION – COMMERCIAL ITEMS

52.212-3

NOV 2007

OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL ITEMS

52.212-4

FEB 2007

CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS

52.212-5

APRIL 2008

CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS – COMMERCIAL ITEMS

52.219-19

OCT 2000

SMALL BUSINESS CONCERN REPRESENTATION FOR THE SMALL BUSINESS COMPETITIVENESS DEMONSTRATION PROGRAM

52.219-20

JAN 1991

NOTICE OF EMERGING SMALL BUSINESS SET ASIDE

52.219-21

MAY 1999

SMALL BUSINESS SIZE REPRESENTATION FOR TARGETED INDUSTRY CATAGORIES UNDER THE SMALL BUSINESS COMPETITIVENESS DEMONSTRATION PROGRAM

52.222-3

JUNE 2003

CONVICT LABOR

52.222-6

FEB 1995

DAVIS-BACON ACT

52.222-7

FEB 1988

WITHHOLDING OF FUNDS

52.222-8

PAYROLLS AND BASIC RECORDS

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER l) CLAUSES CONT’D.

CLAUSE NUMBER

DATE

TITLE___________ _________________

52.222-9

APPRENTICES AND TRAINEES

52.222-10

COMPLIANCE WITH COPELAND ACT

REQUIREMENTS

52.222-11

SUBCONTRACTS (LABOR STANDARDS)

52.222-12

CONTRACT TERMINATION -- DEBARMENT

52.222-13

COMPLIANCE WITH DAVIS-BACON AND

RELATED ACT REGULATIONS

52.222-14

DISPUTES CONCERNING LABOR

STANDARDS

52.222-15

CERTIFICATION OF ELIGIBILITY

52.222-21

FEB 1999

PROHIBITION OF SEGRATED FACILITIES

52.222-23

NOTICE OF REQUIREMENT FOR

AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR

CONSTRUCTION

52.222-26

APR 2002

EQUAL OPPORTUNITY

52.222-27

AFFIRMATIVE ACTION COMPLIANCE

REQUIREMENTS FOR CONSTRUCTION

52.222-35

DEC 2001

EQUAL OPPORTUNITY FOR SPECIAL

DISABLED VETERANS, VETERANS OF THE

VIETNAM ERA, AND OTHER ELIGIBLE

VETERANS

52.222-36

JUN 1998

AFFIRMATIVE ACTION FOR WORKERS

WITH DISABILITIES

52.222-37

DEC 2001

EMPLOYMENT REPORTS ON SPECIAL

DISABLED VETERANS, VETERANS OF THE

VIETNAM ERA, AND OTHER ELIGIBLE

VETERANS

52.223-6 MAY 2001 DRUG-FREE WORKPLACE

52.233-l

JULY 2002

DISPUTES (JULY 2002)

52.233-3 AUG 1996 PROTEST AFTER AWARD

52.236-1 APR 1984 PERFORMANCE OF WORK BY THE

CONTRACTOR

52.236-2

APR 1984

DIFFERING SITE CONDITIONS

52.236-3

SITE INVESTIGATION AND CONDITIONS

AFFECTING THE WORK

52.236-4 APR 1984 PHYSICAL DATA

52.236-5

MATERIAL AND WORKMANSHIP

52.236-6

SUPERINTENDENCE BY THE CONTRACTOR

52.236-7

NOV 1991

PERMITS AND RESPONSIBILITIES

52.236-8

OTHER CONTRACTS

52.236-9

PROTECTION OF EXISTING VEGETATION,

STRUCTURES, EQUIPMENT, UTILITIES,

AND IMPROVEMENTS

52.236-10

OPERATIONS AND STORAGE AREAS

52.236-11

USE AND POSSESSION PRIOR TO COMPLETION

52.236-12

CLEANING UP

52.236-13

NOV 1991

ACCIDENT PREVENTION

52.236-14

AVAILABILITY AND USE OF UTILITY SERVICES

52.236-26

FEB 1995

PRECONSTRUCTION CONFERENCE

52.243-5

CHANGES AND CHANGED CONDITIONS

52.249-1 APR 1984 TERMINATION FOR CONVENIENCE OF THE

GOVERNMENT (FIXED-PRICE) (SHORT FORM).

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

LIST OF ATTACHMENTS (AGAR 452.252-70) (FEB 1988)

Exhibit A

Sample Invoice

Exhibit B

Form AD-655, "Employment of the Handicapped"

(Only applies if contract is for $2,500 or more)

Exhibit C

Davis-Bacon Wage Rates Determination NO. MI080007 09/05/2008, 34 Page(s)

(Only applies if contract is for $2,000 or more)

EXHIBIT A

SAMPLE INVOICE

(MUST BE ON CONTRACTOR'S LETTERHEAD)

INVOICE NUMBER:

INVOICE DATE:

PURCHASE ORDER NUMBER:

Payment to be sent to:

Name

1st Line Address

FFIS #

City

State

Zip Code

Brief description of goods or services as appropriate:

Payment Terms: _____________ (discount/net) Note: If payment terms are not on the invoice, the system will use net 30 for prompt payment purposes.

Invoice Amount: $

PAYEE'S SIGNATURE(required)

EXHIBIT B

UNITED STATES DEPARTMENT OF AGRICULTURE

EMPLOYMENT OF THE HANDICAPPED

(The following clause is applicable to all contracts or purchase orders of $2,500 or more, as required by the regulations of the Secretary of Labor.)

(a) The contractor will not discriminate against any employee or applicant for employment because of physical or mental handicap in regard to any position for which the employee or applicant for employment is qualified. The contractor agrees to take affirmative action to employ, advance in employment and otherwise treat qualified handicapped individuals without discrimination based upon their physical or mental handicap in all employment practices such as the following: employment, upgrading, demotion or transfer, recruitment, advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship.

(b) The contractor agrees to comply with the rules, regulations, and relevant orders of the Secretary of Labor issued pursuant to the Rehabilitation Act of 1973, as amended.

(c) In the event of the contractor's noncompliance with the requirements of this clause, actions for noncompliance may be taken in accordance with the rules, regulations and relevant orders of the Secretary of Labor issued pursuant to the Act.

(d) The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices in a form to be prescribed by the Director, Office of Federal Contract Compliance Programs, Department of Labor, provided by or through the contracting officer. Such notices shall state the contractor's obligation under the law to take affirmative action to employ and advance in employment qualified handicapped employees and applicants for employment, and the rights of applicants and employees.

(e) The contractor will notify each labor union or representative of workers with which it has a collective bargaining agreement or other contract understanding, that the contractor is bound by the terms of section 503 of the Act and is committed to take affirmative action to employ and advance in employment physically and mentally handicapped individuals.

(f) The contractor will include the provisions of this clause in every subcontract or purchase order of $2,500 or more unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 503 of the Act, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the Director, Office of Federal Contract Compliance Programs, may direct to enforce such provisions, including action for noncompliance.

Form AD-655 (Rev. 5-76)

EXHIBIT C

WAGE RATE DETERMINATION

General Decision Number: MI080007 09/05/2008 MI7

Superseded General Decision Number: MI20070007

State: Michigan

Construction Types: Highway (Highway, Airport & Bridge xxxxx and Sewer/Incid. to Hwy.)

Counties: Michigan Statewide.

Modification Number Publication Date

0 02/08/2008

1 03/07/2008

2 03/21/2008

3 04/11/2008

4 05/02/2008

5 06/06/2008

6 06/13/2008

7 06/20/2008

8 07/11/2008

9 07/18/2008

10 07/25/2008

11 09/05/2008

CARP0004-004 06/01/2007

LIVINGSTON COUNTY (Townships of Brighton, Deerfield, Genoa, Hartland, Osceola and Tyrone); MACOMB, MONROE, OAKLAND, SANILAC, ST. CLAIR AND WAYNE COUNTIES:

Rates Fringes

Carpenter; piledriver............$ 28.88 15.48

CARP0004-005 06/01/2007

DOES NOT INCLUDE LIVINGSTON COUNTY (Townships of Brighton, Deerfield, Genoa, Hartland, Osceola and Tyrone); MACOMB, MONROE, OAKLAND, SANILAC, ST. CLAIR AND WAYNE COUNTIES:

Rates Fringes

Carpenter; piledriver............$ 26.42 10.20

FOOTNOTE:

DIVER: to be paid one and one-half (1-1/2) times the regular journeyperson rate.

* ELEC0017-005 06/02/2008

HURON COUNTY; INGHAM COUNTY (Townships of Leroy, Locke, Wheatfield, White Oak and Williamson); LAPEER COUNTY; LENAWEE

COUNTY (Townships of Clinton and Macon); LIVINGSTON COUNTY

(Townships of Brighton, Conway, Genoa, Green Oak, Hamburg, Handy, Hartland, Howell, Iosco, Marion, Oceola and Putnam);

MACOMB COUNTY; MONROE COUNTY (Townships of Ash, Berlin, Dundee, Exeter, Frenchtown, Ida, London, Milan, Monroe, Raisinville and

Summerfield); OAKLAND, ST. CLAIR, SANILAC AND TUSCOLA COUNTIES;

WASHTENAW COUNTY (Townships of Ann Arbor, Augusta, Bridgewater, Dexter, Freedom, Lima, Lodi, Northfield, Pittsfield, Salem, Saline, Scio, Superior, Webster, York and Ypsilanti); AND WAYNE

COUNTY:

Rates Fringes

Line Construction

Cable splicer; Line technician when helio-arc welding.....................$ 39.03 4.80+26%

Combination driver/groundman............$ 26.05 4.80+26%

Combination equipment operator and groundman......$ 27.61 4.80+26%

Groundman...................$ 23.99 4.80+26%

Line technician.............$ 37.47 4.80+26%

TECHNICIAN (Commercial)

ALL COMMERCIAL WORK EXCEPT

LINE CONSTRUCTION:..........$ 33.85 4.80+26%

ELEC0876-001 06/01/2007

REMAINDER OF STATE:

Rates Fringes

Line Construction

Cable splicer...............$ 32.71 3.75+21.5%

Light equipment operator/groundman/truck driver/groundman (winch, A frame, diggers when used for distribution line truck and used for distribution work, distribution truck driver, 5th wheel type trucks, bucket trucks, ladder trucks and all live boom trucks, all equipment 85 hp or under)................$ 20.70 3.75+21.5%

Line technician.............$ 31.41 3.75+21.5%

Operator/groundman

(digger, tractor and setting rig with tracks or rough terrain vehicle, large bombardier, backhoe over 85 hp, hydraulic crane 10 ton or over).......$ 23.62 3.75+21.5%

Truck driver/groundman(trucks with winch or boom or dump, other than distribution work)..........$ 19.70 3.75+21.5%

FOOTNOTE: Operators of 5/8 yard, rated capacity, backhoe or over; and operators of 25 ton, rated capacity, crane or over; and operators of heavy duty tension or pulling machinery on 345 KV and above: to receive the journeyman line technician rate of pay.

ENGI0324-003 06/01/2008

ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON,

CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO,

ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB,

MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO,

PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC,

SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:

Rates Fringes

Power Equipment Operators -

Steel Erection:

GROUP 1....................$ 42.07 17.30

GROUP 2....................$ 43.07 17.30

GROUP 3....................$ 40.57 17.30

GROUP 4....................$ 41.57 17.30

GROUP 5....................$ 39.07 17.30

GROUP 6....................$ 40.07 17.30

GROUP 7....................$ 38.80 17.30

GROUP 8....................$ 39.80 17.30

GROUP 9....................$ 38.35 17.30

GROUP 10....................$ 39.35 17.30

GROUP 11....................$ 37.62 17.30

GROUP 12....................$ 38.62 17.30

GROUP 13....................$ 37.26 17.30

GROUP 14....................$ 38.26 17.30

GROUP 15....................$ 36.62 17.30

GROUP 16....................$ 29.81 17.30

GROUP 17....................$ 28.40 17.30

GROUP 18....................$ 35.57 17.30

FOOTNOTE:

Paid Holidays: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Engineer when operating combination of boom and jib

400' or longer

GROUP 2: Engineer when operating combination of boom and jib

400' or longer on a crane that requires an oiler

GROUP 3: Engineer when operating combination of boom and jib

300' or longer

GROUP 4: Engineer when operating combination of boom and jib

300' or longer on a crane that requires an oiler

GROUP 5: Engineer when operating combination of boom and jib

220' or longer

GROUP 6: Engineer when operating combination of boom and jib

220' or longer on a crane that requires an oiler

GROUP 7: Engineer when operating combination of boom and jib

140' or longer

GROUP 8: Engineer when operating combination of boom and jib

140' or longer on a crane that requires an oiler

GROUP 9: Tower crane & derrick operator (where operator's work station is 50 ft. or more above first sub-level)

GROUP 10: Tower crane & derrick operator (where operator's work station is 50 ft. or more above first sub-level) on a crane that requires an oiler

GROUP 11: Engineer when operating combination of boom and jib

120' or longer

GROUP 12: Engineer when operating combination of boom and jib

120' or longer on a crane that requires an oiler

GROUP 13: Crane operator; job mechanic and 3 drum hoist and excavator

GROUP 14: Crane operator on a crane that requires an oiler

GROUP 15: Hoisting operator; 2 drum hoist and rubber tired backhoe

GROUP 16: Compressor or welder operator

GROUP 17: Oiler

GROUP 18: Forklift and 1 drum hoist

ENGI0324-004 05/01/2008

Rates Fringes

Power Equipment Operators -

Steel Erection:

ALLEGAN, BARRY, BERRIEN,

BRANCH, CALHOUN, CASS,

EATON, HILLSDALE, IONIA,

KALAMAZOO, KENT, LAKE,

MANISTEE, MASON, MECOSTA,

MONTCALM, MUSKEGON,

NEWAYGO, OCEANA, OSCEOLA,

OTTAWA, ST. JOSEPH, VAN

BUREN

GROUP 1....................$ 28.74 16.75

GROUP 2....................$ 28.49 16.75

GROUP 3....................$ 27.99 16.75

GROUP 4....................$ 22.89 16.75

GROUP 5....................$ 21.24 16.75

GROUP 6....................$ 18.64 16.75

ANTRIM, BENZIE,

CHARLEVOIX, EMMET, GRAND

TRAVERSE, KALKASKA,

LEELANAU, MISSAUKEE AND

WEXFORD COUNTIES:

GROUP 1....................$ 28.74 16.75

GROUP 2....................$ 28.49 16.75

GROUP 3....................$ 27.49 16.75

GROUP 4....................$ 22.59 16.75

GROUP 5....................$ 20.94 16.75

GROUP 6....................$ 18.14 16.75

FOOTNOTES:

Crane operator with main boom and jib 300' or longer: $1.50 additional to the group 1 rate. Crane operator with main boom and jib 400' or longer: $3.00 additional to the group

1 rate.

Certified Crane Operator Premiums:

a) Swing Boom Truck Operator over 12 tons-$.50 per hour

b) Hydraulic Crane Operator 75 tons and under-$.75 per hour

c) Hydraulic Crane Operator over 75 tons-$1.00 per hour

d) Lattiee Boom Crane Operator-$1.50 per hour

PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS:

GROUP 1: Crane Operator with main boom & jib 400', 300', or

220' or longer. Tower Crane Operator with CCO certification for combined length of mast and boom 220' or longer.

GROUP 2: Crane Operator with main boom & jib 140' or longer, Tower Crane(Operators without CCO certification, or less than 220' length) Gantry Crane; Whirley Derrick.

GROUP 3: Regular Equipment Operator, Crane, Dozer, Loader, Hoist, Straddle Wagon, Mechanic, Grader and Hydro Excavator.

GROUP 4: Air Tugger (single drum), Material Hoist Pump 6" or over, Elevators, Brokk Concrete Breaker.

GROUP 5: Air Compressor, Welder, Generators, Conveyors

GROUP 6: Oiler and fire tender

ENGI0324-005 09/01/2007

Rates Fringes

Power equipment operators -underground construction

(includes sewer):

ALCONA, ALLEGAN, ALPENA,

ANTRIM, ARENAC, BARRY,

BAY, BENZIE, BERRIEN,

BRANCH, CALHOUN, CASS,

CHARLEVOIX, CHEBOYGAN,

CLARE, CLINTON, CRAWFORD,

EATON, EMMET, GLADWIN,

GRAND TRAVERSE, GRATIOT,

HILLSDALE, HURON, INGHAM,

IONIA, IOSCO, ISABELLA,

JACKSON, KALAMAZOO,

KALKASKA, KENT, LAKE,

LEELANAU, LENAWEE,

MANISTEE, MASON, MECOSTA,

MIDLAND, MISSAUKEE,

MONTCALM, MONTMORENCY,

MUSKEGON, NEWAYGO, OCEANA,

OGEMAW, OSCEOLA, OSCODA,

OTSEGO, OTTAWA, PRESQUE

ISLE, ROSCOMMON, SAGINAW,

SANILAC, SHIAWASSEE, ST.

JOSEPH, TUSCOLA, VAN BUREN

AND WEXFORD COUNTIES:

GROUP 2....................$ 22.38 15.75

ALCONA, ALLEGAN, ALPENA,

ANTRIM, ARENAC, BARRY,

BAY, BENZIE, BERRIEN,

BRANCH, CALHOUN, CASS,

CHARLEVOIX, CHEBOYGAN,

CLARE, CLINTON, CRAWFORD,

EATON, EMMET, GLADWIN,

GRAND TRAVERSE, GRATIOT,

HILLSDALE, HURON, INGHAM,

IONIA, IOSCO, ISABELLA,

JACKSON, KALAMAZOO,

KALKASKA, KENT, LAKE,

LEELANAU, LENAWEE,

MANISTEE, MASON, MECOSTA,

MIDLAND, MISSAUKEE,

MONTCALM, MONTMORENCY,

MUSKEGON, NEWAYGO, OCEANA,

OGEMAW, OSCEOLA, OSCODA,

OTSEGO, OTTAWA, PRESQUE

ISLE, ROSCOMMON, SAGINAW,

SANILAC, SHIAWASSEE, ST.

JOSEPH, TUSCOLA, VAN BUREN

AND WEXFORD COUNTIES:

GROUP 3....................$ 21.88 15.75

ALCONA, ALLEGAN, ALPENA,

ANTRIM, ARENAC, BARRY,

BAY, BENZIE, BERRIEN,

BRANCH, BAY, CALHOUN,

CASS, CHARLEVOIX,

CHEBOYGAN, CLARE, CLINTON,

CRAWFORD, EATON, EMMET,

GLADWIN, GRAND TRAVERSE,

GRATIOT, HILLSDALE, HURON,

INGHAM, HURON, INGHAM

IONIA, IOSCO, ISABELLA,

JACKSON, KALAMAZOO,

KALKASKA, KENT, LAKE,

LEELANAU, LENAWEE,

MANISTEE, MASON, MECOSTA,

MIDLAND, MISSAUKEE,

MONTCALM, MONTMORENCY,

MUSKEGON, NEWAYGO, OCEANA,

OGEMAW, OSCEOLA, OSCODA,

OTSEGO, OTTAWA, PRESQUE

ISLE, ROSCOMMON, SAGINAW,

SANILAC, SHIAWASSEE, ST.

JOSEPH, TUSCOLA, VAN BUREN

AND WEXFORD COUNTIES:

GROUP 1....................$ 27.27 15.75

ALCONA, ALLEGAN, ALPENA,

ANTRIM, ARENAC, BARRY,

BAY, BENZIE, BERRIEN,

BRANCH, CALHOUN, CASS,

CHARLEVOIX, CHEBOYGAN,

CLARE, CLINTON, CRAWFORD,

EATON, EMMET, GLADWIN,

GRAND TRAVERSE, GRATIOT,

HILLSDALE, HURON, INGHAM,

IONIA, IOSCO, ISABELLA,

JACKSON, KALAMAZOO,

KALKASKA, KENT, LAKE,

LEELANAU, LENAWEE,

MANISTEE, MASON, MECOSTA,

MIDLAND, MISSAUKEE,

MONTCALM, MONTMORENCY,

MUSKEGON, NEWAYGO, OCEANA,

OGEMAW, OSCEOLA, OSCODA,

OTSEGO, OTTAWA, PRESQUE

ISLE, ROSCOMMON, SAGINAW,

SANILAC, SHIAWASSEE, ST.

JOSEPH, TUSCOLA, VAN BUREN

AND WEXFORD COUNTIES:

GROUP 4....................$ 21.60 15.75

GENESEE, LAPEER,

LIVINGSTON, MACOMB,

MONROE, OAKLAND, ST.

CLAIR, WASHTENAW AND WAYNE

COUNTIES:

GROUP 1....................$ 28.98 15.75

GROUP 2....................$ 24.25 15.75

GROUP 3....................$ 23.52 15.75

GROUP 4....................$ 22.95 15.75

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Backfiller tamper; Backhoe; Batch plant operator

(concrete); Clamshell; Concrete paver (2 drums or larger);

Conveyor loader (Euclid type); Crane (crawler, truck type or pile driving); Dozer; Dragline; Elevating grader;

Endloader; Gradall (and similar type machine); Grader;

Mechanic; Power shovel; Roller (asphalt); Scraper

(self-propelled or tractor drawn); Side boom tractor (type

D-4 or equivalent and larger); Slip form paver; Slope paver; Trencher (over 8 ft. digging capacity); Well drilling rig; Concrete pump with boom operator; Hydro

Excavator

GROUP 2: Boom truck (power swing type boom); Crusher; Hoist;

Pump (1 or more - 6-in. discharge or larger - gas or diesel- powered or powered by generator of 300 amperes or more - inclusive of generator); Side boom tractor (smaller than type D-4 or equivalent); Tractor (pneu-tired, other than backhoe or front end loader); Trencher (8-ft. digging capacity and smaller);Vac Truck

GROUP 3: Air compressors (600 cfm or larger); Air compressors

(2 or more-less than 600 cfm); Boom truck (non-swinging, non- powered type boom); Concrete breaker (self-propelled or truck mounted - includes compressor); Concrete paver (1 drum-l/2 yd. or larger); Elevator (other than passenger);

Maintenance person; Pump (2 or more-4-in. up to 6-in.

discharge-gas or diesel powered - excluding submersible pumps); Pumpcrete machine (and similar equipment); Wagon drill (multiple); Welding machine or generator (2 or more-300 amp. or larger - gas or diesel powered)

GROUP 4: Boiler; Concrete saw (40 hp or over); Curing machine

(self-propelled); Farm tractor (with attachment); Finishing machine (concrete); Fire person; Hydraulic pipe pushing machine; Mulching equipment; Oiler; Pumps (2 or more up to

4-in. discharge, if used 3 hours or more a day, gas or diesel powered - excluding submersible pumps); Roller

(other than asphalt); Stump remover; Trencher (service);

Vibrating compaction equipment, self-propelled (6 ft. wide or over); End dump operator; Sweeper (Wayne type); Water wagon and Extend-a boom forklift

ENGI0324-006 06/01/2008

Rates Fringes

Power equipment operators:

(AIRPORT, BRIDGE & HIGHWAY

CONSTRUCTION)

GENESEE, MACOMB, MONROE,

OAKLAND, WASHTENAW AND

WAYNE COUNTIES:

GROUP 1....................$ 27.81 16.80

GROUP 2....................$ 21.08 16.80

GROUP 3....................$ 22.38 16.80

GROUP 4....................$ 20.52 16.80

GENESEE, MACOMB,

MONROE,OAKLAND, WASHTENAW

and WAYNE COUNTIES:

GROUP 5....................$ 20.35 16.80

STATEWIDE (Excluding

Genesee, Macomb, Monroe, Oakland, Washtenaw and

Wayne Counties):

GROUP 1....................$ 27.81 16.80

GROUP 2....................$ 20.93 16.80

GROUP 3....................$ 22.23 16.80

GROUP 4....................$ 20.37 16.80

GROUP 5....................$ 20.05 16.80

FOOTNOTE:

Crane premiums: Swing boom truck operator over 12 tons: $.50 per hour additional. Hydraulic crane operator 75 tons and under: $.75 per hour additional. Hydraulic crane operator over 75 tons: $1.00 per hour additional. Lattice boom crane operator: $1.50 per hour additional.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt plant operator; Crane operator (does not include work on bridge construction projects when the crane operator is erecting structural components); Dragline operator; Shovel operator; Locomotive operator; Paver operator (5 bags or more); Elevating grader operator; Pile driving operator; Roller operator (asphalt); Blade grader operator; Trenching machine operator (ladder or wheel type); Auto-grader; Slip form paver; Self-propelled or tractor-drawn scraper; Conveyor loader operator (Euclid type); Endloader operator (1 yd. capacity and over);

Bulldozer; Hoisting engineer; Tractor operator; Finishing machine operator (asphalt); Mechanic; Pump operator (6-in.

discharge or over, gas, diesel powered or generator of 300 amp. or larger); Shouldering or gravel distributing machine operator (self- propelled); Backhoe (with over 3/8 yd.

bucket); Side boom tractor (type D-4 or equivalent or larger); Tube finisher (slip form paving); Gradall (and similar type machine); Asphalt paver (self- propelled);

Asphalt planer (self-propelled); Batch plant

(concrete-central mix); Slurry machine (asphalt); Concrete pump (3 in. and over); Roto-mill; Swinging boom truck (over

12 ton capacity); Hydro demolisher (water blaster);

Farm-type tractor with attached pan

GROUP 2: Screening plant operator; Washing plant operator;

Crusher operator; Backhoe (with 3/8 yd. bucket or less);

Side boom tractor (smaller than D-4 type or equivalent);

Sweeper (Wayne type and similar equipment); Vacuum truck operator; Batch plant (concrete dry batch)

GROUP 3: Grease Truck

GROUP 4: Air compressor operator (600 cu. ft. per min or more); Air compressor operator (two or more, less than 600 cfm); Wagon drill operator; Concrete breaker; Tractor operator (farm type with attachment)

GROUP 5: Boiler fire tender; Oiler; Fire tender; Trencher

(service); Flexplane operator; Cleftplane operator; Grader operator (self-propelled fine-grade or form (concrete));

Finishing machine operator (concrete); Boom or winch hoist truck operator; Endloader operator (under 1 yd. capacity);

Roller operator (other than asphalt); Curing equipment operator (self-propelled); Concrete saw operator (40 h.p.

or over); Power bin operator; Plant drier operator

(asphalt); Vibratory compaction equipment operator (6 ft.

wide or over); Guard post driver operator (power driven);

All mulching equipment; Stump remover; Concrete pump (under

3-in.); Mesh installer (self- propelled); Tractor operator

(farm type); End dump; Skid steer

ENGI0324-007 05/01/2008

ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON,

IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON

AND SCHOOLCRAFT COUNTIES:

Rates Fringes

Power Equipment Operators -

Steel Erection:

Compressor, welder and forklift....................$ 24.11 16.47

Crane operator, main boom

& jib 120' or longer........$ 27.86 16.47

Crane operator, main boom

& jib 140' or longer........$ 28.11 16.47

Crane operator, main boom

& jib 220' or longer........$ 28.36 16.47

Mechanic with truck and tools.......................$ 28.86 16.47

Oiler and fireman...........$ 22.81 16.47

Regular operator............$ 27.36 16.47

Crane Operator with main boom and jib 300' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 220' of boom and jib wage rate.

Crane Operator with main boom and jib 400' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 300 foot of boom wage rate ($3.00)

ENGI0324-008 10/01/2007

Rates Fringes

Power equipment operators -sewer relining:

GROUP 1.....................$ 27.05 11.00

GROUP 2.....................$ 25.52 11.00

SEWER RELINING CLASSIFICATIONS

GROUP 1: Operation of audio-visual closed circuit TV system, including remote in-ground cutter and other equipment used in connection with the CCTV system

GROUP 2: Operation of hot water heaters and circulation systems, water jetters and vacuum and mechanical debris removal systems

ENGI0325-010 05/01/2008

ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON,

IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON

AND SCHOOLCRAFT COUNTIES:

Rates Fringes

Power equipment operators -underground construction:

Crane operator, main boom

& jib 120' or longer........$ 27.46 16.47

Crane operator, main boom

& jib 140' or longer........$ 27.71 16.47

Crane operator, main boom

& jib 220' or longer........$ 27.96 16.47

GROUP 1.....................$ 26.96 16.47

GROUP 2.....................$ 23.71 16.47

GROUP 3.....................$ 23.13 16.47

GROUP 4.....................$ 22.19 16.47

Mechanic with truck and tools.......................$ 28.46 16.47

FOOTNOTES: Swing boom truck operator over 15 tons: $.50 per hour additional. Hydraulic crane operator 75 tons and under: $.75 per hour additional. Hydraulic crane operator over 75 tons: $1.00 per hour additional. Lattice boom crane operator: $1.50 per hour additional. Crusher pit, shafts and tunnel workers: $2.00 per hour additional.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Regular equipment operator, crane, dozer, front end loader, job mechanic, pumpcrete and squeezecrete, concrete pump, excavator, milling and pulverizing machines, scraper

(self-propelled and tractor drawn), welder

GROUP 2: Air track drill, boom truck (non-swing), concrete mixer, material hoist and tugger, pump 6" and over, beltcrete, sweeping machine, trencher, winches, well points and freeze systems

GROUP 3: Air compressor, conveyor, concrete saw, farm tractor

(without attachments), fork truck, generator, guard post driver, mulching machine, pumps under 6-in., welding machine and grease person

GROUP 4: Oiler, fire tender, heater operator, brock concrete breaker, elevators (other than passenger), end dumps and skid steer

Crane Operator with main boom and jib 300' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 220' of boom and jib wage rate.

Crane Operator with main boom and jib 400' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 300 foot of boom wage rate ($3.00)

ENGI0325-011 10/01/2007

Rates Fringes

Power equipment operators -hazardous waste removal:

(GENESEE, LAPEER, LIVINGSTON,

MACOMB, MONROE, OAKLAND, ST.

CLAIR, WASHTENAW AND WAYNE

COUNTIES:)

LEVEL A:

Engineer when operating crane with boom and jib or leads 140' or longer....$ 34.18 15.75

Engineer when operating crane with boom and jib or leads 220' or longer....$ 34.48 15.75

GROUP 1....................$ 31.53 15.75

GROUP 2....................$ 27.30 15.75

Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 32.50 15.75

LEVEL B AND C:

Engineer when operating crane with boom and jib or leads 140' or longer....$ 33.23 15.75

Engineer when operating crane with boom and jib or leads 220' or longer....$ 33.53 15.75

GROUP 1....................$ 30.58 15.75

GROUP 2....................$ 26.35 15.75

Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, pwer shovel operator.......$ 31.55 15.75

LEVEL D WHEN CAPPING

LANDFILL:

Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.68 15.75

Engineer when operating crane with boom and jib or leads 220' or longer....$ 31.98 15.75

GROUP 1....................$ 29.03 15.75

GROUP 2....................$ 24.80 15.75

Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 29.38 15.75

LEVEL D:

Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.93 15.75

Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.23 15.75

GROUP 1....................$ 29.28 15.75

GROUP 2....................$ 25.05 15.75

Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 30.25 15.75

Power equipment operators -hazardous waste removal:

(REMAINDER OF STATE:)

LEVEL A:

Engineer when operating crane with boom and jib or leads 140' or longer....$ 32.47 15.75

Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.77 15.75

GROUP 1....................$ 29.82 15.75

GROUP 2....................$ 25.42 15.75

Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 30.79 15.75

LEVEL D WHEN CAPPING

LANDFILL:

Engineer when operating crane with boom and jib or leads 140' or longer....$ 29.97 15.75

Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.27 15.75

GROUP 1....................$ 27.32 15.75

GROUP 2....................$ 22.93 15.75

Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 28.29 15.75

LEVEL D:

Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.22 15.75

Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.52 15.75

GROUP 1....................$ 27.57 15.75

GROUP 2....................$ 23.18 15.75

Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 28.54 15.75

LEVELS B AND C:

Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.41 15.75

Engineer when operating crane with boom and jib or leads 220' or longer....$ 31.73 15.75

GROUP 1....................$ 28.87 15.75

GROUP 2....................$ 24.48 15.75

Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 29.84 15.75

HAZARDOUS WASTE REMOVAL CLASSIFICATIONS

Group 1: Backhoe, batch plant operator, clamshell, concrete breaker when attached to hoe, concrete cleaning decontamination machine operator, concrete pump, concrete paver, crusher, dozer, elevating grader, endloader, farm tractor (90 h.p. and higher), gradall, grader,heavy equipment robotics operator, loader, pug mill, pumpcrete machines, pump trucks, roller, scraper (self- propelled or tractor drawn), side boom tractor, slip form paver, slope paver, trencher, ultra high pressure waterjet cutting tool system, vactors, vacuum blasting machine operator, vertical lifting hoist, vibrating compaction equipment

(self-propelled), well drilling rig and hydro excavator

GROUP 2: Air compressor, concrete breaker when not attached to hoe, elevator, end dumps, equipment decontamination operator, farm tractor (less than 90 h.p.), forklift, generator, heater, mulcher, pigs (portable reagent storage tanks), power screens, pumps (water), stationary compressed air plant, sweeper, welding machine and water wagon

ENGI0325-012 05/01/2008

Rates Fringes

Power equipment operators -gas distribution and duct installation work:

MACOMB, MONROE, OAKLAND,

ST. CLAIR, WASHTENAW AND

WAYNE COUNTIES:

GROUP 1....................$ 25.98 16.75

GROUP 2....................$ 25.85 16.75

GROUP 3....................$ 24.72 16.75

GROUP 4....................$ 24.15 16.75

STATEWIDE (does not include Macomb, Monroe, Oakland, St. Clair, Washtenaw and Wayne

Counties):

GROUP 1....................$ 25.07 16.75

GROUP 2-A..................$ 24.97 16.75

GROUP 2-B..................$ 24.75 16.75

GROUP 3....................$ 23.97 16.75

GROUP 4....................$ 23.47 16.75

SCOPE OF WORK: The construction, installation, treating and reconditioning of pipelines transporting gas vapors within cities, towns, subdivisions, suburban areas, or within private property boundaries, up to and including private meter settings of private industrial, governmental or other premises, more commonly…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .