PAGE

VOR SIDING-SPEC

12/29/16 PAGE 2

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

SOUTHWEST REGION

ALBUQUERQUE DISTRICT

SIDING INSTALLATION

CONSTRUCTION SPECIFICATIONS

Corona VOR Corona, New Mexico

January 2017 General

1.01 Scope. This specification covers the requirements of the Federal Aviation Agency for the replacement of siding at a VHF omni-directional radio range (VOR) facility. This facility is located in Corona, New Mexico. The facility coordinates are latitude N 34.366669, longitude W 105.678061.

The contractor shall provide all labor, equipment, material, supplies, and transportation required to perform the work in strict accordance with these specifications and manufacturer’s requirements for the removal and demolition of existing exterior paneling and insulation on the VOR facility. Work shall include the installation of new steel siding and insulation. The insulation shall be a minimum 1 ½ -inch rigid polyisocyanurate foam board with foil facer on one side. Soffits shall be prepped and painted with 2 coats of white exterior enamel paint.

Length of contract: The total contract time for this project shall be 21 calendar days.

FAA Onsite Representative: The Contracting Officer will designate a FAA Representative known as the Contracting Officers Representative (COR) to be present during normal working hours.

1.02 Site Access, Construction Limits, Use of Facilities, and Work Hours

The VOR is a critical navigational facility operating 24-hour, 7-day per week. The facility will not require a shut down for the duration of this project.

Work Hours. All work shall be performed between 7:00 a.m. and 5:00 p.m., five days per week, except that no work shall be performed on Federal Holidays. All work schedules shall be coordinated with the COR.

Contractor's Schedule. The contractor shall prepare a written schedule of his proposed work listing daily work accomplishments and submit it to the FAA Contracting Officer before starting work. The schedule shall contain all major items of work with relative dates of starting and completion.

Construction Limits. The contractor shall confine storage and employee parking to the site as directed by the COR. Additional space the contractor deems necessary shall be obtained off site, at no additional cost to the Government.

Weather Delay. The contractor shall obtain the approval of the FAA COR each day prior to beginning the next day's work activity. The FAA COR may suspend all work activity in the event that outdoor weather conditions pose a threat of damage to equipment or the building interior.

Site Access and Security. Access to the site shall be determined by the COR through coordination with SSC personnel and will be given to the contractor at the Pre-Construction Meeting. The contractor shall maintain the security integrity of the building at all times.

Inspection of Site by Contractor. Contractor must have carefully examined the premises to determine the extent of work and the conditions under which it must be done during an initial pre-bid site survey.

Contractors' Use of Premises. Contractor shall work in conjunction with operations of the facilities within the construction staging area limits for the execution of the work. The contractor and subcontractors shall maintain the job site in a neat and orderly condition.

Security Investigation. Contractor's personnel may be subject to security investigation by FAA. Upon request by the COR, the contractor shall promptly complete all security forms provided by the COR.

Damage to Site. Damage to existing buildings, grounds, drainage, paving, curbs, sidewalks or utilities, caused by the contractor's activities, or that of his employees or subcontractors shall be repaired to their pre-construction condition. The contractor shall pay all costs of repairs. After notice to proceed and prior to the commencement of construction, the contractor and COR shall conduct joint inspections of the existing areas affected by the construction. Existing damage or defects shall be noted and will be used as the basis for determination of damages caused by the contractor's operations.

1.03 Contract Closeout

General. The contractor shall require each subcontractor engaged upon the work to bear full responsibility for cleaning up during and immediately upon completion of his work. All rubbish, waste, tools, equipment and other apparatus caused by or used in the execution of his work shall be removed. This shall in no way be construed to relieve the contractor of his primary responsibility for maintaining the building and the site clean and free of debris, and leaving all work in a clean and proper condition acceptable to the COR. Protection shall be maintained until all work has been completed.

Rubbish Removal. Immediately after unpacking, all packing material, case lumber, wrappings, or other rubbish, flammable or otherwise, shall be collected and removed from the building.

Overall Cleaning. Immediately before the final inspection, the entire exterior of the building and the surrounding areas shall be thoroughly cleaned by the contractor, including but not limited to the following:

a) All construction facilities, debris and rubbish shall be removed from the building and the site.

b) All tools, scaffolding, temporary utility connections or buildings, belonging to the contractor or used under his direction shall be removed from the site.

Punch List. The COR will furnish the contractor with a list of discrepancies in the work, material and equipment noted during the final inspection.

Acceptance of Work. The contractor shall correct discrepancies noted during the final inspection, clean the premises and notify the COR that the work is ready for acceptance.

SIDING REQUIREMENTS

5.01 Manufacturer

Acceptable Manufacturer: Revere Building Products; P. O. Box 110, Akron, OH 44309. ASD. Tel: (800) 548-4542. Fax: (330)922-2354. Email: revereinfo@gentek.ca. Web: www.reverebuildingproducts.com.

** NOTE TO SPECIFIER ** Delete one of the following two paragraphs; coordinate with requirements of Division 1 section on product options and substitutions.

Requests for substitutions will be considered. To ensure functional and appearance compatibility, siding and all trim pieces shall be products of single manufacturer.

5.02 Materials

NOTE TO SPECIFIER ** Materials for aluminum siding panels. Delete if aluminum siding panels not required.

Steel Siding Panels: Fabricate siding, fascia and trim from galvanized steel sheet with G90 galvanized coating complying ASTM A653.

Minimum steel properties:

a.

Ultimate strength: 45 - 55 KSI (310 - 379 MPa).

b.

Yield strength: 40 - 50 KSI (276 - 345 MPa).

c.

Modulus of elasticity: 29,500 KSI (203395 MPa).

d.

Coefficient of linear thermal expansion: 0.6 x 10 to the minus 5 inch/inch/degree (1.09 x 10 to the minus 5 mm/mm/degree C.)

e.

Melting temperature: 2,700 degrees F (1,481 degrees C).

f.

Elongation: 25 percent.

NOTE TO SPECIFIER ** CEDARWOOD SERIES: Revere Cedarwood Steel Siding has a wood grain texture and a variegated paint pattern with intertwining natural hues in random patterns. There are two types: 1) Revere Cedarwood with simulated lap joint forming two 4 inches (102 mm) wide panels; 2) Revere Cedarwood single horizontal panel 8 inches (203 mm). Delete types not required.

Revere Cedarwood Steel Siding:

Type: Cedarwood Double 4 Inch Clapboard Steel Siding by Revere Building Products.

Pattern: Horizontal, double panel siding with slotted attachment holes along top edge.

· Dimensions: 8 inches (203 mm) exposed width by 12 feet 6 inches (3810 mm) long with 1/2 inch (13 mm) butt.

· Thickness: 0.017 inch. (0.43 mm.)

· Surface: Wood grain texture, variegated paint pattern with intertwining natural hues in random patterns, fluoropolymer thermoplastic polymer coating with 70 percent PVDF.

· Color: Aspen Grey.

Revere Fascia Covers, Steel Fascia Panels:

Type: Revere Steel Fascia Panels, 4 Inches Wide by Revere Building Products.

Pattern: 4 inches (102 mm) wide by 10 feet (3048 mm) long steel fascia panel.

· Thickness: 0.017 inch (0.43 mm).

· Surface: Wood grain texture.

· Finish: PVC thermoplastic polymer coating melted and fused on steel.

· Color: Aspen Grey

File details come from the government source that posted it. Updated .