This is a Salient Characteristics document for a federal procurement of fire system booster pumps, dated 28 July 2026, for Project #429A-340. The procurement requires ten (10) Balco LLC Model #GBSLUCK 1029 three-stage booster pump systems or equal equipment meeting the specifications outlined in attached bills of materials, drawings, and cut sheets.

The equipment must comply with OSHA safety requirements under CFR Title 29, Part 1910, Subparts "O" and "S", and shall be inspected and certified by a Nationally Recognized Testing Laboratory (NRTL) authorized by OSHA. The contractor must provide two hard copies of the NRTL certification report for all ten booster pumps, or if the equipment model has already been certified, two hard copies of existing certification documentation or mounted acknowledgment of NRTL certification status. Additionally, the contractor must furnish two hard copies of manufacturer manuals bound in durable three-ring binders that include mechanical and electrical schematics, wiring diagrams, block diagrams, system electrical interface documents, parts lists, and pumping flow charts in English and imperial units of measure. The manuals must be sufficiently detailed to enable troubleshooting and repair by journeymen-level personnel and reflect the "as built" configuration of supplied equipment. The contractor must provide a "no asbestos used" certification statement for all products and materials used in equipment components, and a list of recommended consumable spare parts with possible procurement sources.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Salient Characteristics for 8010 Fire System Booster Pumps (Qty: 10) Project #429A-340

28 July 2026

1. 8010 Fire System Booster Pumps (Qty: 10) (Balco LLC, Model # GBSLUCK 1029 or equal) shall be provided. Each unit shall be a three stage booster pump system. Each booster pump shall meet the drawings and data provided on the attached bill of materials, drawings and cut sheets.

2. Safety Requirement - The equipment and its component parts shall be in compliance with applicable Code of Federal Regulations (CFR) Title 29, Part 1910. By definition, any equipment will be deemed acceptable and approved by TRF, Bangor, if it meets specific Occupational Safety and Health Administration (OSHA) conditions outlined in CFR Title 29, Part 1910;

Subparts "O" and "S". Specifically, equipment will be "Accepted" by TRF, Bangor, if it has been inspected and found by a Nationally Recognized Testing Laboratory (NRTL) to conform to specified plans or procedures of applicable codes. The equipment (as a whole system) shall be Nationally Recognized Testing Laboratory (NRTL) inspected and certified (by an OSHA authorized third party). A total of two (2) “hard” copies of the NRTL certification report (for all ten booster pumps) shall be provided. If the equipment type/model has already been NRTL inspected and certified, a certification report (a total of two (2) ”hard” copies, for all ten booster pumps) or documentation mounted on the equipment, (which acknowledges it is NRTL certified), shall be provided.

3. Operator / Maintenance / Repair Manuals - The equipment shall be furnished with a total of two (2) “hard” copies (for all ten boosters) of the manufacturer’s standard Product Manual/Operation, Maintenance, and Repair Manual(s), bound in durable three ring binder(s).

The manuals shall include all mechanical and electrical schematics showing discrete components/block diagrams/wiring diagrams with inputs and outputs identified/system electrical interface documents and drawings for the specific model of all machine equipment/drives/controls supplied. The information contained in the manual(s) shall reflect the unit and its components in the “as built” configuration. A parts list shall be provided, as well as a pumping flow chart. The information contained in the manual(s) shall be adequate to permit trouble shooting and repair of the equipment by journeymen level personnel. The information contained in the manual(s) shall be in the English language. The information contained in the manual(s) shall be in imperial units of measure. The vendor shall provide a “no asbestos used” statement, certifying that all products/materials (i.e. gaskets, etc.) used in the components of the equipment does not contain asbestos. The contractor shall provide a list of recommended consumable spare parts and possible sources for procurement.