26PSX0176 Exhibit B- Price Schedule.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Boat Maintenance and Repair
- Solicitation number
- 26PSX0176
- Issued by
- Connecticut
About this file
Summary of 26PSX0176 Exhibit B- Price Schedule
This is a price schedule exhibit for a Connecticut boat maintenance and repair contract (26PSX0176) solicitation. The price schedule is structured as a spreadsheet with separate pricing tabs for four vessel categories: Cumberland, Hollister, Selden III, and Other Vessels. Bidders are required to submit pricing for all line items within each tab for which they wish to bid; blank cells will be considered a "no bid," and any modifications to the spreadsheet may result in bid rejection. The pricing schedule does not specify response dates, due dates, site visits, bidder's meetings, award dates, or contract terms within this document.
The price schedule contains 14 line items for the three named vessels (Cumberland, Hollister, Selden III) and 14 line items for Other Vessels, covering services such as haul out and storage, emergency haul out and refloat, hull and structural work, propulsion and machinery work, electrical and navigation work, conversion/overhaul, general maintenance, and naval architecture/marine engineering services. Pricing must be submitted on an hourly basis for labor-intensive services, per-year basis for annual storage, per-each basis for emergency services, and as a percentage discount off manufacturer's suggested retail price (MSRP) for parts and materials. No information regarding set-asides, incumbents, funding sources, or other financial requirements is contained in this pricing exhibit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26PSX0176_Nov_12_26_solicitation_doc.pdf | ||
| 26PSX0176 Contract and Exhibits.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| 26PSX0176- Boat Maintenance and Repair |
| Exhibit B, Price Schedule |
| Bidder Name: |
| Instructions: Please note that there are multiple tabs within this Exhibit B. Pricing must be entered for each vessels and/ or Other Vessels that are not specifically listed in Exhibit A. Bidders must enter pricing in each in column D of the vessel(s) that they are interested in servicing. Bidders must bid all items within a tab. A blank cell will be considered a "no bid." Any modification to this spreadsheet may result in the bid being rejected. |
Cumberland
| 26PSX0176- Boat Maintenance and Repair |
| Exhibit B, Price Schedule |
| Item Number | Description | Unit of Measure | Price |
| 1 | Haul Out and Storage | Per year | |
| 2 | Emergency Haul Out and Refloat | Each | |
| 3 | Hull and Structural Work | Per hour | |
| 4 | Hull and Structural Work Emergency Repair | Per hour | |
| 5 | Propulsion and Machinery Work | Per Hour | |
| 6 | Propulsion and Machinery Work Emergency Repair | Per Hour | |
| 7 | Electrical and Navigation Work | Per Hour | |
| 8 | Electrical and Navigation Work Emergency Repair | Per Hour | |
| 9 | Conversion/ Overhaul | Per Hour | |
| 10 | Conversion/ Overhaul Emergency Repair | Per Hour | |
| 11 | General Maintenance | Per Hour | |
| 12 | General Maintenance Emergency Repair | Per Hour | |
| 13 | Naval Architecture/ Marine Engineering Services | Per Hour |
14 Percentage off MSRP for all Parts and Materials Percent Discount
Hollister
| 26PSX0176- Boat Maintenance and Repair |
| Exhibit B, Price Schedule |
| Item Number | Description | Unit of Measure | Price |
| 1 | Haul Out and Storage | Per year | |
| 2 | Emergency Haul Out and Refloat | Each | |
| 3 | Hull and Structural Work | Per hour | |
| 4 | Hull and Structural Work Emergency Repair | Per hour | |
| 5 | Propulsion and Machinery Work | Per Hour | |
| 6 | Propulsion and Machinery Work Emergency Repair | Per Hour | |
| 7 | Electrical and Navigation Work | Per Hour | |
| 8 | Electrical and Navigation Work Emergency Repair | Per Hour | |
| 9 | Conversion/ Overhaul | Per Hour | |
| 10 | Conversion/ Overhaul Emergency Repair | Per Hour | |
| 11 | General Maintenance | Per Hour | |
| 12 | General Maintenance Emergency Repair | Per Hour | |
| 13 | Naval Architecture/ Marine Engineering Services | Per Hour |
14 Percentage off MSRP for all Parts and Materials Percent Discount
Selden III
| 26PSX0176- Boat Maintenance and Repair |
| Exhibit B, Price Schedule |
| Item Number | Description | Unit of Measure | Price |
| 1 | Haul Out and Storage | Per year | |
| 2 | Emergency Haul Out and Refloat | Each | |
| 3 | Hull and Structural Work | Per hour | |
| 4 | Hull and Structural Work Emergency Repair | Per hour | |
| 5 | Propulsion and Machinery Work | Per Hour | |
| 6 | Propulsion and Machinery Work Emergency Repair | Per Hour | |
| 7 | Electrical and Navigation Work | Per Hour | |
| 8 | Electrical and Navigation Work Emergency Repair | Per Hour | |
| 9 | Conversion/ Overhaul | Per Hour | |
| 10 | Conversion/ Overhaul Emergency Repair | Per Hour | |
| 11 | General Maintenance | Per Hour | |
| 12 | General Maintenance Emergency Repair | Per Hour | |
| 13 | Naval Architecture/ Marine Engineering Services | Per Hour |
14 Percentage off MSRP for all Parts and Materials Percent Discount
Other Vessels
| 26PSX0176- Boat Maintenance and Repair |
| Exhibit B, Price Schedule |
| Item Number | Description | Unit of Measure | Price |
| 1 | Haul Out and Refloat | Each | |
| 2 | Emergency Haul Out and Refloat | Each | |
| 3 | Hull and Structural Work | Per hour | |
| 4 | Hull and Structural Work Emergency Repair | Per hour | |
| 5 | Propulsion and Machinery Work | Per Hour | |
| 6 | Propulsion and Machinery Work Emergency Repair | Per Hour | |
| 7 | Electrical and Navigation Work | Per Hour | |
| 8 | Electrical and Navigation Work Emergency Repair | Per Hour | |
| 9 | Conversion/ Overhaul | Per Hour | |
| 10 | Conversion/ Overhaul Emergency Repair | Per Hour | |
| 11 | General Maintenance | Per Hour | |
| 12 | General Maintenance Emergency Repair | Per Hour | |
| 13 | Naval Architecture/ Marine Engineering Services | Per Hour |
14 Percentage off MSRP for all Parts and Materials Percent Discount
File details come from the government source that posted it. Updated .