2651524031 Construct Recreational Facilities GAAF DRAWINGS.pdf

PDF 1 MB Posted

Attached to
511/24305. AGY; GAA - Construct Recreation Facilities
Solicitation number
RFQ 171 240000000490 3
Issued by
Crawford County, Michigan

About this file

This is a design and construction drawing document prepared by the Michigan Department of Military and Veterans Affairs for the construction of recreational facilities at Grayling Army Airfield in Grayling, Michigan. The project, identified as MDMVA Project No. 2651524031, involves the construction of two primary recreational facilities: a 40' x 70' x 8" sand volleyball court and a 60' x 84' x 4" concrete basketball court. The project is being bid on a lump sum basis with no separate payment or adjustments unless specifically indicated in the proposal or when additional work is authorized in writing by the engineer. All work must comply with the applicable drawings and specifications, with the contractor required to maintain a knowledgeable representative on site at all times during construction. Prior to bidding, contractors and their subcontractors are responsible for visiting the site to verify all existing conditions and dimensions. The contractor must notify the design engineer immediately of any deviations from the plan and must field verify all dimensions, bringing any discrepancies to the owner's attention.

The project includes a deductive alternate for the sand volleyball court installation, which encompasses all material, labor, and associated components. All work must comply with applicable Soil Erosion and Sedimentation Control (SESC) regulations under Michigan's 1994 PA 451, Part 91, and the contractor is responsible for preparing and submitting an SESC Implementation Plan for approval prior to commencement of work. The contractor must install temporary erosion and sedimentation control measures, including silt fence placement around construction areas, perform sweeping and dust control as needed, and maintain and inspect SESC measures weekly and after rain events. Permanent soil erosion control measures must be completed within five calendar days after final grading. The project manager is Josh Harris, and the building construction project superintendent is Eric Campbell. All underground utilities must be located by contacting Miss Dig at 1-800-482-7171, with three working days' notice required before any digging commences.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TS

D

EP

AR

TM

EN

T O

F M

IL

IT

AR

Y

AN

D

V

ET

ER

AN

S

AF

FA

IR

S C

O N

ST

R

U C

T R

EC

R

EA

TI

O N

AL

F

AC

IL

IT

IE

S G

R

AY

LI

N

G A

R M

Y

AI

R

FI

EL

D

G

R

AY

LI

N

G , M

I

J

AN

ST

AT

E O

F M

IC

H

IG

AN

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

M

AY

AD

AM

L

AC

H , R

A, D

IR

EC

TO

R

CONSTRUCT RECREATIONAL FACILITIES

UTILITIESC.G.

TS - TITLE SHEET/OVERALL CANTONMENT PLAN

C1 - SITE TOPOGRAPHIC SURVEY, GRADING

PLAN

C2 - SITE DETAILS

AREA OF WORK

GRAYLING ARMY AIRFIELD

GRAYLING, MICHIGAN

MICHIGAN DEPARTMENT OF

MDMVA PROJECT NO. 2651524031

MILITARY AND VETERANS AFFAIRS

BEG BL

.72

SPOT ELE

V.

.75

SPOT ELE

V.

.68

TEL.

PED.

.57

TEL.

PED.

.16

TEL. P

ED.

1146.59

M

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

AUGUSTA, MI

AutoCAD SHX Text

FORT CUSTER.

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

VICINITY MAP

AutoCAD SHX Text

1. BIDS FOR CONSTRUCTION OF ALL WORK SHOWN ON THE PLANS ARE BIDS FOR CONSTRUCTION OF ALL WORK SHOWN ON THE PLANS ARE SOLICITED ON A LUMP SUM BASIS. NO SEPARATE PAYMENT OR ADJUSTMENTS TO THE LUMP SUM BID WILL BE MADE UNLESS SPECIFICALLY INDICATED ON THE PLANS AND IN THE PROPOSAL OR WHEN ADDITIONAL WORK IS AUTHORIZED IN WRITING BY THE ENGINEER. 2. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE DESIGN ENGINEER OF ANY THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE DESIGN ENGINEER OF ANY DEVIATION FROM THIS PLAN. 3. THE CONTRACTOR AND HIS SUBCONTRACTORS AND/OR SUPPLIERS ARE THE CONTRACTOR AND HIS SUBCONTRACTORS AND/OR SUPPLIERS ARE RESPONSIBLE FOR VISITING THE SITE PRIOR TO BIDDING TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. 4. THE CONTRACTOR SHALL HAVE A KNOWLEDGEABLE REPRESENTATIVE ON SITE THE CONTRACTOR SHALL HAVE A KNOWLEDGEABLE REPRESENTATIVE ON SITE SITE AT ALL TIMES DURING WORK UNDER THIS CONTRACT. THIS REPRESENTATIVE SHALL HAVE ON SITE, HIS OWN COPY OF THE CONTRACT SPECIFICATIONS, DRAWINGS AND DMVA APPROVED SHOP DRAWINGS. 5. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS. ANY DISCREPANCIES CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS. ANY DISCREPANCIES BROUGHT TO THE OWNER'S ATTENTION. 6. PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR TO VERIFY PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR TO VERIFY CONDITION OF EXISTING CONSTRUCTION. DOCUMENT ANY EXISTING CONDITION THAT COULD BE MISCONSTRUED AS DAMAGED DURING NEW CONSTRUCTION. NOTIFY THE DMVA OF EXISTING CONDITIONS IN WRITING PRIOR TO THE COMMENCEMENT OF WORK. 7. DRAWINGS ARE NOT TO BE SCALED FOR ANY DIMENSIONS. DRAWINGS ARE NOT TO BE SCALED FOR ANY DIMENSIONS. 8. ALL WORK MUST COMPLY WITH THE DRAWINGS AND SPECIFICATIONS, ANY ALL WORK MUST COMPLY WITH THE DRAWINGS AND SPECIFICATIONS, ANY REVISIONS REQUIRED DUE TO FIELD CONDITIONS MUST BE REVIEWED AND APPROVED BY THE PROJECT MANAGER PRIOR TO CONSTRUCTION. 9. ALL CONDUIT AND PIPE PENETRATIONS IN WALL SHALL BE SEALED. ALL ALL CONDUIT AND PIPE PENETRATIONS IN WALL SHALL BE SEALED. ALL PENETRATIONS IN FIRE RATED WALLS AND IN ALL FLOORS SHALL BE FIRE STOPPED. PROVIDE FLOOR-TO-FLOOR FIRESTOPPING AT ANY VERTICAL VERTICAL PIPING OR CONDUIT PENETRATIONS, WHICH ARE EXPOSED IN THE COURSE THE COURSE OF THIS RENOVATION WORK. 10. ALL WALL MOUNTED DEVICES SHALL BE FULLY CONCEALED UNLESS ALL WALL MOUNTED DEVICES SHALL BE FULLY CONCEALED UNLESS NOTED OTHERWISE. 11. THESE PLANS INDICATE THE APPROXIMATE LOCATION OF KNOWN THESE PLANS INDICATE THE APPROXIMATE LOCATION OF KNOWN UNDERGROUND UTILITIES BASED UPON A COMBINATION OF ORIGINAL AND AS-BUILT DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE TO HAND DIG, IDENTIFY AND LOCATE ALL EXISTING UNDERGROUND UTILITIES PRIOR TO DEMOLITION OR CONSTRUCTION.

AutoCAD SHX Text SESC PERMIT THROUGH CAMP GRAYLING ENVIRONMENTAL OFFICE. PERMIT WILL BE REQUIRED BEFORE CONSTRUCTION CAN BEGIN.

AutoCAD SHX Text

PERMITS REQUIREMENTS

AutoCAD SHX Text

CONTACT INFORMATION

AutoCAD SHX Text

PRELIMINARY

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

FINAL RECORD

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ISSUED FOR

AutoCAD SHX Text

INDEX CODE

AutoCAD SHX Text

PROJECT

AutoCAD SHX Text

IDENTIFICATION NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

JRH

AutoCAD SHX Text

JRH

AutoCAD SHX Text

TUEBOR

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text Q

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text U

AutoCAD SHX Text P

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text

KAB

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text B

AutoCAD SHX Text U

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text M

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text C

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text U

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

AutoCAD SHX Text

PROCUREMENT AND REAL ESTATE SERVICES ADMINISTRATION

AutoCAD SHX Text

BAB

AutoCAD SHX Text

KMM

AutoCAD SHX Text

(TOLL FREE) FOR THE LOCATION OF UNDERGROUND FACILITIES

AutoCAD SHX Text

3 WORKING DAYS

AutoCAD SHX Text

BEFORE YOU DIG

AutoCAD SHX Text 1-800-482-7171

AutoCAD SHX Text

CALL MISS DIG

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text M

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text PROJECT MANAGER JOSH HARRIS (517) 481-7553 JOSHUA.R.HARRIS56.NFG@MAIL.MIL BUILDING CONSTRUCTION PROJECT SUPERINTENDENT: ERIC CAMPBELL MELISSA MEAD (989) 344-6386 MEADM4@MICHIGAN.GOV

AutoCAD SHX Text

1. ALL WORK SHALL COMPLY WITH THE APPLICABLE SOIL EROSION AND ALL WORK SHALL COMPLY WITH THE APPLICABLE SOIL EROSION AND SEDIMENTATION CONTROL (SESC) RULES AND REGULATIONS (SOIL EROSION AND SEDIMENTATION CONTROL - 1994 PA 451, PART 91, AS AMENDED, MCL 324.9101 ET SEQ.). 2. THE CONTRACTOR SHALL REVIEW THE SESC MEASURES IN ORDER TO PREPARE THE CONTRACTOR SHALL REVIEW THE SESC MEASURES IN ORDER TO PREPARE AND ISSUE FOR APPROVAL AN “SESC IMPLEMENTATION PLAN”, WHICH INDICATES SESC IMPLEMENTATION PLAN”, WHICH INDICATES , WHICH INDICATES THE CONTRACTOR'S INTENDED IMPLEMENTATION OF THE SESC PLAN FOR THE PROJECT, INCLUDING A SCHEDULE. 3. THE CONTRACTOR SHALL INSTALL TEMPORARY EROSION AND SEDIMENTATION THE CONTRACTOR SHALL INSTALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES PRIOR TO OR UPON COMMENCEMENT TO EARTHWORK ACTIVITIES. 4. THE CONTRACTOR TO PLACE SILT FENCE AROUND ALL AREAS WHERE SEDIMENT THE CONTRACTOR TO PLACE SILT FENCE AROUND ALL AREAS WHERE SEDIMENT MAY LEAVE THE CONSTRUCTION AREA. 5. THE CONTRACTOR WILL PERFORM SWEEPING AS NEEDED TO REMOVE ANY THE CONTRACTOR WILL PERFORM SWEEPING AS NEEDED TO REMOVE ANY SEDIMENT TRACKED OFF SITE. FREQUENCY OF SWEEPING WILL BE BASED ON SITE CONDITIONS. 6. THE CONTRACTOR WILL PERFORM DUST CONTROL AS NEEDED BASED ON SITE THE CONTRACTOR WILL PERFORM DUST CONTROL AS NEEDED BASED ON SITE CONDITIONS. 7. DISTURBED AREAS THAT WILL REMAIN IDLE DURING CONSTRUCTION MUST BE DISTURBED AREAS THAT WILL REMAIN IDLE DURING CONSTRUCTION MUST BE TEMPORARILY STABILIZED, INCLUDING SOIL STOCKPILES, 8. THE CONTRACTOR SHALL MAINTAIN AND INSPECT SESC MEASURES THROUGHOUT THE CONTRACTOR SHALL MAINTAIN AND INSPECT SESC MEASURES THROUGHOUT THE COURSE OF THE PROJECT. AT A MINIMUM, THE CONTRACTOR SHALL INSPECT AND MAINTAIN SESC MEASURES ONCE A WEEK AND AFTER RAIN EVENTS. 9. THE CONTRACTOR SHALL CORRECT NON-CONFORMING SESC MEASURES WITHIN THE CONTRACTOR SHALL CORRECT NON-CONFORMING SESC MEASURES WITHIN 24 HOURS, IF WATERS OF THE STATE ARE BEING IMPACTED OR WITHIN 48 HOURS FOR ROUTINE MAINTENANCE ITEMS. OTHER SESC MAINTENANCE SHALL BE COMPLETED AS SOON AS POSSIBLE BUT NEVER MORE THAN FIVE (5) DAYS AFTER DETECTION. 10. THE CONTRACTOR SHALL COMPLETE PERMANENT SOIL EROSION CONTROL THE CONTRACTOR SHALL COMPLETE PERMANENT SOIL EROSION CONTROL MEASURES FOR ANY DISTURBED LAND AREA WITHIN 5 CALENDAR DAYS AFTER FINAL GRADING OR THE FINAL EARTH CHANGE HAS BEEN COMPLETED. THE CONTRACTOR SHALL MAINTAIN TEMPORARY CONTROL MEASURES UNTIL PERMANENT SOIL EROSION CONTROL MEASURES ARE IN PLACE AND THE AREA IS STABILIZED. 11. THE CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL MEASURES THE CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER PERMANENT SOIL EROSION MEASURES ARE IN PLACE AND THE AREA IS STABILIZED. 12. CONTRACTOR AND ENGINEER SHALL DISCUSS APPROPRIATE CONSTRUCTION CONTRACTOR AND ENGINEER SHALL DISCUSS APPROPRIATE CONSTRUCTION ACCESS ROUTES DURING PRE-CONSTRUCTION MEETING. CONTRACTOR & ENGINEER SHALL MARK UP CONSTRUCTION PLAN AND AGREE TO CONSTRUCTION ACCESS ROUTES FOR ALL MATERIALS AND EQUIPMENT. CONTRACTOR SHALL NOTIFY ENGINEER PRIOR TO ANY DEVIATION FROM ROUTES.

AutoCAD SHX Text

SESC NOTES

AutoCAD SHX Text

1. LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE. LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE. 2. UNLESS SPECIFICALLY NOTED FOR REMOVAL ON THE PLANS, ALL SIDEWALKS UNLESS SPECIFICALLY NOTED FOR REMOVAL ON THE PLANS, ALL SIDEWALKS DRIVES, PAVEMENT, CULVERTS, GUARDRAILS, AND UTILITIES SHALL BE PROTECTED. ANY ITEMS DAMAGED OR DESTROYED DURING CONSTRUCTION SHALL BE REMOVED AND REPLACED INCIDENTAL TO CONSTRUCTION. 3. CONTRACTOR SHALL RESTORE AND REPAIR ANY EXISTING CONDITIONS TO CONTRACTOR SHALL RESTORE AND REPAIR ANY EXISTING CONDITIONS TO REMAIN THAT ARE DISTURBED BY CONSTRUCTION. THIS INCLUDES BURIED UTILITIES, LIGHTING, PAVING, DRAINAGE AND LANDSCAPING. 4. ANY AREAS DISTURBED BY CONSTRUCTION THAT ARE OUTSIDE THE ANY AREAS DISTURBED BY CONSTRUCTION THAT ARE OUTSIDE THE CONSTRUCTION AREA SHALL BE RESTORED TO A CONDITION EQUAL OR BETTER THAN BEFORE CONSTRUCTION BEGAN.

AutoCAD SHX Text

DEMOLITION NOTES

AutoCAD SHX Text 1-989-344-6184

AutoCAD SHX Text

BEFORE YOU DIG

AutoCAD SHX Text

CALL MR. SHIRKEY

AutoCAD SHX Text (Facilities Management)

AutoCAD SHX Text R

AutoCAD SHX Text

3 WORKING DAYS

AutoCAD SHX Text

FOR SITE OWNED UTILITIES

AutoCAD SHX Text

FOR PRIMARY SERVICES

AutoCAD SHX Text

AREA OF WORK MAP

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

DRAWING INDEX

AutoCAD SHX Text

1. ALL MATERIAL/LABOR AND PARTS/PIECES ASSOCIATED WITH THE INSTALLATION ALL MATERIAL/LABOR AND PARTS/PIECES ASSOCIATED WITH THE INSTALLATION OF THE SAND VOLLEYBALL COURT.

AutoCAD SHX Text

DEDUCTIVE ALTERNATE

CONTROL

TOWER

12PR

BLDG 1182

BLDG 1184

BLDG 1186

BLDG 1188

BLDG 1199

C2 B1

C2 B1

C2 V1

C2 V1

11491149

BLDG 1184

BLDG 1186

50.00

.0

40.00 30.00

.0

.0

C2 V1

C2 V1

BLDG 1182

.0

.0

60.00 50.00

39.50

12.00

5.

4.

.0

5.

.0

50.00

C

D

EP

AR

TM

EN

T

O F

M

IL

IT

AR

Y

AN

D V

ET

ER

AN

S

AF

FA

IR

S

C O

N

ST

R U

C T

R

EC

R

EA

TI

O

N

AL

F

AC

IL

IT

IE

S

G R

AY

LI

N G

A R

M Y

AI

R

FI

EL

D

G R

AY

LI

N G

, M I

J

AN

ST

AT

E O

F M

IC

H

IG

AN

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

M

AY

AD

AM

L

AC

H , R

A, D

IR

EC

TO

R

UTILITIESC.G.

INSTALL NEW 40' X 70' X 8"

SAND VOLLEYBALL COURT.

REMOVE TOPSOIL TO 8"

BELOW GRADE, INSTALL

NEW BEACH GRADE SAND.

(DEDUCTIVE ALTERNATE #1)

NOTE: SAND FOR COURT

AND COMPACTABLE SAND

FOR BASE (IF NEEDED) IS

AVAILABLE ON GRAYLING

MAIN CAMP 600 AREA.

CONTACT MR. SHIRKEY AT

CAMP GRAYLING FOR ALL

UTILITY LOCATIONS

INSTALL 60' X 84' X 4"

(THICKENED EDGE) CONCRETE

SLAB FOR BASKETBALL COURT.

NEW LOCATION FOR

BUILDING 1189 AND

CONCRETE N.I.C.

PROPOSED SITE PLAN

SCALE: 1" = 30'-0"

VOLLEYBALL DETAIL & DIMENSION PLAN

SCALE: 1" = 20'-0" (DEDUCTIVE ALTERNATE #1)

INSTALL VOLLEYBALL NET

POLES AND NET PER

MANUFACTURERS

RECOMMENDATIONS.

(DEDUCTIVE ALTERNATE #1)

BASKETBALL DETAIL & DIMENSION PLAN

SCALE: 1" = 20'-0"

INSTALL BASKETBALL

POLES AND BACKBOARD

PER MANUFACTURERS

RECOMMENDATIONS.

PAINT 2" COURT LINE AS

SHOWN

EXISTING CONCRETE

SIDEWALK (TYP.)

PROPOSED CONTOURS 1:10

MIN SLOPE

NOTE:

COORDINATE INSTALLATION OF

BASKETBALL POLES AND

VOLLEYBALL POLES. VERIFY

MANUFACTURER

RECOMMENDATIONS FOR

CONCRETE OR CONCRETE

FOOTINGS THAT ARE

REQUIRED.

AutoCAD SHX Text

BEG TOWER

AutoCAD SHX Text

AutoCAD SHX Text 1153.07

AutoCAD SHX Text

TOWER

AutoCAD SHX Text

AutoCAD SHX Text 1153.02

AutoCAD SHX Text

END TOWER

AutoCAD SHX Text

AutoCAD SHX Text 1153.11

AutoCAD SHX Text

GATEOPENER

AutoCAD SHX Text

AutoCAD SHX Text 1153.08

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text

4"PVC

AutoCAD SHX Text

4"PVC

AutoCAD SHX Text

3" PVC

AutoCAD SHX Text

6"PVC

AutoCAD SHX Text

6"PVC

AutoCAD SHX Text H

AutoCAD SHX Text

6"PVC

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

1. BIDS FOR CONSTRUCTION OF ALL WORK SHOWN ON THE PLANS ARE BIDS FOR CONSTRUCTION OF ALL WORK SHOWN ON THE PLANS ARE SOLICITED ON A LUMP SUM BASIS. NO SEPARATE PAYMENT OR ADJUSTMENTS TO THE LUMP SUM BID WILL BE MADE UNLESS SPECIFICALLY INDICATED ON THE PLANS AND IN THE PROPOSAL OR WHEN ADDITIONAL WORK IS AUTHORIZED IN WRITING BY THE ENGINEER. 2. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE DESIGN ENGINEER OF ANY THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE DESIGN ENGINEER OF ANY DEVIATION FROM THIS PLAN. 3. THE CONTRACTOR AND HIS SUBCONTRACTORS AND/OR SUPPLIERS ARE THE CONTRACTOR AND HIS SUBCONTRACTORS AND/OR SUPPLIERS ARE RESPONSIBLE FOR VISITING THE SITE PRIOR TO BIDDING TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. 4. THE CONTRACTOR SHALL HAVE A KNOWLEDGEABLE REPRESENTATIVE ON SITE THE CONTRACTOR SHALL HAVE A KNOWLEDGEABLE REPRESENTATIVE ON SITE SITE AT ALL TIMES DURING WORK UNDER THIS CONTRACT. THIS REPRESENTATIVE SHALL HAVE ON SITE, HIS OWN COPY OF THE CONTRACT SPECIFICATIONS, DRAWINGS AND DMVA APPROVED SHOP DRAWINGS. 5. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS. ANY DISCREPANCIES CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS. ANY DISCREPANCIES BROUGHT TO THE OWNER'S ATTENTION. 6. PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR TO VERIFY PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR TO VERIFY CONDITION OF EXISTING CONSTRUCTION. DOCUMENT ANY EXISTING CONDITION THAT COULD BE MISCONSTRUED AS DAMAGED DURING NEW CONSTRUCTION. NOTIFY THE DMVA OF EXISTING CONDITIONS IN WRITING PRIOR TO THE COMMENCEMENT OF WORK. 7. DRAWINGS ARE NOT TO BE SCALED FOR ANY DIMENSIONS. DRAWINGS ARE NOT TO BE SCALED FOR ANY DIMENSIONS. 8. ALL WORK MUST COMPLY WITH THE DRAWINGS AND SPECIFICATIONS, ANY ALL WORK MUST COMPLY WITH THE DRAWINGS AND SPECIFICATIONS, ANY REVISIONS REQUIRED DUE TO FIELD CONDITIONS MUST BE REVIEWED AND APPROVED BY THE PROJECT MANAGER PRIOR TO CONSTRUCTION. 9. ALL CONDUIT AND PIPE PENETRATIONS IN WALL SHALL BE SEALED. ALL ALL CONDUIT AND PIPE PENETRATIONS IN WALL SHALL BE SEALED. ALL PENETRATIONS IN FIRE RATED WALLS AND IN ALL FLOORS SHALL BE FIRE STOPPED. PROVIDE FLOOR-TO-FLOOR FIRESTOPPING AT ANY VERTICAL VERTICAL PIPING OR CONDUIT PENETRATIONS, WHICH ARE EXPOSED IN THE COURSE THE COURSE OF THIS RENOVATION WORK. 10. ALL WALL MOUNTED DEVICES SHALL BE FULLY CONCEALED UNLESS ALL WALL MOUNTED DEVICES SHALL BE FULLY CONCEALED UNLESS NOTED OTHERWISE. 11. THESE PLANS INDICATE THE APPROXIMATE LOCATION OF KNOWN THESE PLANS INDICATE THE APPROXIMATE LOCATION OF KNOWN UNDERGROUND UTILITIES BASED UPON A COMBINATION OF ORIGINAL AND AS-BUILT DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE TO HAND DIG, IDENTIFY AND LOCATE ALL EXISTING UNDERGROUND UTILITIES PRIOR TO DEMOLITION OR CONSTRUCTION.

AutoCAD SHX Text

PRELIMINARY

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

FINAL RECORD

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ISSUED FOR

AutoCAD SHX Text

INDEX CODE

AutoCAD SHX Text

PROJECT

AutoCAD SHX Text

IDENTIFICATION NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

JRH

AutoCAD SHX Text

JRH

AutoCAD SHX Text

TUEBOR

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text Q

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text U

AutoCAD SHX Text P

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text

KAB

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text B

AutoCAD SHX Text U

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text M

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text C

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text U

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

AutoCAD SHX Text

PROCUREMENT AND REAL ESTATE SERVICES ADMINISTRATION

AutoCAD SHX Text

BAB

AutoCAD SHX Text

KMM

AutoCAD SHX Text

(TOLL FREE) FOR THE LOCATION OF UNDERGROUND FACILITIES

AutoCAD SHX Text

3 WORKING DAYS

AutoCAD SHX Text

BEFORE YOU DIG

AutoCAD SHX Text 1-800-482-7171

AutoCAD SHX Text

CALL MISS DIG

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text M

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text

1. ALL WORK SHALL COMPLY WITH THE APPLICABLE SOIL EROSION AND ALL WORK SHALL COMPLY WITH THE APPLICABLE SOIL EROSION AND SEDIMENTATION CONTROL (SESC) RULES AND REGULATIONS (SOIL EROSION AND SEDIMENTATION CONTROL - 1994 PA 451, PART 91, AS AMENDED, MCL 324.9101 ET SEQ.). 2. THE CONTRACTOR SHALL REVIEW THE SESC MEASURES IN ORDER TO PREPARE THE CONTRACTOR SHALL REVIEW THE SESC MEASURES IN ORDER TO PREPARE AND ISSUE FOR APPROVAL AN “SESC IMPLEMENTATION PLAN”, WHICH INDICATES SESC IMPLEMENTATION PLAN”, WHICH INDICATES , WHICH INDICATES THE CONTRACTOR'S INTENDED IMPLEMENTATION OF THE SESC PLAN FOR THE PROJECT, INCLUDING A SCHEDULE. 3. THE CONTRACTOR SHALL INSTALL TEMPORARY EROSION AND SEDIMENTATION THE CONTRACTOR SHALL INSTALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES PRIOR TO OR UPON COMMENCEMENT TO EARTHWORK ACTIVITIES. 4. THE CONTRACTOR TO PLACE SILT FENCE AROUND ALL AREAS WHERE SEDIMENT THE CONTRACTOR TO PLACE SILT FENCE AROUND ALL AREAS WHERE SEDIMENT MAY LEAVE THE CONSTRUCTION AREA. 5. THE CONTRACTOR WILL PERFORM SWEEPING AS NEEDED TO REMOVE ANY THE CONTRACTOR WILL PERFORM SWEEPING AS NEEDED TO REMOVE ANY SEDIMENT TRACKED OFF SITE. FREQUENCY OF SWEEPING WILL BE BASED ON SITE CONDITIONS. 6. THE CONTRACTOR WILL PERFORM DUST CONTROL AS NEEDED BASED ON SITE THE CONTRACTOR WILL PERFORM DUST CONTROL AS NEEDED BASED ON SITE CONDITIONS. 7. DISTURBED AREAS THAT WILL REMAIN IDLE DURING CONSTRUCTION MUST BE DISTURBED AREAS THAT WILL REMAIN IDLE DURING CONSTRUCTION MUST BE TEMPORARILY STABILIZED, INCLUDING SOIL STOCKPILES, 8. THE CONTRACTOR SHALL MAINTAIN AND INSPECT SESC MEASURES THROUGHOUT THE CONTRACTOR SHALL MAINTAIN AND INSPECT SESC MEASURES THROUGHOUT THE COURSE OF THE PROJECT. AT A MINIMUM, THE CONTRACTOR SHALL INSPECT AND MAINTAIN SESC MEASURES ONCE A WEEK AND AFTER RAIN EVENTS. 9. THE CONTRACTOR SHALL CORRECT NON-CONFORMING SESC MEASURES WITHIN THE CONTRACTOR SHALL CORRECT NON-CONFORMING SESC MEASURES WITHIN 24 HOURS, IF WATERS OF THE STATE ARE BEING IMPACTED OR WITHIN 48 HOURS FOR ROUTINE MAINTENANCE ITEMS. OTHER SESC MAINTENANCE SHALL BE COMPLETED AS SOON AS POSSIBLE BUT NEVER MORE THAN FIVE (5) DAYS AFTER DETECTION. 10. THE CONTRACTOR SHALL COMPLETE PERMANENT SOIL EROSION CONTROL THE CONTRACTOR SHALL COMPLETE PERMANENT SOIL EROSION CONTROL MEASURES FOR ANY DISTURBED LAND AREA WITHIN 5 CALENDAR DAYS AFTER FINAL GRADING OR THE FINAL EARTH CHANGE HAS BEEN COMPLETED. THE CONTRACTOR SHALL MAINTAIN TEMPORARY CONTROL MEASURES UNTIL PERMANENT SOIL EROSION CONTROL MEASURES ARE IN PLACE AND THE AREA IS STABILIZED. 11. THE CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL MEASURES THE CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER PERMANENT SOIL EROSION MEASURES ARE IN PLACE AND THE AREA IS STABILIZED. 12. CONTRACTOR AND ENGINEER SHALL DISCUSS APPROPRIATE CONSTRUCTION CONTRACTOR AND ENGINEER SHALL DISCUSS APPROPRIATE CONSTRUCTION ACCESS ROUTES DURING PRE-CONSTRUCTION MEETING. CONTRACTOR & ENGINEER SHALL MARK UP CONSTRUCTION PLAN AND AGREE TO CONSTRUCTION ACCESS ROUTES FOR ALL MATERIALS AND EQUIPMENT. CONTRACTOR SHALL NOTIFY ENGINEER PRIOR TO ANY DEVIATION FROM ROUTES.

AutoCAD SHX Text

SESC NOTES

AutoCAD SHX Text 1-989-344-6184

AutoCAD SHX Text

BEFORE YOU DIG

AutoCAD SHX Text

CALL MR. SHIRKEY

AutoCAD SHX Text (Facilities Management)

AutoCAD SHX Text R

AutoCAD SHX Text

3 WORKING DAYS

AutoCAD SHX Text

FOR SITE OWNED UTILITIES

AutoCAD SHX Text

FOR PRIMARY SERVICES

AutoCAD SHX Text

NORTH

NORTH

C

D

EP

AR

TM

EN

T

O F

M

IL

IT

AR

Y

AN

D V

ET

ER

AN

S

AF

FA

IR

S

C O

N

ST

R U

C T

R

EC

R

EA

TI

O

N

AL

F

AC

IL

IT

IE

S

G R

AY

LI

N G

A R

M Y

AI

R

FI

EL

D

G R

AY

LI

N G

, M I

J

AN

ST

AT

E O

F M

IC

H

IG

AN

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

M

AY

AD

AM

L

AC

H , R

A, D

IR

EC

TO

R

UTILITIESC.G.

CONCRETE SECTION B-B

NO SCALE

SAND SECTION V-V

NO SCALE (DEDUCTIVE ALTERNATE #1)

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

1. BIDS FOR CONSTRUCTION OF ALL WORK SHOWN ON THE PLANS ARE BIDS FOR CONSTRUCTION OF ALL WORK SHOWN ON THE PLANS ARE SOLICITED ON A LUMP SUM BASIS. NO SEPARATE PAYMENT OR ADJUSTMENTS TO THE LUMP SUM BID WILL BE MADE UNLESS SPECIFICALLY INDICATED ON THE PLANS AND IN THE PROPOSAL OR WHEN ADDITIONAL WORK IS AUTHORIZED IN WRITING BY THE ENGINEER. 2. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE DESIGN ENGINEER OF ANY THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE DESIGN ENGINEER OF ANY DEVIATION FROM THIS PLAN. 3. THE CONTRACTOR AND HIS SUBCONTRACTORS AND/OR SUPPLIERS ARE THE CONTRACTOR AND HIS SUBCONTRACTORS AND/OR SUPPLIERS ARE RESPONSIBLE FOR VISITING THE SITE PRIOR TO BIDDING TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. 4. THE CONTRACTOR SHALL HAVE A KNOWLEDGEABLE REPRESENTATIVE ON SITE THE CONTRACTOR SHALL HAVE A KNOWLEDGEABLE REPRESENTATIVE ON SITE SITE AT ALL TIMES DURING WORK UNDER THIS CONTRACT. THIS REPRESENTATIVE SHALL HAVE ON SITE, HIS OWN COPY OF THE CONTRACT SPECIFICATIONS, DRAWINGS AND DMVA APPROVED SHOP DRAWINGS. 5. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS. ANY DISCREPANCIES CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS. ANY DISCREPANCIES BROUGHT TO THE OWNER'S ATTENTION. 6. PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR TO VERIFY PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR TO VERIFY CONDITION OF EXISTING CONSTRUCTION. DOCUMENT ANY EXISTING CONDITION THAT COULD BE MISCONSTRUED AS DAMAGED DURING NEW CONSTRUCTION. NOTIFY THE DMVA OF EXISTING CONDITIONS IN WRITING PRIOR TO THE COMMENCEMENT OF WORK. 7. DRAWINGS ARE NOT TO BE SCALED FOR ANY DIMENSIONS. DRAWINGS ARE NOT TO BE SCALED FOR ANY DIMENSIONS. 8. ALL WORK MUST COMPLY WITH THE DRAWINGS AND SPECIFICATIONS, ANY ALL WORK MUST COMPLY WITH THE DRAWINGS AND SPECIFICATIONS, ANY REVISIONS REQUIRED DUE TO FIELD CONDITIONS MUST BE REVIEWED AND APPROVED BY THE PROJECT MANAGER PRIOR TO CONSTRUCTION. 9. ALL CONDUIT AND PIPE PENETRATIONS IN WALL SHALL BE SEALED. ALL ALL CONDUIT AND PIPE PENETRATIONS IN WALL SHALL BE SEALED. ALL PENETRATIONS IN FIRE RATED WALLS AND IN ALL FLOORS SHALL BE FIRE STOPPED. PROVIDE FLOOR-TO-FLOOR FIRESTOPPING AT ANY VERTICAL VERTICAL PIPING OR CONDUIT PENETRATIONS, WHICH ARE EXPOSED IN THE COURSE THE COURSE OF THIS RENOVATION WORK. 10. ALL WALL MOUNTED DEVICES SHALL BE FULLY CONCEALED UNLESS ALL WALL MOUNTED DEVICES SHALL BE FULLY CONCEALED UNLESS NOTED OTHERWISE. 11. THESE PLANS INDICATE THE APPROXIMATE LOCATION OF KNOWN THESE PLANS INDICATE THE APPROXIMATE LOCATION OF KNOWN UNDERGROUND UTILITIES BASED UPON A COMBINATION OF ORIGINAL AND AS-BUILT DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE TO HAND DIG, IDENTIFY AND LOCATE ALL EXISTING UNDERGROUND UTILITIES PRIOR TO DEMOLITION OR CONSTRUCTION.

AutoCAD SHX Text

PRELIMINARY

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

FINAL RECORD

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ISSUED FOR

AutoCAD SHX Text

INDEX CODE

AutoCAD SHX Text

PROJECT

AutoCAD SHX Text

IDENTIFICATION NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

DESIGNED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

JRH

AutoCAD SHX Text

JRH

AutoCAD SHX Text

TUEBOR

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text Q

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text U

AutoCAD SHX Text P

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text

KAB

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text B

AutoCAD SHX Text U

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text M

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text C

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text U

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

AutoCAD SHX Text

PROCUREMENT AND REAL ESTATE SERVICES ADMINISTRATION

AutoCAD SHX Text

BAB

AutoCAD SHX Text

KMM

AutoCAD SHX Text

(TOLL FREE) FOR THE LOCATION OF UNDERGROUND FACILITIES

AutoCAD SHX Text

3 WORKING DAYS

AutoCAD SHX Text

BEFORE YOU DIG

AutoCAD SHX Text 1-800-482-7171

AutoCAD SHX Text

CALL MISS DIG

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text M

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text

1. ALL WORK SHALL COMPLY WITH THE APPLICABLE SOIL EROSION AND ALL WORK SHALL COMPLY WITH THE APPLICABLE SOIL EROSION AND SEDIMENTATION CONTROL (SESC) RULES AND REGULATIONS (SOIL EROSION AND SEDIMENTATION CONTROL - 1994 PA 451, PART 91, AS AMENDED, MCL 324.9101 ET SEQ.). 2. THE CONTRACTOR SHALL REVIEW THE SESC MEASURES IN ORDER TO PREPARE THE CONTRACTOR SHALL REVIEW THE SESC MEASURES IN ORDER TO PREPARE AND ISSUE FOR APPROVAL AN “SESC IMPLEMENTATION PLAN”, WHICH INDICATES SESC IMPLEMENTATION PLAN”, WHICH INDICATES , WHICH INDICATES THE CONTRACTOR'S INTENDED IMPLEMENTATION OF THE SESC PLAN FOR THE PROJECT, INCLUDING A SCHEDULE. 3. THE CONTRACTOR SHALL INSTALL TEMPORARY EROSION AND SEDIMENTATION THE CONTRACTOR SHALL INSTALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES PRIOR TO OR UPON COMMENCEMENT TO EARTHWORK ACTIVITIES. 4. THE CONTRACTOR TO PLACE SILT FENCE AROUND ALL AREAS WHERE SEDIMENT THE CONTRACTOR TO PLACE SILT FENCE AROUND ALL AREAS WHERE SEDIMENT MAY LEAVE THE CONSTRUCTION AREA. 5. THE CONTRACTOR WILL PERFORM SWEEPING AS NEEDED TO REMOVE ANY THE CONTRACTOR WILL PERFORM SWEEPING AS NEEDED TO REMOVE ANY SEDIMENT TRACKED OFF SITE. FREQUENCY OF SWEEPING WILL BE BASED ON SITE CONDITIONS. 6. THE CONTRACTOR WILL PERFORM DUST CONTROL AS NEEDED BASED ON SITE THE CONTRACTOR WILL PERFORM DUST CONTROL AS NEEDED BASED ON SITE CONDITIONS. 7. DISTURBED AREAS THAT WILL REMAIN IDLE DURING CONSTRUCTION MUST BE DISTURBED AREAS THAT WILL REMAIN IDLE DURING CONSTRUCTION MUST BE TEMPORARILY STABILIZED, INCLUDING SOIL STOCKPILES, 8. THE CONTRACTOR SHALL MAINTAIN AND INSPECT SESC MEASURES THROUGHOUT THE CONTRACTOR SHALL MAINTAIN AND INSPECT SESC MEASURES THROUGHOUT THE COURSE OF THE PROJECT. AT A MINIMUM, THE CONTRACTOR SHALL INSPECT AND MAINTAIN SESC MEASURES ONCE A WEEK AND AFTER RAIN EVENTS. 9. THE CONTRACTOR SHALL CORRECT NON-CONFORMING SESC MEASURES WITHIN THE CONTRACTOR SHALL CORRECT NON-CONFORMING SESC MEASURES WITHIN 24 HOURS, IF WATERS OF THE STATE ARE BEING IMPACTED OR WITHIN 48 HOURS FOR ROUTINE MAINTENANCE ITEMS. OTHER SESC MAINTENANCE SHALL BE COMPLETED AS SOON AS POSSIBLE BUT NEVER MORE THAN FIVE (5) DAYS AFTER DETECTION. 10. THE CONTRACTOR SHALL COMPLETE PERMANENT SOIL EROSION CONTROL THE CONTRACTOR SHALL COMPLETE PERMANENT SOIL EROSION CONTROL MEASURES FOR ANY DISTURBED LAND AREA WITHIN 5 CALENDAR DAYS AFTER FINAL GRADING OR THE FINAL EARTH CHANGE HAS BEEN COMPLETED. THE CONTRACTOR SHALL MAINTAIN TEMPORARY CONTROL MEASURES UNTIL PERMANENT SOIL EROSION CONTROL MEASURES ARE IN PLACE AND THE AREA IS STABILIZED. 11. THE CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL MEASURES THE CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER PERMANENT SOIL EROSION MEASURES ARE IN PLACE AND THE AREA IS STABILIZED. 12. CONTRACTOR AND ENGINEER SHALL DISCUSS APPROPRIATE CONSTRUCTION CONTRACTOR AND ENGINEER SHALL DISCUSS APPROPRIATE CONSTRUCTION ACCESS ROUTES DURING PRE-CONSTRUCTION MEETING. CONTRACTOR & ENGINEER SHALL MARK UP CONSTRUCTION PLAN AND AGREE TO CONSTRUCTION ACCESS ROUTES FOR ALL MATERIALS AND EQUIPMENT. CONTRACTOR SHALL NOTIFY ENGINEER PRIOR TO ANY DEVIATION FROM ROUTES.

AutoCAD SHX Text

SESC NOTES

AutoCAD SHX Text 1-989-344-6184

AutoCAD SHX Text

BEFORE YOU DIG

AutoCAD SHX Text

CALL MR. SHIRKEY

AutoCAD SHX Text (Facilities Management)

AutoCAD SHX Text R

AutoCAD SHX Text

3 WORKING DAYS

AutoCAD SHX Text

FOR SITE OWNED UTILITIES

AutoCAD SHX Text

FOR PRIMARY SERVICES

AutoCAD SHX Text

HAND-TOOLED CONTROL JOINT

AutoCAD SHX Text

1/4" WIDTH; 1/4 DEPTH OF SLAB

AutoCAD SHX Text

MEDIUM BROOM

AutoCAD SHX Text 1/4"R

AutoCAD SHX Text 2"

AutoCAD SHX Text S

AutoCAD SHX Text 1/4"R

AutoCAD SHX Text

COMPACTED SUBBASE

AutoCAD SHX Text

6" X 6" X 1/4" WWF

AutoCAD SHX Text

FINISH PERPENDICULAR

AutoCAD SHX Text

TO DIRECTION OF TRAVEL

AutoCAD SHX Text

CONCRETE SLAB WITH

AutoCAD SHX Text 2"

AutoCAD SHX Text

COMPACTED SUBGRADE

AutoCAD SHX Text

(GRANULAR MATERIAL

AutoCAD SHX Text

AS SPECIFIED)

AutoCAD SHX Text

SPOILS FROM EXCAVATION TO BE RE-GRADED AROUND PERIMETER OF CONCRETE PAD

AutoCAD SHX Text S

AutoCAD SHX Text 4"

AutoCAD SHX Text 2"

AutoCAD SHX Text 84'-0"

AutoCAD SHX Text

BEACH SAND AVAILABLE ON MAIN

AutoCAD SHX Text

CAMP IN 600 AREA

AutoCAD SHX Text S

AutoCAD SHX Text

COMPACTED SUBBASE

AutoCAD SHX Text 12"

AutoCAD SHX Text

COMPACTED SUBGRADE

AutoCAD SHX Text

(GRANULAR MATERIAL

AutoCAD SHX Text

AS SPECIFIED)

AutoCAD SHX Text

SLOPE GRADE AWAY FROM SAND COURT. SPOILS FROM EXCAVATION IF NECESSARY

AutoCAD SHX Text S

AutoCAD SHX Text 80'-0"

NOTE: ALL SPOILS FROM EXCAVATION CAN BE RE-GRADED ON SITE.

Sheets and Views
2651524031 Construct Recreational Facilities_TS-TS
2651524031 Construct Recreational Facilities_C1-C1
C2 Rec-C2

File details come from the government source that posted it. Updated .