26070- Tuluksak Power Plant Upgrade ITB Drawings.pdf
PDF 10 MB Posted
- Attached to
- Tuluksak Power Plant Upgrade Project (ITB)
- Solicitation number
- 26070
- Issued by
- Dillingham Census Area, Alaska
About this file
This is a drawing set for the Tuluksak Power Plant Upgrade Project issued by the Alaska Energy Authority in coordination with the Department of Energy and Denali Commission. The project encompasses a complete renovation of an existing power plant in Tuluksak, Alaska, including building renovation, installation of new owner-furnished generators, renovation of existing switchgear, and replacement and renovation of various mechanical and electrical systems. The contractor must furnish all labor, materials, supervision, equipment, tools, transportation, quality control, and supplies required to complete the work. A non-mandatory pre-bid meeting is scheduled for April 23, 2026, at 2:00 PM, conducted telephonically via conference call (1-469-810-0642, Conference ID: 217 052 991#). No mandatory site visit is scheduled prior to the bid opening. The drawing set identifies work included in the base bid and additive alternates, with fire alarm and detection systems included under Additive Alternate #1 and fire suppression systems under Additive Alternate #2.
The project funding is exempt from the Build America, Buy America Act and therefore is not subject to Buy America Preferences for Infrastructure Projects as outlined in 2 CFR 184. The funding comprises a combination of Department of Energy Grid Resilience funds under the 40101d program, along with state, local, and Denali Commission non-federal match funding. Both the DOE Grid Resilience funds and non-federal match are subject to the DOE Tribal General Applicability waiver dated August 18, 2023, which exempts the project from all Buy America preference requirements. The Contract Officer is Selwin C. Ray, who may be contacted at (907) 771-3035 for additional information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26070-Addendum 01 - 04.28.2026.pdf | ||
| 26070- Tuluksak Power Plant Upgrade Project ITB Manual.pdf | ||
| 26070- Tuluksak Power Plant Upgrade ITB Drawings.pdf.crdownload | CRDOWNLOAD file | |
| 26070- Tuluksak Power Plant Upgrade Project ITB Manual.pdf.crdownload | CRDOWNLOAD file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P.O. 111405, Anchorage, AK 99511 (907)349-0100
TULUKSAK POWER PLANT UPGRADE PROJECT
ISSUED FOR AEA PROJECT CONSTRUCTION NOVEMBER 2025
ALASKA ENERGY AUTHORITY
THIS DRAWING SET SHOWS WORK THAT IS UNDER THE
BASE BID AND ADDITIVE ALTERNATES. ALL WORK SHOWN
IS INCLUDED IN THE BASE BID UNLESS SPECIFICALLY
INDICATED AS ADDITIVE ALTERNATE.
ALASKA ENERGY AUTHORITY
ALL FIRE ALARM & DETECTION THIS SHEET IS
INCLUDED UNDER ADDITIVE ALTERNATE #1.
ALL SUPPRESSION THIS SHEET IS
INCLUDED UNDER ADDITIVE ALTERNATE #2.
ALASKA ENERGY AUTHORITY
| Cover |
| Mechanical |
| Fire Suppression |
| Electrical |
File details come from the government source that posted it. Updated .