26179_0005 _ Ritz Avenue Road Extension _ Pla.pdf
PDF 21 MB Posted
- Attached to
- Burke County Ritz Avenue Road Extension
- Solicitation number
- PE-61700-NONST-2026-000000059
- Issued by
- Calhoun County, Georgia
About this file
This file contains final construction plans for the Ritz Avenue Road Extension Phase 01 project in Waynesboro, Georgia, prepared for the Development Authority of Burke County by Thomas & Hutton Engineering. The project involves the construction of a road extension of Ritz Avenue, including a cul-de-sac and the TMC Trail, with associated infrastructure such as drainage systems, utilities, and erosion control measures. The plans were initially dated March 11, 2025, with revisions submitted on May 27, 2025, and June 6, 2025. The project site encompasses 158.11 total acres with 10.00 acres of disturbed acreage. The construction plans include road surfaces totaling approximately 27,793.23 linear feet of combined roadway and trail infrastructure, with specific plan and profile sheets for Ritz Avenue (stations 0+00 to 27+93.23) and the TMC Trail (stations 0+00 to 16+35.79). The plans contain detailed erosion, sedimentation, and pollution control specifications with comprehensive stormwater management design including detention ponds, inlet protection, outlet protection structures, and multiple drainage runs.
The construction plans specify comprehensive technical requirements including grading and drainage details, utility coordination for water, sewer, gas, and telecommunications systems, and storm water sampling at designated locations with turbidity monitoring requirements of 50 NTU at outfall locations. The project involves installation of approximately 3,357 cubic yards of sediment storage (exceeding the required 670 cubic yards), multiple catch basins, storm drainage structures, and riprap outlet protection at various discharge points. The plans require certification by GSWCC Level II Design Professional William Eubank (Certification #0000064323, expiring 12/22/2027) and mandate compliance with the Georgia Soil and Water Conservation Commission Manual for Erosion and Sediment Control. Construction sequencing is divided into initial, intermediate, and final phases with specific requirements for BMP installation, inspection, and maintenance. Primary permittee contact is Austin Stacy at the Development Authority of Burke County (706-554-2923), with design oversight by Thomas & Hutton Engineering and surveyor services by Steve Bargeron & Associates, LLC. The project is subject to compliance with the Brier Creek Water Supply Protection requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26179_0005 _ Ritz Avenue Road Extension _ Spe.pdf | ||
| 26179_0005 _ Addendum 1_08_26_25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REV. NO. REVISION
REVISION HISTORY
BY DATE
SUBMITTED TO
SUBMITTAL HISTORY
DATEDATE
CITY OF WAYNESBORO 3/12/25
A CITY OF WAYNESBORO COMMENTS KSC 5/27/25
CITY OF WAYNESBORO 5/27/25
CITY OF WAYNESBORO 6/6/25
B CITY OF WAYNESBORO COMMENTS KSC 6/6/25
J-
9.
3/
/2
RI
TZ
A V
EN
UE
PH
A
SE
Know what'sbelow.
before you dig.Call
R
ROAD EXTENSION
OF
RITZ AVENUE
WAYNESBORO, GEORGIA
PREPARED FOR:
DEVELOPMENT AUTHORITY
OF BURKE COUNTY
MARCH 11, 2025
TM# 073-001
J-26179.0005
VICINITY MAP
SCALE: 1" = 600'
SITE
PREPARED BY:
3633 Wheeler Road • Suite 385 Augusta, GA 30909 p.762.212.4870 www.thomasandhutton.com
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
C
S- D
T.
D
W G
Ju n
, 2
- 3
:4
PM
Sheet List Table Sheet
Number Sheet Title
C0 COVER SHEET
G1.1 GENERAL NOTES
EX1.0 EXISTING CONDITIONS
C1.1 OVERALL SITE PLAN
EC0.1 ES & PC NOTES
EC0.2 ES & PC NOTES
EC0.3 ES & PC NOTES
EC1.1 EROSION CONTROL - INITIAL PHASE
EC1.2 EROSION CONTROL - INITIAL PHASE
EC2.1 EROSION CONTROL - INTERMEDIATE PHASE
EC2.2 EROSION CONTROL - INTERMEDIATE PHASE
EC3.1 EROSION CONTROL - FINAL PHASE
EC3.2 EROSION CONTROL - FINAL PHASE
EC4.1 EROSION CONTROL DETAILS
EC4.2 EROSION CONTROL DETAILS
EC4.3 EROSION CONTROL DETAILS
C1.1 RITZ AVE - ROAD - PLAN & PROFILE
C1.2 RITZ AVE - CUL-DE-SAC - PLAN & PROFILE
C1.3 TMC TRAIL - PLAN & PROFILE
C1.4 TMC TRAIL - PLAN & PROFILE
C3.1 PAVING GRADING & DRAINAGE PLAN
C3.2 PAVING GRADING & DRAINAGE PLAN
C3.3 PAVING GRADING & DRAINAGE PLAN
C3.4 PAVING GRADING & DRAINAGE PLAN
C3.5 PAVING, GRADING, & DRAINAGE DETAILS
C3.6 PAVING, GRADING, & DRAINAGE DETAILS
C3.7 PAVING GRADING & DRAINAGE DETAILS
C3.8 PAVING, GRADING, & DRAINAGE DETAILS
C3.9 PAVING, GRADING, & DRAINAGE DETAILS
C3.10 PAVING, GRADING, & DRAINAGE DETAILS
C4.1 STAKING, SIGNAGE, AND MARKING PLAN
C4.2 STAKING, SIGNAGE, AND MARKING PLAN
GSWCC ID: 0000064323
EXP: 12/22/20276-18-25
F
IN
A L
D R
A W
IN
G
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N http://www.thomasandhutton.com
OHPOHPOHPOHPOHPOHPOHPOHP
O
HP
O
HP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
IE 250.76'
IE 286.24'
10"CMP
IE 279.21'
IE 280.06'
C1.3
C1.2
C1.1
SCALE: 1" = 350'
INDEX
ENGINEER:
BURKE COUNTY
TOWN
COUNTY
GENERAL INFORMATION
OWNER: SURVEYOR:
ZONING
WAYNESBORO
1-1
DEVELOPMENT AUTHORITY OF BURKE
COUNTY
PO BOX 807, WAYNESBORO, GA 30824
706.554.2923
GENERAL NOTES
ABBREVIATIONS
DBL DOUBLE FM FORCE MAIN (SANITARY SEWER) OC ON CENTER SS SANITARY SEWER
BOT BOTTOM FP FINISH PAD PC POINT OF CURVE TC TOP OF CURB
CB CATCH BASIN FPW FIRE PROTECTION PH POST HYDRANT TH THROAT ELEVATION
CI CURB INLET FR FRAME PT POINT OF TANGENT TG TOP OF GUTTER
CO CLEAN OUT GI GRATE INLET PVC POLYVINYL CHLORIDE TP TOP OF PAVEMENT
CPP CORRUGATED PLASTIC PIPE GV GATE VALVE RCP REINFORCED CONCRETE PIPE TW TOP OF WALK
DBL DOUBLE HDPE HIGH DENSITY POLYETHYLENE RC ROLL CURB INLET TYP TYPICAL
DI DITCH INLET HI HOODED INLET RCP REINFORCED CONCRETE PIPE VI VALLEY INLET
DIP DUCTILE IRON PIPE INV INVERT ELEVATION RI ROOF INLET W WATER
EL ELEVATION JB JUNCTION BOX RJP RESTRAINED JOINT PIPE W/ WITH
ES END SECTION LF LINEAR FEET R/W RIGHT-OF-WAY WV WATER VALVE
FES FLARED END SECTION MAX MAXIMUM SD STORM DRAINAGE YI YARD INLET
FG FINISH GRADE MIN MINIMUM SDMH STORM DRAINAGE MANHOLE
FH FIRE HYDRANT MH MANHOLE SF SQUARE FEET
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
G
N -N
T.
D
W G
Ju n
, 2
- 3
:4
PM
STEVE BARGERON & ASSOCIATES, LLC
101 ROGERS DRIVE
WAYNESBORO, GA 30830
THOMAS & HUTTON
3633 WHEELER ROAD, SUITE 385
AUGUSTA, GA 30909
762.212.4870
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GENERAL NOTES
G1.1 26179.0005
PHASE 01
DEVELOPMENT AUTHORITY OF BURKE COUNTY
602 N. LIBERTY STREET
WAYNESBORO, GA 30830
3/11/25
JR
ZKR
WHE
WHE
A 5/27/25
3633 Wheeler Road • Suite 385 Augusta, GA 30909 • 762.212.4870 www.thomasandhutton.com
CITY OF WAYNESBORO COMMENTS KSC
DRAINAGE LEGEND
EXISTING PROPOSED
PIPE
DITCH
CURB INLET (CI)
CATCH BASIN
(CB)
CURB INLET -
RIGHT (CI)
OR
CATCH BASIN -
RIGHT (CB)
OR OR
CURB INLET -
LEFT (CI)
OR
CATCH BASIN -
LEFT (CB)
OR OR
CURB INLET -
BOTH (CI)
OR
CATCH BASIN -
BOTH (CB)
OR OR
CONTROL
STRUCTURE (CS)
DITCH INLET (DI)
GRATE INLET
(GI)
HOODED INLET
(HI)
OR OR
JUNCTION BOX
(JB)
MANHOLE
(SDMH)
ROLL CURB
INLET (RC)
ROOF INLET (RI)
VALLEY INLET
(VI)
YARD INLET (YI)
BEVELED END
SECTION (BES)
END SECTION
(ES)
FLARED END
SECTION (FES)
11-14° BEND -
HORIZONTAL
22-12° BEND -
HORIZONTAL
45° BEND -
HORIZONTAL
90° BEND -
HORIZONTAL
CLEANOUT
PLUG
TEE
WYE
SEWER LEGEND
EXISTING PROPOSED
GRAVITY PIPE
SINGLE SERVICE
LATERAL
DOUBLE
SERVICE
LATERAL
DROP
MANHOLE
(DMH)
MANHOLE (MH)
CLEANOUT
(CO)
FORCEMAIN
AIR RELEASE
VALVE (ARV)
CHECK VALVE
(CV)
PLUG VALVE
AND BOX (PV)
FLUSH HYDRANT
PUMP
CONNECTION
(PC)
REDUCER
TRACER WIRE
ACCESS BOX
(TWAB)
CROSS
TEE
TAPPING
SLEEVE (TS)
90° BEND
HORIZONTAL
45° BEND
HORIZONTAL
22-12° BEND
HORIZONTAL
11-14° BEND
HORIZONTAL
BEND
VERTICAL
PLUG \ CAP
ss
10"FM 10"FM
WATER LEGEND
EXISTING PROPOSED
FIRE
PROTECTION
WATER MAIN
SINGLE SERVICE
LATERAL
DOUBLE
SERVICE
LATERAL
BUTTERFLY
VALVE (BV)
DOUBLE CHECK
DETECTOR
ASSEMBLY
(DCDA)
GATE VALVE
AND BOX (GV)
POST
INDICATOR
VALVE (PIV)
TAPPING
SLEEVE AND
VALVE (TSV)
REDUCED
PRESSURE ZONE
BACKFLOW
(RPZ)
WATER LEGEND
EXISTING PROPOSED
WATER METER
(WM)
TRACER WIRE
ACCESS BOX
(TWAB)
FIRE HYDRANT
W/TEE, VALVE &
BOX (FHA)
POST HYDRANT
(PH)
REDUCER
CROSS
TEE
90° BEND -
HORIZONTAL
45° BEND -
HORIZONTAL
22-12° BEND -
HORIZONTAL
11-14° BEND -
HORIZONTAL
BEND -
VERTICAL
CAP
10"FPW 10"FPW
10"W 10"W
OTHER UTILITIES LEGEND
EXISTING
NATURAL GAS
TELEPHONE
UNDERGROUND TELEPHONE
ELECTRICITY
UNDERGROUND ELECTRICITY
UGG
OHT
UTL
OHP
UGP
GRAPHIC SCALE:
1 INCH =
350 FEET
350 175 350
GSWCC ID: 0000064323
EXP: 12/22/2027
6-18-25
F
IN
A L
D R
A W
IN
G
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
WETLANDS
WETLANDS
WETLANDS
RITZ AVENUE
4 28
7 28 8 28 9 29
1 29
8 279 281
284 286
281282
283284
295294
280 28 028028
278278278 27
1291 29 1 29
0 29
0 29
292 29
WETLANDS
EXISTING
STORMWATER
POND
OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP
O
HP
O
HP
O
HP
O
HP
O
HP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
N 21°10'43" W 410.47'
N 29°56'32" W 456.19'
N
0°
'3 1"
E
6.
CH: 80.00'
A: 482.59'
R: 90.00'
S
°5 1'
" W
5.
S 42°39'38" E 72.61'
S 86°10'46" E 1,440.49'
S 47°20'22" W 68.95'
N 86°10'46" W
1,436.35'
N 42°07'57" W 81.71'
S 29°56'32" E 454.54'
S 21°10'43" E
442.56'
N 49°46'25" E 81.87'
S 25°33'38" E
N 25°33'38" W
N 14°32'31" W
CH: 472.70'
A: 478.44' R: 890.00'
C H:
4 30.21'
A
4 35.4 4'
R :
810.00'
C H:
70.29'
A
70.36'
R:
460.00'
C H:
82.52'
A
82.60'
R:
54 0.00'
S 14°32'31" E
S 89°08'29" E
N 89°19'15" W
C H
3 .
7 3
A
3.
8 1
R:
5 9
. 2 3 '
N
3°
'2 1"
E
S 29°56'32" E
1.65'
S
°5 1'
" W
9.
OHP OHP OHP OHP
OHP OHP OHP
BENCHMARK
RAILROAD SPIKE IN POWER POLE
N: 1132457.392 E: 702236.442
LATITUDE: 33°06'47.812"
LONGITUDE: 82°00'58.324"
ELEV: 285.20
BENCHMARK
PK NAIL
N: 1130578.413 E: 702843.515
LAT: 33°06'29.212"
LONG: 82°00'51.218"
ELEV: 283.61'
N 89°18'15" W
1,462.30'
N 12°22'21" W 1,310.55'
C H:
68 0.87'
A
681.71'
R:
3968.24'
S 89°08'29" E
3,086.32'
C H:
8 .
2 2
A
8 .
R:
.5
2 '
S
°0 1'
" W
2.
C H:
3.
A
6.
R:
.2
3'
S 26°07'28" E
143.54'
N 08°27'22" W
N 13°55'11" W
S
°1 7'
" W
S
°2 0'
" E
S 18°17'43" E
C H:
84 3.51'
A
844.68'
R:
4632.10'
C H:
4 90.61'
A
4 90.67'
R:
9213.31'
N 89°19'15" W
806.15'
N 60°03'28" E856.33'
S 52°46'50" E
175.94'
S
°5 6'
" W
9.
S 27°50'06" E 334.88'
S 17°35'42" E 617.48'
N 89°18'15" W
404.47'
S
°2 0'
" E
4.
N 21°08'47" W 667.72'
86.20'
1" = 150'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
EX
-P L.
D W
G
Ju n
, 2
- 3 :4
PM
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
EXISTING CONDITIONS
EX1.0
26179.0005
PHASE 01
ZKR
WHE
WHE
A 5/27/25
B 6/6/25
CITY OF WAYNESBORO COMMENTS
CITY OF WAYNESBORO COMMENTS KSC
KSC
GRAPHIC SCALE:
1 INCH =
150 FEET
150 75 150
GSWCC ID: 0000064323
EXP: 12/22/2027
6-18-25
F
IN
A L
D R
A W
IN
G
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP
O
HP
O
HP
O
HP
O
HP
O
HP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
O
HP
10"CMP
IE 279.21'
IE 280.06'
OHP OHP OHP OHP
OHP OHP OHP
27+93.23
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00
PI: 0+99.55
PI: 2+49.94
PC: 6+76.89
PT: 7
+53.37
PC: 12+09.56
PT: 16+66.50
+3
5.
0+
1+
2+
3+
4+
5+
6+
7+
8+
9+
+0
+0
+0
+0
+0
+0
+0
WETLANDS
WETLANDS
RITZ AVENUE
WETLANDS
WETLANDS
DAVIS RD
850'R
0'R
75'R
'R
500'R
2' CURB & GUTTER (TYP.)
12'
RI
TZ
A
VE
N
UE
TMC TRAIL
' P
UB
LI
C R
/W
80' PUBLIC R/W
' E
O P
TO
E
O P
' B
O C
T O
B O
C
24' EOP TO EOP
28' BOC TO BOC
RIGHT OF WAY
RIGHT OF WAY
EXISTING POWER POLE
TO BE RELOCATED.
COORDINATE WITH
PLANTERS EMC.
SEE NOTE ON SHEET G1.1.
DRY
DETENTION
POND
35'R 35'R
80'R
1" = 150'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
SP
-P L-
.D
W G
Ju n
, 2
- 3
:4
PM
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
OVERALL SITE PLAN
C1.0 26179.0005
PHASE 01
ZKR
150 FEET
150 75 150
GSWCC ID: 0000064323
EXP: 12/22/2027
6-18-25
F
IN
A L
D R
A W
IN
G
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
EROSION,SEDIMENTATION & POLLUTION CONTROL PLAN CHECKLIST -
INFRASTRUCTURE PROJECTS
ADDRESS: RITZ AVE, WAYNESBORO, GA 30830
DATE ON PLANS: 3/11/25
REVISED DATE:
SWCD: BRIER CREEK SWCD
PROJECT NAME: RITZ AVENUE
CITY/COUNTY: WAYNESBORO/ BURKE
1. THE APPLICABLE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN CHECKLIST ESTABLISHED BY THE COMMISSION AS OF JANUARY 1 OF THE YEAR IN THE LAND-DISTURBING ACTIVITY WAS PERMITTED. (THE COMPLETED CHECKLIST MUST BE SUBMITTED WITH THE ES&PC PLAN OR THE PLAN WILL
NOT BE REVIEWED) (PERMIT IV.D.1. PG 28)
PLEASE FIND THE CURRENT INFRASTRUCTURE EROSION, SEDIMENTATION AND
POLLUTION CONTROL CHECKLIST ATTACHED WITH THIS PLAN
2. LEVEL II CERTIFICATION NUMBER ISSUED BY THE COMMISSION, SIGNATURE AND SEAL OF THE CERTIFIED
DESIGN PROFESSIONAL. (SIGNATURE, SEAL AND LEVEL II NUMBER MUST BE ON EACH SHEET
PERTAINING TO ES&PC PLAN OR THE PLAN WILL NOT BE REVIEWED. THE LEVEL II CERTIFICATION MUST BE ISSUED TO THE DESIGN PROFESSIONAL, AFTER COMPLETION OF A GSWCC APPROVED COURSE, AND WHOSE SIGNATURE AND SEAL ARE ON THE PLAN.)
PLEASE FIND ON EACH SHEET OF THIS PLAN THE GSWCC LEVEL II CERTIFICATION
NUMBER, SIGNATURE AND SEAL FOR MR. WILLIAM EUBANK, PE.
3. THE NAME AND PHONE NUMBER OF 24-HOUR LOCAL CONTACT RESPONSIBLE FOR EROSION,
SEDIMENTATION AND POLLUTION CONTROLS. (PERMIT II.B.1.b PG 14)
AUSTIN STACY - ASTACY@SELECTBURKE.COM
(706) 554-2923
4. PROVIDE NAME, ADDRESS, EMAIL ADDRESS AND PHONE NUMBER OF PRIMARY PERMITTEE. (PERMIT II.B.1 b PG 14)
DEVELOPMENT AUTHORITY OF BURKE COUNTY
602 N. LIBERTY ST.
WAYNESBORO, GA 30830
AUSTIN STACY ; (706) 554-2923 ; ASTACY@SELECTBURKE.COM
5. NOTE TOTAL AND DISTURBED ACREAGE OF THE PROJECT OR PHASE UNDER CONSTRUCTION. (PERMIT IV.D.2 d PG 28)
TOTAL PARCEL ACREAGE IS 158.11 ACRES.
TOTAL DISTURBED ACREAGE FOR THE PROJECT IS 10.00 ACRES.
6. PROVIDE THE GPS LOCATION OF THE BEGINNING AND END OF THE INFRASTRUCTURE PROJECT. GIVE THE LATITUDES AND LONGITUDES IN DECIMAL DEGREES. PERMIT II.B.1 a PG 14
CONSTRUCTION EXITS ARE LOCATED AT:
LAT: N 33.3579 ; LONG: W -83.3471
LAT: N 33.3622 ; LONG: W -83.3437
7. INITIAL DATE OF THE PLAN AND THE DATES OF ANY REVISIONS MADE TO THE PLAN INCLUDING THE
ENTITY WHO REQUESTED THE REVISIONS.
PLEASE FIND THE INITIAL DATE OF THE PLAN AND ALL REVISIONS ON THE COVER
SHEET AS WELL AS EACH INDIVIDUAL SHEET OF THE PLAN.
8. DESCRIPTIONS OF THE NATURE OF CONSTRUCTION ACTIVITY AND EXISTING SITE CONDITIONS. (PERMIT IV.D.2 a PG 28)
THE CONSTRUCTION ACTIVITY AT THE SITE WILL INVOLVE GRADING, PAVING,
INSTALLATION OF DRAINAGE STRUCTURES, ROAD CONSTRUCTION. EXISTING SITE
CONDITIONS ARE UNDEVELOPED FARMLAND
9. PROVIDE VICINITY MAP SHOWING SITE'S RELATION TO SURROUNDING AREAS. INCLUDE DESIGNATION OF SPECIFIC PHASE, IF NECESSARY. (PERMIT IV.D.2 e PG 28)
PLEASE FIND THE VICINITY MAP LOCATED ON THE COVER SHEET OF THE PLANS
10. IDENTIFY THE PROJECT RECEIVING WATERS AND DESCRIBE ALL SENSITIVE ADJACENT AREAS INCLUDING STREAMS, LAKES, RESIDENTIAL AREAS, WETLANDS, MARSHLANDS, ETC. WHICH MAY BE AFFECTED. (PERMIT IV.D.2.g PG 28)
THE RECEIVING WATERS FOR THE PROJECT ARE TRIBUTARIES OF WALNUT BRANCH,
WHICH OUTFALLS TO BRIER CREEK. ULTIMATELY KIOKEE CREEK OUTFALLS TO THE
SAVANNAH RIVER. ALL OF THESE SUPPORT WARM WATER FISHERIES.
11. DESIGN PROFESSIONAL'S CERTIFICATION STATEMENT AND SIGNATURE THAT THE SITE WAS VISITED PRIOR
TO DEVELOPMENT OF THE ES&PC PLAN AS STATED ON PART IV PAGE 21 OF THE PERMIT.
I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS PREPARED AFTER A SITE
VISIT TO THE LOCATIONS DESCRIBED HEREIN BY MYSELF OR AUTHORIZED AGENT
UNDER MY SUPERVISION.
WILLIAM EUBANK, PE
GSWCC LEVEL II DESIGN PROFESSIONAL
CERTIFICATION #0000064323
EXPIRATION DATE: 12/22/2027
12. DESIGN PROFESSIONAL'S CERTIFICATION STATEMENT AND SIGNATURE THAT THE PERMITTEE'S ES&PC PLAN PROVIDES FOR AN APPROPRIATE AND COMPREHENSIVE SYSTEM OF BMP'S AND SAMPLING TO
MEET PERMIT REQUIREMENTS AS STATED ON PART IV PAGE 21 OF THE PERMIT.
I CERTIFY THAT THE PERMITEE'S EROSION, SEDIMENTATION & POLLUTION CONTROL
PLAN PROVIDES FOR AN APPROPRIATE AND COMPREHENSIVE SYSTEM OF BEST
MANAGEMENT PRACTICES REQUIRED BY THE GEORGIA WATER QUALITY
CONTROL ACT AND THE DOCUMENT "MANUAL FOR EROSION AND SEDIMENT
CONTROL IN GEORGIA" (MANUAL) PUBLISHED BY THE GEORGIA SOIL AND WATER
CONSERVATION COMMISSION AS OF JANUARY 1 OF THE YEAR IN WHICH THE
LAND-DISTURBING ACTIVITY WAS PERMITTED, PROVIDES FOR THE SAMPLING OF
THE RECEIVING WATER(S) OR THE SAMPLING OF THE STORM WATER OUTFALLS
AND THAT THE DESIGNED SYSTEM OF BEST MANAGEMENT PRACTICES AND
SAMPLING METHODS IS EXPECTED TO MEET THE REQUIREMENTS CONTAINED IN
THE GENERAL NPDES PERMIT NO. GAR 100002.
WILLIAM EUBANK, PE
GSWCC LEVEL II DESIGN PROFESSIONAL
CERTIFICATION #0000064323
EXPIRATION DATE: 12/22/2027
13. DESIGN PROFESSIONAL CERTIFICATION STATEMENT AND SIGNATURE THAT THE PERMITTEE'S ES&PC PLAN PROVIDES FOR REPRESENTATIVE SAMPLING AS STARTED ON PART IV.D.6.C.(3). PAGE 37 OF THE PERMIT
AS APPLICABLE.
I CERTIFY THAT THE PERMITTEE'S EROSION, SEDIMENTATION AND POLLUTION
CONTROL LAN PROVIDES FOR THE MOINTORING OF: (A) ALL PERENNIAL AND
INTERMITTENT STREAMS AND OTHER WATER BODIES SHOWN ON THE USGS
TOPOGRAPHIC MAP AND ALL OTHER FIELD VERIFIED PERENNIAL AND
INTERMITTENT STREAMS AND OTHER WATER BODIES, OR (B) WHERE ANY SUCH
SPECIFIC IDENTIFIED PERENNIAL OR INTERMITTENT STREAM AND OTHER WATER
BODY IS NOT PROPOSED TO BE SAMPLED, I HAVE DETERMINED IN MY
PROFESSIONAL JUDGEMENT, UTILIZING THE FACTORS REQUIRED IN THE GENERAL
NPDES PERMIT NO. GAR100002, THAT THE INCREASE IN THE TURBIDITY OF EACH
SPECIFIC IDENTIFIED SAMPLED RECEIVING WATER WILL BE REPRESENTATIVE OF THE
INCREASE IN THE TURBIDITY OF A SPECIFIC IDENTIFIED UN-SAMPLED RECEIVING
WATER.
WILLIAM EUBANK, PE
GSWCC LEVEL II DESIGN PROFESSIONAL
CERTIFICATION #0000064323
EXPIRATION DATE: 12/22/2027
14. CLEARLY NOTE THE STATEMENT THAT "THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC PLAN IS TO INSPECT AND CERTIFY THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE REQUIREMENTS AND PERIMETER CONTROL BMP'S WITHIN 7 DAYS AFTER INSTALLATION, IN ACCORDANCE WITH PART IV.A.5
PAGE 26 OF THE PERMIT.
THE DESIGN PROFESSIONAL WHO PREPARED THE ES&PC PLAN IS TO INSPECT AND
CERTIFY THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE REQUIREMENTS
AND PERIMETER CONTROL BMP'S WITHIN 7 DAYS AFTER INSTALLATION.
DESIGN PROFESSIONAL 7-DAY VISIT CERTIFICATION
DESIGN PROFESSIONAL WHO PREPARED THE ES&PC PLAN IS TO INSPECT AND
CERTIFY THE INSTALLATION OF THE INITIAL SEDIMENT STORAGE REQUIREMENTS
AND PERIMETER CONTROL BMPs WITHIN 7 DAYS AFTER INSTALLATION.
DATE OF INSPECTION: _____________
I CERTIFY THE SITE WAS __________ WITH THE ES&PC PLAN ON THE DATE OF
INSPECTION.
GSWCC LEVEL II DESIGN PROFESSIONAL CERTIFICATION #
INSPECTION REVEALED THE FOLLOWING DISCREPANCIES FROM THE ES&PC PLAN
THESE DEFICIENCIES MUST BE ADDRESSED IMMEDIATELY AND A RE-INSPECTION
SCHEDULED. WORK SHALL NOT PROCEED ON THE SITE UNTIL DESIGN
PROFESSIONAL CERTIFICATION IS OBTAINED.
15. CLEARLY NOTE THE STATEMENT THAT "NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE
25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED
VEGETATION OR WITHIN 25-FEET OF THE COASTAL MARSHLAND BUFFER AS MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES AND PERMITS." (PART IV.(i)-(iv) PG 19-24 OF THE PERMIT).
NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50 FOOT
UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED
VEGETATION OR WITHIN 25-FEET OF THE COASTAL MARSHLAND BUFFER AS
MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE WITHOUT FIRST
ACQUIRING THE NECESSARY VARIANCES AND PERMITS.
16. PROVIDE A DESCRIPTION OF ANY BUFFER ENCROACHMENTS AND INDICATE WHETHER A BUFFER
VARIANCE IS REQUIRED.
THERE WILL BE NO BUFFER ENCROACHMENTS THAT ARE PART OF THE PROJECT.
17. CLEARLY NOTE THE STATEMENT THAT "AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMP'S WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN
PROFESSIONAL.", (PART IV.C PG 27 OF PERMIT).
AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT
EFFECT ON BMP'S WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE
DESIGN PROFESSIONAL.
18. CLEARLY NOTE THE STATEMENT THAT "WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS OF THE STATE, EXCEPT AS AUTHORIZED BY A SECTION 404 PERMIT. (PERMIT IV.D.3.c(1) PG 31).
WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS OF THE STATE, EXCEPT
AS AUTHORIZED BY A SECTION 404 PERMIT.
19. CLEARLY NOTE THE STATEMENT THAT "THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO LAND
DISTURBING ACTIVITIES."
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE
INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES
PRIOR TO LAND DISTURBING ACTIVITIES.
20.CLEARLY NOTE THE STATEMENT THAT "EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO
CONTROL OR TREAT THE SEDIMENT SOURCE."
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL
IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE
EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES
SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
21.CLEARLY NOTE THE STATEMENT "ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH MULCH OR TEMPORARY SEEDING." (PERMIT IV.D.3.a.(1) PG 28).
ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS
SHALL BE STABILIZED WITH MULCH OR TEMPORARY SEEDING.
22. ANY CONSTRUCTION ACTIVITY WHICH DISCHARGES STORM WATER INTO A BIOTA IMPAIRED STREAM SEGMENT, OR WITHIN 1 LINEAR MILE UPSTREAM OF AND WITHIN THE SAME WATERSHED AS, ANY PORTION OF A BIOTA IMPAIRED STREAM SEGMENT MUST COMPLY WITH PART III.C. OF THE PERMIT.
INCLUDE THE COMPLETED APPENDIX 1 LISTING ALL THE BMP'S THAT WILL BE USED FOR THOSE AREAS OF THE SITE WHICH DISCHARGE TO THE IMPAIRED STREAM SEGMENT. (PART III.C.2.A - V. PG 19-21)
THE SITE IS LOCATED MORE THAN 1 LINEAR MILE UPSTREAM OF THE NEAREST
IMPAIRED STREAM SEGMENT.
23. IF A TMDL IMPLEMENTATION PLAN FOR SEDIMENT HAS BEEN FINALIZED FOR THE BIOTA IMPAIRED STREAM SEGMENT (IDENTIFIED IN ITEM 22 ABOVE) AT LEAST SIX MONTHS PRIOR TO SUBMITTAL OF NOI, THE ES&PC PLAN MUST ADDRESS ANY SITE-SPECIFIC CONDITIONS OR REQUIREMENTS INCLUDED IN THE
TMDL IMPLEMENTATION PLAN. (PERMIT III.C.1 PG 15)
THE SITE IS LOCATED MORE THAN 1 LINEAR MILE UPSTREAM OF THE NEAREST
IMPAIRED STREAM SEGMENT.
24.BMP'S FOR CONCRETE WASHDOWN OF TOOLS, CONCRETE MIXER CHUTES, HOPPERS AND THE REAR 0F THE VEHICLES. INCLUDE STATEMENT THAT WASHOUT OF THE DRUM AT THE CONSTRUCTION SITE IS PROHIBITED, (PERMIT IV.D.3.c(6) PG 31).
CONCRETE WASHOUT PROHIBITED ON SITE.
25.PROVIDE BMP'S FOR THE REMEDIATION OF ALL PETROLEUM SPILLS AND LEAKS, (PERMIT IV.D.3.c.(5) PG 31).
PETROLEUM BASED PRODUCTS- CONTAINERS FOR PRODUCTS SUCH AS FUELS,
LUBRICANTS AND TARS WILL BE INSPECTED DAILY FOR LEAKS AND SPILLS. THIS
INCLUDES ON-SITE VEHICLE AND MACHINERY INSPECTIONS AND REGULAR
PREVENTATIVE MAINTENANCE FOR SUCH EQUIPMENT. EQUIPMENT
MAINTENANCE AREAS WILL BE LOCATED AWAY FROM STATE WATER, NATURAL
DRAINS AND STORM WATER DRAINAGE INLETS. IN ADDITION, TEMPORARY
FUELING TANKS SHALL HAVE A SECONDARY CONTAINMENT LINER TO
PREVENT/MINIMIZE SITE CONTAMINATION. DISCHARGE OF OILS, FUELS AND
LUBRICANTS IS PROHIBITED. PROPER DISPOSAL METHODS WILL INCLUDE
COLLECTION IN A SUITABLE CONTAINER AND DISPOSAL AS REQUIRED BY LOCAL
AND STATE REGULATIONS. HAVE EQUIPMENT TO CONTAIN AND CLEAN UP
PETROLEUM SPILLS IN FUEL STORAGE AREAS OR ON MAINTENANCE AND FUELING
VEHICLES. STORE IN COVERED AREAS PROTECTED WITH DIKES. REGULARLY
INSPECT FOR CRACKS OR LEAKAGE IN CONTAINERS/TANKS.
SPILL CLEANUP AND CONTROL PRACTICES
· LOCAL, STATE AND MANUFACTURER'S RECOMMENDED METHODS FOR
SPILL CLEANUP WILL BE CLEARLY POSTED AND PROCEDURES WILL BE
MADE AVAILABLE TO SITE PERSONNEL.
· MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE
KEPT IN THE MATERIAL STORAGE AREAS. TYPICAL MATERIALS AND
EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO, BROOMS, DUSTPANS,
MOPS, RAGS, GLOVES, GOGGLES, CAT LITTER, SAND, SAWDUST, AND
PROPERLY LABELED PLASTIC AND MEAL WASTE CONTAINERS.
· SPILL PREVENTION PRACTICES AND PROCEDURES WILL BE REVIEWED
AFTER A SPILL AND ADJUSTED AS NECESSARY TO PREVENT FUTURE SPILLS.
· FOR SPILLS THAT IMPACT SURFACE WATER (LEAVE A SHEEN ON SURFACE
WATER), THE NATIONAL RESPONSE CENTER (NRC) WILL BE CONTACTED
WITHIN 24 HOURS AT 1-800-424-8802.
· FOR SPILLS OF AN UNKNOWN AMOUNT, THE NATIONAL CENTER (NRC)
WILL BE CONTACTED WITHIN 24 HOURS
· FOR SPILLS GREATER THAN 25 GALLONS AND NO SURFACE WATER
IMPACTS, THE GEORGIA EPD WILL BE CONTACTED WITHIN 24 HOURS.
· FOR SPILLS LESS THAN 25 GALLONS AND NO SURFACE WATER IMPACTS,
THE SPILL WILL BE CLEANED UP AND LOCAL AGENCIES WILL BE
CONTACTED AS REQUIRED.
THE CONTRACTOR SHALL NOTIFY THE LICENSED PROFESSIONAL WHO PREPARED THIS PLAN IF
MORE THAN 1320 GALLONS OF PETROLEUM IS STORED ONSITE (THIS INCLUDES CAPACITIES OF
EQUIPMENT) OR IF ANY ONE PIECE OF EQUIPMENT HAS A CAPACITY GREATER THAN 660
GALLONS. THE CONTRACTOR WILL NEED A SPILL PREVENTION CONTAINMENT AND
COUNTERMEASURES PLAN PREPARED BY THAT LICENSED PROFESSIONAL.
26.DESCRIPTION OF THE MEASURES THAT WILL BE INSTALLED DURING THE CONSTRUCTION PROCESS TO CONTROL POLLUTANTS IN STORM WATER THAT WILL OCCUR AFTER CONSTRUCTION OPERATIONS HAVE BEEN COMPLETED. (PERMIT IV.D.3.b PG 29).
RIP-RAP IS INSTALLED ON ALL OUTFALL LOCATIONS. PERMANENT GRASSING
AND LANDSCAPING WILL BE INSTALLED TO PROTECT EARTHEN AREAS FROM
EROSION ONCE CONSTRUCTION IS COMPLETE.
27. DESCRIPTION OF PRACTICES TO PROVIDE COVER FOR BUILDING MATERIALS AND BUILDING PRODUCTS ON SITE, (PERMIT IV.D.3.c.(2) PG 31).
THE CONTRACTOR IS TO PROVIDE COVER FOR: BUILDING MATERIALS, BUILDING
PRODUCTS, CONSTRUCTION WASTES, TRASH, LANDSCAPE MATERIALS, FERTILIZERS,
PESTICIDES, HERBICIDES, DETERGENTS, SANITARY WASTE AND OTHER MATERIALS
THAT ARE STORED ON SITE BY USING PLASTIC SHEETING AS COVER AND
PROTECTION FROM PRECIPITATION. THE ABOVE PRODUCTS WILL BE STORED IN A
LOCATION THAT WOULD MINIMIZE EXPOSURE TO PRECIPITATION AND TO
STORMWATER.
28. DESCRIPTION OF THE PRACTICES THAT WILL BE USED TO REDUCE THE POLLUTANTS IN STORM WATER
DISCHARGES. (PERMIT IV PG 25)
POLLUTANT PREVENTION
THE FOLLOWING MATERIALS ARE EXPECTED ONSITE DURING CONSTRUCTION:
PETROLEUM BASED FUELS AND LUBRICANTS FOR EQUIPMENT, ADDITIVES FOR SOIL
STABILIZATION, PESTICIDES, FERTILIZERS, HERBICIDES, CRUSHED STONE, CONCRETE
PRODUCTS, ASPHALT, TAR, LUMBER, , PAINTS/STAINS/FINISHING TREATMENTS,
PAINT SOLVENTS, CLEANING SOLVENTS, PLASTICS AND METAL PIPES.
PRACTICES SUCH AS GOOD HOUSEKEEPING, PROPER HANDLING OF HAZARDOUS
PRODUCTS AND PROPER SPILL CONTROL PRACTICES WILL BE FOLLOWED TO
REDUCE THE RISK OF SPILLS FROM DISCHARGING INTO STORM WATER RUNOFF.
GOOD HOUSEKEEPING
· QUANTITIES ONSITE WILL BE LIMITED TO THE AMOUNT NEEDED FOR THE
JOB.
· PRODUCTS AND MATERIALS WILL BE STORED IN A NEAT, ORDERLY
MANNER IN APPROPRIATE CONTAINERS PROTECTED FROM RAINFALL,
WHERE POSSIBLE.
· PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH
MANUFACTURER'S LABELS LEGIBLE AND VISIBLE.
· PRODUCT MIXING, DISPOSAL, AND DISPOSAL OF PRODUCT CONTAINERS
WILL BE ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS.
· THE CONTRACTOR WILL INSPECT SUCH MATERIALS TO ENSURE PROPER
USE, STORAGE AND DISPOSAL.
PRODUCT SPECIFIC PRACTICES
FERTILIZER/HERBICIDES/PESTICIDES/DETERGENTS- THESE WILL BE APPLIED AT RATES
THAT DO NOT EXCEED THE MANUFACTURER'S SPECIFICATIONS OR ABOVE THE
GUIDELINES SET FORTH IN THE CROP ESTABLISHMENT OR IN THE GSWCC MANUAL
FOR EROSION AND
SEDIMENTATION CONTROL IN GEORGIA. ANY STORAGE OF THESE MATERIALS
WILL BE UNDER ROOF IN SEALED CONTAINERS. DO NOT DISCHARGE WASH
WATER INTO STORM WATER SYSTEM. INSTALL CURBS OR DIKES AROUND STORAGE
AREA TO PROTECT AGAINST SPILLS. LIMIT USE OF DETERGENTS ON-SITE.
PAINTS/FINISHES/SOLVENTS- ALL PRODUCTS WILL BE STORED IN
TIGHTLY SEALED ORIGINAL CONTAINERS WHEN NOT IN USE. EXCESS
PRODUCT WILL NOT BE DISCHARGED TO THE STORM WATER
COLLECTION SYSTEM. EXCESS PRODUCT, MATERIALS USED WITH
THESE PRODUCTS AND PRODUCT CONTAINERS WILL BE DISPOSED OF
ACCORDING TO THE MANUFACTURER'S SPECIFICATIONS AND
RECOMMENDATIONS.
CONCRETE TRUCK WASHING- CONCRETE WASHOUT SHALL OCCUR
ONLY IN THE WASH PAD VICINITY DELINEATED IN THE PLANS.
BUILDING MATERIALS- NO BUILDING OR CONSTRUCTION MATERIALS
WILL BE BURIED OR DISPOSED OF ONSITE. ALL SUCH MATERIAL WILL
BE DISPOSED OF IN PROPER WASTE DISPOSAL PROCEDURES.
YESATTACHED
YESALL
YESEC0.1
YESEC0.1
YESEC0.1
YESALL
YESEC0.1
YESCOVER
YESEC0.1
YESEC0.1
YESEC0.1
YESEC0.1
YESEC0.1
YESEC0.1
YESEC0.1
YESEC0.1
YESEC0.1
YESEC0.1
YESEC0.1
YESEC0.1
YESEC0.1
YESEC0.1
YESEC0.1
N/AEC0.1
YESEC0.1
N/A
N/A
EC0.1 YES
NTS
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
EC
-N T.
D W
G
Ju n
, 2
- 3 :4
PM
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
ES & PC NOTES
EC0.1
26179.0005
PHASE 01
ZKR
GSWCC ID: 0000064323
EXP: 12/22/2027
6-18-25
F
IN
A L
D R
A W
IN
G
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
YESEC0.2 29.DESCRIPTION AND CHART OR TIMELINE OF THE INTENDED SEQUENCE OF MAJOR ACTIVITIES WHICH DISTURB SOILS FOR THE MAJOR PORTIONS OF THE SITE (I.E., INITIAL PERIMETER AND SEDIMENT STORAGE BMP'S, CLEARING AND GRUBBING ACTIVITIES, EXCAVATION ACTIVITIES, UTILITY ACTIVITIES, GRADING, INFRASTURCTURE, TEMPORARY AND FINAL STABILIZATION). (PERMIT IV.D.2c PG 28)
A SPECIFIED WORK SCHEDULE IS NEEDED TO COORDINATE THE TIMING OF LAND
DISTURBING ACTIVITIES WITH THE INSTALLATION OF EROSION AND SEDIMENTATION
CONTROL MEASURES.
THE PURPOSE OF THE SCHEDULE IS TO REDUCE ON-SITE EROSION AND OFF-SITE
SEDIMENTATION BY PERFORMING LAND DISTURBING ACTIVITIES AND INSTALLING
EROSION AND SEDIMENTATION CONTROL PRACTICES IN ACCORDANCE WITH A
PLANNED SCHEDULE.
IN PLANNING CONSTRUCTION WORK, IT MAY BE HELPFUL TO OUTLINE ALL LAND
DISTURBING ACTIVITIES NECESSARY TO COMPLETE THE PROPOSED PROJECT. THEN
LIST ALL PRACTICES NEEDED TO CONTROL EROSION AND SEDIMENTATION ON THE
SITE. THESE TWO LISTS CAN THEN BE COMBINED IN LOGICAL ORDER TO PROVIDE
A PRACTICAL AND EFFECTIVE CONSTRUCTION SEQUENCE SCHEDULE THAT
BECOMES PART OF THE EROSION AND SEDIMENTATION CONTROL PLAN.
30.PROVIDE COMPLETE REQUIREMENTS OF INSPECTIONS AND RECORD KEEPING BY THE PRIMARY PERMITEE, (PERMIT IV.D.4.a PG 32-34).
INSPECTIONS AND RECORD KEEPING
A. PRIMARY PERMITTEE:
1. EACH DAY WHEN ANY TYPE OF CONSTRUCTION ACTIVITY HAS TAKEN PLACE AT A PRIMARY
PERMITTEE'S SITE, CERTIFIED PERSONNEL PROVIDED BY THE PRIMARY PERMITTEE SHALL INSPECT:
(a) ALL AREAS OF THE PRIMARY PERMITTEE'S SITE WHERE PETROLEUM PRODUCTS ARE STORED, USED, OR HANDLED FOR SPILLS AND LEAKS FROM VEHICLES AND EQUIPMENT. (b) ALL LOCATIONS AT THE PRIMARY PERMITTEE'S SITE WHERE VEHICLES ENTER OR EXIT THE SITE FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING. THESE INSPECTIONS MUST BE CONDUCTED UNTIL
A NOTICE OF TERMINATION IS SUBMITTED.
2. MEASURE AND RECORD RAINFALL WITHIN DISTURBED AREAS OF THE SITE THAT HAVE MET FINAL
STABILIZATION ONCE EVERY 24 HOURS EXCEPT ANY NON-WORKING SATURDAY,
NON-WORKING SUNDAY AND NON-WORKING FEDERAL HOLIDAY. THE DATA COLLECTED FOR
THE PURPOSE OF COMPLIANCE WITH THIS PERMIT SHALL BE REPRESENTATIVE OF THE
MONITORED ACTIVITY. MEASUREMENT OF RAINFALL MAY BE SUSPENDED IF ALL AREAS OF THE
SITE HAVE UNDERGONE FINAL STABILIZATION OR ESTABLISHED A CROP OF ANNUAL
VEGETATION AND A SEEDING OF TARGET PERENNIALS APPROPRIATE FOR THE REGION.
3. CERTIFIED PERSONAL (PROVIDED BY THE PRIMARY PERMITTEE) SHALL INSPECT THE FOLLOWING
AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A
STORM THAT IS 0.5 INCHES OR GREATER (UNLESS SUCH STORM ENDS AFTER 5:00PM ON ANY
FRIDAY OR ON ANY NON-WORKING SATURDAY, NON-WORKING SUNDAY OR ANY FEDERAL
HOLIDAY IN WHICH CASE THE INSPECTION SHALL BE COMPLETED BY THE END OF THE NEXT
BUSINESS DAY AND/OR WORKING DAY, WHICHEVER OCCURS FIRST): (a) DISTURBED AREAS OF THE PRIMARY PERMITTEE'S CONSTRUCTION SITE. (b) AREAS USED BY THE PRIMARY PERMITTEE FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION. AND (c) STRUCTURAL
CONTROL MEASURES. EROSION AND SEDIMENT CONTROL MEASURES IDENTIFIED IN THE PLAN
APPLICABLE TO THE PRIMARY PERMITTEE'S SITE SHALL BE OBSERVED TO ENSURE THAT THEY ARE
OPERATING CORRECTLY. WHERE DISCHARGE LOCATIONS OR POINTS ARE ACCESSIBLE, THEY
SHALL BE INSPECTED TO ASCERTAIN WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE
IN PREVENTING SIGNIFICANT IMPACTS TO RECEIVING WATER(S). FOR AREAS OF A SITE THAT
HAVE UNDERGONE FINAL STABILIZATION OR ESTABLISHED A CROP OF ANNUAL VEGETATION
AND A SEEDING OF TARGET PERENNIALS APPROPRIATE FOR THE REGION, THE PERMITTEE MUST COMPLY WITH PART IV.D.4.a.(4). THESE INSPECTIONS MUST BE CONDUCTED UNTIL A NOTICE
OF TERMINATION IS SUBMITTED.
4. CERTIFIED PERSONNEL (PROVIDED BY PRIMARY PERMITTEE) SHALL INSPECT AT LEAST ONCE PER MONTH DURING THE TERM OF THIS PERMIT (I.e. UNTIL A NOTICE OF TERMINATION HAS BEEN
SUBMITTED) THE AREAS OF THE SITE THAT HAVE UNDERGONE FINAL STABILIZATION OR
ESTABLISHED A CROP OF ANNUAL VEGETATION AND A SEEDING OF TARGET PERENNIALS
APPROPRIATE FOR THE REGION. THESE AREAS SHALL BE INSPECTED FOR EVIDENCE OF, OR THE
POTENTIAL FOR, POLLUTANTS ENTERING THE DRAINAGE SYSTEM AND THE RECEIVING
WATER(S). EROSION AND SEDIMENT CONTROL MEASURES IDENTIFIED IN THE PLAN SHALL BE
OBSERVED TO ENSURE THAT THEY ARE OPERATING CORRECTLY. WHERE DISCHARGE
LOCATIONS OR POINTS ARE ACCESSIBLE, THEY SHALL BE INSPECTED TO ASCERTAIN WHETHER
EROSION CONTROL MEASURES ARE EFFECTIVE IN PREVENTING SIGNIFICANT IMPACTS TO
RECEIVING WATER(S).
5. BASED ON THE RESULTS OF EACH INSPECTION, THE SITE DESCRIPTION AND THE POLLUTION
PREVENTION AND CONTROL MEASURES IDENTIFIED IN THE EROSION, SEDIMENTATION AND
POLLUTION CONTROL PLAN, THE PLAN SHALL BE REVISED AS APPROPRIATE NOT LATER THAN
SEVEN (7) CALENDAR DAYS FOLLOWING EACH INSPECTION. IMPLEMENTATION OF SUCH
CHANGES SHALL BE MADE AS SOON AS PRACTICAL BUT IN NO CASE LATER THAN SEVEN (7)
CALENDAR DAYS FOLLOWING EACH INSPECTION.
6. A REPORT OF EACH INSPECTION THAT INCLUDES THE NAME(S) OF CERTIFIED PERSONNEL
MAKING EACH INSPECTION, THE DATE(S) OF EACH INSPECTION, CONSTRUCTION PHASE (I.E., INITIAL, INTERMEDIATE OR FINAL), MAJOR OBSERVATIONS RELATING TO THE IMPLEMENTATION
OF THE EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN, AND ACTIONS TAKEN IN
ACCORDANCE WITH PART IV.D.4.a.(5). OF THE PERMIT SHALL BE MADE AND RETAINED AT THE SITE OR BE READILY AVAILABLE AT A DESIGNATED ALTERNATE LOCATION UNTIL THE ENTIRE SITE
OR THAT PORTION OF A CONSTRUCTION PROJECT THAT HAS BEEN PHASED HAS UNDERGONE
FINAL STABILIZATION AND A NOTICE OF TERMINATION IS SUBMITTED TO EPD. SUCH REPORTS
SHALL BE READILY AVAILABLE BY END OF THE SECOND BUSINESS DAY AND/OR WORKING DAY
AND SHALL IDENTIFY ALL INCIDENTS OF BEST MANAGEMENT PRACTICES THAT HAVE NOT BEEN
PROPERLY INSTALLED AND/OR MAINTAINED AS DESCRIBED IN THE PLAN. WHERE THE REPORT
DOES NOT IDENTIFY ANY INCIDENTS, THE INSPECTION REPORT SHALL CONTAIN A
CERTIFICATION THAT THE BEST MANAGEMENT PRACTICES ARE IN COMPLIANCE WITH THE
EROSION, SEDIMENTATION AND POLLUTION CONTROL PLAN. THE REPORT SHALL BE SIGNED IN
ACCORDANCE WITH PART V.G.2 OF THIS PERMIT.
AN "EROSION & SEDIMENTATION INSPECTION AND MAINTENANCE REPORT" SHEET IS
ATTACHED. SHOULD THE INSPECTION REVEAL ANY DEFICIENCIES, A COPY SHALL BE SENT
TO:
WILLIAM EUBANK
THOMAS & HUTTON
3363 WHEELER RD., SUITE 385
AUGUSTA, GA 30909
706.910.7387
31.PROVIDE COMPLETE REQUIREMENTS OF SAMPLING FREQUENCY AND REPORTING OF SAMPLING RESULTS. (PART IV.D.6.d PG 38-39 & PART IV.E PG 40)
SAMPLING REQUIREMENTS. THIS PERMIT REQUIRES THE MONITORING OF
NEPHELOMETRIC TURBIDITY IN RECEIVING WATER(S) OR OUTFALLS IN ACCORDANCE
WITH THIS PERMIT. THIS PARAGRAPH SHALL NOT APPLY TO ANY LAND DISTURBANCE
ASSOCIATED WITH THE CONSTRUCTION OF SINGLE-FAMILY HOMES WHICH ARE NOT
PART OF A SUBDIVISION OR PLANNED COMMON DEVELOPMENT UNLESS FIVE (5)
ACRES OR MORE WILL BE DISTURBED. THE FOLLOWING PROCEDURES CONSTITUTE
EPD'S GUIDELINES FOR SAMPLING TURBIDITY.
a. SAMPLING REQUIREMENTS SHALL INCLUDE THE FOLLOWING:
(1) A USGS TOPOGRAPHIC MAP, A TOPOGRAPHIC MAP OR A DRAWING (REFERRED TO AS A
TOPOGRAPHIC MAP) THAT IS A SCALE EQUAL TO OR MORE DETAILED THAN A 1:24000 MAP
SHOWING THE LOCATION OF THE SITE OR THE STAND ALONE CONSTRUCTION; (a) THE
LOCATION OF ALL PERENNIAL AND INTERMITTENT STREAMS AND OTHER WATER BODIES
LOCATED DURING MANDATORY FIELD VERIFICATION, INTO WHICH THE STORM WATER IS
DISCHARGED AND (b) THE RECEIVING WATER AND/OR OUTFALL SAMPLING LOCATIONS.
WHEN THE PERMITTEE HAS CHOSEN TO USE A USGS TOPOGRAPHIC MAP AND THE
RECEIVING WATER(S) IS NOT SHOWN ON THE USGS TOPOGRAPHIC MAP, THE LOCATION
FOR THE RECEIVING WATER(S) MUST BE HAND-DRAWN ON THE USGS TOPOGRAPHIC MAP
FROM WHERE THE STORM WATER(S) ENTERS THE RECEIVING WATER(S) TO THE POINT WHERE
THE RECEIVING WATER(S) COMBINES WITH THE FIRST BLUE LINE STREAM SHOWN ON THE
USGS TOPOGRAPHIC MAP;
(2) A WRITTEN NARRATIVE OF SITE SPECIFIC ANALYTICAL METHODS USED TO COLLECT,
HANDLE AND ANALYZE THE SAMPLES INCLUDING QUALITY CONTROL/QUALITY
ASSURANCE PROCEDURES. THIS NARRATIVE MUST INCLUDE PRECISE SAMPLING
METHODOLOGY FOR EACH SAMPLING LOCATION;
(3) WHEN THE PERMITTEE HAS DETERMINED THAT SOME OR ALL OUTFALLS WILL BE SAMPLED, A
RATIONALE MUST BE INCLUDED ON THE PLAN FOR THE NTU LIMIT(S) SELECTED FROM
APPENDIX b. THIS RATIONALE MUST INCLUDE THE SIZE OF THE CONSTRUCTION SITE, THE
CALCULATION OF THE SIZE OF THE SURFACE WATER DRAINAGE AREA, AND THE TYPE OF
RECEIVING WATER(S) (I.E., TROUT STREAM OR SUPPORTING WARM WATER FISHERIES); AND
(4) ANY ADDITIONAL INFORMATION EPD DETERMINES NECESSARY TO BE PART OF THE PLAN.
EPD WILL PROVIDE WRITTEN NOTICE TO THE PERMITTEE OF THE INFORMATION NECESSARY
AND THE TIME LINE FOR SUBMITTAL.
b. SAMPLE TYPE. ALL SAMPLING SHALL BE COLLECTED BY "GRAB SAMPLES" AND THE ANALYSIS
OF THESE SAMPLES MUST BE CONDUCTED IN ACCORDANCE WITH METHODOLOGY AND TEST
PROCEDURES ESTABLISHED BY 40 CFR PART 136 (UNLESS OTHER TEST PROCEDURES HAVE BEEN
APPROVED); THE GUIDANCE DOCUMENT TITLED "NPDES STORM WATER SAMPLING GUIDANCE
DOCUMENT, EPA 833-B-92-001" AND GUIDANCE DOCUMENTS THAT MAY BE PREPARED BY THE
EPD.
1. SAMPLE CONTAINERS SHOULD BE LABELED PRIOR TO COLLECTING THE SAMPLES.
2. SAMPLES SHOULD BE WELL MIXED BEFORE TRANSFERRING TO A SECONDARY CONTAINER.
3. LARGE MOUTH, WELL CLEANED AND RINSED GLASS OR PLASTIC JARS SHOULD BE USED
FOR COLLECTING SAMPLES. THE JARS SHOULD BE CLEANED THOROUGHLY TO AVOID
CONTAMINATION.
4. MANUAL, AUTOMATIC OR RISING STAGE SAMPLING MAY BE UTILIZED. SAMPLES REQUIRED
BY THIS PERMIT SHOULD BE ANALYZED IMMEDIATELY, BUT IN NO CASE LATER THAN 48
HOURS AFTER COLLECTION. HOWEVER, SAMPLES FROM AUTOMATIC SAMPLERS MUST BE
COLLECTED NO LATER THAN THE NEXT BUSINESS DAY AFTER THEIR ACCUMULATION, UNLESS
FLOW THROUGH AUTOMATED ANALYSIS IS UTILIZED. IF AUTOMATIC SAMPLING IS UTILIZED
AND THE AUTOMATIC SAMPLER IS NOT ACTIVATED DURING THE QUALIFYING EVENT, THE
PERMITTEE MUST UTILIZE MANUAL SAMPLING OR RISING STAGE SAMPLING DURING THE
NEXT QUALIFYING EVENT. DILUTION OF SAMPLES IS NOT REQUIRED. SAMPLES MAY BE
ANALYZED DIRECTLY WITH A PROPERLY CALIBRATED TURBIDIMETER. SAMPLES ARE NOT
REQUIRED TO BE COOLED.
5. SAMPLING AND ANALYSIS OF THE RECEIVING WATER(S) OR OUTFALLS BEYOND THE
MINIMUM FREQUENCY STATED IN THE PERMIT MUST BE REPORTED TO EPD AS SPECIFIED IN
PART IV.E. OF THE PERMIT.
c. SAMPLING POINTS: THERE WILL BE 1 STORM WATER SAMPLING LOCATIONS. THE SAMPLING
LOCATION WILL BE THE DOWNSTREAM POINTS, PER NPDES PERMIT GAR 100002, FOR
CONSTRUCTION ACTIVITIES, THE PRIMARY PERMITTEE MUST COMPLETE ALL SAMPLING.
1. FOR CONSTRUCTION ACTIVITIES THE PRIMARY PERMITTEE MUST SAMPLE ALL RECEIVING
WATER(S) OR ALL OUTFALL(S), OR A COMBINATION OF RECEIVING WATER(S) AND
OUTFALL(S). SAMPLES TAKEN FOR THE PURPOSE OF COMPLIANCE WITH THIS PERMIT SHALL
BE REPRESENTATIVE OF THE MONITORED ACTIVITY AND REPRESENTATIVE OF THE WATER
QUALITY OF THE RECEIVING WATER(S) AND/OR THE STORM WATER OUTFALL(S) USING THE
FOLLOWING MINIMUM GUIDELINES:
A. THE UPSTREAM SAMPLE FOR EACH RECEIVING WATER(S) MUST BE TAKEN IMMEDIATELY
UPSTREAM OF THE CONFLUENCE OF THE FIRST STORM WATER DISCHARGE FROM THE
PERMITTED ACTIVITY (I.E., THE DISCHARGE FARTHEST UPSTREAM AT THE SITE) BUT DOWNSTREAM
OF ANY OTHER STORM WATER DISCHARGES NOT ASSOCIATED WITH THE PERMITTED ACTIVITY,
WHERE APPROPRIATE, SEVERAL UPSTREAM SAMPLES FROM ACROSS THE RECEIVING WATER(S)
MAY NEED TO BE TAKEN AND THE ARITHMETIC AVERAGE OF THE TURBIDITY OF THESE SAMPLES
USED FOR THE UPSTREAM TURBIDITY VALUE.
B. THE DOWNSTREAM SAMPLE FOR EACH RECEIVING WATER(S) MUST BE TAKEN DOWNSTREAM
OF THE CONFLUENCE OF THE LAST STORM WATER DISCHARGE FROM THE PERMITTED ACTIVITY
(I.E., THE DISCHARGE FARTHEST DOWNSTREAM AT THE SITE) BUT UPSTREAM OF ANY OTHER
STORM WATER DISCHARGE NOT ASSOCIATED WITH THE
PERMITTED ACTIVITY. WHERE APPROPRIATE, SEVERAL DOWNSTREAM SAMPLES FROM
ACROSS THE RECEIVING WATER(S) MAY NEED TO BE TAKEN AND THE ARITHMETIC
AVERAGE OF THE TURBIDITY OF THESE SAMPLES USED FOR THE DOWNSTREAM TURBIDITY
VALUE.
C. IDEALLY THE SAMPLES SHOULD BE TAKEN FROM THE HORIZONTAL AND VERTICAL
CENTER OF THE RECEIVING WATER(S) OR THE STORM WATER OUTFALL CHANNELS(S).
D. CARE SHOULD BE TAKEN TO AVOID STIRRING THE BOTTOM SEDIMENTS IN THE
RECEIVING WATER(S) OR IN THE OUTFALL STORM WATER CHANNEL.
E. THE SAMPLING CONTAINER SHOULD BE HELD SO THAT THE OPENING FACES
UPSTREAM.
F. THE SAMPLES SHOULD BE KEPT FREE FROM FLOATING DEBRIS.
G. PERMITTEES DO NOT HAVE TO SAMPLE SHEETFLOW THAT FLOWS ONTO UNDISTURBED
NATURAL AREAS OR AREAS STABILIZED BY THE PROJECT. FOR PURPOSES OF THIS
SECTION, STABILIZED SHALL MEAN, FOR UNPAVED AREAS AND AREAS NOT COVERED
BY PERMANENT STRUCTURES AND AREAS LOCATED OUTSIDE THE WASTE DISPOSAL
LIMITS OF A LANDFILL CELL THAT HAS BEEN CERTIFIED BY EPD FOR WASTE DISPOSAL,
100% OF THE SOIL SURFACE IS UNIFORMLY COVERED IN PERMANENT VEGETATION
WITH A DENSITY OF 70% OR GREATER, OR LANDSCAPED ACCORDING TO THE PLAN
(UNIFORMLY COVERED WITH LANDSCAPING MATERIALS IN PLANNED LANDSCAPED
AREAS), OR EQUIVALENT PERMANENT STABILIZATION MEASURES AS DEFINED IN THE
MANUAL (EXCLUDING A CROP OF ANNUAL VEGETATION AND A SEEDING OF
TARGET CROP PERENNIALS APPROPRIATE FOR THE REGION).
H. ALL SAMPLING PURSUANT TO THIS PERMIT MUST BE DONE IN SUCH A WAY
(INCLUDING GENERALLY ACCEPTED SAMPLING METHODS, LOCATIONS, TIMING AND
FREQUENCY) AS TO ACCURATELY REFLECT WHETHER STORM WATER RUNOFF FROM
THE CONSTRUCTION SITE IS IN COMPLIANCE WITH THE STANDARD SET FORTH IN PARTS
III.D.3. OR III.D.4., WHICHEVER IS APPLICABLE.
d. SAMPLING FREQUENCY
1. THE PRIMARY PERMITTEE MUST SAMPLE IN ACCORDANCE WITH THE PLAN AT LEAST ONCE
FOR EACH RAINFALL EVENT DESCRIBED BELOW. FOR A QUALIFYING EVENT, THE PERMITTEE
SHALL SAMPLE AT THE BEGINNING OF ANY STORM WATER DISCHARGE TO A MONITORED
RECEIVING WATER AND/OR FROM A MONITORED OUTFALL LOCATION WITHIN FORTY-FIVE
(45) MINUTES OR AS SOON AS POSSIBLE.
2. HOWEVER, WHERE MANUAL AND AUTOMATIC SAMPLING ARE IMPOSSIBLE (AS DEFINED IN
THIS PERMIT), OR ARE BEYOND THE PERMITTEE'S CONTROL, THE PERMITTEE SHALL TAKE
SAMPLES AS SOON AS POSSIBLE, BUT IN NO CASE MORE THAN TWELVE (12) HOURS AFTER
THE BEGINNING OF THE STORM WATER DISCHARGE.
3. SAMPLING BY THE PERMITTEE SHALL OCCUR FOR THE FOLLOWING QUALIFYING EVENTS:
A. FOR EACH AREA OF THE SITE THAT DISCHARGES TO A RECEIVING WATER OR FROM
AN OUTFALL, THE FIRST RAIN EVENT THAT REACHES OR EXCEEDS 0.5 INCH WITH A
STORM WATER DISCHARGE THAT OCCURS DURING NORMAL BUSINESS HOURS AS
DEFINED IN THIS PERMIT AFTER ALL CLEARING AND GRUBBING OPERATIONS HAVE
BEEN COMPLETED, BUT PRIOR TO COMPLETION OF MASS GRADING OPERATIONS, IN
THE DRAINAGE AREA OF THE LOCATION SELECTED AS THE SAMPLING LOCATION;
B. IN ADDITION TO (A.) ABOVE, FOR EACH AREA OF THE SITE THAT DISCHARGES TO A
RECEIVING WATER OR FROM AN OUTFALL, THE FIRST RAIN EVENT THAT REACHES OR
EXCEEDS 0.5 INCH WITH A STORM WATER DISCHARGE THAT OCCURS DURING
NORMAL BUSINESS HOURS AS DEFINED IN THE PERMIT EITHER 90 DAYS AFTER THE FIRST
SAMPLING EVENT OR AFTER ALL MASS GRADING OPERATIONS HAVE BEEN
COMPLETED, BUT PRIOR TO SUBMITTAL OF A NOT, IN THE DRAINAGE AREA OF THE
LOCATION SELECTED AS THE SAMPLING LOCATIONS, WHICHEVER COMES FIRST;
C. AT THE TIME OF SAMPLING PERFORMED PURSUANT TO (A) AND (B) ABOVE, IF BMPS IN
ANY AREA OF THE SITE THAT DISCHARGES TO A RECEIVING WATER OR FROM AN
OUTFALL ARE NOT PROPERLY DESIGNED, INSTALLED AND MAINTAINED, CORRECTIVE
ACTION SHALL BE DEFINED AND IMPLEMENTED WITHIN TWO (2) BUSINESS DAYS, AND
TURBIDITY SAMPLES SHALL BE TAKEN FROM DISCHARGES FROM THAT AREA OF THE
SITE FOR EACH SUBSEQUENT RAIN EVENT THAT REACHES OR EXCEEDS 0.5 INCH
DURING NORMAL BUSINESS HOURS* UNTIL THE SELECTED TURBIDITY STANDARD IS
ATTAINED, OR UNTIL POST-STORM EVENT INSPECTIONS DETERMINE THAT BMPS ARE
PROPERLY DESIGNED, INSTALLED AND MAINTAINED;
D. WHERE SAMPLING PURSUANT TO (A), (B) OR (C) ABOVE IS REQUIRED BUT NOT
POSSIBLE (OR NOT REQUIRED BECAUSE THERE WAS NO DISCHARGE), THE PERMITTEE,
IN ACCORDANCE WITH PART IV.D.4.a.(6), MUST INCLUDE A WRITTEN JUSTIFICATION
IN THE INSPECTION REPORT OF WHY SAMPLING WAS NOT PERFORMED. PROVIDING
THIS JUSTIFICATION DOES NOT RELIEVE THE PERMITTEE OF ANY SUBSEQUENT
SAMPLING OBLIGATIONS UNDER (A), (B) OR (C) ABOVE; AND
E. EXISTING CONSTRUCTION ACTIVITIES, I.E., THOSE THAT ARE OCCURRING ON OR
BEFORE THE EFFECTIVE DATE OF THIS PERMIT, THAT HAVE MET THE SAMPLING
REQUIRED BY (A) ABOVE SHALL SAMPLE IN ACCORDANCE WITH (B). THOSE EXISTING
CONSTRUCTION ACTIVITIES THAT HAVE MET THE SAMPLING REQUIRED BY (B) ABOVE
SHALL NOT BE REQUIRED TO CONDUCT ADDITIONAL SAMPLING OTHER THAN AS
REQUIRED BY (C) ABOVE.
*NOTE THAT THE PERMITTEE MAY CHOOSE TO MEET THE REQUIREMENTS OF (A) AND
(B) ABOVE BY COLLECTING TURBIDITY SAMPLES FROM ANY RAIN EVENT THAT
REACHES OR EXCEEDS 0.5 INCH AND ALLOWS FOR SAMPLING AT ANY TIME OF THE
DAY OR WEEK.
REPORTING
1. THE APPLICABLE PERMITTEES ARE REQUIRED TO SUBMIT THE SAMPLING RESULTS TO THE EPD
AT THE ADDRESS SHOWN IN PART II.C BY THE FIFTEENTH DAY OF THE MONTH FOLLOWING
THE REPORTING PERIOD. REPORTING PERIODS ARE MONTHS DURING WHICH SAMPLES ARE
TAKEN IN ACCORDANCE WITH THIS PERMIT. SAMPLING RESULTS SHALL BE IN A CLEARLY
LEGIBLE FORMAT. UPON WRITTEN NOTIFICATION, EPD MAY REQUIRE THE APPLICABLE
PERMITTEE TO SUBMIT THE SAMPLING RESULTS ON A MORE FREQUENT BASIS. SAMPLING
YESEC0.2
YESEC0.2
CONSTRUCTION SCHEDULE
ACTIVITY 1
PERIMETER BMPS
TEMPORARY SEDIMENT
CONTROL BMPS
SITE CLEARING
TEMPORARY GRASSING
PERMANENT GRASSING
FINAL STABILIZATION/
BMP REMOVAL
BMP MAINTENANCE
SITE GRADING
1. OBTAIN ALL PLAN APPROVALS AND OTHER
APPLICABLE PERMITS.
2. FLAG THE WORK LIMITS AND MARK THE TREES
AND BUFFER AREAS FOR PROTECTION.
3. HOLD PRE CONSTRUCTION CONFERENCE AT LEAST
ONE WEEK PRIOR TO STARTING CONSTRUCTION.
4. CONSTRUCTION ACCESS - CONSTRUCTION
ENTRANCE, CONSTRUCTION ROUTES, EQUIPMENT
PARKING AREAS.
5. SEDIMENT TRAPS AND BARRIERS - BASIN TRAPS,
SEDIMENT FENCES, AND OUTLET PROTECTION.
6. RUNOFF CONTROL - DIVERSIONS, PERIMETER
DIKES, WATER BARS, AND OUTLET PROTECTION.
7. RUNOFF CONVEYANCE SYSTEM- STABILIZE
STREAM BANKS, STORM DRAINS, CHANNELS, INLET
AND OUTLET PROTECTION, SLOPE DRAINS.
8. LAND CLEARING AND GRADING - SITE
PREPARATION CUTTING, FILLING AND GRADING,
SEDIMENTATION TRAPS, BARRIERS, DIVERSIONS,
DRAINS,SURFACE ROUGHENING.
9. SURFACE STABILIZATION - TEMPORARY AND
PERMANENT SEEDING, MULCHING, SODDING, RIPRAP.
10. BUILDING CONSTRUCTION- BUILDINGS UTILITIES,
PAVING.
11. LANDSCAPING AND FINAL STABILIZATION -
TOPSOILING, TREES AND SHRUBS, PERMANENT
SEEDING, MULCHING, SODDING RIPRAP.
LAST CONSTRUCTION PHASE--STABILIZE ALL OPEN
AREAS, INCLUDING BORROW AND SPOIL AREAS.
REMOVE AND STABILIZE ALL TEMPORARY CONTROL
MEASURES.
APPLY TEMPORARY OR PERMANENT STABILIZATION
MEASURES IMMEDIATELY ON ALL DISTURBED AREAS
WHERE WORK IS DELAYED OR COMPLETE.
INSTALL NECESSARY EROSION AND SEDIMENTATION
CONTROL PRACTICES AS WORK TAKES PLACE.
BEGIN MAJOR CLEARING AND GRADING AFTER
PRINCIPAL SEDIMENT AND KEY RUNOFF - CONTROL
MEASURES ARE INSTALLED. INSTALL ADDITIONAL
CONTROL MEASURES AS GRADING PROGRESSES.
MARK TREES AND BUFFER AREAS FOR PRESERVATION.
WHERE NECESSARY, STABILIZE STREAM BANKS AS
EARLY AS POSSIBLE. INSTALL PRINCIPAL RUNOFF
CONVEYANCE SYSTEM WITH RUNOFF- CONTROL
MEASURES. INSTALL REMAINDER OF SYSTEM AFTER
GRADING.
INSTALL KEY PRACTICES AFTER PRINCIPAL SEDIMENT
TRAPS AND BEFORE LAND GRADING. INSTALL
ADDITIONAL RUNOFF-CONTROL MEASURES DURING
GRADING.
INSTALL PRINCIPAL BASINS AFTER CONSTRUCTION SITE
IS ACCESSED. INSTALL ADDITIONAL TRAPS AND
BARRIERS AS NEEDED DURING GRADING.
FIRST LAND DISTURBING ACTIVITY - STABILIZE BARE
AREAS IMMEDIATELY WITH GRAVEL AND
TEMPORARY VEGETATION AS CONSTRUCTION TAKES
PLACE.
CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION
MONTH
2 3 4 5 6
UTILITY INSTALLATION
ROAD CONSTRUCTION
SITE PAVING
EROSION,SEDIMENTATION & POLLUTION CONTROL PLAN CHECKLIST -
INFRASTRUCTURE PROJECTS
ADDRESS: RITZ AVE, WAYNESBORO, GA 30830
DATE ON PLANS: 3/11/25
REVISED DATE:
SWCD: BRIER CREEK SWCD
PROJECT NAME: RITZ AVENUE
CITY/COUNTY: WAYNESBORO/ BURKE
1" = 200'
Z:
\2
\2
.0
5\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
EC
-N T.
D W
G
Ju n
, 2
- 3 :4
PM
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
ES & PC NOTES
EC0.2
26179.0005
PHASE 01
ZKR
200 FEET
200 100 200
GSWCC ID: 0000064323
EXP: 12/22/2027
6-18-25
F
IN
A L
D R
A W
IN
G
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
AND ANALYSIS OF ANY STORM WATER DISCHARGE(S) OR THE RECEIVING WATER(S)
BEYOND THE MINIMUM FREQUENCY STATED IN THIS PERMIT MUST BE REPORTED IN A SIMILAR
MANNER TO THE EPD. THE SAMPLING REPORTS MUST BE SIGNED IN ACCORDANCE WITH
PART V.G.2. SAMPLING REPORTS MUST BE SUBMITTED TO EPD USING THE ELECTRONIC
SUBMITTAL SERVICE PROVIDED BY EPD. SAMPLING REPORTS MUST BE SUBMITTED TO EPD
UNTIL SUCH TIME AS A NOT IS SUBMITTED IN ACCORDANCE WITH PART VI.
2. ALL SAMPLING REPORT SHALL INCLUDE THE FOLLOWING INFORMATION:
a. THE RAINFALL AMOUNT, DATE, EXACT PLACE AND TIME OF SAMPLING OR
MEASUREMENTS;
b. THE NAME(S) OF THE CERTIFIED PERSONNEL WHO PERFORMED THE
SAMPLING AND MEASUREMENTS;
c. THE DATE(S) ANALYSES WERE PERFORMED;
d. THE TIME(S) ANALYSES WERE INITIATED;
e. THE NAMES(S) OF THE CERTIFIED PERSONNEL WHO PERFORMED THE ANALYSES;
f. REFERENCES AND WRITTEN PROCEDURES , WHEN AVAILABLE, FOR THE
ANALYTICAL TECHNIQUES OR METHODS USED;
g. THE RESULTS OF SUCH ANALYSES, INCLUDING THE BENCH SHEETS, INSTRUMENT
READOUTS, COMPUTER DISKS OR TAPES, ETC., USED TO DETERMINE THESE
RESULTS;
h. RESULTS WHICH EXCEED 1000 NTU SHALL BE REPORTED AS "EXCEEDS 1000 NTU;"
AND
i. CERTIFICATION STATEMENT THAT SAMPLING WAS CONDUCTED AS PER THE
PLAN.
3. ALL WRITTEN CORRESPONDENCE REQUIRED BY THIS PERMIT SHALL BE SUBMITTED BY RETURN RECEIPT CERTIFIED MAIL (OR SIMILAR SERVICE) TO THE APPROPRIATE DISTRICT OFFICE OF
THE EPD ACCORDING TO THE SCHEDULE IN APPENDIX A OF THIS PERMIT. THE PERMITTEE
SHALL RETAIN A COPY OF THE PROOF OF SUBMITTAL AT THE CONSTRUCTION SITE OR THE
PROOF OF SUBMITTAL SHALL BE READILY AVAILABLE AT A DESIGNATED LOCATION FROM
COMMENCEMENT OF CONSTRUCTION UNTIL SUCH TIME AS A NOT IS SUBMITTED IN
ACCORDANCE WITH PART VI.
EPD OFFICE:
EAST CENTRAL DISTRICT - AUGUSTA OFFICE
GEORGIA ENVIRONMENTAL PROTECTION DIVISION
3525 WALTON WAY EXT.
AUGUSTA, GA 30909
(706)-667-4343
32. PROVIDE COMPLETE DETAILS FOR RETENTION OF RECORDS AS PER PART IV.F. PG 38 OF THE PERMIT.
RETENTION OF RECORDS
1. THE PRIMARY PERMITTEE SHALL RETAIN THE FOLLOWING RECORDS AT THE CONSTRUCTION
SITE OR THE RECORDS SHALL BE READILY AVAILABLE AT A DESIGNATED ALTERNATE
LOCATION FROM COMMENCEMENT OF CONSTRUCTION UNTIL SUCH TIME AS A NOTICE OF
TERMINATION IS SUBMITTED IN ACCORDANCE WITH PART VI.
· COPY OF ALL NOTICES OF INTENT SUBMITTED TO EPD.
· A COPY OF THE ES&PC PLAN REQUIRED IN PERMIT No. GAR 100002.
· THE DESIGN PROFESSIONALS REPORT OF THE THE RESULTS OF THE INSPECTION
CONDUCTED IN ACCORDANCE WITH PART IV.A.5 IN PERMIT
No. GAR 100002.
· A COPY OF ALL SAMPLING INFORMATION , RESULTS, AND REPORTS REQUIRED BY IN
PERMIT No. GAR 100002.
· A COPY OF ALL INSPECTION REPORTS GENERATED IN ACCORDANCE WITH PART
IV.D.4.a OF PERMIT No. GAR 100002.
· A COPY OF ALL VIOLATION SUMMARIES AND VIOLATION SUMMARY REPORTS
GENERATED IN ACCORDANCE WITH PART III.D.2 IN PERMIT No. GAR 100002.
· DAILY RAINFALL INFORMATION COLLECTED IN ACCORDANCE WITH PART
IV.D.4.a.(2). IN PERMIT No. GAR 100002.
2. COPIES OF ALL NOTICES OF INTENT, NOTICES OF TERMINATION, INSPECTION REPORTS,
SAMPLING REPORTS (INCLUDING ALL CALIBRATION AND MAINTENANCE RECORDS
AND ALL ORIGINAL STRIP CHART RECORDINGS FOR CONTINUOUS MONITORING
INSTRUMENTATION) OR OTHER REPORTS REQUESTED BY THE EPD, EROSION,
SEDIMENTATION AND POLLUTION CONTROL PLANS, RECORDS OF ALL DATA USED TO
COMPLETE THE NOTICE OF INTENT TO BE COVERED BY THIS PERMIT AND ALL OTHER
RECORDS REQUIRED BY THIS PERMIT SHALL BE RETAINED BY THE PERMITTEE WHO
EITHER PRODUCED OR USED IT FOR A PERIOD OF AT LEAST THREE YEARS FROM THE
DATE THAT THE NOTICE OF TERMINATION IS SUBMITTED IN ACCORDANCE WITH PART
VI OF THE GAR100002. THESE RECORDS MUST BE MAINTAINED AT THE PERMITTEE'S
PRIMARY PLACE OF BUSINESS OR AT A DESIGNATED ALTERNATIVE LOCATION ONCE
THE CONSTRUCTION ACTIVITY HAS CEASED AT THE PERMITTED SITE. THIS PERIOD MAY
BE EXTENDED BY REQUEST OF THE EPD AT ANY TIME UPON WRITTEN NOTIFICATION TO
THE PERMITTEE.
33. DESCRIPTION OF ANALYTICAL METHODS TO BE USED TO COLLECT AND ANALYZE THE SAMPLES FROM EACH LOCATION. (PERMIT IV.D.6.a.-c. PG 34-35)
STORM WATER SAMPLES ARE TO BE ANALYZED IN ACCORDANCE WITH METHODOLOGY
AND TEST PROCEDURES ESTABLISHED BY 40 CFR PART 136 AND THE GUIDANCE DOCUMENT
TITLED "NPDES STORM WATER SAMPLING GUIDANCE DOCUMENT EPA 833-8-92-001.
34. APPENDIX B RATIONALE FOR NTU VALUES AT ALL OUTFALL SAMPLING POINTS WHERE APPLICABLE. (PERMIT IV.D.6.a.(3) PG 34)
STORM WATER IS TO BE SAMPLED FOR NEPHELOMETRIC TURBIDITY UNITS (NTU) AT THE
OUTFALL LOCATIONS. A DISCHARGE OF STORM WATER RUNOFF FROM DISTURBED AREAS
WHERE BEST MANAGEMENT PRACTICES HAVE NOT BEEN PROPERLY DESIGNED, INSTALLED,
AND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .