26Q0086_RFC Template.docx

DOCX document 208 KB Posted

Attached to
SOLICITATION _ 100-TON H-FRAME HYDRAULIC PRESS W/ AUXILIARY ATTACHMENTS
Solicitation number
N5523626Q0086
Issued by

About this file

This file is a Request for Specification Clarification (RFC) template used by the Southwest Regional Maintenance Center (SWRMC) for solicitation N5523626Q0086. The template is a standardized form designed to document and process technical inquiries or clarification requests related to the 100-ton Hydraulic Press procurement. The document includes fields for tracking question submission details (date, question number), solicitation reference information, and contractor points of contact. It designates Scott Quiambao and Ricardo Barraza-Cobos as SWRMC primary and secondary points of contact for specification-related inquiries.

The form incorporates internal SWRMC review workflow procedures requiring technical review, planner review, supervisor review, Code 230 review, and Advanced Planning review, with designated date fields for each checkpoint. It also includes checkboxes to track whether specification changes, drawing or reference changes, requirements changes, or material changes result from the clarification process. This template serves as the administrative mechanism for managing contractor questions and coordinating technical responses during the solicitation period for the Naval Base San Diego hydraulic press procurement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SWRMC

REQUEST FOR SPECIFICATION CLARIFICATION

DATE OF REQUEST: DDMMMYYYY
QUESTION NO: 001
SHIP/HULL NO: N/A
SOLICITATION NO: N5523626Q0086

ITEM NO: N/A

TITLE: CODE 958A _ 100-TON HYDRAULIC PRESS
SWRMC POC & PHONE: SCOTT QUIAMBAO

EMAIL: scott.s.quiambao.civ@us.navy.mil

Ricardo Barraza-Cobos ricardo.barraza-cobos.civ@us.navy.mil

PAGE NO:
CONTRACTOR:
PLANNER’S NAME:
ATTACH. NO:
CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION:

DO NOT WRITE BELOW THIS LINE

(FOR SWRMC USE ONLY)

TECHNICAL REVIEW:
SERIAL NO:
PLANNER REVIEW
DATE:
SUPERVISOR REVIEW:
DATE:
CODE 230 REVIEW:
DATE:
ADV PLAN REVIEW:
DATE:
SPEC CHG: Y/N
DWG/REF CHG. Y/N
RQMTS CHG: Y/N
MAT'L CHG: Y/N

image1.jpeg image2.png

File details come from the government source that posted it. Updated .