This is an Exhibit A to a Connecticut state contract (26PSX0105) that details the scope of services and deliverables for environmental consulting services. The contract is administered by the State of Connecticut and covers oversight, consultation, and administration of environmental projects involving the discovery, reporting, investigation, evaluation, mitigation, and remediation of contaminated media including soil, sediment, surface water, groundwater, drinking water, wastewater, sludge, biosolids, and air. Services encompass Phase I, II, and III Environmental Site Assessments; environmental investigations and characterization; ecological and human health risk assessments; remedial action design and project management; PFAS investigation and remediation; environmental permit preparation; and laboratory analytical services. The document does not specify response dates, bid submission deadlines, site visits, or bidders' conferences. Contract terms and renewal options are not defined in this exhibit. The contract requires contractors to execute a Statement of Work (SOW) for most projects, with the Client Agency determining whether an SOW is necessary for routine or time-sensitive assignments.
Pricing under the contract is established through Exhibit B schedules containing labor rates (Exhibit B-1), equipment rates (Exhibit B-2), and material prices (Exhibit B-3), which are not included in this document. The contract permits cost-plus billing for materials not specifically listed in Exhibit B-3 at the documented actual cost plus an applicable percentage. Equipment charges are subject to Fair Market Value (FMV) ceilings, with the Client Agency retaining the option to take ownership once cumulative charges reach 100 percent of the FMV. Subcontracted services exceeding $2,500 require three competitive cost proposals unless circumstances prevent such competition, with approved markups not to exceed five percent. Laboratory services through state-contracted laboratories are billed at established state contract rates with no contractor markup permitted. The contract imposes detailed invoicing requirements including daily field records, labor hour tracking, equipment usage justification, and comprehensive cost documentation. No set-asides are identified in this document. The contract requires compliance with federal environmental laws, Connecticut occupational safety and health regulations, and Department of Correction security requirements where applicable. All project materials, reports, data, and intellectual property created under the contract become the property of the Client Agency, though contractors retain ownership of pre-existing proprietary materials incorporated into deliverables.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Connecticut Contract# 26PSX0105
EXHIBIT A
DESCRIPTION OF DELIVERABLES:
A. The Contractor shall provide Services, in the form of oversight, consultation and administration of various environmental projects involving the discovery, reporting, investigation, evaluation, mitigation, and remediation of contaminated media. Media may include but is not limited to, soil, sediment, surface water, groundwater, drinking water, land and waters of the State (offshore and coastal waters), wastewater, sludge and biosolids, and air resulting from the release or migration of oil or petroleum, chemical liquids, solid, liquid or gaseous products, waste oil, or hazardous wastes, or other contaminants. Contractor shall also provide Services, in the form of maintenance and monitoring of remedial activities, including at landfills; and preparation of environmental permit applications. Services may also require provision of professional or expert advice and/or testimony in administrative, arbitration, or judicial proceedings related to work Performed under this Contract.
B. Upon award, the negotiated Deliverables will be incorporated as Exhibit A, Description of Deliverables.
SCOPE OF SERVICES:
C. Definitions As used in this Exhibit A, unless specified otherwise, the following terms shall have the following meanings:
i. “Contractor Parties” shall mean employees, agents or Subcontractors of a Contractor.
ii. “Day” shall mean a calendar day.
iii. “Week” shall mean any consecutive seven (7) day period.
iv. “Month” shall mean thirty (30) consecutive days.
v. “Occupational Safety and Health Law" shall mean Chapter 571 of Title 31 of the Connecticut General Statutes (“CGS”), the Federal Occupational Safety and Health Act of 1970, and all regulations promulgated under the aforementioned State and Federal statutes, including any amendment thereto.
vi. “Release-based cleanup regulations” or “RBCRs” means sections 22a-134tt-1 to 22a-134tt-APP12, inclusive, of the Regulations of Connecticut State Agencies (“RCSA”), and any amendment thereto.
vii. The terms “chemical liquids”, “hazardous waste”, “oil or petroleum”, “solid, liquid or gaseous products” and “waste oil” shall be defined as those terms are defined in CGS §22a-448, including any amendment thereto.
viii. “Substance” shall mean an element, compound or material which, when added to air, water, soil or sediment, may alter the physical, chemical, biological or other characteristics of such air, water, soil or sediment.
ix. “Release” shall be defined as the term is defined in the CGS §22a-134pp and CGS §22a-448, including any amendments thereto.
x. “Characterization” shall be defined as the term is defined in RCSA §22a-134tt-1(a) and include actions defined in RCSA §22a-134tt-4 et seq., including any amendment thereto.
xi. “Remediation” shall be defined as the term is defined in CGS §22a-134pp and RCSA §22a-134tt-1(a), including any amendment thereto.
xii. “Phase I Environmental Site Assessment” shall mean an investigation of the existing and past uses of a Site for the purpose of identifying all potential areas of concern at a Site at which substances may have been released to the environment.
xiii. “Phase II Environmental Site Assessment” shall mean an investigation of all potential areas of concern identified in the Phase I Environmental Site Assessment for the purpose of determining if a release of any substance has occurred.
xiv. “Phase III Environmental Site Assessment” shall mean an investigation that fully defines the nature and extent of pollution associated with releases confirmed during the Phase II Environmental Site Assessment or otherwise known to be present.
xv. “Ecological Risk Assessment” shall mean qualitative and quantitative evaluation of the potential for harm to occur to ecological receptors as a result of exposure to one or more stressors.
xvi. “Human Health Risk Assessment” shall mean qualitative and quantitative evaluation of the potential for harm to occur to people as a result of exposure to one or more stressors.
xvii. “Discovery of Releases” shall mean the definition and actions defined in RCSA §22a-134tt-2 et seq.
xviii. “Reporting” shall mean the definition and actions defined in RCSA §22a-134tt-3 et seq.
xix. “Licensed Environmental Professional” or “LEP” shall be defined as the term is defined in CGS §22a-133v and RCSA §22a-134tt-1(a), including any amendment thereto.
xx. “Permitted Environmental Professional” or “PEP” shall be defined as the term is defined in RCSA §22a-134tt-1(a), including any amendment thereto.
xxi. “Per- and polyfluoroalkyl substances” or “PFAS” shall be defined as the term is defined in RCSA §22a-134tt-1(a), including any amendment thereto.
D. Environmental Services
i. Environmental Investigation Services: Environmental investigations include release characterization activities necessary for reporting and achieving compliance with the RBCRs, Phase I Environmental Site Assessments, Phase II Environmental Site Assessments, Phase III Environmental Site Assessments, conceptual Site model development, potable well water sampling and receptor surveys, ecological risk assessments, human health risk assessments and any other investigations necessary for the Client Agency to ensure that public health and the environment are protected. Environmental investigations are conducted, among other purposes, to determine the past and current uses of a Site that may have resulted in a release of a substance or substances to the soil, sediment, surface water or groundwater; determine if such releases have occurred; determine the degree and extent of such releases; and evaluate the compliance with all applicable environmental laws including, but not limited to, the RBCRs. Such environmental investigations may, among other actions, require the Contractor to:
1) Locate the source of contamination or define the extent and degree of pollution attributable to a release(s); with a view toward designing an immediate action plan, a remedial feasibility study and/or remedial action plan;
2) Locate and gather relevant geological, Site, or other data including, but not limited to, geologic maps and property records;
3) Prepare release characterization or parcel or Site investigation scopes of work that propose the location and number of soil borings, soil samples, soil-gas samples, water samples, wastewater samples, sludge samples, and groundwater monitoring or water supply wells, to be analyzed, as applicable; and the analytical methods to be used;
4) Conduct release characterization or Site investigation activities that may include collecting soil, sediment, air, surface water, groundwater, wastewater, sludge, and drinking water samples, and conducting geophysical, hydrogeologic, geotechnical, and soil gas testing;
5) Prepare reports that describe the characterization or investigation conducted, present the results of the characterization or investigation, interpret the data collected and make recommendations for further actions, and provide reports in the manner and format required by the Client Agency, which may include electronic submission through the Department of Energy and Environmental Protection’s Release, Environmental Assessment, and Cleanup Tracker (REACT) online portal;
6) Prepare ecological and/or human health risk assessments that evaluate the risks posed by releases or pollution identified; and
7) Perform any other activities deemed necessary by the Client Agency.
ii. Remedial Action Design and Project Management Services: Services may include but are not limited to:
1) The preparation of an immediate action plan or remedial action plan that details the actions proposed for remediation of a release or parcel; design of a remediation system; development of Request for Proposal (“RFP”) documents and specifications for remedial Services; assistance in procurement of a remedial Contractor and/or Subcontractor; oversight and management of remediation and remedial Contractors and/or Subcontractors; conducting monitoring to determine the effectiveness of any such remediation; preparation of immediate action reports, release remediation closure reports, remedial action reports, and certifications or verifications that document the results of remediation conducted, the compliance of the release, parcel, or Site with respect to environmental laws including, but not limited to the RBCRs and recommends any additional actions;
2) Development of RFP documents and specifications for establishing a supply of public water, including design and construction of water mains and residential Service connections, abandonment of supply wells, and constructing any necessary project elements, oversight and management of public water supply projects;
3) Maintenance, monitoring, and oversight of ongoing investigation and remedial activities including, but not limited to, landfill maintenance and monitoring; and
4) Any other activity deemed necessary by the Client Agency to carry out an environmental project.
iii. PFAS Investigation and Remediation Services: In addition to the work specified in subsections (i) and (ii) above, the Contractor may be required to provide investigation and remediation Services specifically for PFAS. Requested Services may include but are not limited to, the collection and analysis of potable drinking water well samples, soil, sediment, groundwater, surface water, tissue, wastewater, sludge, biosolids, and other environmental matrices for PFAS; and evaluating, recommending, and implementing remedial alternatives including but not limited to drinking water treatment. The Contractor may also be required to conduct investigations to determine the source of PFAS.
iv. Environmental Permit Preparation Services: The Contractor may be required to provide comprehensive environmental permitting preparation Services on behalf of the Client Agency, including but not limited to preparation of permit applications and supporting documentation, agency coordination, and related activities. Such permits may be necessary to facilitate investigation and remediation activities or for compliance at Client Agency facilities.
v. Laboratory Analytical Services: The Contractor shall make reasonable efforts to procure analytical Services provided by a laboratory that is currently under contract with the State, and such Services shall be billed at the rates established in the applicable state Contract with no additional Contractor markup. If a state-contracted laboratory is unavailable or unsuitable, a Contractor may request authorization from the Client Agency to use a non-state contracted laboratory whose rates are consistent with or less than existing contract rates. All laboratory invoices shall include an itemized list of charges for analyses Performed and the corresponding chain of custody documentation for all analyses. For Services Performed by the state-contracted laboratories, either the state-contracted laboratory or the Contractor may invoice the Client Agency. If invoiced by the Contractor, the Contractor must identify the laboratory’s state contract number and verify the charges for the requested analyses are consistent with state contract rates.
E. General Performance Requirements
i. Safety Precautions and Environmental Compliance: The Contractor shall be responsible for taking all necessary precautions for the safety of employees on the work Site and shall comply with all applicable provisions of federal, state, and municipal regulations and building codes to prevent accidents or injuries to persons on, about, or adjacent to the premises where the work is being Performed. The work areas shall be kept orderly, clean, and free from any unnecessary material and rubbish.
The Contractor shall erect and properly maintain at all times, as required by the conditions and progress of work, all necessary safeguards for the protection of workers and the public. The Contractor shall post danger signs warning against the hazards created by such features of construction. The Contractor shall designate a responsible member on the work Site whose duty shall be the prevention of accidents.
The Contractor shall comply with all applicable provisions of Environmental law and Occupational Safety and Health law and all applicable state and municipal laws when Performing work under this Contract.
ii. Health and Safety Plan Requirements: Each Contractor shall initiate, develop, maintain and comply with at all times, a health and safety plan (“HASP”) applicable to all actions undertaken or all activities Performed at a project Site. Such HASP shall ensure that all such actions and activities taken at a Site by a Contractor, its employees, agents and subcontractors are in full compliance with the Occupational Health and Safety Act (“OSHA”) of 1970 29 U.S.C. §651 et seq., CGS §31-367 et seq., the Solid Waste Disposal Act, 42 U.S.C. §6907 et seq., CGS §22a-449(c) and their implementing regulations, any permit(s) or order(s) issued by the Client Agency to such Contractor and all other applicable State and Federal statutes and regulations. Such HASP shall be available at the Contractor's principal place of business in the State and shall be made available for inspection during normal business hours or be provided to the Client Agency upon request. In addition, each Contractor providing Services shall maintain a Site-specific HASP on-Site, as required by applicable occupational health and safety laws. This Site-specific HASP shall be available for review by the Client Agency immediately upon request. In the event the Client Agency determines that any action, inaction or condition at a Site is inconsistent with or in violation of a Contractor’s HASP, any applicable OSHA or other requirement, or poses or may pose a threat to public safety, human health or the environment, the Client Agency shall take the actions necessary to prevent or abate such threat including, but not limited to, ordering or directing a Contractor to take or refrain from taking certain actions.
iii. Equipment, Vehicle and Emissions Requirements:
1) The Contractor is responsible for controlling air pollution at all times during work, twenty-four (24) hours per day, seven (7) days per week, including non-working hours, weekends and holidays.
2) Contractors renting or supplying equipment or vehicles are required to equip them with all required safety and air pollution control devices. Equipment must be in compliance with all applicable Federal, State of Connecticut, and municipal regulations.
3) All motor vehicles and/or construction equipment (both on-highway and non-road) shall comply with all pertinent State and Federal regulations relative to exhaust emission controls and safety.
4) The Contractor shall establish truck-staging zones for vehicles that are waiting to load or unload material at the Site. Such zones shall be located where the emissions from the trucks will have minimum impact on abutters, other nearby properties, and the general public. Idling of delivery and/or dump trucks, or other equipment shall not be permitted during periods of non-active use, and it should be limited to three (3) minutes in accordance with RCSA §22a-174-18(b)(3)(c): No mobile source engine shall be allowed “to operate for more than three (3) consecutive minutes when the mobile source is not in motion, except as follows:
a. When a mobile source is forced to remain motionless because of traffic conditions or mechanical difficulties over which the operator has no control,
b. When it is necessary to operate defrosting, heating or cooling equipment to ensure the safety or health of the driver or passengers,
c. When it is necessary to operate auxiliary equipment that is located in or on the mobile source to accomplish the intended use of the mobile source,
d. To bring the mobile source to the manufacturer’s recommended operating temperature,
e. When the outdoor temperature is below twenty degrees Fahrenheit (20 degrees F),
f. When the mobile source is undergoing maintenance that requires such mobile source be operated for more than three (3) consecutive minutes, or
g. When a mobile source is in queue to be inspected by U.S. military personnel prior to gaining access to a U.S. military installation.”
5) All work shall be conducted to ensure that no harmful effects are caused to adjacent sensitive receptors. Sensitive receptors include but are not limited to hospitals, schools, daycare facilities, elderly housing and convalescent facilities. Exhaust from engines shall be located away from fresh air intakes, air conditioners, and windows. Upon request of the Client Agency, the Contractor shall prepare a diesel emissions mitigation plan for areas where extensive work will be Performed in close proximity (less than 50 feet (15 meters)) to sensitive receptors. No work will proceed until a construction sequence and a vehicle emissions mitigation plan is submitted to the Client Agency for review and all comments are addressed prior to the commencement of any extensive construction work in close proximity (less than 50 feet (15 meters)) to sensitive receptors. The mitigation plan must address the control of vehicle emissions from all vehicles and construction equipment.
6) The Contractor shall comply with all State and federal regulations pertaining to dust control. Particular attention shall be made to the RCSA § 22a-174-18, “Control of Particulate Emissions”. The Contractor shall submit a dust control plan to the Client Agency for extensive construction projects or upon request of the Client Agency. The dust control plan shall include contact information for the responsible individual(s) from the Contractor (24-hour availability) who has authority to implement necessary controls. The plan must detail dust control procedures for anticipated activities that may typically generate dust (ex. Jack hammering, saw-cutting pavement, haul roads, material storage Sites, etc.).
iv. Protection of Work, Equipment, Materials and Project Sites: Contractor agrees that it shall keep and hold the State, its officers, agents, etc. harmless and that the State will not be liable for and assumes no liability for any temporary structures, supplies, materials, equipment, owned or leased, or anything else of value which a Contractor stores, keeps or maintains at a Site. Each Contractor shall be solely responsible for securing and providing security for any such temporary structure(s), supplies, materials, equipment, owned or leased, or anything else of value, which a Contractor stores, keeps or maintains at a Site. In addition, and with respect to all work Performed a Contractor shall:
1) Continuously and adequately protect the work Performed at a Site including, but not limited to, all equipment and/or materials against damage from any cause; and
2) Provide and maintain safeguards for the protection of the public and for all Contractor Parties and all persons undertaking response actions at a Site including, but not limited to, posting adequate warning signs or taking steps to prevent the public from entering certain areas.
F. Conflict of Interest:
i. Before providing any and all Services at a Site, a Contractor shall determine if it is or may be potentially liable, as defined by CGS §22a-451 or any other State or Federal law, for the pollution or contamination at the Site. If a Contractor determines that it may be potentially liable, it shall inform the Client Agency before initiating Services at the Site.
ii. A Contractor shall not provide labor, equipment and/or materials at a Site if said Contractor may be potentially liable, under CGS §22a-451 or any other State or Federal law, for the pollution or contamination at the Site. In addition, the Contractor must determine, before providing Services at a Site, if any other potential conflict of interest exists. At a minimum, the Contractor must identify any known relationships with current or past owners of the Site where Services have been requested by the Client Agency or any known relationships with parties responsible or potentially responsible for a release at the Site where Services have been requested by the Client Agency. Based on the Contractor's response to this requirement, the Client Agency may choose to seek the Services of another Contractor, if an actual or potential conflict of interest exists.
G. Federal Laws Contractor shall comply with Federal Laws as listed in Attachment 1.
H. Department of Correction (“DOC”) facility access Contractor shall comply with DOC facility access and security requirements, where applicable, including the Guide for Contractors in the Correctional Environment attached hereto as Attachment 2.
I. Client Agency Authorities and Duties:
i. Each Contractor shall permit the Client Agency, its agents or representatives to enter any portion of a project Site at any time for any purpose.
ii. The Client Agency shall have the authority to direct, coordinate and/or oversee all activities, actions or Services being conducted at a project Site by the Contractor. This includes, but is not limited to, the authority to stop work, direct, modify or schedule the Performance of any work at a Site.
iii. A Contractor Performing activities at a project Site shall coordinate through the Client Agency all activities at a project Site, shall fully coordinate with all representatives of all Client Agency parties to include but not be limited to, municipal, State and Federal officials, other Contractors, Subcontractors, State personnel, public utility companies and others engaged in Performing response activities at a project Site and shall attend such meetings, discussions, hearings as may be requested from time to time by the Client Agency.
SERVICE AUTHORIZATION, CHARGES AND PAYMENT:
J. Authorization to Perform Services: Services shall not commence until the Contractor has received an authorized Purchase Order from the Client Agency. When determined necessary by the Client Agency based on the nature, scope, or complexity of the assignment, the Client Agency may also require an SOW prior to commencement of Services.
K. Labor Charges:
i. The Client Agency shall only pay the Contractor for pre-authorized labor costs incurred in Performing Services associated with the project in accordance with Exhibit B-1.
ii. Allowable charges for labor include, but shall not exceed, the time actually spent traveling to and from the Site from either the Contractor’s closest place of business or residence, whichever is closer. Such travel time shall not exceed two (2) hours per day, unless otherwise authorized in advance by the Client Agency.
iii. If a project requires the assignment of out-of-state personnel who are essential to the project and possess specialized expertise necessary to Perform the Services, the Client Agency may, on a case-by-case basis and with prior written authorization, approve reasonable travel expenses. Such authorization shall be limited to extenuating circumstances where the nature or requirements of the specific project necessitate specialized expertise that is not reasonably available from personnel located within or ordinarily serving Connecticut. A Contractor’s lack of local staffing, personnel availability, staffing decisions, or ordinary business operations shall not constitute an extenuating circumstance or otherwise provide a basis for reimbursement of travel expenses.
Reimbursement for authorized lodging and per diem expenses shall not exceed the applicable rates published by the U.S. General Services Administration for Connecticut.
L. Equipment Charges:
i. The Client Agency shall pay the Contractor the applicable Contract equipment rate identified in Exhibit B-2 for authorized Contractor-owned or Subcontractor-owned equipment identified in Exhibit B-2 and used at a project Site, unless the Client Agency determines, in its sole discretion, either before or after equipment is or has been used at a Site that:
1) A task Performed by the Contractor at a Site could have been accomplished using equipment chargeable at a lower rate than the equipment selected by the Contractor; or
2) The Contractor substituted equipment at a Site resulting in a higher equipment rate. In such instance, the allowable equipment charges shall be limited to the lowest Contract equipment rate for equipment that the Client Agency, in its sole discretion, determines should or would have been sufficient to complete the tasks Performed.
ii. Equipment charges shall apply only when Contractor-owned or Subcontractor-owned equipment at a project Site is operational and available for its intended use. If such equipment becomes inoperable or unusable and the Contractor must procure, purchase, or rent replacement equipment, the allowable equipment charges for such replacement equipment shall be limited to the Contract equipment rate in effect for the equipment being replaced or the Contractor’s actual cost to procure or rent the replacement equipment, whichever is lower, unless otherwise authorized in writing by the Client Agency.
iii. Except for costs expressly authorized for Client Agency-owned equipment pursuant to Section 3.D., the Contractor shall not seek or receive separate payment or reimbursement for:
1) Repairs to Contractor-owned or subcontractor-owned equipment, including, but not limited to, labor and parts;
2) Costs associated with repairing or replacing inoperable Contractor-owned or subcontractor-owned equipment;
3) Rental, operational, or other cost attributable to any period during which Contractor-owned or subcontractor-owned equipment is inoperable or unusable;
4) Fuel, oil, replacement filters, or similar consumables associated with Contractor-owned or subcontractor-owned equipment; or
5) Equipment brought to a project Site that the Client Agency, in its sole discretion, determines is unnecessary.
iv. Contractor-owned and subcontractor-owned equipment identified in Exhibit B-2 shall be subject to the equipment charge, documentation, FMV, and maximum allowable equipment charge requirements of this Section and Section 3.D. The Contractor shall be responsible for obtaining and maintaining all required documentation for subcontractor-owned equipment and for ensuring compliance with all Contract requirements applicable to such equipment.
v. If the Contractor requires equipment for a project that it does not own or otherwise have available, including because its own equipment is unavailable or in use on another project, the Contractor may, with prior written authorization from the Client Agency, obtain such equipment from a subcontractor, equipment rental company, or other third-party source. If the same or comparable equipment is identified in the Contractor's Exhibit B-2, the allowable equipment charge shall not exceed the applicable Contract equipment rate established in Exhibit B-2 or the Contractor's actual documented cost to obtain the equipment, whichever is lower. No additional markup shall apply to such equipment charge.
If the required equipment is not identified in the Contractor's Exhibit B-2 and no applicable Contract equipment rate has been established, the Contractor shall obtain prior written authorization from the Client Agency in accordance with Section 3.F., Subcontracted Services. The procurement, pricing, documentation, competitive cost proposal requirements, and any allowable markup for such equipment shall be subject to the applicable requirements of Section 3.F.
M. Maximum Allowable Equipment Charges
i. Individual Equipment FMV Ceiling. Except for vehicles identified in Exhibit B-2 as exempt for the FMV requirement, each separately authorized piece of Contractor-owned or subcontractor-owned equipment identified in Exhibit B-2 and used at a project Site shall be subject to its applicable approved Fair Market Value (“FMV”) identified in Exhibit B-2. The approved FMV shall establish the maximum cumulative equipment charges that may be paid by the Client Agency for the use of that individual piece of equipment at a project Site.
When more than one unit of the same or similar equipment is authorized and used at a project Site, each separately identifiable piece of equipment shall be tracked independently and shall be subject to its own applicable approved FMV. Equipment charges shall not be combined solely because multiple pieces of the same or similar equipment are used at the project Site.
ii. Tracking of Equipment Charges. The Contractor shall be responsible for tracking cumulative equipment charges for each individual piece of equipment used at each project Site and comparing such charges to the applicable approved FMV prior to submitting an invoice to the Client Agency. Upon request, the Contractor shall provide documentation sufficient to identify the equipment and substantiate its original purchase price, approved FMV, and cumulative equipment charges billed to the project Site.
iii. Notification When Equipment Approaches FMV. The Contractor shall notify the Client Agency in writing when cumulative equipment charges for an individual piece of equipment are reasonably anticipated to reach its approved FMV. Such notification shall be provided sufficiently in advance to allow the Client Agency to determine whether continued use of the equipment is appropriate and how the Client Agency wishes to proceed.
iv. Equipment Charges Upon Reaching FMV. In no event shall cumulative equipment charges paid for an individual piece of equipment at a project Site exceed the applicable approved FMV. Once cumulative equipment charges reach one hundred percent (100%) of the approved FMV, the Contractor shall cease charging the applicable Exhibit B-2 equipment rate for that piece of equipment at that project Site.
v. Client Agency Election to Take Ownership. When cumulative equipment charges for an individual piece of equipment reach one hundred percent (100%) of its approved FMV, the Client Agency may, in its sole discretion, elect to take ownership of the equipment. Any such election shall be made in writing by the Client Agency. Upon such election, the Contractor shall transfer the equipment to the Client Agency free and clear of any liens or other encumbrances and shall provide any documentation reasonably required to evidence or effectuate the transfer of ownership.
Following transfer of ownership, the Contractor shall not charge the Client Agency an equipment usage, rental, or similar rate for the Client-Agency owned equipment. The Client Agency may authorize payment of reasonable and necessary operating costs associated with continued use of the equipment for the project, including fuel, oil, replacement filters, or similar operating consumables, provided such costs are authorized by the Client Agency and adequately documented.
vi. Equipment Not Acquired by the Client Agency. If the Client Agency does not elect to take ownership of equipment upon reaching its approved FMV, ownership shall remain with the Contractor or subcontractor, as applicable; however, no additional equipment charges may be billed to the Client Agency for use of that individual piece of equipment at that project Site.
vii. Excluded Items: Except where otherwise expressly authorized by the Client Agency or provided in Exhibit B, the Client Agency will not separately pay for:
1) Reusable hand tools, including screwdrivers, hammers, and similar items;
2) Gasoline, oils, fuels, filters, or similar operating consumables for Contractor-owned or subcontractor-owned equipment;
3) Reusable protective clothing and equipment (e.g., air purifying respirators or their disposable cartridges);
4) Disposable protective clothing including Tyvek suits, boots, bootees, latex or similar gloves;
5) Computer equipment and software, including costs associated with their use;
6) Communication equipment, including regular or cellular telephones and costs associated with their use;
7) Standard mailing charges for project documents or reports excluding authorized overnight, expedited mail, or courier Services;
8) Routine copying and reproduction costs. Upon request of the Client Agency, the Contractor shall provide, without additional charge, one (1) draft and two (2) final copies of reports documenting project work. Additional copies specifically requested by the Client Agency may be separately authorized;
9) Food or beverages; and
10) Routine cleaning of equipment.
N. Material Charges
i. The Client Agency shall pay the Contractor only for materials that are necessary for the Performance of authorized Services and approved by the Client Agency.
ii. Materials specifically identified and priced in Exhibit B-3 shall be invoiced at the applicable Contract price established in Exhibit B-3.
iii. Materials not specifically identified and priced in Exhibit B-3 shall be invoiced at the Contractor's actual documented cost plus the applicable Cost Plus percentage established in Exhibit B-3. The Contractor shall provide invoices, receipts, or other documentation sufficient to substantiate the actual cost of such materials.
iv. The Contractor shall provide documentation sufficient to substantiate all material charges, including, as applicable, the material description, quantity used, applicable Contract price, actual cost, Cost Plus percentage, and resulting charge.
v. The Contractor shall not separately charge the Client Agency for materials, supplies, consumables, or other items that are included in the labor rate, equipment rate, other Contract price, or otherwise identified under the Contract as a cost for which separate payment is not allowed.
O. Subcontracted Services
i. The Contractor shall obtain written authorization from the Client Agency before engaging a subcontractor to Perform Services for a project, except where the subcontractor and its Services have been specifically identified and authorized in applicable SOW or other project authorization.
ii. When the anticipated cost of Subcontracted Services exceeds two thousand five hundred dollars ($2,500.00), the Contractor shall, unless otherwise authorized by the Client Agency, obtain and provide to the Client Agency at least three (3) competitive cost proposals for the required Services. The Contractor shall provide its recommended selection and sufficient information to support the qualifications, appropriateness, and best value of the recommended subcontractor.
The Client Agency may authorize fewer than three (3) cost proposals when circumstances reasonably prevent or make it impracticable to obtain three (3) competitive proposals, including emergency conditions, specialized Services, limited availability of qualified providers, or other circumstances determined by the Client Agency. The Contractor shall document the basis for obtaining fewer than three (3) cost proposals.
iii. When the Client Agency authorizes the use of a Subcontractor that is not itself a Contractor under this Contract, the Contractor may be authorized to apply a markup to the actual documented cost of the Subcontracted Services. The Client Agency shall determine, in its sole discretion and after a necessary negotiation with the Contractor, whether a markup will be permitted and, if permitted, the allowable percentage, which shall not exceed five percent (5%). The Client Agency may authorize the Subcontracted Services without permitting any markup. Authorization to use a subcontractor shall not, by itself, constitute authorization for the Contractor to apply a markup.
iv. When the authorized subcontractor is itself a Contractor under this Contract or holds another applicable Contract with DAS for the Services being provided, charges for Services provided by that subcontractor shall not exceed the applicable rates established under such DAS Contract. No markup, administrative fee, or other additional charge shall be applied to such Contract rates.
v. The Contractor shall provide invoices, receipts, cost proposals, or other documentation required by the Client Agency to substantiate all Subcontracted Services and an authorized markup.
vi. Laboratory Analytical Services. No Contractor markup shall be permitted for laboratory analytical Services provided by a state-contracted laboratory.
P. Daily Field Records
i. When providing labor, equipment or materials, or Subcontracted Services, the Contractor shall maintain a written daily record for each day which such labor, equipment, materials, or Subcontracted Services are provided at the project Site. This daily record shall include, at a minimum:
1) A description of the tasks Performed for the project for that day;
2) The equipment used in Performing such tasks, including sufficient information to identify each piece of equipment for purpose of tracking equipment charges in accordance with Sections 3.C. and 3.D.;
3) The materials used in Performing such tasks;
4) The personnel, including Subcontractors, that Performed Services for the project;
5) The time accounting for personnel, equipment and Subcontracted Services; and
6) Any other information that the Client Agency may require for the project.
Such records shall be immediately available upon request of the Client Agency or any authorized auditing agency.
ii. If the Contractor is deficient in providing such records, the Contractor shall correct the deficiency and resubmit the records within the time specified by the Client Agency, which shall not exceed thirty (30) days from the notice of the deficiency.
Q. Invoicing and Payment Requirements
i. Each invoice shall include the Client Agency project name, address, and Client Agency Purchase Order number, and include the following:
1) Cover Letter. This letter must clearly describe, by task, activities that were conducted during the billing cycle, the percent completion of all tasks for the project, and the percent of each task’s budget that has been billed to date. For each task, if any discrepancies occur or are anticipated between the cost estimate and actual expenditures, the cover letter must describe and support such discrepancy.
2) Labor. Invoices must summarize all labor charges. At a minimum, such information must include the following:
a. Contractor’s employee names.
b. Classification and Contract rate listed in Exhibit B-1.
c. The total number of hours and charges for each classification, by employee for the billing period.
d. The total number of hours worked per day during the billing period for each task, and subtask, by labor classification.
e. A summary for each task and subtask that compares the hours billed by each employee classification in relation to the cost estimate included in the scope of work approved by the Client Agency for the project.
f. A detailed summary of the work completed and hours spent on each task for each team member working on the project.
3) Equipment. Invoices must summarize the following:
a. The equipment used,
b. The contracted rate,
c. The total number of hours used per day of billing cycle,
d. The justification for use of hourly, daily, weekly, or monthly rate for equipment,
e. The cumulative equipment charges billed for each individual piece of equipment at the project Site, including the current billing period, compared to the applicable approved FMV identified in Exhibit B-2.
f. A justification that equipment used was necessary for task Performed,
g. A summary for each task and subtask that compares the hours of equipment use with the cost estimate included in the scope of work for the project approved by the Client Agency,
h. The vehicles used, class, make and model,
i. The purpose of the vehicle usage (e.g. transport staff to Site, transport of groundwater sampling equipment for Performing sampling of monitoring wells),
j. The mileage or hours used, as applicable, and,
k. The number of Contractor Parties using such vehicle.
4) Materials. Invoices must summarize the following:
a. A description and amount of materials used during the billing cycle,
b. A description of task completed with such materials, and
c. A summary for each task and subtask that compares the materials used with the cost estimate included in the scope of work for the project approved by the Client Agency.
5) Records requested must be appended to the invoice.
6) Receipts. Copies of all receipts or invoices for all billable items purchased, and all subcontracted Services or items in the Performance of the Client Agency project must be appended to the invoice.
R. Invoice Discrepancies and Corrections
i. A Contractor shall notify the Client Agency, in writing as soon as possible but no later than five (5) business days of becoming aware that an invoice submitted to the Client Agency contains incorrect information. This notification shall include the Client Agency project name and address, the incorrect information, the known and correct information and a brief explanation of why the incorrect information was provided to the Client Agency. Receipt of any such notification by the Client Agency shall not prevent nor shall be deemed to prevent the Client Agency from seeking its Contractual rights.
ii. The Client Agency shall reserve the right to require a Contractor to provide any and all additional information regarding any portion of any and all invoices submitted by the Contractor. Revised, corrected, or resubmitted invoices shall be prominently marked “REVISED” and include the revised invoice number.
S. Overpayments
i. In the event that the Client Agency determines that a Contractor has received an overpayment, the Client Agency shall request the return of such overpayment from the Contractor. The Contractor shall reimburse the Client Agency for the overpayment within thirty (30) days of receipt of the request. In the event the Contractor fails to reimburse the Client Agency within thirty (30) days, the State shall charge the Contractor an annual percentage interest rate of 10% on any outstanding balance.
CONTRACT ADMINISTRATION:
T. Contract Implementation and Project Assignment: The Client Agency will select a Contractor according to the procedures set forth below:
i. Standard Contract Use: The Client Agency will request a work plan and cost estimate for required Services from all Contractors. Contractors will then be required to submit a work plan and cost estimate that will accomplish the work task requested by the Client Agency. The Client Agency will evaluate each of the proposals and authorize the selected Contractor to proceed. The Client Agency may provide comments or other conditions to revise the selected Contractor’s work plan.
ii. Specialized Contract Use: The Client Agency will request a work plan and cost estimate after providing a detailed scope of services request from Contractors deemed to be most qualified in their respective disciplines and consistent to the initial selection of the award. At the discretion of the Client Agency, and to serve the Client Agency’s best interests, the Client Agency may select a single Contractor to submit a work plan and cost estimate. The Client Agency’s best interests are determined by factors that include special expertise, past Performance, project knowledge, time sensitivity, or other factors determined by the Client Agency.
iii. For both Standard and Specialized uses of the Contract, the Client Agency shall review the submitted work plans and cost estimates and select the Contractor providing the best overall value to the project, based on factors including responsiveness, experience, qualifications, availability, and cost.
STATEMENT OF WORK
Following selection of a Contractor for a project in accordance with Section 4.A, Contract Implementation and Project Assignment, the Contractor and Client Agency shall mutually agree upon a Statement of Work (“SOW”), when required by the Client Agency, using the SOW template attached hereto as Attachment 3. The SOW shall define the specific Services, deliverables, schedule, staffing, and authorized costs applicable to the project. The Client Agency, in its sole discretion, shall determine whether an SOW is required. Routine, minor, or time-sensitive assignments may be authorized without a formal SOW, provided the Contractor has received an authorized purchase order or other written authorization to proceed in accordance with this Contract.
A. SOW Requirements Each SOW:
i. Shall be issued pursuant to and governed by the terms and conditions of the Contract;
ii. Shall not modify, amend, supersede, or conflict with any term, condition, requirement, or provision of the Contract;
iii. Shall not establish or introduce additional contractual obligations, legal terms, indemnification provisions, insurance requirements, or pricing structures beyond those authorized under the Contract;
iv. Shall be limited to Services authorized under the Contract, including, as applicable, environmental investigation, release characterization, environmental Site assessments, risk assessments, remedial action design, remediation oversight and project management, environmental monitoring, environmental permitting, laboratory analytical Services, PFAS investigation and remediation, and other related environmental Services authorized under Exhibit A;
v. May include, as applicable, field investigations and sampling; data evaluation and interpretation; development or refinement of conceptual Site models; preparation of immediate action plans, remedial action plans, reports, certifications, verifications, and other environmental documentation; design and evaluation of remedial systems or alternatives; preparation of specifications or procurement documents for remedial activities; oversight and management of remediation activities and Subcontractors; environmental monitoring; permitting support; regulatory coordination; and other project-specific activities consistent with the Scope of Services and Contract requirements;
vi. Shall utilize only the labor categories and rates, equipment rates, material prices, and other pricing provisions authorized under the Contract and applicable Exhibit B schedules, except as otherwise expressly authorized in accordance with the Contract; and
vii. In the event of a conflict between an SOW and the Contract, the terms and conditions of the Contract shall govern and prevail.
B. Use of Statement of Work At the discretion of the Client Agency, an SOW may be required for assignments including, but not limited to:
i. Environmental investigations, release characterizations, Phase I, Phase II, or Phase III Environmental Assessments, receptor surveys, risk assessments, or other environmental evaluations;
ii. Projects involving the investigation, evaluation, mitigation, remediation, monitoring, or management of releases or contaminated environmental media;
iii. Development, evaluation, design, implementation, oversight, operation, maintenance, or monitoring of remedial actions or remedial systems;
iv. PFAS investigation, sampling, evaluation, treatment, remediation, or related Services;
v. Environmental permitting, regulatory compliance, agency coordination, or preparation of permit applications and supporting documentation;
vi. Projects requiring defined scopes, schedules, milestones, deliverables, staffing plans, budgets, or Not-To-Exceed (“NTE”) authorizations;
vii. Projects requiring laboratory analytical Services, specialized technical Services, Subcontractors, or other project-specific resources; and
viii. Projects funded in whole or in part through federal, state, municipal, or other grant or funding programs where project-specific documentation or requirements apply.
C. SOW Development and Approval
i. The Client Agency will request a work plan and cost estimate from one or more Contractor(s) in accordance with Section 4.A, Contract Implementation and Project Assignment.
ii. Following selection by the Client Agency, the selected Contractor shall prepare and submit a proposed SOW based upon the Client Agency’s requested Services, the Contractor’s submitted work plan and cost estimate, and any revisions, comments, or conditions requested by the Client Agency.
iii. Each SOW shall include, at a minimum, the following, as applicable:
1) Project title, location, background, objectives, and scope;
2) Detailed description of Services to be Performed;
3) Project tasks and subtasks;
4) Deliverables, milestones, and Performance requirements;
5) Project schedule and anticipated period of Performance;
6) Staffing plan, including applicable job titles and estimated hours;
7) Equipment, materials, laboratory analytical Services, Subcontractors, and other project resources anticipated to be required;
8) Detailed cost estimate utilizing applicable Contract rates and pricing provisions;
9) A NTE amount, unless otherwise approved in writing by the Client Agency;
10) Roles, responsibilities, assumptions, dependencies, and coordination requirements of the Contractor and Client Agency; and
11) Applicable regulatory, permitting, reporting, health and safety, or funding requirements.
iv. No work under an SOW shall commence until the SOW has been approved in writing by the Client Agency and the Contractor has received an authorized purchase order or other written authorization to proceed in accordance with the Contract.
D. Deliverables and Acceptance Each SOW shall establish project-specific deliverables, schedules, and, when applicable, acceptance criteria appropriate to the assigned Services. Deliverables may include, but are not limited to:
i. Environmental investigation, characterization, assessment, monitoring, and remediation reports;
ii. Phase I, Phase II, and Phase III Environmental Site Assessments;
iii. Ecological and Human Health Risk Assessments;
iv. Sampling plans, analytical results, data validation documentation, maps, figures, tables, conceptual Site models, and supporting datasets;
v. Immediate action plans, remedial action plans, remedial designs, specifications, cost estimates, and procurement documents;
vi. Release reporting, remediation closure reports, remedial action reports, certifications, verifications, and other documentation required by applicable environmental laws or regulatory agencies;
vii. Environmental…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .