26094 Fivemile Hydroelectric - Phase 1 Construction ITB Manual

This is an Invitation to Bid (ITB) manual for Chitina Electric, Inc., the project owner, with HDR Engineering, Inc. serving as the engineer. The project involves Phase 1 construction of infrastructure to support a future hydroelectric generating facility near Chitina, Alaska. The scope of work includes construction of a pioneer road, staging areas, retaining walls, an access gate, culverts, and installation of a section of penstock designed to supply water to the hydroelectric facility. Construction of the actual hydropower facility and all electrical work are reserved for future contracts. The manual establishes the bidding procedures, contract terms, and technical requirements that prospective contractors must follow to submit competitive bids for the construction work.

The ITB manual provides contractors with comprehensive information regarding bid submission procedures, contract conditions, technical specifications, and project requirements necessary to prepare and submit proposals. Specific details regarding response deadlines, bid opening dates, site visit requirements, pre-bid conferences, contract award timelines, and contract term provisions are contained within the manual. Pricing and cost proposal requirements, any applicable set-asides, funding sources, and financial terms governing the contract are documented in the manual's detailed sections. Contractors should review all sections of this manual thoroughly to ensure full compliance with bidding requirements and to understand all terms and conditions that will govern the executed contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Manual For:

Fivemile Hydroelectric Project – General Construction

Project No. 26094

State of Alaska Alaska Energy Authority 813 W Northern Lights Blvd, Anchorage, Alaska 99503

Advertising Date: July 23, 2026 i Table of Contents

Table of Contents

DIVISION 00 – BIDDING AND CONTRACT REQUIREMENTS

Section No. Form Date

Invitation

00 02 00 INVITATION TO BID 25D-7 (8/01)

Bid Notices

00 10 00 INFORMATION TO BIDDERS 25D-3 (7/88)

00 10 10 SUPPLEMENTARY INFORMATION TO BIDDERS (11/92)

00 11 50A SPECIAL NOTICE TO BIDDERS

00 12 00 REQUIRED DOCUMENTS 25D-4 (4/12)

Forms

00 12 90 FEDERAL EEO BID CONDITIONS 25A-301 (8/01)

00 31 00 PROPOSAL 25D-9A (07/03)

00 32 00 BID SCHEDULE

00 41 00 BID BOND 25D-14 (8/01)

00 42 00 BID MODIFICATION 25D-16 (8/01)

00 43 00 SUBCONTRACTOR LIST 25D-5 (10/12)

00 51 00 CONSTRUCTION CONTRACT 25D-10A (8/01)

00 61 00 PERFORMANCE BOND 25D-13 (8/01)

00 62 00 PAYMENT BOND 25D-12 (8/01)

00 67 00 CONTRACTOR'S QUESTIONNAIRE 25D-8 (8/01)

Contract Provisions and Specifications

00 70 00 GENERAL CONDITIONS

00 80 00 SUPPLEMENTARY CONDITIONS

00 90 00 FEDERAL ASSURANCES

Project Manual ii Table of Contents

DIVISION 01 – GENERAL REQUIREMENTS

Section 01 11 00 - Summary of Work

Section 01 30 00 - Special Conditions Section 01 33 04 - Operation and Maintenance Manuals

Section 01 35 05 - Environmental Protection and Special Controls Section 01 74 13 - Cleaning

DIVISION 02 - 40 - TECHNICAL SPECIFICATIONS

DIVISION 31 — EARTHWORK

Section 31 10 00 - SITE CLEARING Section 31 21 33 - TRENCHING, BACKFILLING, AND

COMPACTING FOR UTILITIES

Section 31 23 00 - EARTHWORK Section 31 25 00 - SOIL EROSION AND SEDIMENT

CONTROL

Section 31 37 00 - STONE REVETMENT (RIP RAP)

DIVISION 40 — PROCESS INTERCONNECTIONS

Section 40 20 44 - PIPE POLYETHYLENE (HDPE)

END TABLE OF CONTENTS

Form 25D-7 (8/01) 00 02 00 Page 1 of 2

ALASKA ENERGY AUTHORITY

INVITATION TO BID

for Construction Contract

Date July 23, 2026

Fivemile Hydroelectric - Phase 1 Construction No. 26094

Location of Project: Fivemile Creek, Alaska Contract Officer: Selwin C. Ray Issuing Office: Alaska Energy Authority (Authority)

State Funded [ ] Federal Aid [ x ]

Description of Work: The Work under this Contract consists of the construction of a pioneer road, staging areas, retaining walls, access gate, culverts and installation of a section of penstock that will supply water to a future hydroelectric generating facility near the city of Chitina, AK as specified on the Drawings. The "Owner" is Chitina Electric, Inc and the "Engineer" is HDR Engineering, Inc. Construction of the hydropower facility and all electrical work will be a part of a future contract.

The Engineer’s Estimate is between $1,500,000 and $2,000,000

All portions of the work shall be substantially completed by dates indicated in Section 01 11 13 - Summary of Work.

Bidders are invited to submit single bid, for furnishing all labor, equipment, and materials and for performing all work for the project described above.

Bids will be opened publicly on August 11, 2026 at 2:00 PM local time. The bid opening will be conducted telephonically. Potential bidders may attend telephonically by calling 1- 469-810-0642 and when prompted enter Conference I.D. 136 148 495# .

SUBMISSION OF BIDS

ALL BIDS INCLUDING ANY AMENDMENTS OR WITHDRAWALS MUST BE RECEIVED PRIOR TO BID OPENING. BIDS

SHALL BE SUBMITTED ON THE FORMS FURNISHED AND MUST BE MARKED AS FOLLOWS:

Bid for Project:

Fivemile Hydroelectric - Phase 1 Construction Project No. 26094

ATTN: Selwin C. Ray, Contract Officer Alaska Energy Authority 813 West Northern Lights Blvd.

Anchorage, AK 99503

Mailed Bids, amendments or withdrawals transmitted must be received at the above specified address no later than 4 hours prior to the scheduled time of bid opening. Hand-delivered bids, amendments or withdrawals must be received in the Bid Drop Box in front of the Alaska Energy Authority, prior to the scheduled time of bid opening. Emailed bid amendments or withdrawals must be received in the email inbox prior to the scheduled time of bid opening, addressed to:

Selwin C. Ray, Email: AEAProcurement@akenergyauthority.org

A bid guaranty is required with each bid in the amount of 5% of the amount bid. (Alternate bid items as well as supplemental bid items appearing on the bid schedule shall be included as part of the total amount bid when determining the amount of bid guaranty required for the project.)

Form 25D-7 (8/01) 00 02 00 Page 2 of 2

The Authority hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this Invitation, Disadvantaged Business Enterprises (DBEs) will be afforded full opportunity to submit bids and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award.

NOTICE TO BIDDERS

Bidders are hereby notified that data to assist in preparing bids is available as follows:

See attached Special Notice to Bidders for this project.

Electronic Plans and Specifications may be ordered, for the price of $0.00 from:

Alaska Energy Authority 813 West Northern Lights Blvd.

Anchorage, AK 99503

Phone: (907) 771-3035

All questions relating to design features, constructability, quantities, or other technical aspects of the project should be directed to the following. Bidders requesting assistance in viewing the project must make arrangements at least 48 hours in advance with:

James Mendenhall - Director, Owned Assets Phone: (907) 771-3040 Email: jwmendenhall@akenergyauthority.org

All questions relating to bidding procedures should be directed to:

Selwin Ray Contract Officer 813 West Northern Lights Blvd.

Anchorage, AK 99503 Phone: (907) 771-3035 (907) 771-3055 Email: AEAProcurement@akenergyauthority.org

The Bid Calendar, Planholder lists, and Bid Results information are available on the Internet at:

http://www.akenergyauthority.org/ under Procurement Opportunities.

Reminder: 3 AAC 109.220 requires all Bidders to have a valid Alaska Business License and an Alaska Contractor’s Certificate of Registration prior to award.

25D-3 (7/88) 00 10 00-1 Page 1 of 3

INFORMATION TO BIDDERS

The Authority is concerned over the manner in which bids are submitted. Bidders are requested to study and follow the bid assembly instructions as to the method and form for submitting bids so there will be no reason to reject a bid.

EXAMINATION OF CONTRACT REQUIREMENTS

Bidders are expected to examine carefully the plans, specifications and all other documents incorporated in the contract to determine the requirements thereof before preparing bids.

Any explanation desired by bidders regarding the meaning or interpretation of drawings and specifications must be requested in writing and with sufficient time allowed for a reply to reach them before the submission of their bids. Oral explanations or instructions given before the award of the contract will not be binding. Any interpretation made will be in the form of an addendum to the specifications or drawings and will be furnished to all bidders and its receipt by the bidder shall be acknowledged.

CONDITIONS AT SITE OF WORK

Bidders are expected to visit the site to ascertain pertinent local conditions such as the location, accessibility and character of the site, labor conditions, the character and extent of the existing work within or adjacent thereto, and any other work being performed thereon.

PREPARATION OF BIDS

(a) Bids shall be submitted on the forms furnished, and must be manually signed in ink. The person signing the proposal must initial any erasures or changes made to the bid.

(b) The bid schedule will provide for quotation of a price or prices for one or more pay items which may include unit price or lump sum items and alternative, optional or supplemental price schedules or a combination thereof which will result in a total bid amount for the proposed construction.

Where required on the bid form, bidders must quote on all items and THEY ARE WARNED that failure to do so will disqualify them. When quotations on all items are not required, bidders should insert the words "no bid" in the space provided for any item not requiring a quotation and for which no quotation is made.

(c) The bidder shall specify the price or prices bid in figures. On unit price contracts the bidder shall also show the products of the respective unit prices and quantities written in figures in the column provided for the purpose and the total amount of the proposal obtained by adding the amounts of the several items. All the figures shall be in ink or typed.

(d) Neither conditional nor alternative bids will be considered unless called for.

(e) Unless specifically called for, telegraphic or telefacsimile bids will not be considered.

(f) Bid Schedule form should be enclosed in a separate sealed envelope and enclosed with all other bidding forms required at the opening.

25D-3 (7/88) 00 10 00-2 Page 2 of 3

BID SECURITY

All bids shall be accompanied by a bid security in the form of an acceptable Bid Bond (Form 25D- 14), or a certified check, cashier's check or money order made payable to the Alaska Energy Authority.

The amount of the bid security is specified on the Invitation To Bid.

Bid Bonds must be accompanied by a legible Power of Attorney.

If the bidder fails to furnish an acceptable bid security with the bid, the bid shall be rejected as non-responsive. Telegraphic notification of execution of Bid Bond does not meet the requirements of bid security accompanying the bid. An individual surety will not be accepted as a bid security.

The Authority will hold the bid securities of the two lowest bidders until the Contract has been executed, after which they will be returned. All other bid securities will be returned as soon as practicable.

BIDDERS QUALIFICATIONS

Before a bid is considered for award, the bidder may be requested by the Authority to submit a statement of facts, in detail, as to his previous experience in performing comparable work, his business and technical organization, financial resources, and plant available to be used in performing the contemplated work.

SUBMISSION OF BIDS

Bids must be submitted as directed on the Invitation To Bid. Do not include in the envelope any bids for other work.

ADDENDA REQUIREMENTS

The bid documents provide for acknowledgement individually of all addenda to the drawings and/or specifications on the signature page of the Proposal. All addenda shall be acknowledged on the Proposal or by telegram prior to the scheduled time of bid opening. If the bidder received no addenda, the word "None" should be shown as specified.

Every effort will be made by the Authority to insure that Contractors receive all addenda when issued. Addenda will be issued to the individual or company to whom bidding documents were issued.

Addenda may be issued by any reasonable method such as hand delivery, mail, telefacsimile, telegraph, courier, and in special circumstances by phone. Addenda will be issued to the address, telefacsimile number or phone number as stated on the planholder's list unless picked up in person or included with the bid documents. It is the bidder's responsibility to insure that he has received all addenda affecting the Invitation To Bid. No claim or protest will be allowed based on the bidder's allegation that he did not receive all of the addenda for an Invitation To Bid.

All questions must be received 72 hours before the bid opening. Questions submitted after the deadline may be rejected by the Authority.

WITHDRAWAL OR REVISION OF BIDS

A bidder may withdraw or revise a bid after it has been deposited with the Authority, provided that the request for such withdrawal or revision is received by the designated office, in writing, by telegram, or by telefacsimile, before the time set for opening of bids.

Emailed or telefacsimile modifications shall include both the modification of the unit bid price and the total modification of each item modified, but shall not reveal the amount of the total original or revised bids. Form 25D-16 shall be used to submit such modifications.

25D-3 (7/88) 00 10 00-3 Page 3 of 3

RECEIPT AND OPENING OF BIDS

(a) The Authority must receive all bids, including any amendment or withdrawal prior to the scheduled time of bid opening. Any bid, amendment, or withdrawal that has not actually been received by the Authority prior to the time of the scheduled bid opening will not be considered.

(b) No responsibility will be attached to any officer or employee of the Authority for the premature opening of, or failure to open, a bid improperly addressed or identified.

(c) The Authority reserves the right to waive any technicality in bids received when such waiver is in the interest of the State.

BIDDERS PRESENT

At the time fixed for bid opening, bids will be publicly opened and read for the information of bidders and others properly interested, who may be present either in person or by representative. The amount of the bid and the name of the bidder shall be compiled and distributed as soon as possible after bid opening. Bids are not open for public inspection until after the Notice of Intent to Award is issued.

BIDDERS INTERESTED IN MORE THAN ONE BID

If more than one bid is offered by any one party, by or in the name of his or their clerk or partner, all such bids will be rejected. A party who has quoted prices to a bidder is not thereby disqualified from quoting prices to other bidders or from submitting a bid directly for the work.

REJECTION OF BIDS

The Authority reserves the right to reject any and all bids when such rejection is in the best interest of the State; to reject the bid of a bidder who has previously failed to perform properly, or complete on time, contracts of a similar nature; to reject the bid of a bidder who is not, in the opinion of the Contracting Officer, in a position to perform the contract; and to reject a bid as non-responsive where the bidder fails to furnish the required documents, fails to complete required documents in the manner directed, or makes unauthorized alterations to the bid documents.

AWARD OF CONTRACT

(a) The letter of award, if the contract is to be awarded, will be issued to the lowest responsible and responsive bidder as soon as practical and usually within 40 calendar days after opening of proposals.

(b) The successful bidder will be notified of the Authority's intent to award the contract and requested to execute certain documents, including the contract form and bonds.

(c) The contract will be awarded to the successful bidder following receipt by the Authority of all required documents, properly executed, within the time specified in the intent to award. Failure to enter into a contract within the specified time shall be grounds for forfeiture of the bid security and consideration of the second low bidder for award.

Supplementary 00 10 10-1 Issued: December 1987 Info. to Bidders (Revised 12/88, 11/92)

ALASKA ENERGY AUTHORITY

SUPPLEMENTARY INFORMATION TO BIDDERS

This document modifies or adds to the provisions of Alaska Energy Authority’s form 25D-3, INFORMATION TO BIDDERS.

Following subject area "REJECTION OF BIDS", add the following subject area:

"CONSIDERATION OF PROPOSALS

After the Proposals are opened and read, they will be compared on the basis identified on the bid schedule and the apparent low Bidder announced. The apparent low Bidder shall, within 5 working days following identification as the apparent low Bidder, submit a list of all firms with which the prime CONTRACTOR intends to execute subcontracts for the performance of the Contract. The list shall include the name, business address, Alaska business license number, and contractor's registration number of each proposed Subcontractor.

Upon confirmation of the contents of the proposal the low Bidder will be identified by the AUTHORITY in writing. If the low Bidder differs from the apparent low Bidder then the requirements for Subcontractor listing, as noted above, shall become effective upon the low Bidder at the time of identification.

If a Bidder fails to list a Subcontractor or lists more than one Subcontractor for the same portion of Work and the value of that Work is in excess of one-half of one percent of the total bid, the Bidder agrees that it shall be considered to have agreed to perform that portion of Work without the use of a Subcontractor and to have represented that the Bidder is qualified to perform the Work.

A Bidder who attempts to circumvent the requirements of this section by listing as a Subcontractor another contractor who, in turn, sublets the majority of the Work required under the Contract, violates this section.

If a Contract is awarded to a Bidder who violates this section, the Bidder agrees that the Contracting Officer may:

(1) cancel the Contract without any damages accruing to the State; or

(2) after notice and a hearing, assess a penalty on the Bidder in an amount that does not exceed 10 percent of the value of the Subcontract at issue.

Supplementary 00 10 10-2 Issued: December 1987 Info. to Bidders (Revised 12/88, 11/92)

A Bidder may replace a listed Subcontractor who:

(1) fails to comply with AS 08.18;

(2) files for bankruptcy or becomes insolvent;

(3) fails to execute a contract with the Bidder involving performance of the Work for which the Subcontractor was listed and the Bidder acted in good faith;

(4) fails to obtain bonding;

(5) fails to obtain insurance acceptable to the State;

(6) fails to perform the Contract with the Bidder involving Work for which the Subcontractor was listed;

(7) must be substituted in order for the prime CONTRACTOR to satisfy required State and Federal affirmative action requirements;

(8) refuses to agree or abide with the bidder's labor agreement; or

(9) is determined by the Contracting Officer to be nonresponsive."

Modify subject area "AWARD OF CONTRACT" as follows:

Subparagraph (a) substitute the word "generally" for the phrase "as soon as practical and"

Subparagraph (b) delete and substitute the following:

"All Bidders will be notified of the AUTHORITY's intent to Award the Contract and the successful Bidder will be requested to execute certain documents, including the Contract form and bonds."

1.1.

Special Notice to Bidders

Owner has not performed a comprehensive geo-technical investigation for the proposed roadway alignment and has limited information regarding subsurface conditions within the project corridor. Bidders should not interpret the absence of indicated rock, bedrock, or groundwater on the drawings as evidence that such conditions do not exist. Available information is provided solely for the convenience of Bidders and does not represent complete characterization of site conditions.

Subsurface materials encountered during construction may vary significantly and may include soil, organics, glacial deposits, weathered rock, fractured rock, bedrock, groundwater, or other unforeseen conditions. Bidders are responsible for evaluating available information and making an independent assessment of conditions that may affect the work.

The Work is being procured on a lump-sum basis. The contractor shall include in its Bid all costs necessary to complete the Work as shown and specified.

The Owner's primary objective for the 2026 construction season is establishment of a functional pioneer access road capable of supporting further construction and heavy-equipment access to the project area.

Bidders should prepare a construction approach and schedule with the intent of achieving intake access suitable for heavy equipment no later than 20 October 2026 and substantial completion no later than 20 June 2027.

The Owner recognizes that weather, site conditions, and Contractor means and methods may influence the exact sequencing of the Work. Bidders are advised that early establishment of reliable site access is a significant project priority and will be considered when evaluating construction schedules.

Form 25D-4 (4/12) 00 12 00 Page 1 of 1

REQUIRED DOCUMENTS

REQUIRED FOR BID. Bids will not be considered if the following documents are not completely filled out and submitted at the time of bidding:

1. Bid Form (Form 25D-9)

2. Bid Schedule

3 Bid Security

4. Any bid revisions must be submitted by the bidder prior to bid opening on the following form:

Bid Modification (Form 25D-16)

5. Debarment Certification (See Federal Assurances 00 90 00)

6. Lobbying Certification (See Federal Assurances 00 90 00)

REQUIRED AFTER NOTICE OF APPARENT LOW BIDDER. The apparent low bidder is required to complete and submit the following document within 5 working days after receipt of written notification:

1. Subcontractor List (Form 25D-5)

REQUIRED FOR AWARD. In order to be awarded the contract, the successful bidder must completely fill out and submit the following documents within the time specified in the intent to award letter:

1. Construction Contract (Form 25D-10A)

2. Payment Bond (Form 25D-12)

3. Performance Bond (Form 25D-13)

4. Contractor's Questionnaire (Form 25D-8)

5. Certificate of Insurance (from carrier)

Form 25A-301 (8/01)/AEA2005 00 12 90 Page 1 of 4

FEDERAL EEO BID CONDITIONS

STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY CONSTRUCTION CONTRACT

SPECIFICATIONS (EXECUTIVE ORDER 11246). FOR ALL NON-EXEMPT FEDERAL AND FEDERALLY-

ASSISTED CONSTRUCTION CONTRACTS TO BE AWARDED IN THE STATE OF ALASKA

1. Definitions. As used in these specifications:

a. “Covered area” means the geographical area described in the solicitation from which this contract resulted;

b. “Director” means Director, Office of Federal Contract Compliance Programs (OFCCP), United States Department of Labor (DOL), or any persons to whom the Director delegates authority;

c. “Employer” identification number” means the Federal Social Security number used on the Employer’s Quarterly Federal Tax Return, U.S. Treasury Department Form 941.

d. “Minority” includes:

(1) Black (all persons having origins in any of the Black African racial groups not of Hispanic origin);

(2) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American or other Spanish culture or origin, regardless of race);

(3) Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, Southeast

Asia, the Indian Subcontinent, or the Pacific Islands); and

(4) American Indian or Alaska Native (all persons having origins in any of the original peoples of North

America and maintaining identifiable tribal affiliations through membership and participation or community identification).

2. Whenever the Contractor, or any subcontractor at any tier, subcontracts a portion of the work involving any construction trade, it shall physically include in each subcontract in excess of $10,000 the provisions of these specifications and the Notice which contains the applicable goals for minority and female participation and which is set forth in the solicitations from which this contract resulted.

3. If the Contractor is participating (pursuant to 41 CFR 60-4.5) in a Hometown Plan approved by the DOL in the covered area, either individually or through an association, its affirmative action obligations on all work in the Plan area (including goals and timetables) shall be in accordance with that Plan for those trades that have unions participating in the Plan. Contractors must be able to demonstrate their participation in and compliance with the provisions of any such Hometown Plan. Each Contractor or subcontractor participating in an approved Plan is individually required to comply with its obligations under the EEO clause, and to make good faith effort to achieve each goal under the Plan in each trade in which it has employees. The overall good faith performance by other Contractors or subcontractors toward a goal in an approved Plan does not excuse any covered Contractor’s or subcontractor’s failure to make good faith efforts to achieve the Plan goals and timetables.

4. The Contractor shall implement the specific affirmative action standards provided in paragraphs 7(a) through 7(p) of these specifications. The goals set forth in the solicitation from which this contract resulted are expressed as percentages of the total hours of employment and training of minority and female utilization the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. The Contractor is expected to make substantially uniform progress toward its goals in each craft during the period specified.

Form 25A-301 (8/01)/AEA2005 00 12 90 Page 2 of 4

Covered construction contractors performing construction work in geographical areas where they do not have a federal or federally-assisted construction contract shall apply the minority and female goals established for the geographical area where the work is being performed. Goals are published periodically in the Federal Register in notice form, and such notices may be obtained from any OFCCP office or from federal procurement contracting officers.

5. Neither the provisions of any collective bargaining agreement, nor the failure by a union with whom the Contractor has a collective bargaining agreement, to refer either minorities or women shall excuse the Contractor’s obligations under these specifications, Executive Order 11246, or the regulations promulgated pursuant thereto.

6. In order for the non-working training hours of apprentices and trainees to be counted in meeting the goals, such apprentices and trainees must be employed by the Contractor during the training period of an approved training program and the Contractor must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities.

7. The Contractor shall take specific affirmative actions to ensure equal employment opportunity. The evaluation of the Contractor’s compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. The Contractor shall document these efforts fully, and shall implement affirmative action steps at least as extensive as the following:

a. Ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites, and in all facilities at which the Contractor’s employees are assigned to work. The Contractor, where possible, will assign two or more women to each construction project. The Contractor shall specifically ensure that all foremen, superintendents, and other on-site supervisory personnel are aware of and carry out the Contractor’s obligations to maintain such a working environment, with specific attention to minority or female individuals working at such sites or in such facilities.

b. Establish and maintain a current list of minority and female recruitment sources, provide written notification to minority and female recruitment sources and to community organizations when the Contractor or its unions have employment opportunities available, and maintain a record of the organizations’ responses.

c. Maintain a current file of the names, addresses and telephone numbers of each minority and female off-the-street applicant and minority or female referral from a union, a recruitment source or community organization and of what action was taken with respect to each such individual. If such individual was sent to the union hiring hall for referral and was not referred back to the Contractor by the union or, if referred, not employed by the Contractor, this shall be documented in the file with the reason therefor, along with whatever additional actions the Contractor may have taken.

d. Provide immediate written notification to the Director when the union or unions with which the Contractor has a collective bargaining agreement has not referred to the Contractor a minority person or woman sent by the Contractor, or when the Contractor has other information that the union referral process has impeded the Contractor’s efforts to meet its obligations.

e. Develop on-the-job training opportunities and/or participate in training programs for the area which expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the Contractor’s employment needs, especially those programs funded or approved by the DOL. The Contractor shall provide notice of these programs to the sources compiled under 7(b) above.

f. Disseminate the Contractor’s EEO policy by providing notice of the policy to unions and training programs and requesting their cooperation in assisting the Contractor in meeting its EEO obligations; by including it in any policy manual and collective bargaining agreement; by publicizing it in the company newspaper, annual report, etc.; by specific review of the policy with all management personnel and with all minority and female employees at least once a year; and by posting the company EEO policy on bulletin boards accessible to all employees at each location where construction work is performed.

Form 25A-301 (8/01)/AEA2005 00 12 90 Page 3 of 4

g. Review, at least annually, the company’s EEO policy and affirmative action obligations under these specifications with all employees having any responsibility for hiring, assignment, layoff, termination or other employment decisions including specific review of these items with on-site supervisory personnel such as Superintendent, general foreman, etc., prior to the initiation of construction work at any job site. A written record shall be made and maintained identifying the time and place of these meetings, persons attending, subject matter discussed, and dispositions of the subject matter.

h. Disseminate the Contractor’s EEO policy externally by including it in any advertising in the news media, specifically including minority and female news media, and providing written notification to and discussing the Contractor’s EEO policy with other Contractors and Subcontractors with whom the Contractor does or anticipates doing business.

i. Direct its recruitment efforts, both oral and written, to minority, female and community organizations, to schools with minority and female students and to minority and female recruitment and training organizations serving the Contractor’s recruitment area and employment needs. Not later than one month prior to the date for the acceptance of applications for apprenticeship or other training by any recruitment source, the Contractor shall send written notification to organizations such as the above, describing the openings, screening procedures, and tests to be used in the selection process.

j. Encourage present minority and female employees to recruit other minority persons and women and, where reasonable, provide after school, summer and vacation employment to minority and female youth both on the site and in other areas of a Contractor’s workforce.

k. Validate all tests and other selection requirements where there is an obligation to do so under 41 CFR Part 60-3.

l. Conduct, at least annually, an inventory and evaluation at least of all minority and female personnel for promotional opportunities and encourage these employees to seek or to prepare for, through appropriate training, etc., such opportunities.

m. Ensure that seniority practices, job classifications, work assignments and other personnel practices do not have a discriminatory effect by continually monitoring all personnel and employment related activities to ensure that the EEO policy and the Contractor’s obligations under these specifications are being carried out.

n. Ensure that all facilities and company activities are nonsegregated except that separate or single-used toilet, necessary changing facilities and necessary sleeping facilities shall be provided to assure privacy between the sexes.

o. Document and maintain a record of all solicitations of offers for subcontractors from minority and female construction contractors and suppliers, including circulations of solicitations to minority and female contractor associations and other business associations.

p. Conduct a review, at least annually, of all supervisors’ adherence to and performance under the Contractor’s EEO policies and affirmative action obligations.

8. Contractors are encouraged to participate in voluntary associations which assist in fulfilling one or more of their affirmative action obligations 7(a) through 7(p). The efforts of a contractor association, joint contractor-union, contractor-community, or other similar group of which the Contractor is a member and participant, may be asserted as fulfilling any or more of its obligations under 7(a) through 7(p) of these specifications provided that the Contractor actively participates in the group, makes every effort to assure that the group has a positive impact on the employment of minorities and women in the industry, ensures that the concrete benefits of the program are reflected in the Contractor’s minority and female work force participation, makes a good faith effort to meet its individual goals and timetables, and can provide access to documentation which demonstrates the effectiveness of actions taken on behalf of the Contractor. The obligation to comply, however, is the Contractor’s and failure of such a group to fulfill an obligation shall not be a defense for the Contractor’s noncompliance.

Form 25A-301 (8/01)/AEA2005 00 12 90 Page 4 of 4

9. A single goal for minorities and a separate goal for women have been established. The Contractor, however, is required to provide equal employment opportunity and to take affirmative action for all minority groups, both male and female, and all women, both minority and non-minority. Consequently, the Contractor may be in violation of the Executive Order if a particular group is employed in a substantially disparate manner (for example, even though the Contractor has achieved its goals for women generally, the Contractor may be in violation of the Executive Order if a specific minority group of women is underutilized.)

10. The Contractor shall not use the goals and timetables or affirmative action standards to discriminate against any person because of race, color, religion, sex, or national origin.

11. The Contractor shall not enter into any subcontract with any person or firm debarred from government contracts pursuant to Executive Order 11246.

12. The Contractor shall carry out such sanctions and penalties for violation of these specifications and of the Equal Opportunity Clause, including suspension, termination and cancellation of existing subcontracts as may be imposed or ordered pursuant to Executive Order 11246, as amended, and its implementing regulations, by the OFCCP. Any Contractor who fails to carry out such sanctions and penalties shall be in violation of these specifications and Executive Order 11246, as amended.

13. The Contractor, in fulfilling its obligations under these specifications, shall implement specific affirmative action steps, at least as extensive as those standards prescribed in paragraph 7 of these specifications, so as to achieve maximum results from its efforts to ensure equal employment opportunities. If the Contractor fails to comply with the requirements of the Executive Order, the implementing regulations or these specifications, the Director shall proceed in accordance with 41 CFR 60-4.8.

14. The Contractor shall designate a responsible official to monitor all employment related activity to ensure that the company EEO policy is being carried out, to submit reports relating to the provisions hereof as may be required by the Government and to keep records. Records shall at least include for each employee the name, address, telephone numbers, construction trade, union affiliation if any, employee identification number when assigned, social security number, race, sex, status (e.g., mechanic apprentice, trainees, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in an easily understandable and retrievable form; however, to the degree that the existing records satisfy this requirement, Contractors shall not be required to maintain separate records.

15. Nothing herein provided shall be construed as a limitation upon the application of other laws that establish different standards of compliance or upon the application of requirements for the hiring of local or other area residents (e.g., those under the Public Works Employment Act of 1977 and the Community Development Block Grant Programs).

16. The Bidder’s attention is called to the “Equal Opportunity Clause” and the “Standard Federal Equal Employment Opportunity Construction Contract Specifications” set forth herein.

17. The Contractor shall provide written notification to the Department, for all subcontracts documents as follows: the name, address and telephone number of subcontractors and their employer identification number; the estimated dollar amount of the subcontracts; estimated starting and completion dates of the subcontracts; and the geographical area in which the contract is to be performed.

This written notification shall be required for all construction subcontracts in excess of $10,000 at any tier for construction work under the contract resulting from this project’s solicitation.

18. As used in the Bid Notice, and in the contract resulting from this project’s solicitation, the “covered area” is the State of Alaska.

Form 25D-9A (07/03) 00 31 00 Page 1 of 2

PROPOSAL

of

NAME ______________________________________________________________________________________

ADDRESS ______________________________________________________________________________________

To the CONTRACTING OFFICER, ALASKA ENERGY AUTHORITY:

In compliance with your Invitation To Bid dated April 14, 2026, the Undersigned proposes to furnish and deliver all the materials and do all the work and labor required in the construction of Project:

Project Name

Fivemile Creek Construction Project Project No. 26094

Located at Five Mile Creek, Alaska, according to the plans and specifications and for the amount and prices named herein as indicated on the Bid Schedule consisting of 2 sheet(s), which is made a part of this Bid.

The Undersigned declares that he has carefully examined the contract requirements and that he has made a personal examination of the site of the work; that he understands that the quantities, where such are specified in the Bid Schedule or on the plans for this project, are approximate only and subject to increase or decrease, and that he is willing to perform increased or decreased quantities of work at unit prices bid under the conditions set forth in the Contract Documents.

The Undersigned hereby agrees to execute the said contract and bonds within fifteen calendar days, or such further time as may be allowed in writing by the Contracting Officer, after receiving notification of the acceptance of this proposal, and it is hereby mutually understood and agreed that in case the Undersigned does not, the accompanying bid guarantee shall be forfeited to the Alaska Energy Authority, as liquidated damages, and the said Contracting officer may proceed to award the contract to others.

The Undersigned agrees to commence the work within 10 calendar days of the effective date of Notice to Proceed and to Substantially Complete the work by the date indicated in Section 01 11 13 - Summary of Work unless extended in writing by the Contracting Officer.

The Undersigned proposes to furnish Payment Bond in the amount of 100% (of the contract) and Performance Bond in the amount of 100% (of the contract), as surety conditioned for the full, complete and faithful performance of this contract.

Form 25D-9A (07/03) 00 31 00 Page 2 of 2

The Undersigned acknowledges receipt of the following addenda to the drawings and/or specifications (give number and date of each).

Addendum Date Addendum Date Addendum Date Number Issued Number Issued Number Issued

NON-COLLUSION AFFIDAVIT

The Undersigned declares, under penalty of perjury under the laws of the United States, that neither he nor the firm, association, or corporation of which he is a member, has, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with this bid.

The Undersigned has read the foregoing proposal and hereby agrees to the conditions stated therein by affixing his signature below:

Signature

Name and Title of Person Signing

Telephone Number

Fax Number

003200 - 1

BID SCHEDULE

Fivemile Creek Construction Project Project No. 26094

Bidders Please Note: Before preparing this bid schedule, read carefully, "Information to Bidders", and the following:

The Bidder shall insert a fixed price in figures opposite each pay item that appears on the bid schedule to furnish all labor, material, equipment, supervision and provide all work for each item listed. No price is to be entered or tendered for any item not appearing in the bid schedule. In case of error in the extension of prices in the bid, the unit prices will govern.

Contract award shall be made based on the Total Base Bid. AEA reserves the right to award none or any number of alternates in any order in the best interest of the State.

Bidders are required to bid on all bid items. Conditioned or qualified bids will be considered non-responsive.

Bid Item Description Lump Sum Price

1 Base Bid $

2 $

3 $

See Specification Section 01 11 13 Summary of Work and Drawings for detailed descriptions of each bid item.

2. Acknowledge all addenda Addendum No

Date Issued Addendum No

Date Issued Addendum No

Date Issued

3. BIDDER’S NOTICE: By signature on this form, the Bidder certifies that:

a. The price(s) submitted are independent and without collusion.

b. The Bidder will comply with the laws of the State of Alaska;

c. The Bidder will comply with applicable portions of the Federal Civil Rights Act of 1964;

d. The Bidder will comply with the Equal Employment Opportunity Act and the regulations issued there under by the State and Federal Government; and

e. The Bidder has reviewed all terms and conditions in this Invitation to Bid.

003200 - 2

If any Bidder fails to comply with any of these requirements, the Authority may reject its bid, terminate the contract, or consider the Vendor in default.

Company Submitting Bid Telephone Number

Address Fax Number

Authorized Signature E-mail Address

Print Name Alaska Business License number:

______________________ EXPRES DATE:___________________

Alaska Contractor’s Registration #

______________________ EXPRES DATE:___________________

End of Bid Schedule.

Form 25D-14 (8/01) 00 41 00 Page 1 of 2

BID BOND

For

Fivemile Hydroelectric - Phase 1 Construction Project No. 26094

DATE BOND EXECUTED:

PRINCIPAL (Legal name and business address): TYPE OF ORGANIZATION:

[ ] Individual [ ] Partnership [ ] Joint Venture [ ] Corporation

STATE OF INCORPORATION:

SURETY(IES) (Name and business address):

A. B. C.

PENAL SUM OF BOND: DATE OF BID:

We, the PRINCIPAL and SURETY above named, are held and firmly bound to the State (State of Alaska), in the penal sum of the amount stated above, for the payment of which sum will be made, we bind ourselves and our legal representatives and successors, jointly and severally, by this instrument.

THE CONDITION OF THE FOREGOING OBLIGATION is that the Principal has submitted the accompanying bid in writing, date as shown above, on the above-referenced Project in accordance with contract documents filed in the office of the Contracting Officer, and under the Invitation To Bid therefore, and is required to furnish a bond in the amount stated above.

If the Principal's bid is accepted and he is offered the proposed contract for award, and if the Principal fails to enter into the contract, then the obligation to the State created by this bond shall be in full force and effect.

If the Principal enters into the contract, then the foregoing obligation is null and void.

PRINCIPAL

Signature(s) 1. 2. 3.

Name(s) & Title(s) (Typed)

1. 2. 3.

See Instructions on Reverse

Corporate Seal

CORPORATE SURETY(IES)

Form 25D-14 (8/01) 00 41 00 Page 2 of 2

Surety A Name of Corporation State of Incorporation Liability Limit

Signature(s) 1. 2.

Corporate

Name(s) & Titles (Typed)

1. 2. Seal

Surety B Name of Corporation State of Incorporation Liability Limit

Signature(s) 1. 2.

Corporate

Name(s) & Titles (Typed)

1. 2. Seal

Surety C Name of Corporation State of Incorporation Liability Limit

Signature(s) 1. 2.

Corporate

Name(s) & Titles (Typed)

1. 2. Seal

INSTRUCTIONS

1. This form shall be used whenever a bid bond is submitted.

2. Insert the full legal name and business address of the Principal in the space designated. If the Principal is a partnership or joint venture, the names of all principal parties must be included (e.g., "Smith Construction, Inc. and Jones Contracting, Inc. DBA Smith/Jones Builders, a joint venture"). If the Principal is a corporation, the name of the state in which incorporated shall be inserted in the space provided.

3. Insert the full legal name and business address of the Surety in the space designated. The Surety on the bond may be any corporation or partnership authorized to do business in Alaska as an insurer under AS 21.09. Individual sureties will not be accepted.

4. The penal amount of the bond may be shown either as an amount (in words and figures) or as a percent of the contract bid price (a not-to-exceed amount may be included).

5. The scheduled bid opening date shall be entered in the space marked Date of Bid.

6. The bond shall be executed by authorized representatives of the Principal and Surety. Corporations executing the bond shall also affix their corporate seal.

7. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

8. The states of incorporation and the limits of liability of each surety shall be indicated in the spaces provided.

9. The date that bond is executed must not be later than the bid opening date.

Form 25D-16 (8/01) 00 42 00 Page 1 of 1

BID MODIFICATION

Fivemile Hydroelectric Phase 1

Construction No. 26094

Modification Number: ___________________

Note: All revisions shall be made to the unadjusted bid amount(s).

Changes to the adjusted bid amounts will be computed by the Authority.

PAY ITEM NO. PAY ITEM DESCRIPTION

REVISION TO

UNIT BID PRICE +/-

REVISION TO

BID AMOUNT +/-

TOTAL REVISION: $__________________________________________________________________

Name of Bidding Firm

Responsible Party Signature Date

This form may be duplicated if additional pages are needed.

Form 25D-5 (10/12) 00 43 00 Page 1 of 2

SUBCONTRACTOR LIST

Fivemile Hydroelectric - Phase 1

Construction Project No. 26094

The apparent low bidder shall complete this form and submit it so as to be received by the Contracting Officer prior to the close of business on the fifth working day after receipt of written notice from the Authority.

Failure to submit this form with all required information by the due date will result in the bidder being declared nonresponsive and may result in the forfeiture of the Bid Security.

Scope of work must be clearly defined. If an item of work is to be performed by more than one firm, indicate the portion or percent of work to be done by each.

Check as applicable: [ ] All Work on the above-referenced project will be accomplished without subcontracts greater than ½ of 1% of the contract amount.

Or [ ] Subcontractor List is as follows:

LIST FIRST TIER SUBCONTRACTORS ONLY

FIRM NAME,

ADDRESS,

PHONE NO.

AK BUSINESS LICENSE NO.,

CONTRACTOR'S

REGISTRATION NO.

SCOPE OF WORK TO

BE PERFORMED

CONTINUE SUBCONTRACTOR INFORMATION ON REVERSE

For projects with federal-aid funding, I hereby certify Alaska Business Licenses and Contractor’s Registrations will be valid for all subcontractors prior to award of the subcontract. For projects without federal-aid funding (State funding only), I hereby certify the listed Alaska Business Licenses and Contractor’s Registrations were valid at the time bids were opened for this project.

Signature of Authorized Company Representative Title

Company Name Company Address (Street or PO Box, City, State, Zip)

Date Phone Number

Form 25D-5 (10/12) 00 43 00 Page 2 of 2

FIRM NAME,

ADDRESS,

PHONE NO.

AK BUSINESS LICENSE NO.,

CONTRACTOR'S

REGISTRATION NO.

SCOPE OF WORK TO

BE PERFORMED

Form 25D-10A (8/01) 00 51 00 Page 1 of 2

CONSTRUCTION CONTRACT

Fivemile Hydroelectric - Phase 1 Construction Project No. 26094

This CONTRACT, between the ALASKA ENERGY AUTHORITY, herein called the Authority, acting by and through its Contracting Officer, and

Company Name

Company Address (Street or PO Box, City, State, Zip) a/an [ ] Individual [ ] Partnership [ ] Joint Venture [ ] Sole Proprietorship [ ] Corporation incorporated under the laws of the State of ______________________________, its successors and assigns, herein called the Contractor, is effective the date of the signature of the Contracting Officer on this document.

WITNESSETH: That the Contractor, for and in consideration of the payment or payments herein specified and agreed to by the Department, hereby covenants and agrees to furnish and deliver all the materials and to do and perform all the work and labor required in the construction of the above-referenced project at the prices bid by the Contractor for the respective estimated quantities aggregating approximately the sum of Dollars ($_________________________), and such other items as are mentioned in the original Bid, which Bid and prices named, together with the Contract Documents are made a part of this Contract and accepted as such.

It is distinctly understood and agreed that no claim for additional work or materials, done or furnished by the Contractor and not specifically herein provided for, will be allowed by the Authority, nor shall the Contractor do any work or furnish any material not covered by this Contract, unless such work is ordered in writing by the Authority.

In no event shall the Authority be liable for any materials furnished or used, or for any work or labor done, unless the materials, work,…