26QA243 Salient Characteristics and Pricing Schedule.pdf
PDF 179 KB Posted
- Attached to
- Transformer Upgrade Supplies Federal contract opportunity
- Solicitation number
- FA462026QA243
About this file
This document is a Salient Characteristics & Pricing Schedule for a federal supply contract with Fairchild Air Force Base, Washington.
The 92 Civil Engineer Squadron (CES) Structures Shop requires supplies to repair and upgrade a transformer to provide a stable and robust power supply capable of handling high-draw equipment. The upgrade will ensure mission readiness and prevent damage to critical tools and infrastructure. The contractor must provide and deliver 12 line items as brand name or equal based on salient characteristics. The parts list includes electrical conduit and fittings (EMT 90-degree elbows, set screw couplings and connectors, rigid steel conduit), structural support components (deep strut, end angles, all-threaded rods, universal strut straps), an enclosure (36"x36"x14" NEMA 3R with screw cover), mechanical lugs, and 1,280 units of 400 MCM THHN/THWN-2 stranded copper wire in black (2,500-foot spool). All items are listed with part numbers, descriptions, quantities, and unit measurements (primarily in each/EA). The document provides columns for unit pricing and total pricing but does not include pre-populated pricing data or contract award information. The solicitation is dated April 2026.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SALIENT CHARACTERISTICS & PRICING SCHEDULE
FOR
Transformer Upgrade Supplies
April 2026
Salient Characteristics & Pricing Schedule For
Transformer Upgrade Supplies
Fairchild AFB, WA
1. BACKGROUND:
The 92 CES requires supplies to repair and upgrade the transformer in the Structures Shop.
2. OBJECTIVES:
Upgrading the transformer will provide the 92 CE Structures shop with a stable and robust power supply, capable of handling high-draw equipment. This ensures mission readiness and prevents damage to critical tools and infrastructure
3. REQUIREMENTS:
Contractor shall provide and deliver the parts listed below as Brand Name or Equal in salient characteristics.
4. PARTS LIST:
ITEM
PART
NUMBER or
EQUAL
DESCRIPTION or EQUAL QTY Unit Unit $ Total $
1 980020020304 4”EMT 90 Degree Elbow 2 Ea 2 784564104694 4” EMT Set Screw Coupling 10 Ea 3 783510145170 36”x36”x14” Nema 3R
Enclosure, screw cover 1 Ea
4 980010020109 4” EMT Conduit, Steel, 10’ length
100 Ea
5 702316501027 Deep strut, elongated holes, steel pre-galvanized, 1-5/8”x1- 5/8”x10’
20 Ea
6 702316501164 Two Hole End angle, steel electro-galvanized, 9/16”, 8 bolt
8 Ea
7 702316528925 All Threaded rod, Zinc-plated, 3/8”x10’
20 Ea
8 784564104595 4” EMT Set Screw Connector 4 Ea 9 980010001108 4” Rigid Steel Conduit, 10’ length 20 Ea
10 783669005684 Mechanical Lug, 1-hole, 2 conductor, 2AWG-600 MCM, ½” stud size, aluminum
4 Ea
11 616013140819 Universal Strut Strap, 4”, Hot dipped, galvanized
10 Ea
12 048243539062 400 MCM THHN/THWN-2
Stranded Copper, Black 2500'
1280 Ea
File details come from the government source that posted it. Updated .