This is a Notice of Intent to Bid solicitation document issued by Connecticut's Department of Administrative Services/Construction Services (DAS/CS) on behalf of the Connecticut Department of Correction (DOC) for housing unit renovations at Manson Youth Institution located at 42 Jarvis Street, Cheshire, Connecticut, under Solicitation Number 2627BIJA509 (BI-JA-509). The project follows a two-round bidding process, with Round 1 closing December 1, 2026 at 10:00 a.m. EST and Round 2 closing January 21, 2027 at 10:00 a.m. EST. A mandatory pre-bid meeting is scheduled for December 8, 2026 at 9:00 a.m., and attendance with proper registration is required for bid acceptance; failure to attend results in automatic rejection as non-responsive. Specifications and drawings will be provided only to Round 1-qualified bidders prior to the mandatory meeting. The solicitation accepts vendor questions from November 10, 2026 through December 1, 2026 at 9:45 a.m. EST. A maximum of two persons per company are permitted to attend the pre-bid meeting, and each attendee requires DOC security clearance through completion of a Security Background Questionnaire.
Bidders must obtain a Certificate of Legal Existence from the Connecticut Secretary of State and agree to five confidentiality certification provisions restricting use and disclosure of project documents. Bids exceeding $1,000,000 require current prequalification status. The selected contractor must comply with Connecticut General Statutes Sections 4a-60, 4a-60g, and 46a-68b through 46a-68f, including meeting minimum spending allocation goals for subcontractors holding current DAS certification, with demonstrated good faith effort required. Payment terms are Net 30 days. The contact for this solicitation is Ryan Davis, DAS Construction Services, 450 Columbus Blvd, Hartford, Connecticut 06103, Ryan.Davis@ct.gov. The estimated total value is not specified in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2627BIJA509_Nov_12_26_solicitation_doc.pdf | ||
| 2627BIJA509_Nov_11_26_solicitation_doc.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 2627BIJA509
Notice of Intent to Bid for DAS Construction Services
DAS-CS Invitation to Bid (CITB)
DAS Construction Services
November 10, 2026 - December 01, 2026
Page:2
General Header Information
2627BIJA509
No. 2627BIJA509 Title: Notice of Intent to Bid for DAS Construction Services Start Date: November 10, 2026 at 10:00:00 AM EST End Date: December 01, 2026 at 10:00:00 AM EST Vendor Q&A Start Date: November 10, 2026 at 10:15:00 AM EST Vendor Q&A End Date: December 01, 2026 at 9:45:00 AM EST Estimated Total Value:
Who can respond to this bid? : All Vendors Description: Manson Youth Institution Housing Unit Renovations
42 Jarvis Street Cheshire, CT, 06410
BI-JA-509
Delivery Terms: N/A: Not Applicable Payment Terms: Net 30 Days
Page:3
Contact Information: DAS Construction Services Ryan Davis 450 Columbus Blvd Hartford CT, 06103 United States Ryan.Davis@ct.gov
FREQUENTLY ASKED QUESTIONS:
Where can I find the Specifications and Drawings for Department of Correction (DOC) Projects?
The Specifications and Drawings will be made available to the qualified General Contractors who successfully complete Round 1 of the Invitation to Bid and attend the Mandatory Meeting. Once the Mandatory Meeting is concluded, Round 2 of the bid will be posted on CTsource and the Specifications and Drawings will be made available to the qualified General Contractors who attended the Mandatory Meeting.
Commission on Human Rights and Opportunities:
The contractor who is selected to perform this State project must comply with Connecticut General Statutes Sections (C.G.S. §§) 4a-60, 4a-60g, and 46a-68b through 46a-68f. State law requires a minimum spending allocation goal of the state-funded portion of the contract for award to subcontractors holding current certification from DAS under the provisions of C.G.S. § 4a-60g. The contractor must demonstrate good faith effort to meet the spending allocation goals.
Why Can’t I Click “Select” and “Accept” in the Solicitation?
You need to select “Add New Response” and create a Quote (which you can rename) in order to “Select” and “Accept” the boxes next to the documents. If you do not see the “Attach Documents” tab, not all Solicitation Documents have been opened and accepted on the “Overview” tab.
Does My Firm Need To Be Prequalified To Bid?
All bids greater than $1,000,000 require a bidder to be currently prequalified. To find the specific prequalification requirements for a project, see page 1 of the Invitation to Bid. The Invitation to Bid can be downloaded from the DAS Construction Services Bid Board on CTsource (https://portal.ct.gov/DAS/Construction-Services/BidBoard).
How Do I Find The List of Plan Holders?
Go to the DAS Construction Services Bid Board (https://portal.ct.gov/DAS/Construction-Services/BidBoard) and select the “View Plan Holder List”.
How Do I Find The Pre-Bid Site Meeting Attendance List?
The Pre-Bid Site Meeting Attendance List will be provided in an addendum to the solicitation. To find the addendums for a solicitation, go to the DAS Construction Services Bid Board (https://portal.ct.gov/DAS/Construction-Services/BidBoard), scroll down and click on the appropriate solicitation, and click on the link(s) for the addendums. If there are no addendums, then the Pre-Bid Meeting has not yet taken place.
How Do I Find The Bid Tab (and Bids) After The Bid Has Closed?
Go to the DAS Construction Services Bid Board
Page:4
(https://portal.ct.gov/DAS/Construction-Services/BidBoard), scroll down and click on the appropriate solicitation, and click on the “View Award Report” in the top right corner, located next to the “Print/Download solicitation summary”. The Bid Tab Sheet will be available under “Award Documents”. Individual bid documents will be available under “Vendor Attachments”. Note: If “View Award Report” is not available, then it has not yet been published – check back later in the day.
Page:5
Contact Details: If you have any questions, please contact:
Ryan Davis 450 Columbus Blvd Hartford CT, 06103 United States Ryan.Davis@ct.gov
FREQUENTLY ASKED QUESTIONS:
Where can I find the Specifications and Drawings for Department of Correction (DOC) Projects?
The Specifications and Drawings will be made available to the qualified General Contractors who successfully complete Round 1 of the Invitation to Bid and attend the Mandatory Meeting. Once the Mandatory Meeting is concluded, Round 2 of the bid will be posted on CTsource and the Specifications and Drawings will be made available to the qualified General Contractors who attended the Mandatory Meeting.
Commission on Human Rights and Opportunities:
The contractor who is selected to perform this State project must comply with Connecticut General Statutes Sections (C.G.S. §§) 4a-60, 4a-60g, and 46a-68b through 46a-68f. State law requires a minimum spending allocation goal of the state-funded portion of the contract for award to subcontractors holding current certification from DAS under the provisions of C.G.S. § 4a-60g. The contractor must demonstrate good faith effort to meet the spending allocation goals.
Why Can’t I Click “Select” and “Accept” in the Solicitation?
You need to select “Add New Response” and create a Quote (which you can rename) in order to “Select” and “Accept” the boxes next to the documents. If you do not see the “Attach Documents” tab, not all Solicitation Documents have been opened and accepted on the “Overview” tab.
Does My Firm Need To Be Prequalified To Bid?
All bids greater than $1,000,000 require a bidder to be currently prequalified. To find the specific prequalification requirements for a project, see page 1 of the Invitation to Bid. The Invitation to Bid can be downloaded from the DAS Construction Services Bid Board on CTsource (https://portal.ct.gov/DAS/Construction-Services/BidBoard).
How Do I Find The List of Plan Holders?
Go to the DAS Construction Services Bid Board (https://portal.ct.gov/DAS/Construction-Services/BidBoard) and select the “View Plan Holder List”.
How Do I Find The Pre-Bid Site Meeting Attendance List?
The Pre-Bid Site Meeting Attendance List will be provided in an addendum to the solicitation. To find the addendums for a solicitation, go to the DAS Construction Services Bid Board (https://portal.ct.gov/DAS/Construction-Services/BidBoard), scroll down and click on the appropriate solicitation, and click on the link(s) for the addendums. If there are no addendums, then the Pre-Bid Meeting has not yet taken place.
How Do I Find The Bid Tab (and Bids) After The Bid Has Closed?
Go to the DAS Construction Services Bid Board
Page:6
(https://portal.ct.gov/DAS/Construction-Services/BidBoard), scroll down and click on the appropriate solicitation, and click on the “View Award Report” in the top right corner, located next to the “Print/Download solicitation summary”. The Bid Tab Sheet will be available under “Award Documents”. Individual bid documents will be available under “Vendor Attachments”. Note: If “View Award Report” is not available, then it has not yet been published – check back later in the day.
Selected Categories:
Page:7
Header Custom Fields:
2627BIJA509
DAS Construction Services – Response Requirements For This Solicitation
DOC PROJECTS: REQUIREMENTS TO BID:
Page:8
SUMMARY OF REQUIREMENTS:
INVITATIONS TO BID FOR DEPARTMENT OF CORRECTION (DOC) PROJECTS:
This Invitation to Bid has been issued by the Connecticut Department of Administrative Services /
Construction Services (DAS/CS) on behalf of the Connecticut Department of Correction (DOC).
ROUND 1 END DATE AND TIME: December 1, 2026 at 10:00AM
MANDATORY PRE-BID MEETING DATE AND TIME:December 8, 2026 at 9:00AM
ROUND 2 END DATE AND TIME: January 21, 2027 at 10:00AM
There will be TWO ROUNDS of this DOC Invitation to Bid on CTsource:
ROUND 1: AGREEMENTS AND ATTACHMENTS:
You must respond to ROUND 1 prior to the end date and time of ROUND 1. If your responses to
ROUND 1 are acceptable, you will be invited to ROUND 2.
1.1 DOC SECURITY BACKGROUND QUESTIONNAIRE: AS SOON AS POSSIBLE: Go to the CT DOC website and download the “Security Background Questionnaire”
(https://portal.ct.gov/DOC, scroll down and click on “Forms”). Complete and submit the form as directed, and obtain approval, otherwise you will not be accepted into the Mandatory Pre-Bid
Meeting. This can take up to three to four weeks. It is recommended that the approved form be brought as evidence to be accepted into the Mandatory Pre-Bid Meeting.
Security clearance is required FOR EACH PERSON to enter the facility for the Mandatory Pre-Bid
Meeting. There is a MAXIMUM 2-person per company limit. Any attending subcontractors must submit their own form(s) and attend as a “contractor”. If a person is not cleared, they will not be admitted to the facility for the tour. Read the “00 73 63 Connecticut Department of Correction (CT
DOC) Security Requirements” in Division 00.
https://portal.ct.gov/DOC
Page:9
1.2 CERTIFICATE OF LEGAL EXISTENCE: AS SOON AS POSSIBLE: Obtain a copy of your firm’s Certificate of Legal Existence (issued within one year) from the Connecticut Secretary of the State. Go to https://business.ct.gov/knowledge-base/articles/certificate-of-legal-existence-forms-and-fees and log in to Business.CT.gov. You must have a Business.CT.gov account before you can log in. Select “Verify or obtain a certificate” > “Obtain a Certificate of Legal Existence”.
Questions should be directed to https://business.ct.gov/business-services/business-forms-and-fees.
1.3 CONFIDENTIALITY CERTIFICATION PROVISIONS: Read the five (5) Confidentiality
Certification Provisions:
CERTIFICATION PROVISION 1: The Contractor agrees that if not selected as the Prime
Contractor for this project, all plans and specifications in their possession for the project shall be destroyed.
CERTIFICATION PROVISION 2: The Contractor further agrees on behalf of the Contractor and the Contractor's principals, employees, agents, heirs, successors and assigns that they shall only utilize drawings, specifications, maps, reports, records or other documents to the extent necessary for the performance of the Contractor's work and duties under this contract. This limitation on use applies to those items produced by the Contractor, as well as to those items received by the
Contractor from the Awarding Authority or others in connection with the Contractor's work and duties under this contract.
CERTIFICATION PROVISION 3: The Contractor further agrees that said drawings, specifications, maps, reports, records and other documents may not be released to any other entity or person except for the sole purpose of the work described in this contract. No other disclosure shall be permitted without the prior written consent of the Awarding Authority.
CERTIFICATION PROVISION 4: The Contractor further agrees that the following provision will be included in all of its contracts with subcontractors and sub-consultants:
“Any and all drawings, specifications, maps, reports, records or other documents associated with the contract work shall only be utilized to the extent necessary for the performance of the work and duties under this contract. Said drawings, specifications, maps, reports, records and other documents may not be released to any other entity or person except for the sole purpose of the work described in this contract. No other disclosure shall be permitted without the prior written consent of the Awarding Authority. When the Awarding Authority deems any such drawings, specifications, maps, reports, records or other documents are no longer needed, they shall be destroyed.”
http://business.ct.gov/knowledge-base/articles/certificate-of-legal-existence-forms-and-fees http://business.ct.gov/knowledge-base/articles/certificate-of-legal-existence-forms-and-fees http://business.ct.gov/business-services/business-forms-and-fees http://business.ct.gov/business-services/business-forms-and-fees
Page:10
CERTIFICATION PROVISION 5: The Contractor further agrees that upon completion of the construction and the issuance of a certificate of occupancy, the plans and specifications shall be returned to the Awarding Authority, or destroyed, or retained in a secure location and not released to anyone without first obtaining the permission of the Awarding Authority.
1.4 QUESTIONNAIRE TAB: On the “Questionnaire” tab in the CTsource solicitation, select
“Yes” to agree to the Confidentiality Certification Provisions and “Yes” to agree that you have attached a recent copy of your Firm’s Certificate of Legal Existence.
SAVE the Questionnaire.
NOTE: The option to attach a document will be activated once you save the Questionnaire.
1.5 ATTACHMENTS TAB: On the “Attachments” tab in the CTsource solicitation, upload your firm’s Certificate of Legal Existence. (It is not necessary to upload your firm’s DOC Security
Background Questionnaire.)
1.6 DEADLINE FOR ROUND 1: Submit your agreements and attachments prior to the end date and time of ROUND 1.
ROUND 2: SPECIFICATIONS, DRAWINGS, MANDATORY PRE-BID MEETING, AND BIDDING
DOCUMENTS:
2.1 SPECIFICATIONS AND DRAWINGS: Bidders who submit acceptable responses to
ROUND 1 will be invited to ROUND 2 via an email from CTSource titled “SOLICITATION NEW
ROUND NOTIFICATION” and will be able to download the full set of Specifications and
Drawings.
2.2 MANDATORY PRE-BID MEETING: Accepted bidders will be invited to attend the
Mandatory Pre-Bid Meeting via an email from CTSource titled “ROUND 2: DAS
CONSTRUCTION SERVICES INVITATION TO BID AND MANDATORY PRE-BID MEETING”.
Additional details will be provided in the email and in Section 00 25 13 Pre-Bid Meeting Agenda.
DOC SECURITY CLEARANCE FORM: It is recommended that the approved Security Clearance
Form from the DOC be brought as evidence to be accepted into the Mandatory Pre-Bid Meeting.
Page:11
PROPERLY REGISTER PRIOR TO START TIME AND ATTEND MEETING: Properly register means that the prospective bidder must sign his or her name to the official roster and list the name and address of the company he or she represents on the official roster no later than the designated start time of the MANDATORY Pre-Bid Meeting. Bidders are advised to register early as no attendee will be allowed to register after the advertised start time of the MANDATORY
Pre-Bid Meeting. Bidders must attend the Mandatory Pre-Bid Meeting in order to submit their bidding documents. All bids submitted by contractors who have not properly registered and attended the MANDATORY Pre-Bid Meeting shall be rejected as non-responsive.
2.3 BIDDING DOCUMENTS: Bidding documents will be made available in CTsource when
ROUND 2 opens. Bidding documents will only be accepted from bidders who (1) were invited to
ROUND 2, (2) who properly registered at, and attended, the Mandatory Pre-Bid Meeting, and (3) who uploaded their bidding documents prior to the end date and time of ROUND 2.
2.4 DEADLINE FOR ROUND 2: Submit your bidding documents prior to the end date and time of ROUND 2.
Page:12
Questionnaire:
2627BIJA509
YOU MUST RESPOND TO THE FOLLOWING QUESTIONS:
Description: ANSWER THE FOLLOWING QUESTIONS:
QUESTION: DO YOU AGREE TO THE CONFIDENTIALITY
CERTIFICATION PROVISIONS? (See the “Overview” tab)
Type YES/NO Is Required Y
QUESTION: HAVE YOU ATTACHED YOUR FIRM’S CERTIFICATE
OF LEGAL EXISTENCE? (The option to attach a document will be activated once you save the Questionnaire)
Type YES/NO Is Required Y
Page:13
Documents:
BI-JA-509 DIVISION 00 and 01 SPECIFICATIONS.pdf
BI-JA-509 DOC BID REQUIREMENTS.pdf
Page:14
Item Specifications Solicitation has been designated as having no line items.
Page:15
File details come from the government source that posted it. Updated .