This is a Request for Professional Services (RPS) solicitation issued by Sarasota County, Florida, for Construction Engineering and Inspection (CEI) Services for the Fruitville Road Widening project extending from Debrecen Road to Lorraine Road. The County seeks a qualified professional services firm to provide comprehensive CEI services including project oversight and management, on-site and off-site inspection, materials sampling and testing, and project closeout documentation. The scope of work encompasses full project administration, inspection of contractor activities, verification of materials and construction techniques, maintenance of project records, processing of shop drawings and requests for information, coordination with utility companies, daily reporting with photographs, monthly drone aerial photography, live feed camera services, and certification of final estimates. Proposers must be registered with the Florida Department of Business & Professional Regulation to provide engineering services and must have at least one registered Professional Engineer on staff at the time of submittal. The solicitation requires proposals to be submitted through OpenGov Procurement at https://procurement.opengov.com/portal/scgov, with specific details regarding timeline and submittal dates available on that portal. Short-listed proposers will be required to participate in presentations and interviews either in Sarasota, Florida or virtually at the County's discretion. The County anticipates awarding a CCNA Specific Project Agreement for the duration of the project.

Preferred qualifications include key personnel with experience in roundabout construction, multi-phase construction, and multilane road widening, as well as current Florida Department of Transportation Construction Training Qualification Program certifications in areas such as Advanced Maintenance of Traffic, Earthwork Construction Inspection Level II, Concrete Field Inspector Level II, Quality Control Manager, Final Estimates, and Asphalt Paving Level II certifications. The evaluation process will utilize a Professional Services Review Committee that will score written proposals using a five-point scale (5=Excellent through 0=N/A), conduct presentations with the three highest-scoring proposers, and rank candidates based on written proposals, clarifications, and presentation performance. The proposer ranked first by the committee will be recommended for award. Insurance requirements include Workers' Compensation with $500,000 minimum per accident, Commercial General Liability of $1,000,000 per occurrence/$2,000,000 aggregate with Sarasota County as additional insured, Business Automobile Liability of $1,000,000 combined single limit, and Professional Liability or Errors & Omissions of $1,000,000 per claim/occurrence. All insurance carriers must maintain an A.M. Best's Financial Strength Rating of A- Class VII or better and be licensed in Florida.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROFESSIONAL SERVICES (“RPS”) – PART I

RPS Part I Rev. 02/10/25 Page 1 of 6

RPS #: 262856FB

RPS TITLE: CEI SERVICES FOR FRUITVILLE ROAD WIDENING - DEBRECEN RD. TO

LORRAINE RD.

PURPOSE

In accordance with Section 287.055, Florida Statutes, Sarasota County, a political subdivision of the State of Florida, will receive proposals on the date indicated in OpenGov Procurement (OpenGov), the County’s electronic procurement portal, for the purpose of selecting a qualified Proposer to provide Construction, Engineering, and Inspection (CEI) Services for Fruitville Road Widening from Debrecen Road to Lorraine Road.

Proposers are required to comply with Part II, Scope of Services.

OpenGov is located at https://procurement.opengov.com/portal/scgov

PROPOSER

2.1 For the purposes of this RPS, the term “Proposer” is defined as the legal entity submitting a proposal.

2.2 Proposers intending to submit a bid as a joint venture with another company must provide documentation attesting to the formation of that joint venture with their submittal. For purposes of this solicitation, all vendors who make up the joint venture will be considered together as the Proposer.

QUALIFICATIONS

3.1 The Proposer must be a business organization registered with the Florida Department of Business & Professional Regulation (DBPR) to provide engineering services in the State of Florida at the time of submittal.

3.2 At least one key personnel listed in the Proposal must be a registered Professional Engineer (PE) licensed by the Florida Board of Professional Engineers at the time of submittal.

3.3 Proposals should demonstrate experience providing CEI services in earthwork, roadway construction or reconstruction projects, working in multi-phase construction.

3.4 Preferred Qualifications

3.4.1 At least one Key Personnel listed in the Proposal possesses experience in roundabout construction, multi-phase construction, and multilane road widening.

https://procurement.opengov.com/portal/scgov

RPS Part I Rev. 02/10/25 Page 2 of 6

3.4.2 Key Personnel, as a team, have current Florida Department of Transportation (FDOT) Construction Training Qualification Program (CTQP) certifications and additional certifications as follows (all certifications must be active at the time of submittal):

a. Advanced Maintenance of Traffic (MOT)

b. CTQP Earthwork Construction Inspection Level II

c. CTQP Concrete Field Inspector Level II

d. CTQP Quality Control Manager

e. CTQP Final Estimates I and II

f. Florida Department of Environmental Protection (FDEP) Florida Stormwater, Erosion, and Sedimentation Control Training and Certification Program for Inspector and Contractors.

g. Nuclear Radiation Safety Certification

h. CTQP Asphalt Paving Level II

i. CTQP Asphalt Plant II

MEETINGS & SCHEDULE

An anticipated schedule is provided in the Timeline posted in OpenGov. All meetings will take place at the time, date, and location specified in the solicitation Timeline. Short-listed Proposers should be prepared to attend presentations and/or interviews either in Sarasota, Florida or virtually, at the County’s discretion.

SUBMITTAL INSTRUCTIONS

Refer to the Submittal Instructions section in OpenGov for instructions on how to submit a proposal. Proposers are advised to review the General Terms and Conditions of Solicitations which are available in OpenGov.

VENDOR QUESTIONNAIRE

6.1 All proposers must complete the required forms and information included in the Vendor Questionnaire section of OpenGov. Completed forms and other requested documents must be uploaded with proposer’s submittal in OpenGov. Proposers who fail to complete and upload required forms and documents or fail to provide responses to questions in the Vendor Questionnaire section of OpenGov may be found non-responsive.

RPS Part I Rev. 02/10/25 Page 3 of 6

WRITTEN PROPOSALS

The information requested in each section below will be used by the evaluation committee to evaluate and score written proposals. All proposal documents must be submitted in the Vendor Questionnaire section in OpenGov in the format requested.

7.1 Ability of Professional Personnel

7.1.1 Single page letter of interest summarizing Proposer’s

qualifications.

7.1.2 Required and preferred licenses and certifications.

7.1.3 Resumes of key personnel, including subconsultants, demonstrating individual qualifications and experience.

7.2 Proposer’s Past Performance & Experience

7.2.1 Complete the Summary of Professional Experience &

Capabilities Form in the Vendor Questionnaire section of OpenGov). Projects submitted should demonstrate the experience of the Proposer, subcontractor(s), and current team members who may have worked for other firms on similar projects and provide detailed information regarding the Proposer’s capabilities, project management techniques, and project controls.

7.3 Approach

7.3.1 Project Approach – Provide a detailed project approach that includes, but is not limited to the following:

a. Project management techniques, controls, program and technologies to be employed to meet project schedule and budget requirements.

b. Assignment of personnel to provide the most efficient service.

c. Where elements of the work will be performed, and who in the organizational chart will oversee performance of the work to provide the most efficient services.

d. Anticipated impacts of the Proposer’s current and projected workload on the project.

e. Detailed information explaining how location of the firm, key personnel and sub-contractors will affect project, RPS Part I Rev. 02/10/25 Page 4 of 6 including how impact of any physical distance will be mitigated through the use of technology, processes or other means.

7.3.2 Workload

Complete the Current & Projected Workload Form (in the Vendor Questionnaire section of OpenGov) to identify active and awarded projects.

7.3.3 Organization

a. Provide an organizational chart delineating personnel assigned to the project (including subconsultants).

b. Provide an organizational chart showing the corporate management structure of the Proposer.

7.3.4 Schedule/Timeline

Provide a graphical representation of the proposed project schedule/timeline indicating major milestones and deliverables.

SELECTION PROCESS

8.1 Written Proposals

8.1.1 All timely responses meeting the criteria set forth in this RPS will be considered by the County.

8.1.2 Written proposals will be evaluated and scored by the

Professional Services Review Committee (PSRC) using the evaluation criteria in the Evaluation Criteria section of OpenGov.

8.1.3 When evaluating written proposals, the PSRC will use the scale below to score each criterion. Only whole numbers are to be used when scoring. Scores will be given weight as indicated in the evaluation criteria in OpenGov.

Score Description

5 Excellent

4 Very Good

3 Good

2 Satisfactory

RPS Part I Rev. 02/10/25 Page 5 of 6

1 Unsatisfactory

0 N/A

8.2 Presentations

The PSRC will conduct discussions with, and may require public presentations by, no fewer than the three (3) highest scoring Proposer

8.3 Ranking

Following discussions or presentations, the PSRC will rank the short-listed Proposers. When ranking short-listed Proposers, the PSRC will consider information contained in the written proposals, clarifications (if any), and information provided during discussions or presentations.

Ranking shall be determined without regard to the score established as a result of the evaluation of written proposals.

8.4 Recommendation of Award

The Proposer ranked first by the PSRC will be recommended for award.

AWARD

9.1 It is the intent of the County to award a contract to the Proposer(s) who, in the sole opinion of the County, is most qualified to perform the scope of services required.

9.2 In the event of a tie the tie-breaking procedures identified in the Sarasota County Procurement Manual will apply.

9.3 Local preference as defined in the Procurement Code section 2-215 is not applicable to this solicitation.

9.4 Contract

A draft of the contract that the successful Proposer(s) will be expected to sign (a CCNA Specific Project Agreement) is posted on the Procurement website, shown below. The County may, in its sole discretion, select a different contract type or make revisions to the one referenced above following the recommended award of this solicitation.

https://www.scgov.net/government/procurement/contract-templates

CONFLICT OF INTEREST

10.1 Any Proposer who has drafted any portion of a scope of work or specifications for a project, or any entity which provides material assistance to such Proposer in such work, shall be ineligible to compete for the contract for design or construction of that project.

RPS Part I Rev. 02/10/25 Page 6 of 6

10.2 Selected Proposers, either directly or through an affiliate, may not have a business relationship with any entity to perform work related to a work assignment issued under any resulting contract

CHANGES IN PROJECT TEAM

11.1 A change in the project team of a Proposer after the submission of a proposal could result in reconsideration of the scoring of applicable evaluation criteria, at the sole discretion of the County.

11.2 Any changes in the Proposer’s Key Personnel must be brought to the attention of Procurement as soon as possible after the change is made.

The changes, the reasons for the changes, and resumes for the individuals being substituted for an original project team member, must be submitted to the Procurement Analyst identified in the Solicitation Summary prior to the scheduled evaluation committee meeting.

11.3 Decreases in scoring may result from the reconsideration of changes in the project team of a Proposer. No increases in scoring will result from the reconsideration of changes in the project team of a Proposer.

11.4 After recommendation of award, the successful Proposer shall not be allowed to substitute project team members named in this proposal without the prior written permission of the County. Substitution may, in the sole opinion of the County, be grounds for cancellation of a recommended award, or termination of agreement.

REUSE OF EXISTING PLANS

The plans on this project are subject to reuse in accordance with Section 287.055 (10), Florida Statutes.

(END OF PART I)

PART II

SCOPE OF SERVICES

Prepared by Capital Projects Department Part II - Page 1 of 4

1. Description of Project

The County is requesting Construction Engineering and Inspection (CEI) Services including verification testing services which are required for inspection, and materials sampling and testing for Fruitville Road Widening – Debrecen Road to Lorraine Road Project.

2. Scope of Services

Consultant shall provide CEI services which may include, but are not limited to:

A. Project Oversight and Management:

i. Provide inspection services and services deemed necessary for the successful completion and closure of the work performed by the contractor and their subcontractors on the County construction contract.

ii. Provide the required level of surveillance of contractor activities and work to determine the progress and quality of work.

iii. Identify discrepancies and note any significant omissions, substitutions, defects, or deficiencies in the work of the contractor.

Inform and consult with the County on the best course of action to resolve such omissions, substitutions, defects, or deficiencies. Direct and monitor the contractor to resolve the corrective actions.

Document and report all details of each corrective action and its associated resolution to the County.

iv. Maintain complete and accurate records of all activities and events relating to the construction project and properly document all project changes.

v. Maintain complete and accurate records of the contractor's daily operations and of significant events that affect the work of activities both on-site and off-site.

vi. Lead all project meetings including providing agenda and meeting minutes.

vii. Interpret plans, specifications, and special provisions for the construction contract(s) associated with this project.

viii. Inspect materials entering into the work in accordance with the plans, specifications, and special provisions for the construction contract to determine if the project is constructed in conformity with those documents.

ix. Process and review shop-drawings for construction project.

Prepared by Capital Projects Department Part II - Page 2 of 4

x. Process Requests for Information (RFI) or Requests for Modification

(RFM).

xi. Process Claim Analysis and extra work cost-estimations.

xii. Conduct baseline project schedule analysis and provide written response.

xiii. Conduct monthly project schedule update analysis and provide written response.

xiv. Perform verification of contractor’s monthly pay estimates, resolve any disputed quantities, and provide final concurrence within three days after the monthly cut-off.

xv. Perform coordination with utility companies, and adjacent property owners.

xvi. Prepare one Daily Report of Construction including photographs for each inspector(s) assigned to the project, for every calendar day of the project.

xvii. Provide drone services for aerial photography monthly or for each monthly cut-off.

xviii. Prepare Sarasota County Communication Update, one week look ahead.

xix. Provide two live feed cameras at a specified location according to the Construction Project Manager. The county shall have access to the live feed 24/7.

B. On-site Inspection:

i. Monitor and inspect contractor’s work zone traffic control plan and review modifications to the work zone traffic control plan, including alternate work zone traffic control plan, in accordance with the County’s procedures. Consultant employees performing such services shall be qualified in accordance with the Florida Department of Transportation’s (FDOT) procedures.

ii. Verify all construction activity, materials, and construction techniques to ensure that the project is built according to applicable specifications.

C. Off-site Inspection:

i. Monitor contractor's construction activities off-site (casting yards, borrow pits, manufacturers facilities, asphalt plant, etc.) as directed and inspect materials being used in the work to ensure accordance

Prepared by Capital Projects Department Part II - Page 3 of 4 with the plans, specifications, and special provisions of the construction contract.

ii. Perform the inspection and verification of materials on hand at the contractor or fabricator yard. Consultant employees shall verify the quantities of stored materials to the quantities provided by contractor.

D. Sampling and Testing:

i. Perform sampling and testing of component materials and completed work in accordance with the contract documents listed in the construction contract. The minimum sampling frequencies set out in the FDOT's Materials Sampling, Testing and Reporting Guide shall be met. In complying with the aforementioned guide, provide daily surveillance of the contractor's quality control activities and perform the sampling and testing of materials and completed work items for verification and acceptance.

ii. Perform inspection and sampling of materials and components at the asphalt plant and of materials normally done in a laboratory remote from the project site.

iii. Determine the acceptability of all materials and completed work items on the basis of either test results or verification of a certification.

iv. The County may monitor the effectiveness of Consultant's testing procedures through observation and independent assurance testing.

v. Sampling, testing and laboratory methods shall be as required by the County’s and FDOT's Standard Specifications, Supplemental Specifications or as modified by the Special Provisions of the construction contract.

E. Certifications

i. The Proposer must maintain the certifications they submit in their proposal among its team for the life of the resulting contract.

ii. Consultant’s staff preparing the Certified Final Estimate shall be Construction Training qualifications Program’s Final Estimates Level II certified.

F. Close-out

i. Submit project documents electronically into the County’s Project Management Information System and file in accordance with

Prepared by Capital Projects Department Part II - Page 4 of 4

County procedures and Consultant’s approved Quality Assurance (QA) Plan.

ii. Project documents shall be uploaded on a continuous, real-time basis and shall be completed within 15 calendar days of Final Acceptance of the construction contract. Examples of closeout documents are as-builts, project photographs, pipe video, field books, asphalt LOT packages, National Pollution Discharge Elimination System Inspections, Earthwork Density Logs, Change Orders/Interim Field Change Agreements, Plan sheet revisions, shop drawings, mix designs, claims, manual, warranties, and general correspondence.

(END OF PART II)

PART III – INSURANCE REQUIREMENTS

Insurance Template 1 Revised 05/13/16 Page 1 of 2

CONTRACTOR’S INSURANCE

Contractor shall, on a primary basis and at its sole expense, maintain in full force and effect, at all times during the life of this Contract, insurance coverage (including endorsements) and limits as described herein. These requirements, as well as the County’s review or acceptance of insurance maintained by Contractor, are not intended to and shall not in any manner limit or qualify the liabilities or obligations assumed by Contractor under this Contract.

Insurance requirements itemized in this Contract and required of the Contractor shall extend to all subcontractors to cover their operations performed under this Contract.

The Contractor shall be responsible for any modifications, deviations, or omissions in these insurance requirements as they apply to subcontractors.

Insurance carriers providing coverage required herein must be licensed to conduct business in the State of Florida and must possess a current A.M. Best’s Financial Strength Rating of A- Class VII or better.

Each insurance policy required by this Contract shall apply separately to each insured against whom claim is made and suit is brought, except with respect to limits of the insurer’s liability.

The Contractor shall be solely responsible for payment of all premiums for insurance contributing to the satisfaction of this Contract and shall be solely responsible for the payment of all deductibles and retentions to which such policies are subject.

Contractor shall furnish Certificates of Insurance to the County Administrative Agent evidencing the types and amounts of coverage, including endorsements, required by this Contract prior to commencement of work and prior to expiration of the insurance contract, when applicable. Such Certificate(s) of Insurance shall, to the extent allowable by the insurer, include a minimum thirty (30) day notice of cancellation (10 days for non-payment of premium) or non-renewal of coverage. Notwithstanding these notification requirements, the Contractor will be required to provide County with 5-day prior written notice of any policy cancellation or non-renewal.

The County reserves the right to review, modify, reject, or accept any required policies of insurance, including limits, coverage, or endorsements, herein from time to time throughout the term of this Contract. County reserves the right, but not the obligation, to review and reject any insurer providing coverage due to its poor financial condition or failure to operate legally.

A. WORKERS’ COMPENSATION: Contractor agrees to maintain Workers’ Compensation insurance in accordance with Florida Statutes, Chapter 440.

Employers Liability to be included with a minimum limit of $500,000.00 per accident/per disease/per employee. If work is to be performed over or adjacent to navigable water and involves maritime exposure, applicable LHWCA, Jones Act, or other maritime law coverage shall be included.

PART III – INSURANCE REQUIREMENTS

Insurance Template 1 Revised 05/13/16 Page 2 of 2

In the event the Contractor has “leased” employees, the Contractor or the employee leasing company must provide evidence of a Workers’ Compensation policy for all personnel on the worksite.

Contractors who are exempt from Florida’s Workers’ Compensation law must provide proof of such exemption issued by the Florida Department of Financial Services, Bureau of Workers’ Compensation.

B. COMMERCIAL GENERAL LIABILITY: Contractor agrees to maintain Commercial General Liability per ISO form CG0001 or its equivalent, including but not limited to coverage for premises and operations, personal injury, products & completed operations, liability assumed under an insured contract, and independent contractors with limits of not less than $1,000,000.00 each occurrence, $2,000,000.00 aggregate covering all work performed under this Contract.

Contractor agrees to endorse Sarasota County Government as an additional insured on the Commercial General Liability coverage.

C. BUSINESS AUTOMOBILE LIABILITY: Contractor agrees to maintain Business Automobile Liability with limits not less than $1,000,000.00 combined single limit for each accident covering all Owned, Non-Owned & Hired automobiles used in the performance of this Contract. In the event Contractor does not own automobiles, Contractor agrees to maintain coverage for Hired & Non-Owned Auto Liability, which may be satisfied by way of endorsement to the Commercial General Liability policy or separate Business Auto Liability policy. Contractor agrees to endorse Sarasota County Government as an additional insured on the Business Automobile Liability coverage.

If the Contractor is shipping a product via common carrier, the contractor shall be responsible for any loss or damage sustained in delivery/transit.

D. PROFESSIONAL LIABILITY: Consultant agrees to maintain Professional Liability insurance, or equivalent Errors & Omissions Liability insurance, with limits not less than $1,000,000 per claim/occurrence and in the aggregate for professional services rendered under this contract. If coverage is written on a claims-made basis: a. Any retroactive date shall precede the effective date of this contract; b. Consultant shall provide certificates of insurance evidencing the required coverage for a period of two years after final payment under this contract is made, or provide evidence showing Consultant has obtained a two year extended reporting period endorsement.