About this file
This document contains the architectural drawings and specifications for the repair of racquetball courts in Building S-1715 at Camp Casey. The key details are:
The scope of work includes replacing deteriorated ceiling panels, wall panels, lighting fixtures, and HVAC diffusers. It also requires grinding and refinishing the existing wood flooring and replacing thresholds. The drawings provide the floor plan, interior finish schedule, and construction details for these repairs.
The related federal contract opportunity is Solicitation W90VN824R0071 issued by the Department of the Army Materiel Command Army Contracting Command for the "MATOC Racquetball Court Repair Casey" project. The contract requires the contractor to provide all necessary resources to perform the repair work in accordance with the provided Statement of Work, specifications, and drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN924R0071_SF30.pdf | ||
| Solicitation_0071.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.
T - 1
RING NO. DESCRIPTION OF DRAWINGS
TITLE SHEET
DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
TITLE SHEET
T-1
A - 1
A - 2
ARCHITECTURAL
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
FLOOR PLAN, GENERAL NOTES AND SCOPE OF WORK
SECTION DETAIL, INTERIOR FINISH SCHEDULE AND MATERIAL SCHEDULE
262280
BLDG. S-1715
REPAIR RACQUETBALL COURTS
CAMP CASEYKIM, YK
BLDG. S-1715
REPAIR RACQQUETBALL COURTS
FEWR NO. 262280, CP CASEY
MANUFACTURES INDICATED.
PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE
COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING IDENTIFICATION 1.
ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE (COR).
CAUSED BY THIS PROJECT AND SHALL REPAIR THE DAMAGES TO MATCH UP TO
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO EXISTING AREAS
FOR APPROVAL.
CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITION AND SUBMITED TO COR
CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE PREPARED AT THE SITE BY THE
SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE WITH THE FIELD
8.
FOR APPROVAL.
CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP DRAWINGS TO COR
2.
3.
4.
5.
6.
7.
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT. THE GENERAL
AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION
ADDITIONAL COST TO THE GOVERNMENT.
EQUIPMENT, ETC), ELECTRICAL, TELEPHONE AND FIRE ALARM SYSTEM WITHOUT
THE INSTALLATION AND/OR REPLACEMENT OF MECHANICAL (PLUMBING, HEATING,
ITEMS, CUT, PATCH AND RESTORE WALLS, FLOORS AND CEILING WHERE REQUIRED FOR
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVE/REINSTALL ANY OBSTRUCTED
GENERAL NOTES
1.
2.
SCOPE OF WORKS (ARCHITECTURAL WORKS)
REPAIR / MAINTENANCE (K) WORKS
SCALE: 1/100
A-1
ARCHITECTURAL
COURT DESIGN WILL BE FOLLOWED AS CURRENT FLOOR DESIGN AND GYM MANAGER.
W
W
D D
FEC
,5
,5
,5
,5
6,096
9144,267914
FLOOR PLAN @ RACQUETBALL COURT
,1
14' 3'3'
ON THE WALL
NO LINES AREA ALLOWED
AND SOLID RED IN COLOR
ALL LINES ARE 1.5" WIDE
ROOM NO. 112
RACQUETBALL COURT
KEY PLAN @ BLDG S-1715
CLEAN EXST GLASS WALL & DOOR
ON EACH EDGES
REPLACE SEALANT CAULKING
7.
262280
BLDG. S-1715
REPAIR RACQUETBALL COURTS
CAMP CASEYKIM, YK
3.
CLEAN EXISTING GLASS WALL AND GLASS DOOR.4.
5.
ON FLOOR PLAN.
REPLACE DETERIORATED EXSITING SEALNT CAULKING WITH NEW FOR ALL EDGES AS SHOWN
COMPONENTS AS SHOWN ON FLOOR PLAN, DETAIL DRAWINGS & INTERIOR FINISH SCHEDULE.
INCLUDING NEW SUSPENDED CEILING SYSTEM, METAL FRAMINGS AND ASSOCIATED
REPLACE DETERIORATED EXISTING CEILING PANELS FOR RACQUET BALL COURT WITH NEW
REPLACE DETERIORATED EXSITING LINEAR SLOT DIFFUSERS WITH NEW.6.
RACQUETBALL COURT LIGHTING FIXTURES. (7 SETS, 2' X 2', 117 WATTS @ 12,075 LUMENS )
REPLACE DETERIORATED EXSITING LIGHTING FIXTURES WITH NEW IMPACT RESISTANT LED
REPLACE EXST WALL PANEL & CEILING PANEL
APPLY URETHANE FINISH
GRIND WOODEN FLOORING &
REPLACE THRESHOLDS
PER REGULATIONS AS SHOWN ON FLOOR PLAN & INTERIOR FINISH SCHEDULE.
APPLY URETHANE FINISH PER MANUFACTURERS SPECIFICATIONS AND LINE MARKING
GRIND THE EXISTING WOOD FLOORING TO FLATTEN THE PEELED SURFACES AND
AS SHOWN ON FLOOR PLAN, DETAIL DRAWINGS & INTERIOR FINISH SCHEDULE.
INCLUDING NEW METAL STUDS, METAL CHANNELS AND ASSOCIATED COMPONENTS
REPLACE DETERIORATED EXISTING WALL PANELS FOR RACQUET BALL COURT WITH NEW
AND SCOPE OF WORK
FLOOR PLAN, GENERAL NOTES
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SCALE: 1/2
6 THK OPENING FOR AIR VENT
EXST CONCRETE SLAB
A-2
ARCHITECTURAL
262280
BLDG. S-1715
REPAIR RACQUETBALL COURTS
CAMP CASEYKIM, YK
ROOM NAMES
INTERIOR FINISH SCHEDULE
FLOOR BASE WALLS CEILING
FINISH COLOR FINISH COLOR FINISH COLOR FINISH COLOR HEIGHT
MAT'L
EXST
MAT'L
NEW
MAT'L
EXST
MAT'L
NEW
MAT'L
EXST
MAT'L
NEW
MAT'L
NEW
MAT'L
EXST
6100WF - CP
FLOOR MATERIAL/COLOR
UT-1
OR APPROVED EQUAL
RACQUETBALL COURT
REMARKS
ROOM NOS
- - - - GLASS/WP CP
FINISH SCHEDULE NOTES :
PAINT -/WP -/F.F. F.F.
SCALE:
PICTURES
N/A
APPLY URETHANE FINISH
GRIND WOODEN FLOORING &
CEILING PANEL
REPLACE EXST WALL PANEL &
REPLACE LINEAR SLOT DIFFUSERS REMAIN EXST SPRINKLER HEADS
* IMPACT RESISTANT TYPE (LED)
REPLACE LIGHTING FIXTURES
WALL MATERIAL/COLOR
WP-1
OR APPROVED EQUAL
ALLIED PRODUCTS, LLC
: CEILING PANELCP-1
ALLIED PRODUCTS, LLC
THE MANUFACTURERS STANDARD MUST APPROACH.
THE SELECTIONS SERVE ONLY TO INDICATE THE COLOR WHICH
COLOR IS NOT REQUIRED.
OF PRODUCTS. AN EXACT MATCH OF THE MANUFACTURERS
PURPOSES ONLY AND ARE NOT INTENDED TO LIMIT SELECTIONS
MANUFACTURERS' COLORS LISTED ARE FOR IDENTIFICATION
CEILING MATERIAL/COLOR
-/WP-1 CP-1
: WALL PANEL
UT-1
: URETHANE PAINT LACQUER
TRANSPARENT COLOR
EXST 19 THK RUBBER PAD @ 300 OC
EXST 50 X 75 X 1200 WOOD SLEEPER @ 300 OC
CONC SLAB
MEMBRANE ON EXST
EXST 6 MIL POLYETHYLENE
(OPTIONAL BY MANUFACTURER)
EXST 12 THK PLYWOOD
TONGUE & GROOVE COURT WALL PANEL
REPLACE 1219 X 2438 X 28.5 THK
- CEILING : 16
- SIDE WALL : 22
- FRONT WALL : 28.5
* PANEL THICKNESS (OPTIONAL BY MANUFACTURER)
- CEILING : 16
- SIDE WALL : 22
- FRONT WALL : 28.5
* PANEL THICKNESS (OPTIONAL BY MANUFACTURER)
(OPTIONAL BY MANUFACTURER)
@400 O.C.(SIDE WALLS)
@300 O.C.(FRONT WALL)
THK150 METAL STUD
W/HIGH-DENSITY PARTICLEBOARD
W/85 lbs/cf, AVERAGE DENSITY
W/VELVET TEXTURE FINISH, 0.5THK
HIGH-PRESSURE PLASTIC LAMINATE
OR APPROVED EQUAL
W/HIGH-DENSITY PARTICLEBOARD
W/85 lbs/cf, AVERAGE DENSITY
W/VELVET TEXTURE FINISH, 0.5THK
HIGH-PRESSURE PLASTIC LAMINATE
GRINDING & URETHANE REFINISH
EXST 20 THK MAPLE FLOORING/
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
DPW, ENGINEERING SERVICES DIVISON, DESIGN BRANCH
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-CASEY
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SECTION DETAIL
SCHEDULE AND MATERIAL SCHEDULE
SECTION DETAIL, INTERIOR FINISH
MATERIAL SCHEDULE
| T-01 |
| A-01 |
| A-02 |