2631_FINAL Contract Provisions.pdf
PDF 20 MB Posted
- Attached to
- Sidney & Pine Roundabout
- Solicitation number
- CRP 2631
- Issued by
- Kitsap County, Washington
About this file
This contract provisions document outlines the bidding and contract requirements for Kitsap County Department of Public Works' Sidney & Pine Roundabout project (County Road Project No. 2631, Federal Aid No. HSIP-000S(680), Contract No. TA7870), located at the intersection of SW Pine Road and Sidney Road SW in Kitsap County, Washington. The project scope includes construction of a single-lane roundabout, installation of an illumination system, stormwater conveyance infrastructure, and a bioretention stormwater facility. The work encompasses 61 bid items across multiple divisions, including clearing and grubbing (0.7 acre), roadway excavation (340 cubic yards), asphalt concrete pavement removal (3,662 square yards), hot mix asphalt paving (810 tons), cement concrete pavement (1,063 square yards across multiple applications), drainage structures and storm sewers (928 linear feet), curbs and gutters (2,212 linear feet), riprap protection, illumination systems, bioretention facilities, and landscape restoration with specific native plant selections. Sealed bids are due September 22, 2026, at 11:00 AM at the Kitsap County Department of Public Works Front Entrance (507 Austin Avenue, Port Orchard, Washington), with electronic bids accepted via email or fax by 5:00 PM the day before opening. The successful contractor must complete all work within 80 working days of the Notice to Proceed. No pre-bid conference or mandatory site visit is specified; however, prospective bidders may request written clarification by close of business 5 business days before bid opening.
The engineer's estimate ranges from $2,000,000 to $2,500,000. All bids must include a bid bond equal to five percent (5%) of the total bid amount, made payable to Kitsap County Department of Public Works. The contract is federally funded through Highway Safety Improvement Program (HSIP) funds, requiring compliance with federal prevailing wage rates and the Davis-Bacon Act provisions outlined in FHWA Form 1273. Washington State prevailing wage rates also apply. Bidders must submit complete proposal packages including the proposal form, bid bond, bidder responsibility statement, wage payment certification, non-collusion declaration, subcontractor list, recycled materials proposal, bidder questionnaire (WSDOT Form 272-022), and local agency certification for federal-aid contracts. Bids must be accompanied by all required certifications, and failure to include any required documentation may result in rejection as an irregular proposal. The successful bidder must provide payment and performance bonds for the full contract amount from an approved surety registered with the Washington State Insurance Commissioner and provide proof of current Washington State Contractors Registration. Liquidated damages apply for late completion as described in the contract documents.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIDNEY & PINE ROUNDABOUT
KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS
COUNTY ROAD PROJECT NO. 2631
SIDNEY & PINE
ROUNDABOUT
Federal Aid No. HSIP-000S(680) Contract No. TA7870
CONTRACT PROVISIONS
614 DIVISION STREET, MS-26
PORT ORCHARD, WASHINGTON 98366-4699
360.337.5777
APPROVED FOR CONSTRUCTION:
DATE JOSEPH P. RUTAN, P.E.
COUNTY ENGINEER
8/7/2026
BACK OF COVER
i
Table of Contents
CALL FOR BIDS
PROPOSAL
BID BOND
BIDDER RESPONSIBILITY STATEMENT
CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES
NON-COLLUSION DECLARATION FORM
SUBCONTRACTOR LIST
PROPOSAL FOR INCORPORATING RECYCLED MATERIALS INTO THE PROJECT
BIDDER QUESTIONNAIRE
LOCAL AGENCY CERTIFICATION FOR FEDERAL-AID CONTRACTS
AGREEMENT
PUBLIC WORKS PAYMENT BOND
PUBLIC WORKS PERFORMANCE BOND
SPECIAL PROVISIONS .............................................................................................. 1-1
INTRODUCTION TO THE SPECIAL PROVISIONS .................................................... 1-3
DIVISION 1 GENERAL REQUIREMENTS .................................................................. 1-5
1-01 Definitions and Terms ................................................................................ 1-5
1-01.3 Definitions ........................................................................................... 1-5
1-02 Bid Procedures and Conditions ................................................................ 1-7
1-02.1 Prequalification of Bidders ................................................................ 1-7
1-02.2 Plans and Specifications ................................................................... 1-7
1-02.4 Examination of Plans, Specifications and Site of Work .................. 1-8
1-02.5 Proposal Forms .................................................................................. 1-8
1-02.6 Preparation of Proposal ..................................................................... 1-9
1-02.7 Bid Deposit ....................................................................................... 1-11
1-02.9 Delivery of Proposal ......................................................................... 1-12
1-02.10 Withdrawing, Revising, or Supplementing Proposal .................. 1-12
1-02.13 Irregular Proposals......................................................................... 1-13
1-02.14 Disqualification of Bidders ............................................................ 1-14
1-03 Award and Execution of Contract ........................................................... 1-18
1-03.1 Consideration of Bids ...................................................................... 1-18
1-03.3 Execution of Contract ...................................................................... 1-19 ii
1-03.4 Contract Bond .................................................................................. 1-19
1-03.7 Judicial Review ................................................................................. 1-20
1-04 Scope of Work ........................................................................................... 1-21
1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda ........................................................................ 1-21
1-04.4 Changes ............................................................................................ 1-21
1-05 Control of Work ......................................................................................... 1-21
1-05.3 Working Drawings ............................................................................ 1-21
1-05.4 Conformity With and Deviations from Plans and Stakes .............. 1-25
1-05.7 Nonconforming Work ..................................................................... 1-30
1-05.11 Final Inspection .............................................................................. 1-31
1-05.13 Superintendents, Labor and Equipment of Contractor ............... 1-33
1-05.15 Method of Serving Notices ............................................................ 1-33
1-05.16 Water and Power ............................................................................ 1-33
1-05.17 Project Management Communications – Provided at no cost to Contractor ...................................................................................................... 1-34
1-06 Control of Material .................................................................................... 1-37
1-06.6 Recycled Materials ........................................................................... 1-42
1-07 Legal Relations and Responsibilities to the Public ............................... 1-43
1-07.1 Laws to be Observed ....................................................................... 1-43
1-07.2 State Taxes ....................................................................................... 1-44
1-07.7 Load Limits ....................................................................................... 1-45
1-07.8 High-Visibility Apparel ..................................................................... 1-46
1-07.9 Wages ................................................................................................ 1-46
1-07.11 Requirements for Nondiscrimination ........................................... 1-47
1-07.12 Federal Agency Inspection ............................................................ 1-67
1-07.17 Utilities and Similar Facilities ........................................................ 1-68
1-07.18 Public Liability and Property Damage Insurance ........................ 1-70
1-07.24 Rights of Way ................................................................................. 1-74
1-08 Prosecution and Progress ....................................................................... 1-75
1-08.0 Preliminary Matters .......................................................................... 1-75
1-08.1 Subcontracting ................................................................................. 1-77
1-08.3 Progress Schedule ........................................................................... 1-78
1-08.4 Prosecution of Work ........................................................................ 1-79
1-08.5 Time for Completion ......................................................................... 1-79
1-08.9 Liquidated Damages ........................................................................ 1-81
1-09 Measurement and Payment ..................................................................... 1-82 iii
1-09.2 Weighing Equipment ........................................................................ 1-82
1-09.6 Force Account .................................................................................. 1-82
1-09.9 Payments .......................................................................................... 1-83
1-09.11 Disputes and Claims ...................................................................... 1-84
1-09.13 Claims Resolution .......................................................................... 1-84
DIVISION 2 TEMPORARY FEATURES ...................................................................... 2-1
2-04 Temporary Traffic Control .......................................................................... 2-1
2-04.3 Construction Requirements .............................................................. 2-1
2-04.5 Payment .............................................................................................. 2-2
DIVISION 3 EARTHWORK .......................................................................................... 3-1
3-01 Clearing, Grubbing and Roadside Cleanup .............................................. 3-1
3-01.1 Description .......................................................................................... 3-1
3-01.2 Disposal of Usable Material and Debris ........................................... 3-1
3-02 Removal of Structures and Obstructions ................................................. 3-1
3-02.1 Description .......................................................................................... 3-1
3-02.3 Construction Requirements .............................................................. 3-2
3-02.4 Vacant .................................................................................................. 3-3
3-02.5 Payment .............................................................................................. 3-4
3-03 ROADWAY EXCAVATION AND EMBANKMENT ........................................ 3-4
3-03.1 Description .......................................................................................... 3-4
3-03.2 Vacant .................................................................................................. 3-4
3-03.3 Construction Requirements .............................................................. 3-5
3-03.4 Measurement ...................................................................................... 3-6
3-03.5 Payment .............................................................................................. 3-7
3-07 STRUCTURE EXCAVATION ........................................................................ 3-7
3-07.3 Construction Requirements .............................................................. 3-7
3-07.4 Measurement ...................................................................................... 3-8
3-07.5 Payment .............................................................................................. 3-8
DIVISION 4 AGGREGATES AND BASES .................................................................. 4-1
4-05 Ballast and Crushed Surfacing .................................................................. 4-1
4-05.3 Construction Requirements .............................................................. 4-1
DIVISION 5 SURFACE TREATMENTS AND PAVEMENTS ....................................... 5-1
5-04 HOT MIX ASPHALT ..................................................................................... 5-1
5-04.1 Description .......................................................................................... 5-1
5-04.2 Materials .............................................................................................. 5-1
5-04.3 Construction Requirements .............................................................. 5-4 iv
5-04.4 Measurement .................................................................................... 5-29
5-04.5 Payment ............................................................................................ 5-29
5-05 CEMENT CONCRETE PAVEMENT ........................................................... 5-31
5-05.1 Description ........................................................................................ 5-31
5-05.2 Materials ............................................................................................ 5-31
5-05.3 Construction Requirements ............................................................ 5-32
5-05.4 Measurement .................................................................................... 5-35
5-05.5 Payment ............................................................................................ 5-36
DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS,
WATERMAINS AND CONDUITS ................................................................................ 7-1
7-02 CULVERT PIPE ............................................................................................ 7-1
7-02.2 Materials .............................................................................................. 7-1
7-02.5 Payment .............................................................................................. 7-1
7-04 STORM SEWERS ........................................................................................ 7-1
7-04.2 Materials .............................................................................................. 7-1
7-04.3 Construction Requirements .............................................................. 7-1
7-04.5 Payment .............................................................................................. 7-2
7-05 MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS ....................... 7-2
7-05.1 Description .......................................................................................... 7-2
7-05.2 Materials .............................................................................................. 7-3
7-05.5 Payment .............................................................................................. 7-3
7-08 General Pipe Installation Requirements ................................................... 7-3
7-08.3 Construction Requirements .............................................................. 7-3
7-08.4 Measurement ...................................................................................... 7-4
7-08.5 Payment .............................................................................................. 7-4
DIVISION 8 MISCELLANEOUS CONSTRUCTION ..................................................... 8-1
8-01.1 Description .......................................................................................... 8-1
8-01.3 Construction Requirements .............................................................. 8-1
8-02 Roadside Restoration ................................................................................. 8-2
8-02.3 Construction Requirements .............................................................. 8-2
8-04 Curbs, Gutters, and Spillways ................................................................... 8-3
8-04.4 Measurement ...................................................................................... 8-3
8-04.5 Payment .............................................................................................. 8-3
8-15 Riprap .......................................................................................................... 8-3
8-15.1 Description .......................................................................................... 8-3 v
8-15.2 Materials .............................................................................................. 8-4
8-15.4 Measurement ...................................................................................... 8-4
8-15.5 Payment .............................................................................................. 8-4
8-20 Illumination, Traffic Signal Systems, Intelligent Transportation Systems, and Electrical ........................................................................................ 8-5
8-20.1 Description .......................................................................................... 8-5
8-20.2 Materials .............................................................................................. 8-6
8-20.3 Construction Requirements .............................................................. 8-7
8-20.4 Measurement .................................................................................... 8-12
8-20.5 Payment ............................................................................................ 8-13
8-23 Temporary Pavement Markings ............................................................... 8-14
8-23.4 Measurement .................................................................................... 8-14
8-28 Bioretention Facility ................................................................................. 8-14
8-28.1 Description ........................................................................................ 8-14
8-28.2 Materials ............................................................................................ 8-14
8-28.3 Construction Requirements ............................................................ 8-15
8-28.4 Measurement .................................................................................... 8-19
8-28.5 Payment ............................................................................................ 8-19
DIVISION 9 MATERIALS ............................................................................................. 9-1
9-03 Aggregates .................................................................................................. 9-1
9-03.8 Aggregates for Hot Mix Asphalt ........................................................ 9-1
9-03.14 Borrow ............................................................................................... 9-2
9-03.21 Recycled Materials ........................................................................... 9-2
9-05 Drainage Structures and Culverts ............................................................. 9-2
9-05.13 Ductile Iron Sewer Pipe ..................................................................... 9-2
9-05.15 Metal Casings ................................................................................... 9-3
9-14 EROSION CONTROL AND ROADSIDE PLANTING ................................... 9-3
9-14.2 Topsoil ................................................................................................. 9-3
9-14.9 Bioretention Soil Media ....................................................................... 9-6
9-29 Illumination, Signal, Electrical ................................................................... 9-7
9-29.2 Junction Boxes, Cable Vaults, and Pull Boxes ................................ 9-7
9-29.3 Fiber Optic Cable, Electrical Conductors, and Cable ...................... 9-8
9-29.6 Light and Signal Standards ............................................................... 9-8
9-29.10 Luminaires ...................................................................................... 9-10
9-29.12 Electrical Splice Materials ............................................................. 9-10
9-29.24 Service Cabinets ............................................................................ 9-11 vi
9-35 Temporary Traffic Control Materials ....................................................... 9-11
9-35.2 Construction Signs .......................................................................... 9-11
9-35.6 Barricades ......................................................................................... 9-12
9-35.7 Traffic Safety Drums ........................................................................ 9-12
9-35.9 Traffic Cones .................................................................................... 9-12
9-35.10 Tubular Markers ............................................................................. 9-12
9-35.12 Transportable Attenuator .............................................................. 9-13
9-35.13 42-inch Tall Channelizing Devices ................................................ 9-13
9-35.16 Pedestrian Channelizing Devices ................................................. 9-13
STANDARD PLANS ....................................................................................................S-1
ATTACHMENTS
A. WASHINGTON STATE PREVAILING WAGE RATES, STATE BENEFIT CODE
KEY AND SUPPLEMENTAL (L&I STATEMENT)
B. FEDERAL PREVAILING RATES
C. FEDERAL CONTRACT PROVISIONS (FHWA 1273), W/ AMENDMENT
CALL FOR BIDS
BID OPENING: DATE: September 22, 2026 TIME: 11:00 AM
Sealed bids for the project designated above will be received by Kitsap County Department of Public Works before the time and date indicated above, at which time they will be opened and publicly read aloud. The Public Works building is closed to the public.
Bids delivered in person or by private carrier (UPS, Federal Express, etc.) will be received by staff from Kitsap County Department of Public Works between the hours of 10:30 AM and 11:00 AM at:
Kitsap County Department of Public Works Front Entrance of the Public Works Building, 507 Austin Avenue Port Orchard, Washington
Bids will be opened and publicly read aloud at the front entrance of the Public Works Building.
Bids delivered by US Postal Service shall be addressed to:
Kitsap County Department of Public Works 614 Division Street, MS-26 Port Orchard, Washington 98366-4699
Prospective bidders are hereby notified that they are solely responsible for ensuring timely delivery of their bid to the place of bid opening.
All bid proposals shall be accompanied by a bid proposal surety bond made payable to Kitsap County Department of Public Works in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful Bidder fail to enter into such contract and furnish satisfactory performance and payment bonds within the time stated in the Special Provisions, the bid proposal bond shall be forfeited to Kitsap County Department of Public Works.
2 Special Provisions
Each proposal or bid shall be completely sealed in a separate envelope, properly addressed as stated above, with the name and address of the bidder and the name of the project plainly written on the outside of the envelope. A complete bid proposal shall include the following:
1) Proposal Form
2) Bid Bond
3) Bidder Responsibility Statement
4) Certification of Compliance with Wage Payment Statutes
5) Non-Collusion Affidavit
6) Subcontractor List
7) Proposal for Incorporating Recycled Materials into the Project
8) Bidder Questionnaire (Bidders are made aware of the requirement to include a Bidders Questionnaire, WSDOT form 272‐022, in accordance with special provisions section 1‐02.6. Bids that do not include this form at the time of bid will be rejected in accordance with Section 1‐02.13 of the special provisions.)
9) Local Agency Certification for Federal Aid Contracts
All of the above items must be complete in all respects, including signatures (notarized where required). Bidder shall acknowledge receipt of all addendums in the spaces provided. The successful Bidder will be required to submit a photocopy of their current Washington State Contractors Registration. Failure to include all items may be cause for the bid to be considered irregular and thereby rejected.
Bids or proposals received after the time set for the opening of bids will not be considered.
Bidders are notified that all bids are likely to be rejected if the lowest responsible bid received exceeds the Engineer's estimate by an unreasonable amount.
Kitsap County reserves the right to award the bid in a manner and on a basis, which will best serve the County, taking into consideration the Bidder Responsibility Statement included with the bids and the requirements of the WSDOT/APWA Standard Specifications and the Contract Provisions.
The award of the contract, if made, shall be made to the responsible Bidder submitting the lowest responsive bid, based upon the total sum of the extension of unit prices for the bid items.
DESCRIPTION OF WORK
This contract is an intersection improvement project which provides for the construction of a single-lane roundabout, an illumination system, stormwater conveyance and a stormwater facility at the intersection of SW Pine Road and Sidney Road SW, in accordance with the Contract Documents. The engineer’s estimate ranges from $2,000,000 to $2,500,000.
The following is applicable to federal aid projects:
The Kitsap County Board of Commissioners, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C.
2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
OBTAINING PLANS AND CONTRACT PROVISIONS:
Electronic copies of the Plans and Contract Provisions in PDF format are available on the internet through Kitsap County’s website, Department of Public Works, Road Projects Open for Bid, located at http://kcowa.us/roadbid.
Paper copies of the Contract Plans and Provisions for the proposed work may be obtained from the Kitsap County Department of Public Works at 507 Austin Avenue, 3rd floor Reception Desk, Port Orchard, Washington for a non-refundable fee of $35.00 for each set plus $5.00 to cover postage and handling if mailing is requested. To order these Contract Documents or to obtain a Bid Proposal Package at no cost, please call 360-337-5777 or email at help@kitsap1.com. Plans and Contract Provisions will not be shipped until the fee is received.
To be added to the Plan Holder List, please complete the form available online at https://www.kitsapgov.com/pw/Pages/planholders.aspx. Any questions or issues, please call 360-337-5777 or email at help@kitsap1.com.
CONTACT PERSON
Any prospective Bidder having questions or desire an explanation or interpretation of the Bid Documents are requested to contact Theresa Smith, Project Manager, at tsmith@kitsap.gov by close of business 5 business days preceding the bid opening.
General questions about the project may be addressed by Theresa Smith, Project Manager, at tsmith@kitsap.gov or at (360) 337-4556.
KITSAP COUNTY BOARD OF COMMISSIONERS
4 Special Provisions
THIS PAGE INTENTIONALLY LEFT BLANK
PROPOSAL
The Honorable Board of Commissioners Kitsap County 614 Division Street Port Orchard, Washington 98366
1. Pursuant to and in compliance with your Advertisement for Bids and the other documents relating thereto, the undersigned Bidder, having familiarized themselves with the terms of the project related to those items herein bid, being aware of the local conditions affecting the performance of a Contract covering the items bid, having knowledge of the cost of the work at the place where the work is to be done, having familiarized themselves with the Contract Documents, hereby proposes and agrees to perform the work and/or to furnish the equipment, and to furnish any and all of the labor, materials, tools, expendable equipment and all utility and transportation services necessary to perform a Contract covering any or all of those items herein bid and to complete in a workmanlike manner all work covered by said Contract in connection with the Owner's Improvement Project, for an amount computed upon the basis of the quantity of work actually performed at the following bid prices:
NOTE: UNIT PRICES FOR ALL ITEMS, ALL EXTENSIONS, AND THE TOTAL
AMOUNT OF BID MUST BE SHOWN. All prices shall be in legible figures (not words) written in ink or typed. The proposal shall include: A unit price for each item (omitting digits more than four places to the right of the decimal point); an extension for each unit price (omitting digits more than two places to the right of the decimal point); the total Contract price (the sum of all extensions).
6 Special Provisions
COST CODE (a guide to locate Bid Item information – the Contracting Agency does not warrant its accuracy): The Cost Code for each Bid Item consists of the WSDOT/APWA Standard Specifications division number, the section number and the item number, in that order. An example is shown below:
Kitsap County-specific Bid Items are noted with “KC” at the end. Project-specific Bid Items are noted with “SP”. Bid Items that have options (e.g. Plant Selection or Beam Guardrail Anchor Type X) are designated as such. Examples are shown below:
01-04-7728 WSDOT Standard Bid Item
01-07-0010KC Kitsap County Standard Bid Item
05-05-SP01 Project-specific Bid Item
08-02-6550-AC WSDOT Standard Bid Item with Option
08-11-6760-16 WSDOT Standard Bid Item with Option
(e.g. specific pipe size)
NO.
COST
CODE
ITEM QTY UNIT UNIT COST AMOUNT
01-04-
MINOR CHANGE 20000 CALC $ 1.00 $ 20,000.00
01-07-
0010KC
PROTECTION &
SUPPORT OF
EXISTING UTILITIES
1 L.S.
01-07-
REIMBURSEMENT
FOR THIRD PARTY
DAMAGE
5 EST. $ 1.00 $ 5.00
01-07-
SPCC PLAN 1 L.S.
01-08-
TYPE B PROGRESS
SCHEDULE
1 L.S.
02-01-
MOBILIZATION 1 L.S.
02-04-
OTHER TEMPORARY
TRAFFIC CONTROL
DEVICES
1 L.S.
02-04-
TRAFFIC CONTROL
SUPERVISOR
1 L.S.
02-04-
FLAGGERS
(MINIMUM
$50 PER HR)
2560 HR
02-04-
CONSTRUCTION
SIGNS CLASS A
54 S.F.
02-04-
PORTABLE
CHANGEABLE
MESSAGE SIGN
10752 HR
03-01-
CLEARING
AND GRUBBING
0.7 ACRE
03-02-
0050KC
REMOVAL OF
STRUCTURES
AND OBSTRUCTIONS
1 L.S.
8 Special Provisions
03-02-
0079KC
SAW CUT ASPHALT
CONCRETE
PAVEMENT
137 L.F.
03-02-
0120KC
REMOVING ASPHALT
CONC. PAVEMENT
3662 S.Y.
03-02-
0090KC
REMOVING CEMENT
CONC. PAVEMENT
27 S.Y.
03-03-
ROADWAY
EXCAVATION
INCL. HAUL
340 C.Y.
03-03-
UNSUITABLE
FOUNDATION
EXCAVATION
INCL. HAUL
50 C.Y.
03-03-
0411KC
SPECIAL BORROW
INCL. HAUL
1900 TON
03-03-
EMBANKMENT
COMPACTION
930 C.Y.
03-06-
WATER 80 MGAL
03-07-
7008KC
SHORING OR EXTRA
EXCAVATION
CLASS B
1 L.S.
03-08-
TRIMMING
AND CLEANUP
1 L.S.
04-05-
CRUSHED
SURFACING
BASE COURSE
1670 TON
04-05-
CRUSHED
SURFACING
TOP COURSE
590 TON
05-04-
5767KC
HMA CL. 1/2 IN.
PG 58H-22
810 TON
05-04-
5878KC
HMA ROAD
APPROACH
50 S.Y.
05-05-
SP01
DECORATIVE
CEMENT CONC.
PAVEMENT –
TRUCK APRON
928 S.Y.
05-05-
SP02
DECORATIVE
CEMENT CONC.
PAVEMENT -
SPLITTER ISLAND
127 S.Y.
05-05-
SP03
ROUNDABOUT
TRUCK APRON
CEM. CONC.
RAMP TRANSITION
8 EACH
07-02-
SP04
DUCTILE IRON
CULV. PIPE
12 IN. DIAM.
54 L.F.
07-04-
TESTING
STORM SEWER PIPE
928 L.F.
07-04-
CORRUGATED
POLYETHYLENE
STORM SEWER PIPE
12 IN. DIAM.
928 L.F.
07-05-
3091KC
CATCH BASIN
TYPE 1
11 EACH
07-05-
3105KC
CATCH BASIN
TYPE 2 48 IN. DIAM.
1 EACH
07-08-
7715KC
FORCE ACCOUNT
POT-HOLE
UTILITY CROSSING
1000 EST. $ 1.00 $ 1,000.00
08-01-
6488KC
EROSION CONTROL
AND WATER
POLLUTION
PREVENTION
1 L.S.
08-02-
6406KC
TOPSOIL TYPE A 140 C.Y.
08-02-
6414KC
SEEDING,
FERTILIZING,
AND MULCHING
0.5 ACRE
08-02-
FINE COMPOST 0.5 ACRE
10 Special Provisions
08-02-
SOIL AMENDMENT 0.5 ACRE
08-02- 6550-
CO
PLANT SELECTION
SLOUGH SEDGE
(CAREX OBNUPTA)
53 EACH
08-02-
6550-JE
PLANT SELECTION
DAGGER LEAF RUSH
(JUNCUS
ENSILOLIUS)
46 EACH
08-02-
6550-JT
PLANT SELECTION
SLENDER RUSH
(JUNCUS TENUIS)
102 EACH
08-02- 6550-
PC2
PLANT SELECTION
PACIFIC NINEBARK
(PHYSOCARPUS
CAPITATIS)
7 EACH
08-02-
6550-SA
PLANT SELECTION
SNOWBERRY
(SYMPHORICARPOS
ALBUS)
81 EACH
08-02-
6550-SS
PLANT SELECTION
DOUGLAS ASTER
(SYMPHYOTRICHUM
SUBSPICATUM)
172 EACH
08-04-
ROUNDABOUT
SPLITTER ISLAND
NOSING CURB
4 EACH
08-04-
ROUNDABOUT
CEMENT CONCRETE
CURB AND GUTTER
859 L.F.
08-04-
ROUNDABOUT
CENTRAL ISLAND
CEMENT CONCRETE
CURB
103 L.F.
08-04-
ROUNDABOUT
TRUCK APRON CEM.
CONC. CURB
AND GUTTER
1250 L.F.
08-04-
SP05
ROUNDABOUT
TRUCK APRON CEM.
CONC. CURB
AND GUTTER
TRANSITION
8 EACH
08-15-
0903KC
STREAMBED
COBBLES 10 IN.
40.3 TON
08-15-
1087KC
ROCK
PROTECTION PAD
10 EACH
08-18- 7562-1
MAILBOX SUPPORT
TYPE 1
1 EACH
08-20-
ILLUMINATION
SYSTEM
1 L.S.
08-21-
PERMANENT
SIGNING
1 L.S.
08-22-
PAINT LINE 2470 L.F.
08-22-
PLASTIC WIDE
DOTTED ENTRY LINE
100 L.F.
08-22-
PLASTIC YIELD LINE
SYMBOL
20 EACH
08-28-
SP06
BIORETENTION
FACILITY
1 L.S.
TOTAL CONTRACT COST $
12 Special Provisions
2. BIDDER SHALL INCLUDE SALES TAX IN THE LUMP SUM AND UNIT PRICE
BID ITEMS in accordance with Section 1-07.2(1) of Special Provisions.
3. The undersigned Bidder hereby proposes and agrees to commence work under this Contract, if awarded to them, in accordance with Sections 1-08.4 and 1-08.5 of the Special Provisions. They further agree to complete the contract within 80 working days.
4. The agreed liquidated damage to the Owner shall be in accordance with Liquidated Damages as described in the Standard Specifications, Amendments thereto, and Special Provisions.
5. The Owner reserves the right to delete all or any portions of the work as outlined in the Contract Documents.
6. The required bid security in the amount of five percent (5%) of the total bid is hereto attached.
7. It is understood that the Contractor is responsible for obtaining and completing all required government forms.
8. Receipt of the following Addenda to the Contract Document is hereby acknowledged.
ADDENDUM #
DATE OF RECEIPT OF
ADDENDUM
SIGNED
ACKNOWLEDGMENT
(Note: Failure to acknowledge receipt of the Addenda may be considered an irregularity in the proposal).
9. Notice of Acceptance of this bid or requests for additional information should be addressed to the undersigned at the address stated below and unless otherwise notified in writing, this address shall be used by the successful bidder during the life of the Contract for all official notices.
10. By signing this Proposal, the Bidder certifies that they have read and understand all of the terms and Conditions of the Contract Plans, Standard Specifications, the Amendments there to, and these Special Provisions, and agrees to comply with them.
Date:
Proper Name of Bidder (Type or Print):
By (Signature):
Name and Title (Type or Print Name and Title of Signatory):
Street Address:
City, State and Zip Code:
Telephone Number with Area Code:
Fax Number with Area Code:
Mailing Address, if different from above:
E-mail Address (to be used by the County to send award documents)
14 Special Provisions
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, as Principal, and as Surety, are hereby held and firmly bound unto Kitsap County Department of Public Works as Owner in the penal sum of for payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. Signed this day of , 2026.
The Condition of the above obligation is such that whereas the Principal has submitted To Kitsap County Department of Public Works, a certain BID, attached hereto and made a part hereof to enter a contract in writing, for the
NOW, THEREFORE,
(a) If said BID be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attachment hereto (properly completed in accordance with said BID) and shall furnish a BOND for faithful performance of said contract, and for the payment of all persons performing labor and furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said BID, then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such BID; and said Surety does hereby waive notice of any such extension.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are Corporations have set their Corporation seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above.
Principal
Surety
By:
16 Special Provisions
BIDDER RESPONSIBILITY STATEMENT
Each Bidder shall prepare and submit the following information with their bid.
By signing the signature page of the Proposal, the Bidder affirms that the following information is true and correct.
Name of Bidder:
Business Address:
A) MANDATORY BIDDER RESPONSIBILITY CRITERIA (RCW 39.04.350)
1. Do you have industrial insurance (workers’ compensation) coverage for your employees working in Washington as required by Title 51 RCW?
Yes: No: Not Applicable:
2. Washington State Employment Security Department number as required by Title 51
RCW.
Number: Not Applicable:
3. Have you ever been disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3)?
Yes: No:
4. Have you received training on the requirements related to public works and prevailing wage?
Yes: No: Exempt:
18 Special Provisions
B) SUPPLEMENTAL BIDDER RESPONSIBILITY CRITERIA
(SPECIAL PROVISIONS SECTION 1-02.14)
1. Do you own delinquent taxes to the State of Washington Department of Revenue?
Yes: No:
2. Are you currently debarred or suspended from bidding by the Federal government?
3. Does your standard subcontract form include the subcontract responsibility language required by RCW 39.06.020?
4. Do you have any established procedure which your company utilizes to validate the responsibility of each of your subcontractors and any sub-tier contractors?
5. Do you have any record of prevailing wage violations in the last 5 years as determined by the Washington State Department of Labor and Industries?
6. Have you had any claims against retainage or payment bonds for public works projects in the last 3 years?
7. Has your company or its owners been convicted of a crime involving bidding on a public works contract in the last 5 years?
8. Has your company had any public works contract terminated for cause or terminated for default by a government agency in the last 5 years?
9. Has your company had any lawsuits with judgments entered against the company in the last 5 years?
This form must be submitted with the Bid Proposal or as a Supplement to the Bid no later than 24 hours after the time for delivery of the Bid Proposal, as provided for in Section 1-02.9 of the Contract
Provisions.
CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES
The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date September 1, 2026, the bidder is not a “willful” violator, as defined in RCW
49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction.
I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct.
Bidder’s Business Name
Signature of Authorized Official*
Printed Name
Title
Date
City
State
Check One:
Sole Proprietorship ☐ Partnership ☐ Joint Venture ☐ Corporation ☐
State of Incorporation, or if not a corporation, State where business entity was formed:
If a co-partnership, give firm name under which business is transacted:
* If a corporation, proposal must be executed in the corporate name by the president or vice-president
(or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner.
20 Special Provisions
NON-COLLUSION DECLARATION FORM
22 Special Provisions
SUBCONTRACTOR LIST
24 Special Provisions
PROPOSAL FOR INCORPORATING RECYCLED MATERIALS INTO THE
PROJECT
APWA-WA Division 1 Committee rev. 5/13/2022
Proposal for Incorporating Recycled Materials into the Project
In compliance with RCW 70A.205.700, the Bidder shall propose below, the total percent of construction aggregate and concrete materials to be incorporated into the Project that are recycled materials. Calculated percentages must be within the amounts allowed in Section 9-03.21(1)E, Table on Maximum Allowable Percent (By Weight) of Recycled Material, of the Standard Specifications.
Proposed total percentage: _____________________________ percent.
Note: Use of recycled materials is highly encouraged within the limits shown above, but does not constitute a Bidder Preference, and will not affect the determination of award, unless two or more lowest responsive Bid totals are exactly equal, in which case proposed recycling percentages will be used as a tie-breaker, per the APWA GSP in Section 1-03.1 of the Special Provisions. Regardless, the Bidder’s stated proposed percentages will become a goal the Contractor should do its best to accomplish.
Bidders will be required to report on recycled materials actually incorporated into the Project, in accordance with the APWA GSP in Section 1-06.6 of the Special Provisions.
Bidder: ___________________________________________
Signature of Authorized Official: ___________________________________________
Date: ___________________________________________
26 Special Provisions
Bidder Questionnaire Agency Name Federal Aid Number
Prime Contractor Name Contract Number
Contract Name
Firm/Subcontractor Name Address (incl. ZIP Code)
DBE
Status
NAICS
Codes Scope of Work Firm Age Firm Gross Receipts
If you have additional Firms or Subcontractors that submitted Bids, please complete additional forms.
All bidders listed on any other forms, including the Subcontractor List, must appear on this form.
Prime Contractor Representative Date
DOT Form 272-022 Revised 4/2026
● Previous Versions Obsolete ● tsmith Text Box
SIDNEY & PINE ROUNDABOUT
tsmith Text Box
DOT Form 272-022 Revised 12/2025
● Previous Versions Obsolete ●
Form Instructions
The following information for each firm that submitted a bid is required as part of 49 CFR 26.11(c)(2):
Firm/Subcontractor Name: Enter the name of each firm or subcontractor who submitted a quote or a bid on the contract.
Address: Enter the main address of the firm/subcontractor. Include the ZIP code.
DBE Status: Enter the DBE status. Options are DBE and Non-DBE.
NAICS Codes: Enter the appropriate NAICS Codes for the work the bid was submitted for.
Scope of Work: Enter the scope of the work the bid was submitted for.
Firm Age: Enter the age of the firm.
Firm Gross Receipts: Enter the annual gross receipts. Options are “Less than $1 million”, “$1-$3 million”, “$3-$6 million”, “$6-$10 million”, “$10-$20 million ”, “$20-$30.72 million ”, “Greater than $30.72 million ”.
https://20-$30.72 tsmith Text Box
SIDNEY & PINE ROUNDABOUT
tsmith Text Box tsmith Text Box
SIDNEY & PINE ROUNDABOUT
tsmith
LOCAL AGENCY CERTIFICATION FOR FEDERAL-AID CONTRACTS
The prospective participant certifies by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.
This certification is material representation of the fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly.
DOT Form 272-040A EF 07/2011
30 Special Provisions
AGREEMENT
This Agreement, made and entered into this day of , 2026 by and between Kitsap County, through the BOARD OF COUNTY COMMISSIONERS of Kitsap County, State of Washington, hereinafter referred to as the “COUNTY”, and, , a general Contractor licensed by the State of Washington, for themselves, their heirs, executors, administrators, successors, and assigns, hereinafter referred to as the “CONTRACTOR.”
RECITALS:
WHEREAS, the COUNTY desires to construct a single-lane roundabout, in Commissioner District #2:
WHEREAS, the CONTRACTOR has been selected by competitive bid as the “responsible bidder with the lowest responsive bid,” as defined under RCW 39.04.010;
NOW THEREFORE, in consideration of the mutual benefits and covenants contained herein, the COUNTY and the CONTRACTOR mutually agree as follows:
CONTRACT DOCUMENTS:
This Agreement hereby incorporates the recitals and the Contract Documents, which documents are incorporated herein by reference. The Contract Documents shall include, but shall not be limited to, the Contract Provisions for “SIDNEY & PINE ROUNDABOUT”, Call for Bids, Contractors accepted Bid Proposal, the General and Special Provisions, Contract Plans and Drawings, Addenda, applicable Bonds, and the 2026 WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal Construction, hereinafter referred to as the “Standard Specifications”, and this Agreement.
“The Work” as referred to in this Agreement means the definition described in WSDOT/APWA Standard Specifications Section 1-01.3
1) DESCRIPTION OF WORK:
This contract is an intersection improvement project which provides for the construction of a single-lane roundabout, an illumination system, stormwater conveyance and a stormwater facility at the intersection of SW Pine Road and Sidney Road SW, in accordance with the Contract Documents.
The CONTRACTOR shall furnish all of the labor, materials, tools, equipment, and everything needed for the construction and completion of the Work described herein, in accordance with, and more fully described in, the Contract Documents.
2) BINDING EFFECT:
The covenants and conditions contained in this Agreement shall apply to and bind the parties, heirs, legal representatives and assigns of the parties.
32 Special Provisions
3) TIME IS OF THE ESSENCE:
The CONTRACTOR agrees to work promptly and to fully complete the Work within the time limits as described in the Contract Documents. Failure to complete within the allowed time limit will subject the CONTRACTOR to Liquidated Damages, as described in Section 1-08.9, Liquidated Damages, of the Contract Documents.
4) TIME FOR COMPLETION:
The work to be performed under this Agreement shall commence and complete in accordance with Sections 1-08.4, Notice to Proceed and Prosecution of Work, and 1- 08.5, Time for Completion, of the Contract Documents and Physically Completion of the work shall be achieved within 80 WORKING DAYS, unless Contract Time is extended otherwise in accordance with the Contract Documents.
5) COMPENSATION:
The COUNTY agrees to pay the CONTRACTOR for the work described and completed according to the Contract Documents the sum of [spell out the amount in words and in numbers] ,$ . This sum shall include state sales tax.
6) INDEPENDENT CONTRACTOR:
The CONTRACTOR shall perform the services under this Agreement as an independent CONTRACTOR and not as an agent, employee or servant of the COUNTY. The parties agree that the CONTRACTOR is not entitled to any benefits or rights enjoyed by employees of the COUNTY. CONTRACTOR shall comply with all laws regarding workers’ compensation.
7) DISCRIMINATION AND AMERICANS WITH DISABILITIES ACT (ADA):
The CONTRACTOR agrees to comply with all provisions of the Americans with Disabilities Act and all regulations interpreting or enforcing said Act. The CONTRACTOR agrees to comply with all Federal, State and County laws and regulations in effect pertaining to non-discrimination. Violation of this section may be treated as a breach of this Agreement.
8) LIABILITY FOR NEGLIGENCE:
The CONTRACTOR shall be liable for any additional expenses incurred by the COUNTY as a result of carelessness or negligence on the part of the CONTRACTOR, the CONTRACTOR’s agents, or the CONTRACTOR’s employees. The CONTRACTOR agrees that the COUNTY may deduct such additional costs on its own behalf from monies due, or to become due, to the CONTRACTOR.
9) TERMINATION:
This Agreement may be terminated by the officials or agents of the COUNTY authorized to contract for or supervise the execution of such work in accordance with Section 1-08.10 of the Contract Documents.
10) MODIFICATION
All amendments or modifications, including Change Orders, shall be in writing, signed by both parties consistent with Kitsap County Code, and attached to this Contract.
11) HOLD HARMLESS:
The CONTRACTOR shall indemnify and hold harmless the COUNTY and its officers and employees from, and shall process and defend at its own expense, all claims, demands or suits at law or equity arising in whole or in part from the CONTRACTOR’s performance of any of its obligations under this Agreement; provided that nothing herein shall require the CONTRACTOR to indemnify the COUNTY against and hold harmless the COUNTY from claims, demands, or suits based upon the sole negligence of the COUNTY, its agents, officers, and employees; and provided further that if claims or suits are caused by or result from the concurrent negligence of (a) the CONTACTOR or CONTRACTOR’s agents or employees, and (b) the COUNTY or COUNTY’s agents, officers, or employees, this indemnity provision shall be valid and enforceable only to the extent of the CONTRACTOR’s negligence or the negligence of the CONTRACTOR’s agents or employees.
The CONTRACTOR expressly assumes potential liability for actions brought by the CONTRACTOR’s own employees against the COUNTY; and, solely for the purpose of this indemnification and defense, the CONTRACTOR specifically waives any immunity under the state industrial insurance law, Title 51 RCW. The CONTRACTOR recognizes that this waiver was specifically entered into pursuant to the provisions of RCW 4.24.115 and was subject of mutual negotiation.
12) INSURANCE REQUIREMENTS:
Section 1-07.18 of the Contract Documents shall govern this Agreement.
13) VENUE AND CHOICE OF LAW:
Any action at law, suit in equity, or other judicial proceeding for the enforcement of this contract or any provisions thereof shall be instituted as provided for in RCW 36.01.050. It is mutually understood and agreed that this Agreement shall be governed by the laws of the State of Washington, both as to interpretation and performance.
14) INTEGRATION CLAUSE:
This instrument embodies the entire agreement of the parties. There are no promises, terms, conditions or obligations other than those contained herein; and this Agreement shall supersede all previous communications, representations or agreements, either verbal or written, between parties.
15) AUTHORIZATION:
Each party signing below warrants to the other party, that they have the full power and authority to execute this Agreement on behalf of the party for…