260424 - Forest Hills Nature Center - Bid set - MP.pdf
PDF 11 MB Posted
- Attached to
- Forest Hill Nature Center - New Building
- Solicitation number
- RFP GIR 260000001926 4
- Issued by
- Ingham County, Michigan
About this file
This is a bid set document for mechanical, plumbing, and HVAC systems for the Forest Hills Nature Center new building project located at 1297 N Rich Road, Alma, Michigan 48801, in Seville Township, Gratiot County. The project encompasses comprehensive mechanical and plumbing infrastructure designed in two phases. Phase 1 includes HVAC systems with multiple water source heat pumps (HP-1 through HP-9), energy recovery ventilators (ERV-1, ERV-2, ERV-3), in-floor heating zones (Zones 1-9 with varying square footage and BTU loads ranging from 9,450 to 74,625 BTU), and snow melt zones (Zones 1-9). The mechanical systems feature propane boilers (B-1, B-2 at 500 CFH each), a cooling tower (CT-1), and multiple circulation pumps with variable frequency drives. Phase 2 includes additional heat pump installations and supplemental systems. Plumbing systems include a domestic water heater (DWH-1), water softener and filter systems, fixtures including water closets, lavatories, sinks, and floor drains throughout the facility, with connections to an existing well system.
The bid document specifies all work must conform to the Michigan Mechanical Code and Michigan Plumbing Code with latest applicable editions, and must be performed by licensed contractors and subcontractors as required by law. The system design includes 650 gallons of fluid volume filled with 40% propylene glycol, with hot water supply temperatures of 130°F and return temperatures of 110°F for in-floor heat zones, and 100°F return temperatures for snow melt zones. The contractor is required to provide separate pricing for Phase 1 and Phase 2 scopes, coordinate with the Building Automation System (BAS) for controls and sequencing of operations, and install a Flowtech water treatment system on the cooling tower. An alternate pricing option requires the contractor to provide design and installation pricing for a geothermal system connection. All work is subject to field verification of existing conditions, coordination with other trades to avoid conflicts, and compliance with manufacturer installation instructions. The document includes detailed mechanical and plumbing enlargements, control sequences, and technical specifications for all equipment installations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL HVAC NOTES
1. ALL WORK SHALL CONFORM TO MICHIGAN MECHANICAL CODE,
LATEST APPLICABLE EDITION.
2. LOCATE EXHAUST OUTLETS OF VENTILATION SYSTEMS,
COMBUSTION EQUIPMENT STACKS & PLUMBING VENTS AT
LEAST 10 FEET FROM OUTDOOR AIR INTAKES.
3. INSTALL ALL EQUIPMENT, MATERIALS, AND ACCESSORIES PER
MANUFACTURERS WRITTEN INSTRUCTIONS.
4. BOTTOM OF EQUIPMENT ON ROOF SHALL BE A MINIMUM OF 12"
ABOVE ROOF MEMBRANE. CONTRACTOR SHALL COORDINATE
ASSOCIATED ROOF CURB HEIGHT AS REQUIRED.
5. PROVIDE BALANCE DAMPERS FOR EACH DIFFUSER/GRILLE
AND BRANCH DUCT.
6. MAXIMUM LENGTH OF FLEXIBLE DUCT TO AIR TERMINAL
DEVICES SHALL NOT EXCEED 6'-0" IN LENGTH WITH A MAXIMUM
OF ONE 90° TURN AND SHALL BE INSULATED. ELBOWS SHALL
BE MIN. 1.5 RADIUS. CONNECTIONS TO TERMINAL DEVICES
SHALL BE BANDED AND TAPED.
7. FIRE DAMPERS & COMBINATION FIRE/SMOKE DAMPERS SHALL
MATCH RATING OF WALL. UNLESS NOTED OTHERWISE.
8. COORDINATE LOUVER SIZES WITH ARCHITECTURAL TRADES
PRIOR TO CONSTRUCTION.
9. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER
DISCIPLINES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.
10. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.
11. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION,
ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS
THAT MAY AFFECT THE WORK.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
THE INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A "NEW"
CONDITION DURING CONSTRUCTION.
13. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED BY
LAW.
14. CONTRACTOR SHALL USE LOW PRESSURE LOSS DUCT
FITTINGS IN ACCORDANCE WITH SMACNA. (WYES, RADIUSED
OR VANED TEES, ETC.) DUCTWORK SHALL BE GALVANIZED
SHEET METAL, MIN. 26 GA.
15. ALL DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSION.
INCREASE DUCT SIZE FOR LINING.
16. CONSTRUCT ALL TRANSFER DUCTS W/ 1-INCH THICK LINING.
17. ALL EXPOSED ROUND DUCTWORK SHALL BE SPIRAL.
18. ALL EXTERNALLY ISOLATED HVAC EQUIPMENT SHALL HAVE
FLEXIBLE DUCT CONNECTORS.
19. ALL CONDENSATE DRAIN PIPING SET @ MIN. 1% SLOPE.
20. ALL CONDENSATE DRAIN PIPING TO TERMINATE TO DRAIN VIA
AIR GAP.
21. IF THERE IS CONFLICTING INFORMATION IN THE PLANS OR
SPECIFICATIONS THE MORE STRINGENT AND GREATER COST
ITEM SHALL BE USED.
22. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND DUCTS AND SUGGESTED ROUTES.
IT IS NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE
HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.
DO NOT SCALE FROM DRAWINGS.
23. ANY INFORMATION FOUND ON THE DRAWINGS AND NOT IN THE
SPECIFICATIONS, OR FOUND IN SPECIFICATIONS AND NOT IN
THE DRAWINGS, SHALL BE CONSTRUED AS TO BE INCLUDED IN
BOTH THE SPECIFICATIONS AND THE DRAWINGS. ANY
CONFLICT BETWEEN THE PLANS AND THE SPECIFICATIONS
WILL BE INTERPRETED BY THE ARCHITECT. IN THE EVENT OF
CONFLICT, FOR THE PURPOSE OF BIDDING, THE CONTRACTOR
SHALL PRESUME THE MOST EXPENSIVE COMBINATION OF
QUALITY AND QUANTITY OF WORK SHALL PREVAIL.
24. PERFORM WORK IN ACCORDANCE WITH THE LATEST EDITIONS,
REVISIONS, AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE
STATUTES, ORDINANCES, CODES OR REGULATIONS OF
FEDERAL, STATE, AND LOCAL AUTHORITIES HAVING
JURISDICTION IN EFFECT ON THE DATE BIDS ARE RECEIVED.
25. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY
OSHA, UNDERWRITERS, LABORATORIES, AMERICAN CODES,
ASA, ASHRAE, ARI, NEC, STATE FIRE INSURANCE REGULATION
BODY, NFPA OR OTHERS, THESE STANDARDS SHALL BE
FOLLOWED WHETHER OR NOT INDICATED ON THE DRAWING
AND SPECIFICATIONS.
26. COORDINATE WITH ARCHITECTURAL AND STRUCTURAL
DRAWINGS FOR EXACT LOCATION OF ROOF TOP EQUIPMENT.
27. DUCTWORK SHALL BE ACOUSTICALLY LINED WITHIN 10 FT OF
THE INTAKE AND/OR DISCHARGE OF A FAN.
28. DUCT/PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF
DUCT/PIPING AND EQUIPMENT SHALL BE COORDINATED WITH
BUILDING STRUCTURE, EQUIPMENT FURNISHED,
ARCHITECTURAL DRAWINGS, AND ALL OTHER TRADES PRIOR
TO INSTALLATION. ANY CONTRACTOR INSTALLING WORK
WITHOUT PRIOR COORDINATION SHALL RELOCATE HIS WORK
AT HIS EXPENSE TO ALLOW PROPER INSTALLATION OF ANY
AND ALL TRADES WORK.
29. UNLESS OTHERWISE NOTED, ALL DUCT/PIPING SHALL BE
CONCEALED WHEREVER POSSIBLE. PROVIDE CHROME
ESCUTCHEON OR ALUMINUM DUCT COLLAR AT EACH
PENETRATION OF A FINISHED SURFACE.
30. DUCT/PIPING SHALL NOT BE RUN ABOVE ELECTRICAL GEAR IN
THE SERVICE SPACE REQUIRED BY THE NATIONAL ELECTRICAL
CODE.
31. ANY ADDITIONAL LOW VOLTAGE CONTROL WIRING THAT IS
REQUIRED SHALL BE PROVIDED BY THE HVAC CONTRACTOR.
CONTROL WIRING SHALL BE RUN IN CONDUIT IF REQUIRED BY
LOCAL CODES OR THE SPECIFICATIONS. POWER SHALL BE
PROVIDED BY THE ELECTRICAL CONTRACTOR.
32. PROVIDE TRAP FOR CONDENSATION DRAIN LINES.
33. PROVIDE VIBRATION ISOLATION AT EACH CONNECTION TO A
MOTORIZED PIECE OF EQUIPMENT BY THE HVAC
CONTRACTOR.
34. MOUNT THERMOSTAT/SENSORS AT 48" AFF UNLESS NOTED
OTHERWISE.
35. THE HVAC CONTRACTOR SHALL CLOSELY COORDINATE AIR
DEVICE AND DUCTWORK LOCATIONS WITH REFLECTED
CEILING AND STRUCTURAL PLANS.
36. CONTRACTOR SHALL PROVIDE SEPARATE PRICES FOR
PHASE-1 AND PHASE-2 SCOPES.
MECHANICAL SYMBOLS LEGEND
HVAC PIPING SYMBOLSHVAC PIPING
HVAC DUCTWORK
F/S F/S s s
TEMPERATURE CONTROL SYMBOLS
MISCELLANEOUS NOTES
HVAC DUCTWORK SYMBOLS HVAC DUCTWORK & DIFFUSER TAGS HVAC PIPING VALVES
MECHANICAL ABBREVIATIONS
AFF ABOVE FINISH FLOOR
AC AIR COMPRESSOR
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
A.T.C. ARCHITECTURAL TRADES CONTRACTOR
B BOILER
B.A.S. BUILDING AUTOMATION SYSTEM
CAF COMBUSTION AIR FAN
CC COOLING COIL
CFM CUBIC FEET PER MINUTE
CHLR CHILLER
CHP CONSOLE HEAT PUMP
CONV CONVECTOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONTROL VALVE
CWP CHILLED WATER PUMP
DB DRY BULB
DFU DUCT FURNACE
DIA DIAMETER
DN DOWN
DPR DAMPER
DS DUCT SILENCER
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
E.T.C. ELECTRICAL TRADES CONTRACTOR
EVR EVAPORATOR
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST EXISTING
FF FINISH FLOOR
FPM FEET PER MINUTE
FT FEET
FTR FINNED TUBE RADIATION
FU FURNACE
GAL GALLON
GFRH GAS FIRED RADIANT HEATER
GR GRILLE
H HUMIDIFIER
HC HEATING COIL
HD HEAD (FT)
HP HORSE POWER
HHP HORIZONTAL HEAT PUMP
HTG HEATING
HVAC HEATING, VENTILATION, & AIR CONDITIONING
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
IAH INTAKE HOOD
LAT LEAVING AIR TEMPERATURE
LH LATENT HEAT (MBH)
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH BTU PER HOUR (THOUSAND)
MIN MINIMUM
M.T.C. MECHANICAL TRADES CONTRACTOR
N.C. NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NTS NOT TO SCALE
P PUMP
PCR PUMPED CONDENSATE RETURN
PD PRESSURE DROP
RCP RADIANT CEILING PANEL
REQ'D REQUIRED
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RLH RELIEF HOOD
RTU ROOF TOP UNIT
SD SUPPLY DIFFUSER
SF SUPPLY FAN
SG SUPPLY GRILLE
SH SENSIBLE HEAT (MBH)
SM SHEET METAL
SQ. FT. SQUARE FEET
SST SATURATED SUCTION TEMPERATURE
STR STRAINER
TC TOTAL COOLING (MBH)
TCL TEMPERATURE CONTROL
T&P TEMPERATURE & PRESSURE RELIEF VALVE
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
VRH VARIABLE AIR VOLUME REHEAT BOX
FPVAV FAN POWERED VARIABLE AIR VOLUME BOX
V.F.D VARIABLE FREQUENCY DRIVE
ZD ZONE DAMPER
X-SA EXISTING ITEM (EXISTING SUPPLY AIR DUCT)
ITEM
EXISTING
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
COOLING TOWER WATER SUPPLY
COOLING TOWER WATER RETURN
DIRECT EXPANSION
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
PROPANE
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
SOLENOID VALVE
EXPANSION VALVE WITH
THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
THERMOMETER
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
BACK FLOW PREVENTER
PIPE CAP
PIPE BREAK
THERMOMETER WELL
EXPANSION LOOP
THERMOSTAT
ROOM SENSOR
HUMIDISTAT
PRESSURE GAUGE
DAMPER (ELECTRIC OPERATION)
DAMPER (PNEUMATIC OPERATION)
DAMPER BLADES
SUPPLY AIR DUCT
EXIST SUPPLY AIR DUCT
RETURN AIR DUCT
EXIST RETURN AIR DUCT
OUTSIDE AIR DUCT
EXIST OUTSIDE AIR DUCT
EXHAUST AIR DUCT
EXIST EXHAUST AIR DUCT
SUPPLY AIR DUCT RISER
RETURN AIR DUCT RISER
OUTSIDE AIR DUCT RISER (AS NOTED)
EXHAUST AIR DUCT
INSULATED DUCTWORK (AS NOTED)
SUPPLY AIR DIFFUSER (SQUARE)
SUPPLY AIR DIFFUSER (INLINE)
TURNING VANES
SURFACE MTD. GRILLE
SUPPLY AIR DIFFUSER (ROUND)
90° TEE W/45° APPROACH
CONICAL TAKE-OFF
CONICAL TAKE-OFF W/ DAMPER
BALANCE DAMPER
RETURN AIR DUCT BOOT
ECCENTRIC REDUCER
CONCENTRIC REDUCER
VERTICAL FIRE DAMPER
EXISTING VERTICAL FIRE DAMPER
HORIZONTAL FIRE DAMPER
EXISTING HORIZONTAL FIRE DAMPER
VERTICAL SMOKE DAMPER
HORIZONTAL SMOKE DAMPER
VERTICAL FIRE / SMOKE DAMPER
HORIZONTAL FIRE / SMOKE DAMPER
DUCT SMOKE DETECTOR, INSTALLED BY M.T.C.,
PROVIDED & WIRED BY E.T.C.
UNIT HEATER
CEILING EXHAUST FAN
ROOF MOUNTED EXHAUST FAN
DEMOLITION
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
X
X
XX
XXXX
XX
XXXX
SA
OA
X-OA
X-EA
EA
X-SA
X-RA
RA
HR
CR
CD
CS
DX
CTR
HPR
HS
HPS
CTS
CWR
CWSTAG CFM
NECK REMARKS
SIZE
SD-1 250
8"ø ---
P
H
S
T
M
M
SD
LP
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
M-100
SA
SA
SA
SA SA
SA
SA
SA
SASA
SA
SA
SA
SA
RA
EA
HP-4
4" DRYER VENT UP
THROUGH ROOF
SG-1 200
10"x6" TYP. 4
SG-1 200
10"x6" TYP. 4
SG-1 200
10"x6" TYP. 4
SD-1 125
6"Ø ---
SD-1 175
8"Ø ---
SD-1 200
8"Ø TYP. 2
SG-1 50
10"x4" ---
SG-1 200
10"x6" TYP. 8SG-1 150
10"x4" ---
SD-1 200
8"Ø TYP. 2
SD-1 100
6"Ø ---
RG-2 ---
24"x12" TYP. 2
RG-2 ---
24"x12" ---
RG-1 550
22"x10" ---
RG-2 ---
24"x12" ---
MAIN HALL
VESTIBULE
ENTRY HALL
STAFF
103OFFICE
OFFICE
LAUNDRY
TOILET
STORAGE
MECHANICAL
MEN
WOMEN
JANITOR
MECHANICAL
CLASSROOM
CLASSROOM
CLASSROOM
STORAGE
CLOSET
STORAGE
CLOSET
CLOSET
STORAGE
HALL
SA
10" Ø
14" Ø
18" Ø
10"x10"
10"x12"
14" Ø
6" Ø
16" Ø
16" Ø
10" Ø
14" Ø
14" Ø
8"x8"
(ATTIC)
OA
OA
OA
SA
10"x10"
EG-2 100
12"x12" ---
EG-2 250
12"x12" TYP. 2
B-1
B-2
10"x10"
(ATTIC)
14"x12"
8"x8"
(ATTIC)
6"x6" OA DN
10" Ø
10" Ø
CUH-1
CUH-2
T
T
T
T
T T
6"x6"
(ATTIC)
14" Ø
10" Ø
M-702
TO HP-6 TO HP-5
TO HP-7
TO HP-4 TO HP-3
TO HP-1 & HP-2
HVAC KEY NOTES
INSTALL SUPPLY DIFFUSER ON A 22.5° ANGLE DOWN.
INSTALL SUPPLY DIFFUSER ON A 45° ANGLE DOWN.
INSTALL DUCTWORK TO MAINTAIN THE BOTTOM OF DUCT 14' AFF.
INSTALL DUCTWORK TO MAINTAIN THE BOTTOM OF DUCT 9' AFF.
INSTALL WATER SOURCE HEAT PUMP ON 4" CONCRETE PAD AT
LOCATION SHOWN. LINE THE FIRST 10' OF SUPPLY AND RETURN
DUCTWORK.
12" Ø
(ATTIC)
M-702
T
TO IFH-4
T
TO HP-4 & IFH-7
6"x6" OA
SG-1 200
10"x6" TYP. 8
10"x10"
(ATTIC)
18" Ø
12" Ø
GENERAL NOTES
1. ALL ASSOCIATED ENERGY RECOVERY VENTILATOR
DUCTWORK SHALL BE INSULATED.
TG-1 250
10"x6" ---
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
M-400
N FIRST FLOOR PLAN - HVAC NEW - PHASE 1
SCALE: 1/8" = 1'-0"
0 1 5 10 20
IN-FLOOR HEAT ZONE #1
AREA = 2,985 FT²
# OF CIRCUITS = 11
TOTAL 1/2" TUBING = 3,310 FT
FLOW RATE = 9.22 GPM
HEAD LOSS = 7.2 FT
BTU LOAD = 74,625 BTU
EWT = 130°F
LWT = 110°F
TUBE SPACING = 12"
40% PROP. GLYCOL
IN-FLOOR HEAT ZONE #2
AREA = 1,868 FT²
# OF CIRCUITS = 7
TOTAL 1/2" TUBING = 2,100 FT
FLOW RATE = 6.41 GPM
HEAD LOSS = 7.5 FT
BTU LOAD = 46,700 BTU
EWT = 130°F
LWT = 110°F
TUBE SPACING = 12"
40% PROP. GLYCOL
IN-FLOOR HEAT ZONE #3
AREA = 912 FT²
# OF CIRCUITS = 4
TOTAL 1/2" TUBING = 1,100 FT
FLOW RATE = 3.13 GPM
HEAD LOSS = 5 FT
BTU LOAD = 22,800 BTU
EWT = 130°F
LWT = 110°F
TUBE SPACING = 12"
40% PROP. GLYCOL
IN-FLOOR HEAT ZONE #4
AREA = 917 FT²
# OF CIRCUITS = 4
TOTAL 1/2" TUBING = 1,100 FT
FLOW RATE = 3.14 GPM
HEAD LOSS = 5 FT
BTU LOAD = 22,925 BTU
EWT = 130°F
LWT = 110°F
TUBE SPACING = 12"
40% PROP. GLYCOL
IN-FLOOR HEAT ZONE #5
AREA = 922 FT²
# OF CIRCUITS = 4
TOTAL 1/2" TUBING = 1,100 FT
FLOW RATE = 3.16 GPM
HEAD LOSS = 5 FT
BTU LOAD = 23,050 BTU
EWT = 130°F
LWT = 110°F
TUBE SPACING = 12"
40% PROP. GLYCOL
IN-FLOOR HEAT ZONE #6
AREA = 912 FT²
# OF CIRCUITS = 4
TOTAL 1/2" TUBING = 1,100 FT
FLOW RATE = 3.13 GPM
HEAD LOSS = 5 FT
BTU LOAD = 22,800 BTU
EWT = 130°F
LWT = 110°F
TUBE SPACING = 12"
40% PROP. GLYCOL
IN-FLOOR HEAT ZONE #7
AREA = 378 FT²
# OF CIRCUITS = 2
TOTAL 1/2" TUBING = 460 FT
FLOW RATE = 1.30 GPM
HEAD LOSS = 3 FT
BTU LOAD = 9,450 BTU
EWT = 130°F
LWT = 110°F
TUBE SPACING = 12"
40% PROP. GLYCOL
SNOW MELT ZONE #1
AREA = 586 FT²
# OF CIRCUITS = 3
TOTAL 5/8" TUBING = 920 FT
FLOW RATE = 7.16 GPM
HEAD LOSS = 18 FT
BTU LOAD = 88,399 BTU
EWT = 130°F
LWT = 100°F
TUBE SPACING = 9"
40% PROP. GLYCOL
SNOW MELT ZONE #2
AREA = 50 FT²
# OF CIRCUITS = 1
TOTAL 5/8" TUBING = 115 FT
FLOW RATE = 0.67 GPM
HEAD LOSS = 0.8 FT
BTU LOAD = 8,304 BTU
EWT = 130°F
LWT = 100°F
TUBE SPACING = 9"
40% PROP. GLYCOL
SNOW MELT ZONE #3
AREA = 320 FT²
# OF CIRCUITS = 2
TOTAL 5/8" TUBING = 520 FT
FLOW RATE = 3.99 GPM
HEAD LOSS = 11.5 FT
BTU LOAD = 49,365 BTU
EWT = 130°F
LWT = 100°F
TUBE SPACING = 9"
40% PROP. GLYCOL
SNOW MELT ZONE #4
AREA = 467 FT²
# OF CIRCUITS = 3
TOTAL 5/8" TUBING = 745 FT
FLOW RATE = 5.63 GPM
HEAD LOSS = 9.9 FT
BTU LOAD = 69,569 BTU
EWT = 130°F
LWT = 100°F
TUBE SPACING = 9"
40% PROP. GLYCOL
S
MOISTURE/TEMPERATURE
SNOWMELT SLAB SENSOR
SNOW MELT ZONE #8
AREA = 171 FT²
# OF CIRCUITS = 1
TOTAL 5/8" TUBING = 285 FT
FLOW RATE = 2.18 GPM
HEAD LOSS = 13.9 FT
BTU LOAD = 27,021 BTU
EWT = 130°F
LWT = 100°F
TUBE SPACING = 9"
40% PROP. GLYCOL
SNOW MELT ZONE #9
AREA = 30 FT²
# OF CIRCUITS = 1
TOTAL 5/8" TUBING = 115 FT
FLOW RATE = 0.41 GPM
HEAD LOSS = 0.3 FT
BTU LOAD = 5,092 BTU
EWT = 130°F
LWT = 100°F
TUBE SPACING = 9"
40% PROP. GLYCOL
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
M-600
N BELOW FLOOR PLAN - PIPING NEW - PHASE 1
Propane
MAIN HALL
VESTIBULE
ENTRY HALL
STAFF
OFFICE
OFFICE
LAUNDRY
TOILET
STORAGE
MEN
111WOMEN
JANITOR
MECHANICAL
CLASSROOM
CLASSROOM
STORAGE
STORAGE
CLOSET
CLOSET
STORAGE
MECHANICAL
HS
HS
CS
CS
CR
CR
3" 2"
1 1/2"
1"
3"
M-701
M-701
HR
1-1/2"
1"
1-1/2"
1" HS & HR
DN TO SM-4
1" HS & HR
DN TO SM-3
CT-1
LP
LP
PIPE SUPPORTS (TYP.)
2"
HS
HP
S
3" 2"
CLOSET
CLASSROOM
HALL
VESTIBULE
M-701
SM-4
SM-3
MECHANICAL KEY NOTES
ROUTE PIPING THROUGH SOFFIT. REFER TO ARCHITECTURAL
DRAWINGS FOR SOFFIT SIZE AND ELEVATION.
ROUTE PIPING BELOW FINISHED FLOOR.
PROPANE PROVIDER SHALL PROVIDE AND INSTALL PROPANE
TANK, REGULATOR, AND ASSOCIATED PIPING BETWEEN THE
TANK AND REGULATOR.
PIPE SUPPORTS BASED ON MIRO 5-RAH-8.
INSTALL COOLING TOWER ON CONCRETE PAD PROVIDED BY
GENERAL TRADES CONTRACTOR AT LOCATION SHOWN. INSTALL
PER MANUFACTURERS INSTRUCTIONS. REFER TO DETAIL 1 ON
M-800.
INSTALL SNOW MELT MANIFOLD IN WALL AT LOCATION SHOWN.
MANIFOLD SHALL BE ACCESSIBLE FROM THE ADJACENT SPACE.
COORDINATE ACCESS PANEL DOOR SIZE AND LOCATION WITH
GENERAL TRADES CONTRACTOR.
3"
2"
HP
R
HS
HP
S
HR
3/4" HS & HR
DN TO SM-9
3/4"
LP
2" LP DN
SM-9 6
ADD ALTERNATE
1. CONTRACTOR SHALL PROVIDE PRICING FOR DESIGN AND
INSTALLATION OF GEOTHERMAL SYSTEM TO CONNECT
ONTO THE SYSTEM.
2" 1-1/2"
2" 1-1/2"
B-1 - 500 CFH
B-2 - 500 CFH
TOTAL = 1000 CFH
NOTE:
CONTRACTOR SHALL COORDINATE PROPANE TANK, REGULATOR,
AND ASSOCIATED PROPANE PIPING WITH PROPANE PROVIDER.
PROPANE LOAD SUMMARY
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
M-601
N FIRST FLOOR PLAN - PIPING NEW - PHASE 1
OA
OA
ERV-3
(1000 CFM)
HP-9
HP-8
EG-1 500
20"x10" ---
RG-1 325
22"x10" ---
RG-1 325
22"x10" ---
SD-1 100
6" TYP. 2
SD-1 175
10"x6" TYP. 4
VESTIBULE
VESTIBULE
HALL
CLASSROOM
CLASSROOM
STORAGE
CLOSET
CLOSET
STORAGE
EA
8" Ø
SA
10" Ø
14" Ø
SD-1 175
10"x6" TYP. 4
SA
10" Ø 14" Ø
SA
16"x12" OA UP
TO IAH-2
16"x12"EA UP
TO RLH-2
12"x10"
(ATTIC)
12"x10"
(ATTIC)
EG-1 500
20"x10" ---
14"x8" OA DN
14"x8" OA DN
10"x10"
(ATTIC)
10"x10"
(ATTIC)
16"x12"
16"x12"
8" Ø
14" Ø
14" Ø
EA
16"x10" RA DN
16"x10" RA DN
T
T
TO HP-9 & IFH-9
TO HP-8 & IFH-8
14"x14" SA DN
14"x14" SA DN
SNOW MELT ZONE #5
AREA = 95 FT²
# OF CIRCUITS = 1
TOTAL 5/8" TUBING = 165 FT
FLOW RATE = 1.23 GPM
HEAD LOSS = 3.2 FT
BTU LOAD = 15,367 BTU
EWT = 130°F
LWT = 100°F
TUBE SPACING = 9"
40% PROP. GLYCOL
SNOW MELT ZONE #6
AREA = 275 FT²
# OF CIRCUITS = 2
TOTAL 5/8" TUBING = 450 FT
FLOW RATE = 3.44 GPM
HEAD LOSS = 7.8 FT
BTU LOAD = 42,667 BTU
EWT = 130°F
LWT = 100°F
TUBE SPACING = 9"
40% PROP. GLYCOL
SNOW MELT ZONE #7
AREA = 95 FT²
# OF CIRCUITS = 1
TOTAL 5/8" TUBING = 165 FT
FLOW RATE = 1.23 GPM
HEAD LOSS = 3.2 FT
BTU LOAD = 15,367 BTU
EWT = 130°F
LWT = 100°F
TUBE SPACING = 9"
40% PROP. GLYCOL
IN-FLOOR HEAT ZONE #9
AREA = 1,125 FT²
# OF CIRCUITS = 5
TOTAL 1/2" TUBING = 1,360 FT
FLOW RATE = 3.86 GPM
HEAD LOSS = 4.9 FT
BTU LOAD = 28,125 BTU
EWT = 130°F
LWT = 110°F
TUBE SPACING = 12"
40% PROP. GLYCOL
IN-FLOOR HEAT ZONE #8
AREA = 1,125 FT²
# OF CIRCUITS = 5
TOTAL 1/2" TUBING = 1,350 FT
FLOW RATE = 3.86 GPM
HEAD LOSS = 4.9 FT
BTU LOAD = 28,125 BTU
EWT = 130°F
LWT = 110°F
TUBE SPACING = 12"
40% PROP. GLYCOL
HP-8
HP-9
VESTIBULE
VESTIBULE
HALL
CLASSROOM
CLASSROOM
STORAGE
CLOSET
CLOSET
STORAGE
HP
S
HP
R
HP
S
HP
R
HS
HR
HS
HR
SM-5
SM-6
SM-7
IFH-9
IFH-8
HS
HR
HS
HR
1 1/2"
1 1/2"
1 1/2"
1"
3/4"
3/4"
1"
1"
1"
HVAC KEY NOTES
INSTALL SUPPLY DIFFUSER ON A 22.5° ANGLE DOWN.
INSTALL INTAKE/RELIEF AIR HOODS AND ASSOCIATED CURB ON
ROOF AT LOCATION SHOWN. INTAKE AIR HOOD SHALL BE
INSTALLED AT LEAST 10' AWAY FROM BUILDING AND PLUMBING
EXHAUST/VENT TERMINATIONS.
INSTALL ENERGY RECOVERY VENTILATOR IN ATTIC AT LOCATION
SHOWN. ASSOCIATED OUTSIDE AIR AND EXHAUST DUCTWORK
SHALL BE INSULATED AND ROUTED THROUGH THE ATTIC FROM
THE ENERGY RECOVERY VENTILATOR TO THE ASSOCIATED
EXHAUST GRILL/HEAT PUMP. COORDINATE THE INSTALLATION
ATTIC ACCESS WITH GENERAL TRADES CONTRACTOR PRIOR TO
CONSTRUCTION. COORDINATE THE UNIT SIZE AND CLEARANCES
WITH THE GENERAL TRADES CONTRACTOR PRIOR TO THE
TRUSSES BEING ORDERED TO CONFIRM THERE IS ADEQUATE
SPACE AND SUPPORT FOR THE UNIT WITHIN THE TRUSS WEBBING.
INSTALL DUCTWORK TO MAINTAIN THE BOTTOM OF DUCT 9' AFF.
INSTALL INFLOOR HEAT/SNOW MELT MANIFOLD IN WALL AT
LOCATION SHOWN. MANIFOLD SHALL BE ACCESSIBLE FROM THE
ADJACENT HALL/VESTIBULE. COORDINATE ACCESS PANEL/DOOR
SIZE AND LOCATION WITH GENERAL TRADES CONTRACTOR.
INSTALL WATER SOURCE HEAT PUMP AT LOCATION SHOWN. LINE
THE FIRST 10' OF SUPPLY AND RETURN DUCTWORK. PROVIDE AND
INSTALL UNIT ON 3' TALL CUSTOM SUPPORT STAND BUILT OUT OF
1-1/2"x1-1/2" ANGLE IRON WELDED TOGETHER. SUPPORT STAND
SHALL NOT INTERFERE WITH UNIT ACCESS OR DUCT/PIPE
CONNECTIONS. CONNECT ONTO ASSOCIATED HEAT PUMP SUPPLY
AND RETURN PIPING. ROUTE CONDENSATE TO NEAREST OUTLET
BOX. INSTALL PER THE MANUFACTURERS INSTALLATION
INSTRUCTIONS.
GENERAL NOTES
1. ALL ASSOCIATED ENERGY RECOVERY VENTILATOR
DUCTWORK SHALL BE INSULATED.
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
M-700
N BELOW FLOOR PLAN - MECHANICAL PIPING NEW - PHASE 2
SCALE: 1/8" = 1'-0"
0 1 5 10 20
N FIRST FLOOR PLAN - HVAC NEW - PHASE 2
SCALE: 1/8" = 1'-0"
0 1 5 10 20
N FIRST FLOOR PLAN - MECHANICAL PIPING NEW - PHASE 2
HP-4
MECHANICAL
HS
HR
HS
HR
HR HR
HR
HS
HS
AS-1
XT-1
HRHRHR
HSHSHS
HS
HR
HS
HR
HS
HR
HR
HP
R
HP
S
HP
S
HP
R
HSHR
AS-2
CR
CS
IFH-6 IFH-3 IFH-1
IFH-5
IFH-4 IFH-7 IFH-2
HPR
2"3"3"1"
1"
2"
3"
2"
1 1/2"
1 1/2"1"
1"
1 1/2"
3/4"1"
3"1"
1 1/2" VALVE
AND CAP
FOR PHASE 2
B-1
B-2
GFU-1
4" CA & V UP TO
CONCENTRIC VENT
ROOF TERMINATION
4" CA & V UP TO
CONCENTRIC VENT
ROOF TERMINATION
2"
LP
1 1/2"
1 1/2"
REFER TO M-601 FOR CONTINUATION
REFER TO DETAIL 3 ON M-701 FOR CONTINUATION
HP
S
HS
P-5
P-1P-2
P-4
P-3
2" LP DN
HP-2
STORAGE
HP-3 HP-1
MECHANICAL
HPS
HPR
SM-2HR
HS
HPS
HPR
HR
HS
1 1/2"
2"
2"
3/4"
1"
1 1/2"
3/4"
1-1/2" 2"
SM-1
REFER TO M-601 FOR
CONTINUATION
1 1/2"
3/4"
10 GPM
2 2 2
STORAGE
CLOSET
STORAGE
HP-5HP-6
HP-7
HPR
HS CS
CR
1 1/2" VALVE AND
CAP FOR PHASE 2
2"
3"
2"
1"
1"
3"
1"
1"
2"
1-1/2"
2"
1-1/2"2"
HS
HPS
HPS
HPR
HR
LP
2"
1 1/2"
1 1/2"
1-1/2"
HR
2"
1-1/2" 2"
CLOSET
HALL
VESTIBULE
REFER TO M-601 FOR
CONINTUATION
REFER TO M-601 FOR
CONINTUATION
2"3"
REFER TO M-601 FOR
CONINTUATION
REFER TO M-601 FOR
CONINTUATIONREFER TO DETAIL 2 ON
M-701 FOR CONINTUATION
1-1/2"1 1/2" VALVE AND
CAP FOR PHASE 2
1" HS & HR
DN TO SM-8
SM-8
2"
1"
3/4"
3"
HS
HS
HR
HR
HS
HR
1-1/2"
2"
MECHANICAL KEY NOTES
ROUTE PIPING BELOW FINISHED FLOOR.
INSTALL WATER SOURCE HEAT PUMP AT LOCATION SHOWN.
CONNECT ONTO ASSOCIATED HEAT PUMP SUPPLY AND RETURN
PIPING. ROUTE CONDENSATE TO NEAREST OUTLET BOX. INSTALL
PER THE MANUFACTURERS INSTALLATION INSTRUCTIONS.
INSTALL BOILER ON 4" CONCRETE PAD AT LOCATION SHOWN.
CONNECT ONTO ASSOCIATED HOT WATER SUPPLY, RETURN, AND
PROPANE PIPING. VENT THROUGH ROOF WITH CONCENTRIC VENT.
ROUTE CONDENSATE TO NEAREST FLOOR DRAIN. INSTALL PER
MANUFACTURERS INSTALLATION INSTRUCTIONS.
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
M-701
SCALE: 1/2" = 1'-0"
0 1 52 MECHANICAL ENLARGEMENT - 114 MECHANICAL
1 MECHANICAL ENLARGEMENT - 110 MECHANICAL
SCALE: 1/4" = 1'-0"
0 1 5 10
3 MECHANICAL ENLARGEMENT - 124 HALL
SCALE: 1/4" = 1'-0"
0 1 5 10
PLUMBING ABBREVIATIONS
PLUMBING SYMBOLS LEGEND
PLUMBING PIPING PLUMBING EQUIPMENT
1. ALL PLUMBING WORK SHALL CONFORM TO MICHIGAN
PLUMBING CODE, LATEST APPLICABLE EDITION, AND ALL
APPLICABLE LOCAL CODES.
2. INSTALL ALL EQUIPMENT, MATERIALS, AND
ACCESSORIES PER MANUFACTURERS WRITTEN
INSTRUCTIONS.
3. INSTALL ISOLATION BALL VALVES @ ALL FIXTURE
WATER SUPPLY LINES.
4. SITE CONTRACTOR TO RUN UTILITIES TO 5'-0" FROM
BUILDING LINE.
5. ALL INVERT ELEVATIONS ARE BASED ON A FINISH
FLOOR LEVEL OF 100'-0". ALL INVERTS, STATED OR NOT,
NEW OR EXISTING, SHALL BE COORDINATED IN THE
FIELD. VERIFY EXISTING INVERTS PRIOR TO STARING
WORK.
6. ALL ELEVATIONS SHOWN ARE INVERTS OF PIPING. THE
SLEEVES SHALL BE COORDINATED WITH THESE
ELEVATIONS.
7. ALL PIPE SIZES SHOWN ARE SERVICE SIZE. SIZE
SLEEVES FOR 1" CLEAR SPACE BETWEEN PIPE AND
SLEEVE FOR INSTALLATION OF MECHANICAL SEAL.
8. CONTRACTOR TO VERIFY LOCATIONS OF EXISTING
UNDERGROUND UTILITIES BEFORE BEGINNING WORK.
9. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT
MAY CONFLICT WITH NEW CONSTRUCTION AND
RELOCATE AS NEEDED.
10. MECHANICAL SEALS REQUIRED FOR BELOW GRADE
WALL PENETRATIONS. ALL WALL AND SLAB
PENETRATIONS OF MASONRY OR CONCRETE
CONSTRUCTION SHALL BE SLEEVED.
11. ALL FLOOR DRAINS TO BE EQUIPPED WITH CODE
APPROVED TRAP SEALS, UNLESS OTHERWISE NOTED.
12. 2% SLOPE FOR ALL SANITARY PIPING 2-1/2" OR LESS IN
DIAMETER. 1% SLOPE FOR ALL SANITARY PIPING 3" OR
MORE IN DIAMETER.
13. PROVIDE SHOCK STOPS FOR EVERY PLUMBING GROUP.
PROVIDE SHOCK ABSORBER IN THE DOMESTIC COLD
AND HOT WATER PIPING. SHOCK ABSORBERS TO BE
LOCATED IN AN ACCESSIBLE LOCATION.
14. PROVIDE AIR ELIMINATION DEVICES FOR EACH
PLUMBING SYSTEM.
15. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES,
LOCATION, ELEVATIONS, AND DETAILS OF ALL EXISTING
CONDITIONS THAT MAY AFFECT THE WORK.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING THE INTEGRITY OF ALL EQUIPMENT AND
MATERIALS IN A "NEW" CONDITION DURING
CONSTRUCTION.
17. ALL WORK SHALL BE PERFORMED BY LICENSED
CONTRACTORS AND SUBCONTRACTORS AS REQUIRED
BY LAW.
18. DESIGN AND CONSTRUCTION SHALL BE IN
ACCORDANCE WITH THE CODES AND REGULATIONS
ENFORCED BY LOCAL BUILDING OFFICIALS.
19. IF THERE IS CONFLICTING INFORMATION IN THE PLANS
OR SPECIFICATIONS THE MORE STRINGENT AND
GREATER COST ITEM SHALL BE USED.
20. DRAWINGS INDICATE REQUIRED SIZES AND POINTS OF
TERMINATION OF PIPES AND SUGGESTED ROUTES. IT IS
NOT INTENTION OF DRAWINGS TO INDICATE ALL
NECESSARY OFFSETS. INSTALL WORK IN MANNER TO
CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS,
PRESERVE HEADROOM AND KEEP OPENINGS AND
PASSAGEWAYS CLEAR. DO NOT SCALE FROM
DRAWINGS.
21. ANY INFORMATION FOUND ON THE DRAWINGS AND NOT
IN THE SPECIFICATIONS, OR FOUND IN SPECIFICATIONS
AND NOT IN THE DRAWINGS, SHALL BE CONSTRUED AS
TO BE INCLUDED IN BOTH THE SPECIFICATIONS AND
THE DRAWINGS. ANY CONFLICT BETWEEN THE PLANS
AND THE SPECIFICATIONS WILL BE INTERPRETED BY
THE ARCHITECT. IN THE EVENT OF CONFLICT, FOR THE
PURPOSE OF BIDDING, THE CONTRACTOR SHALL
PRESUME THE MOST EXPENSIVE COMBINATION OF
QUALITY AND QUANTITY OF WORK SHALL PREVAIL.
22. PIPING LAYOUT IS SCHEMATIC. EXACT LOCATION OF
PIPING AND EQUIPMENT SHALL BE COORDINATED WITH
BUILDING STRUCTURE, EQUIPMENT FURNISHED,
ARCHITECTURAL DRAWINGS AND ALL OTHER TRADES
PRIOR TO INSTALLATION. ANY CONTRACTOR INSTALLING
WORK WITHOUT PRIOR COORDINATION SHALL
RELOCATE HIS WORK AT HIS EXPENSE TO ALLOW
PROPER INSTALLATION OF ANY AND ALL TRADES WORK.
23. UNLESS OTHERWISE NOTED, ALL PIPING SHALL BE
CONCEALED WHEREVER POSSIBLE. PROVIDE CHROME
ESCUTCHEON AT EACH PENETRATION OF A FINISHED
SURFACE.
24. PLUMBING UTILITY PIPING SHALL NOT BE RUN ABOVE
ELECTRICAL GEAR OR IN THE SERVICE SPACE
REQUIRED BY THE NATIONAL ELECTRICAL CODE.
25. PROVIDE ISOLATION SEPARATORS FOR COPPER PIPING
RUNNING THROUGH METAL STUDS.
26. ALL FIXTURES SHALL HAVE SHUTOFF STOP VALVES IN
AN ACCESSIBLE LOCATION. PIPING BEYOND THE STOP
VALVES AND EXPOSED IN OCCUPIED SPACES SHALL BE
CHROME-PLATED. ANY NOTED SHUTOFF VALVES ARE IN
ADDITION TO THIS REQUIREMENT.
27. PROVIDE FIRE STOPPING AT ALL PENETRATIONS OF
FIRE RATED ENCLOSURES.
GENERAL PLUMBING NOTES
MISCELLANEOUS NOTES
PLUMBING VALVES
POINT OF CONNECTION BETWEEN NEW AND
EXISTING
POINT OF EXISTING TO REMAIN AND EXISTING
TO BE REMOVED
INDICATES PLAN NOTE
INDICATES DEMOLITION NOTE
DETAIL BUBBLE
DETAIL NUMBER
PAGE LOCATION INDICATES
DIRECTION OF DETAIL SECTION
AD AREA DRAIN
ASR AUTOMATIC SPRINKLER RISER
BFS BELOW FLOOR SLAB
BWV BACK WATER VALVE
CB CATCH BASIN
CI CAST IRON
CO CLEAN OUT
CV CONTROL VALVE
DF DRINKING FOUNTAIN
DIA DIAMETER
DN DOWN
DWH DOMESTIC WATER HEATER
E.T.C. ELECTRICAL TRADES CONTRACTOR
EWC ELECTRIC WATER COOLER
EXIST EXISTING
FD FLOOR DRAIN
FC FINAL CONNECTIONS
FDC FIRE DEPT. CONNECTION
FF FINISH FLOOR
FHV FIRE HOSE VALVE
FT FEET
GAL GALLON
GD GARBAGE DISPOSAL
GI GREASE INTERCEPTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HB HOSE BIB
HD HEAD (FT)
HP HORSE POWER
ID INSIDE DIAMETER
I.E. INVERT ELEVATION
LAV LAVATORY
LT LAUNDRY TRAY
MA MEDICAL AIR
MAX MAXIMUM
MGC MEDICAL GAS CONSOLE
MH MAN HOLE
MIN MINIMUM
MS MOP SINK
M.T.C. MECHANICAL TRADES CONTRACTOR
NTS NOT TO SCALE
ORD OVERFLOW ROOF DRAIN
OXY OXYGEN
P PUMP
PD PRESSURE DROP
PVC POLY-VINYL-CHLORIDE
RC RAIN CONDUCTOR
RD ROOF DRAIN
RI ROUGH-IN
REQ'D REQUIRED
SAN SANITARY
SHWR SHOWER
SK SINK
SP STAND PIPE
SQ. FT. SQUARE FEET
SS SERVICE SINK
ST STORM
S&W STOP & WASTE
STR STRAINER
SV STACKED VENT
TYP. TYPICAL
UR URINAL
VB VACUUM BREAKER
VS VENT STACK
V.F.D VARIABLE FREQUENCY DRIVE
VTR VENT THRU ROOF
W WASTE
WB WET BULB
WC WATER CLOSET
WH WALL HYDRANT
WS WASTE STACK
W&V WASTE AND VENT
X-CW EXIST. CW PIPING
ITEM
EXISTING
COLD WATER
COLD WATER BELOW FINISH SLAB
HOT WATER
HOT WATER BELOW FINISH SLAB
HOT WATER RETURN
HOT WATER RETURN BELOW FINISH SLAB
FIRE PROTECTION
GAS (NATURAL)
GAS (LIQUID PETROLEUM)
SANITARY WASTE
SANITARY WASTE BELOW FINISH SLAB
VENT PIPING
VENT PIPING BELOW FINISH SLAB
SOFTENED WATER
SOFTENED WATER BELOW FINISH SLAB
GATE VALVE
GAS COCK
CHECK VALVE
BALANCE COCK
CIRCUIT SETTER
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
GLOBE VALVE
BALL VALVE
OS&Y VALVE
SOLENOID VALVE
EXPANSION VALVE WITH THERMOSTATIC BULB
PLUG VALVE
BUTTERFLY VALVE
RELIEF VALVE
HOSE & DRAIN END VALVE
PRESSURE RELIEF VALVE
PRESSURE REDUCING VALVE
TRIPLE DUTY VALVE
GAS PRESSURE REGULATOR
STRAINER (BLOW-OFF)
FLOW DIRECTION
PIPING DROP
PIPING RISE
FLOOR CLEANOUT
INLINE PIPING DROP
INLINE PIPING RISE
PIPING TEE
PIPING ELBOW
INLINE CLEANOUT
PLUMBING TRAP
THERMOMETER
CONNECTION
PUMP
UNION
PIPE ANCHOR
PIPE GUIDE
FLOOR DRAIN & FLOOR SINK
BACK FLOW PREVENTER
FLANGE END CONNECTION
WALL HYDRANT & HOSE BIBB
REGULAR & OVERFLOW ROOF DRAIN
PIPE CAP
PIPE BREAK
WATER METER
GAS METER
PRESSURE GAUGE
X
X
XX
XXXX
XX
XXXX
CW
CW
HW
HW
HWR
HWR
FP
G
LP
SAN
SAN
V
V
M
M
P
T&P RELIEF
VALVE
EXTEND TO
FLOOR
FLOOR
DWH-1
4" CONCRETE
PAD
1" CW
1" HW
DIELECTRIC
UNION (TYPICAL)
HOSE END
DRAIN VALVE
LOWER
ELEMENT
ELECTRICAL
ELEMENT (TYP.)
BALL VALVE (TYP.)
THERMOMETER
3/4" HWR
CHECK VALVE (TYP.)
CP-1
EXPANSION TANK
AMTROL MODEL
ST-5, 2 GAL.
SW
SW
CHROME
WALLCOVER
AND SCREW WALL
PLUGGED
TEE WITH
CLEANOUT
FLOOR
LINE
CAST IRON PIPE
C.I. WASE LINE.
LENGTH TO SUIT
WASTE LINE
1/8" BEND IF
CLEANOUT
OCCURS AT END
OF LINE
WALL CLEANOUT FLOOR CLEANOUT
1/8" BEND IF CLEANOUT
OCCURS AT END OF LINE.
C.I. WASTE
LINE. LENGTH TO SUIT
WASTE LINE
1/8" C.I.
BEND
FLOOR LINE
CLEANOUT AND ACCESS
COVER. TOP OF COVER
TO BEFLUSH W/ TOP OF FLOOR.
0' -9
MAY EXTEND
AS A WASTE OR
VENT LINE
ACCESS PANEL
THREADED
COMPRESSED
AIR CONNECTION
INSTALL DRAIN
VALVE AT LOWEST
POINT OF PIPE
TO CT-1
REFER TO CIVIL FOR
CONTINUATION TO GROUND BOX
1" CW
1" CW
3/4" CW
EXTERIOR WALL
ROOF
WALL SOFFIT
BACK FLOW PREVENTER
3" SAN OUTLET
NOTE: INSTALL TRENCH DRAIN PER
MANUFACTURER'S WRITTEN INSTRUCTIONS
LONG TRENCH DRAIN SECTION,
SLOPED 1/8" PER FOOT
TOWARDS CATCH BASIN
CB-1
3" SAN, REFER TO PLANS
FOR CONTINUATION
6"4" CONCRETE
SLAB
MINIMUM 6"
MINIMUM 6"
MINIMUM 2"
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
P-100
1 WATER HEATER DETAIL
SCALE: NTS
2 CLEANOUT DETAIL
SCALE: NTS
COLD WATER TO COOLING TOWER AND
GREENHOUSE DETAIL
SCALE: NTS
4 TRENCH DRAIN & CATCH BASIN DETAIL
SCALE: NTS
2" V UP
3" SAN UP TO FD-1
4" SANFCO
2" SAN UP
TO LAV-2
2" SAN UP
TO FD-1
4" SAN UP
TO WC-1
3" SAN UP
TO MS-1
2" SAN UP
TO LS-1
3" SAN UP
TO FD-2
3" SAN UP
TO FD-1
2" SAN UP
TO SK-2
2" SAN UP
TO SK-1
2" V UP
FCO
2" V UP
2" CW UP
FCO
P700
2" SAN UP
TO OB-1
3" SAN
4" SAN
4" SAN4" SAN
3" SAN
2" CW
2" CW
4" SAN
3" SAN
3" SAN
3" SAN
REFER TO CIVIL FOR
CONTINUATION TO WELL PUMP
FCO
FINISHED FLOOR = 100'-0"
2" SAN UP
TO OB-2
2" SAN UP
TO OB-2
2" SAN UP
TO OB-2
4" SAN
REFER TO CIVIL FOR
CONTINUATION
4" SAN
4" SAN
CO
2" V UP
CB-1
I.E. 96'-4"
I.E. 97'-11"
3" SAN UP
TO FD-2
CB-1
3" SAN
REFER TO CIVIL FOR
CONTINUATION TO GROUND BOX
3/4" CW UP
FCO
I.E. 98'-6"
I.E. 98'-6"
I.E. 97'-1-3/4"
PLUMBING KEY NOTES
PIPING PROVIDED AND INSTALLED BY WELL PROVIDER.1
TD-1
TYP. 6
TD-1
TYP. 6
2" V UP
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
P-400
N BELOW FLOOR PLAN - PLUMBING NEW - PHASE 1
P700
HB-1
HB-1
HB-1
FD-1
1/2" HW
1/2" HWR
1" SW
2" V
2" V
2" V DN3/4" CW
3/4" CW
3/4" CW
MAIN HALL
VESTIBULE
ENTRY HALL
STAFF
103OFFICE
OFFICE
LAUNDRY
106 TOILET
STORAGE
109 MECHANICAL
MEN
WOMEN
JANITOR
MECHANICAL
CLASSROOM
CLASSROOM
CLASSROOM
STORAGE
CLOSET
STORAGE
CLOSET
CLOSET
STORAGE
HALL
124VALVE AND CAP
FOR PHASE 2
0.5 GPM
1" CW
3/4" CW
1" CW DN
EXTEND 3/4" CW TO CT-1
VESTIBULE
2" V DNOB-2
3/4" CW
HB-1
HB-1
HB-1
OB-2
P701
P-100
3/4" CW
3/4" CW
1" CW
2" VVALVE AND CAP
FOR PHASE 2
CAP FOR PHASE 2
CB-1
CB-1
TD-1
TYP. 6
TD-1
TYP. 6
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
P-401
N FIRST FLOOR PLAN - PLUMBING NEW - PHASE 1
2" SAN UP
TO OB-2FCO
2" V UP
3" SAN
2" V UP
3" SAN
4" SANFCO
REFER TO P-400
FOR CONTINUATION
FCO 2" SAN UP
TO OB-2
FCO 3" SAN
I.E. 98'-6"
I.E. 97'-11"
CB-1TD-1
TYP. 6
HB-1
HB-1
HB-1
1/2" SW & 1/2" HW
DN TO WSB-1
2" V DN
2" V DN
& 3" VTR
3/4" CW
3/4" CW
1" SW
1/2" HW
2" V
2" V
1/2" HW
VESTIBULE
VESTIBULE
HALL
CLASSROOM
CLASSROOM
STORAGE
CLOSET
CLOSET
STORAGE
REFER TO P-401
FOR CONTINUATION
OB-2
OB-2
3/4" CW
CB-1TD-1
TYP. 6
1" CW
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
P-402
N BELOW FLOOR PLAN - PLUMBING NEW - PHASE 2
SCALE: 1/8" = 1'-0"
0 1 5 10 20
N FLOOR PLAN - PLUMBING NEW - PHASE 2
2" SAN UP
TO LAV-1
2" SAN UP
TO SK-2
2" SAN UP
TO FD-1
2" SAN UP
TO FD-1
2" SAN UP TO
LAV-1 (TYP. 2)
FCOFCO
4" SAN UP TO WC-1
4" SAN UP TO WC-1
4" SAN UP TO
WC-1 (TYP. 4)
2" SAN UP
TO UR-1
2" SAN UP
TO UR-2
4" SAN UP TO
WC-2 (TYP. 2)2" V UP
2" SAN
2" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" V UP
2" SAN UP TO EWC-1
2" SAN UP TO SK-3
4" SAN
2" SAN
2" SAN
FCO
4" SAN
4" SAN
3" SAN
FCO
4" SAN
4" SAN
3" SAN
2" V
CLASSROOM
STORAGE
2" SAN UP
TO LAV-1
2" SAN UP TO DF-1
FCO
2" SAN
2" SAN
REFER TO P-400
FOR CONTINUATION
REFER TO P-400
FOR CONTINUATION
WCO
4" SAN
2" V UP
2" V UP
I.E. 98'-6"
I.E. 98'-6"
REFER TO P-400
FOR CONTINUATION
4" SAN
WC-1
WC-2
WC-2
UR-2
UR-1
WC-1
WC-2
WC-2
WC-2
WC-2
LAV-1
LAV-1
FD-1FD-1
1" SW DN
2" V DN
1" SW DN
1" SW DN
1" SW DN
1" SW DN
SK-2
1" HW
3/4" HW
3/4" HW
1/2" HW
1/2" HWR
3/4" HW
1/2" HW
3/4" HW
2" V
3/4" SW
3/4" SW
3/4" SW
1-1/2" SW
1" SW
1-1/2" SW
2" V
2" V
1/2" SW & 1/2" HW
DN TO WSB-1
MEN
WOMEN
1/2" HWR
HB-1
SK-3
EWC-1
1/2" HWR
1/2" HWR
1/2" HWR
1" HW
3/4" HW
1" CW
3/4" CW
2" V
1/2" HW
0.5 GPM
2" V
1" HW
1/2" HWR
CLASSROOM
STORAGE
1" CWDF-1
2" V
1" CW
3/4" CW
1" CW
3/4" SW
1-1/2" CW
3/4" CW
1/2" SW
REFER TO P-701
FOR CONTINUATION
REFER TO P-701
FOR CONTINUATION REFER TO P-701
FOR CONTINUATION
REFER TO P-401
FOR CONTINUATION
REFER TO P-401
FOR CONTINUATION
REFER TO P-401
FOR CONTINUATION
2" V
2" V
2" V
2" V DN
2" V DN
1/2" SW DN TO
SK-2 & LAV-2
0.5 GPM
OB-2
PLUMBING KEY NOTES
INSTALL SHUTOFF VALVE AT LOCATION SHOWN TO ALLOW
FOR WINTERIZATION OF ASSOCIATED EXTERIOR PLUMBING
FIXTURE. PROVIDE DRAINS TO LOW POINTS OF EXTERIOR
PIPING.
ROUTE PIPING THROUGH SOFFIT. REFER TO
ARCHITECTURAL DRAWINGS FOR SOFFIT SIZE AND
ELEVATION.
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
P-700
SCALE: 1/4" = 1'-0"
0 1 5 10
SCALE: 1/4" = 1'-0"
2 TOILET ROOM FLOOR PLAN ENLARGEMENT - PLUMBING NEW 1 TOILET ROOM BELOW FLOOR PLAN ENLARGEMENT - PLUMBING NEW
LAV-2
FD-1
FD-1
FD-2
DWH-1
WC-1
MS-1
SK-1
OB-1
LS-1
SK-2
2" V DN
2" V
2" V DN
2" V
3" VTR
2" V
1/2" HWR
2" CW DN
1-1/2" SW & 1-1/2" HW
DN TO DWH-1
1" SW
1/2" SW
1/2" HW
2" V
3/4" HW
3/4" HW
3/4" SW
2" CW
1" SW
3/4" HWR
1" SW
1" HW
STAFF
OFFICE
LAUNDRY
JANITOR
MECHANICAL
CLASSROOM
CLOSET
HALL
1/2" HWR
1" HW1/2" HW
2" V
1" CW
TOILET
REFER TO P-401
FOR CONTINUATION
REFER TO P-700
FOR CONTINUATION
REFER TO P-700
FOR CONTINUATION
FD-2
2" V
1-1/2" SW
1-1/2" SW
1/2" HW
1/2" SW
1/2" SW & 1/2" HW
DN TO WSB-1
REFER TO P-400
FOR CONTINUATION
1" CW
1" CW
3/4" CW
3/4" CW
PLUMBING KEY NOTES
INSTALL WATER HEATER ON 4" CONCRETE PAD AT
LOCATION SHOWN. CONNECT TO HOT WATER AND COLD
WATER PIPING.
PRESSURE TANK PROVIDED AND INSTALLED BY WELL
PROVIDER. WELL PROVIDER IS RESPONSIBLE FOR ALL
PIPING AND ACCESSORIES BETWEEN THE WELL AND
PRESSURE TANK.
INSTALL WATER FILTER AND WATER SOFTENER AT
LOCATION SHOWN. WATER FILTER AND WATER SOFTENER
SELECTION/BASIS OF DESIGN WILL BE PROVIDED IN
UPCOMING ADDENDUM.
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
P-701
SCALE: 1/4" = 1'-0"
0 1 5 10
P401
MECHANICAL ROOM FLOOR PLAN ENLARGEMENT - PLUMBING NEW
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I
P-900
EG-1 400
20"x10" ---
EG-1 400
20"x10" ---
RG-1 325
22"x10" ---
RG-1 325
22"x10" ---
RG-1 325
22"x10" ---
EG-1 400
20"x10" ---
STORAGE
CLOSET
STORAGE
CLOSET
CLOSET
STORAGE
HALL
EA
EA EA
14" Ø
10"x8"
10"x8"
(ATTIC)
10"x8"
OA
SA
OA
10"x10" (ATTIC)14"x12"
(ATTIC)
EAEA
10"x8" 20"x16"EA UP TO RLH-1
SD-1 50
6"Ø ---
HP-5HP-6
HP-7
8"x6"
SD-1 150
8"Ø TYP. 3
12"x12"
(ATTIC)
16"x12"
(ATTIC)
14"x10"
(ATTIC)
12"x8" OA DN 12"x8" OA DN
12"x8" OA DN 20" Ø 20" Ø
20"x16" OA
UP TO IAH-1
OA
SA
18"x12"
(ATTIC)
10"x10"
(ATTIC)
ERV-1
(2150 CFM)
SA
SA
SA
OA
14" Ø
14" Ø
EG-1 250
12"x10" ---
EG-1 100
6"x6" ---
14"x10"
(ATTIC)
14"x12"
16"x10" RA DN
16"x10" RA DN 16"x10" RA DN
8" Ø
8" Ø 10"x10"
(ATTIC)
6"x6" (ATTIC) 6"x6"
(ATTIC)
12"x8"
(ATTIC)
12"x8"
(ATTIC)
14"x12"
(ATTIC)
16" Ø
14"x12"
10"x10"
(ATTIC)
6"x6"
18"x18" SA DN 18"x18" SA DN
8"x8"
(ATTIC)
18"x18" SA DN
HVAC KEY NOTES
INSTALL INTAKE/RELIEF AIR HOOD AND ASSOCIATED CURB ON
ROOF AT LOCATION SHOWN. INTAKE AIR HOOD SHALL BE
INSTALLED AT LEAST 10' AWAY FROM BUILDING AND PLUMBING
EXHAUST/VENT TERMINATIONS.
INSTALL ENERGY RECOVERY VENTILATOR IN ATTIC AT LOCATION
SHOWN. ASSOCIATED OUTSIDE AIR AND EXHAUST DUCTWORK
SHALL BE INSULATED AND ROUTED THROUGH THE ATTIC FROM
THE ENERGY RECOVERY VENTILATOR TO THE ASSOCIATED
EXHAUST GRILL/HEAT PUMP. COORDINATE THE INSTALLATION
ATTIC ACCESS WITH GENERAL TRADES CONTRACTOR PRIOR TO
CONSTRUCTION. COORDINATE THE UNIT SIZE AND CLEARANCES
WITH THE GENERAL TRADES CONTRACTOR PRIOR TO THE
TRUSSES BEING ORDERED TO CONFIRM THERE IS ADEQUATE
SPACE AND SUPPORT FOR THE UNIT WITHIN THE TRUSS WEBBING.
INSTALL WATER SOURCE HEAT PUMP AT LOCATION SHOWN. LINE
THE FIRST 10' OF SUPPLY AND RETURN DUCTWORK. PROVIDE AND
INSTALL UNIT ON 3' TALL CUSTOM SUPPORT STAND BUILT OUT OF
1-1/2"x1-1/2" ANGLE IRON WELDED TOGETHER. SUPPORT STAND
SHALL NOT INTERFERE WITH UNIT ACCESS OR DUCT/PIPE
CONNECTIONS.
INSTALL WATER SOURCE HEAT PUMP ON 4" CONCRETE PAD AT
LOCATION SHOWN. LINE THE FIRST 10' OF SUPPLY AND RETURN
DUCTWORK.
INSTALL ENERGY RECOVERY VENTILATOR AT LOCATION SHOWN IN
ATTIC. MOUNT TO EXTERIOR WALL
GENERAL NOTES
1. ALL ASSOCIATED ENERGY RECOVERY VENTILATION
DUCTWORK SHALL BE INSULATED.
RA
ERV-2
(850 CFM)
HP-2
EG-1 700
24"x14" ---
RG-1 2350
40"x20" ---
STORAGE
MECHANICAL
EA
OA
HP-3
HP-1
16"x10"
10"x10"
(ATTIC)
L-1 L-2
16"x10"
10"x10"
14"x8" OA DN
14"x8" OA DN14"x8" OA DNOA
SA
18" Ø 18" Ø
20"x14" RA DN20"x14" RA DN
16"x12" RA DN 14"x8"
16"x12"
16"x10" EA
16"x10" EA
& OA DN
16"x10" EA
& OA DN
18"x18" SA DN
18"x18" SA DN
22"x16" RA
EG-1 150
12"x10" ---
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
M-702
1 HVAC ENLARGEMENT - 124 HALL
SCALE: 1/4" = 1'-0"
0 1 5 10
2 HVAC ENLARGEMENT - 110 MECHANICAL
SCALE: 1/4" = 1'-0"
HS
BOILER-2
PRESSURE RELIEF VALVE
(TYP)
TO FLOOR DRAIN
1 1/2" DRAIN VALVE PIPE TO
FLOOR DRAIN (TYP)
P/T
STRAINER,
TYP.
THERMOMETER,
TYP.
BOILER-1
PRESSURE RELIEF VALVE
(TYP)
TO FLOOR DRAIN
P/T
1 1/2" BOILER DRAIN
PIPE TO FLOOR
DRAIN (TYP.)
THERMOMETER,
TYP.
SUPPORT AS
REQUIRED
NO
HS
1 1/2" DRAIN VA
AS-1
THERMOMETER,
TYP.
12" MAXIMUM
HR
HS
HR HS
PUMP BY BOILER
PROVIDER (TYP)
AUTOMATIC AIR VENT NO
GLYCOL FEEDER
BASED ON: BELL & GOSSET,
GMU560, 55 GALLON
STORAGE VOLUME
PRV
1"
P P
TT
BALL VALVE WITH
3/4" HOSE BIBB,
WITH CAP
FLEX CONNECTION
(TYP.)
BMS TEMPERATURE
SENSOR IN WELL
(TYP.)
PRESSURE GAUGE
(0-150 PSI) TYP.
THERMOMETER
(20° - 120°F RANGE)
TYP.
CT-1
1 MECHANICAL PIPING DIAGRAM
SCALE: NTS
1ST FLOOR GRADE
TO BAS
4" CONCRETE PAD (TYP.)
HPR
HPS
CTS
CTR
P P
EXPANSION TANK
PRESSURE GAUGE (TYP.)
AUTOMATIC AIR VENT (TYP.)
LOCK OPEN
CONNECT TO
SIDE OF MAIN
1"
HOSE END
DRAIN VALVE
P
XT-1
P P
P P
P P
S S
AUTOMATIC AIR VENT
NO
AS-2
1/2" DRAIN VALVE
SUPPORT AS
REQUIRED
HPR
HS
(130°F)
HR
TO HEAT PUMPS
TO IN-FLOOR HEAT
MANIFOLDS
TO SNOW MELT
HEAT MANIFOLDS
2"
4"
1"
3"
3"
3"
2"
2"
4"
4"
3"
4"
3" 3"
3"
3"
2"2"
4"
3"
EX
TE
RI
OR
W
AL
L
FLOWTECH
CONTROL PANEL
CONDUCTIVITY
CONTROLLER
SIGNAL TAG
FLOW SENSOR
WATER SAMPLE POINT
BLOW DOWN VALVE
CONDUCTIVITY PROBE
SPRAY WATER PUMP BY
COOLING TOWER PROVIDER
DRAIN BY SITE
CONTRACTOR
3" OVERFLOW DRAIN
PLUMBING KEY NOTES
CONTRACTOR SHALL INSTALL FLOWTECH TREATMENT SYSTEM
FTC SERIES ON CT-1. CONTRACTOR SHALL INSTALL ALL
ASSOCIATED CONTROL PANELS, CONDUCTIVITY CONTROLLERS,
MOTORIZED BLOWDOWN VALVES, PIPING, CONTROL WIRING, AND
ACCESSORIES FOR COMPLETE AND OPERABLE FLOWTECH WATER
TREATMENT SYSTEM. PIPING MUST BE SLOPED AS NECESSARY TO
ALLOW DRAINING AND PREVENT STANDING WATER.
FROM BUILDING
CW
1"
DP
GAS SHUT
OFF VALVE
DRIP LEG
LP
1-1/2"
GAS SHUT
OFF VALVE
DRIP LEG
LP
1-1/2"
GENERAL NOTES
1. FILL SYSTEM WITH 40% PROPYLENE GLYCOL
2. SYSTEM VOLUME = 650 GALLONS (APPROX.)
P P
CONDENSATE
NEUTRALIZING KIT
CHEMICAL
SHOT FEEDER
3/4"
NCNC
DP
P-1
P-2
P-3
P-4
P-5
TO BAS
TO BAS TO BAS TO BAS
CONCRETE PAD BY GENERAL
TRADES CONTRACTOR
3-WAY MODULATING
CONTROL VALVE
BALANCE VALVE TO
20.0 GPM (PHASE 1),
23.5 GPM (PHASE 2)
12" MAXIMUM 12" MAXIMUM
BALANCE VALVE TO
29.5 GPM (PHASE 1),
37.5 GPM (PHASE 2)
BALANCE VALVE TO
34 GPM (PHASE 1),
41 GPM (PHASE 2)
REFER TO CIVIL FOR
STORM CONTINUATION
VIBRATION ISOLATORS
DOMESTIC WATER FILL
TRIPLE DUTY VALVE
TYP.
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I
M-800
NOTES:
1.
2.
3.
THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
ALL STANDARD RADIUS ELBOWS SHOWN ON PLANS MAY BE MADE SHORT RADIUS
ELBOWS.
ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.
1/2W
1/3W
VANE
1/6W
2/3W
RR
VANE
W W
R
1/3WW
SHORT RADIUS ELBOW W/ONE VANESTANDARD RADIUS ELBOW SHORT RADIUS ELBOW W/TWO VANES
R SHALL EQUAL OR
BE GREATER THAN 1/3W.
R SHALL EQUAL OR
BE GREATER THAN W.
R SHALL EQUAL OR BE
GREATER THAN 1/6W
L
W
SA FLOW
RA FLOW
MAIN AIR DUCT
BALANCING DAMPER IN ALL
SA AND RA BRANCHES TO
AIR OUTLETS
BRANCH AIR DUCT
(TYPICAL)
NOTE:
L=1/4 W (4" MIN.)
45°
TO RETURN
AIR PLENUM
OPEN TO SPACE
ABOVE CEILING
1/2" THICK
ACOUSTIC LINING
18"
RETURN GRILLE
DUCT SIZE SHALL BE
REGISTER SIZE
4" CONCRETE PAD
DRAIN PAN
SUPPORT CHANNEL
OR ISOLATORS
UNIT
P (+/-)
DRAIN SHALL BE AT LEAST THE SAME
SIZE AS THE NIPPLE ON THE DRAIN PAN
OPEN VENT
SLOPE TO DRAIN
CLEAN OUT
FLOOR DRAIN
MECHANICAL
ROOM FLOOR
45°
3/8"~ THREADED
ROD. SUSPENDED
FROM STRUCTURE.
OPPOSED BLADE
VOLUME DAMPER.
SUPPLY GRILLE,
REFER TO DWG. FOR SIZE
SUSPENSION RODS TO
BE AT 8'-0" O.C. (MAX)
SPIRAL DUCT.
SIZE AS INDICATED
ON DRAWINGS.
1" WIDE, 20-GAUGE
GALVANIZED METAL
SUPPORT BAND STRAP
LOAD RATED EYE HOOK FASTENER
LOAD RATED FASTENERS
REFER TO DRAWING FOR
MOUNTING ANGLE
SEE PLANS FOR SA DUCT SIZE
TRANSITION TO UNIT
CONNECTION SIZE
FLEXIBLE CONNECTION (TYP.)
UNIVERSAL FILTER FRAME
SA DUCT
RA DUCT
OA DUCT
SIZE AS PER INLET ON EACH UNIT
HEAT
PUMP
CONTINUE TOERV
4" CONCRETE PAD
FLOOR
RETURN AIR
LINE THE FIRST 10' OF RETURN
DUCTWORK FROM THE UNIT
LINE THE FIRST 10' OF SUPPLY
DUCTWORK FROM THE UNIT
SEE PLANS FOR SA DUCT SIZE
TRANSITION TO UNIT
CONNECTION SIZE
FLEXIBLE CONNECTION (TYP.)
UNIVERSAL FILTER FRAME
SA DUCT
RA DUCT
OA DUCT
SIZE AS PER INLET ON EACH UNIT
HEAT
PUMP
CONTINUE TO ERV
RETURN AIR
FLOOR
EQUIPMENT STAND
3'
LINE THE FIRST 10' OF RETURN
DUCTWORK FROM THE UNIT
LINE THE FIRST 10' OF SUPPLY
DUCTWORK FROM THE UNIT
HANGER STRAPS HANGER RODS
STRAP HANGER TRAPEZE HANGER
NO POP RIVETS ALLOWED, USE
SELF-TAPPING SHEETMETAL
SCREWS
ONLY (TYP) LEAST 12" LONG
STEEL SADDLE, AT
14 GAUGE ZINC
INSULATION
PIPE
SHIELD INSERTS (360-DEG)
THERMAL HANGERS
COATED SHEET
HEAT PUMP
HPS
HPR
2-WAY CONTROL VALVE
SHUT OFF VALVE
CIRCUIT SETTER
UNION (TYP)
3/4" HOSE END
DRAIN VALVE
STRAINER
INSULATE & SLOPE TO
DISCHARGE OUTLET
CONDENSATE DRAIN
FLEXIBLE CONNECTOR
CD
GRAVITY RELIEF DAMPER
(0.01"S.P.)
ROOF DECK
ROOFING MATERIAL
CURB & COUNTER
FLASHING
PREFAB CURB
(INSULATED)
12" NECT EXTENSION
ALL ALUMINUM CAP
SEAL WATER TIGHT
ANGLE SUPPORT FRAME
FOR DUCT SIZE REFER
TO DRAWING
ROOF OPENING FRAMING BY
GENERAL TRADES
12" FOR RELIEF
SECURE TO CURB
WITH SHEET METAL
SCREWS 12" O.C. ALL
AROUND
BIRD SCREEN
ALL AROUND
HEAT PUMP
HPS
HPR
2-WAY CONTROL VALVE
SHUT OFF VALVE
CIRCUIT SETTER
UNION (TYP)
3/4" HOSE END
DRAIN VALVE
STRAINER
INSULATE & SLOPE TO
DISCHARGE OUTLET
CONDENSATE DRAIN
FLEXIBLE CONNECTOR
BALANCE TO 10 GPM
CD
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
M-801
WATER SOURCE HEAT PUMP
(HP-1) PIPING DIAGRAM DETAIL
SCALE: NTS
WATER SOURCE HEAT PUMP (HP-2
THRU HP-9) PIPING DIAGRAM DETAIL
SCALE: NTS
3 INSULATED PIPE HANGER DETAIL
SCALE: NTS
4 DUCT HANGER DETAIL
SCALE: NTS
5 WATER SOURCE HEAT PUMP ON STAND DUCTWORK DETAIL
SCALE: NTS
6 WATER SOURCE HEAT PUMP ON CONCRETE PAD DETAIL
SCALE: NTS
7 EXPOSED SPRIAL DUCT AND DIFFUSER DETAIL
SCALE: NTS
8 CONDENSATE TRAP DETAIL
SCALE: NTS
9 RETURN GRILLE BOOT DETAIL
SCALE: NTS
10 SA/RA DUCT CONNECTION DETAIL
SCALE: NTS
11 DUCT FITTING DETAIL - TYPICAL DUCT RADIUS
SCALE: NTS
12 ROOF HOOD DETAIL
RADIUS ELBOW
NOTE:
90° ELBOW SHOWN
SIMILAR RADIUS
CONSTRUCTION FOR
ALL ANGLES
R
R
OFFSET
ELBOW
FULL RADIUS
(R=W)
FLOW
AIR
TRANSITION - CONTRACTION FLOW
TRANSITION - DIVERGING FLOW
15°
FLOW
AIR
15°
W
W
W R=1/ W
CEILING
RETURN AIR DUCT, SEE
PLAN FOR SIZES
RETURN AIR
90° ELL FITTING W/ TURNING VANES
TYPICAL WALL
LINE DUCT W/ 1" THICK DUCT LINER
RETURN AIR
#10 X 3/4" SELF
TAPPING GALVANIZED
SHEET METAL SCREWS
DUCT.
NO POP RIVETS ALLOWED
ALL STRAPS TO BE TIGHT
SUPPORT MEMBERS.(TYP)
AGAINST DUCT AND
TO ANCHOR STRAPS TO
1" X 18 GAGE STRAP
HANGERS AT 8'-0"
SPACING.
1"
(TYP)
DUCT LINER.
12"O.C.MAX. IN DIRECTION
OF AIR FLOW.
2" 2"
SHEET METAL DUCT
NOMINAL
DIMENSION
ON AUTOMATED COIL LINE
THIS DIMENSION MAY BE
INCREASED TO 14" MAX.)
DUCT LINER
NOTE:
(TYP)
FASTENERS
(IF DUCT IS FABRICATED12"O.C.MAX.
NOT MORE THAN 2"
FROM EDGE OF LINER.
WITH ADHESIVE.
EDGES OF LINER TO BE COATED
ALL TRANSVERSE AND LONGITUDINAL
15° MAXIMUM
MAIN DUCT
DOUBLE THICKNESS
AIRFOIL TURNING
VAINES.
B
A
CONICAL TAKE-OFF WITH
VOLUME DAMPER (TYP)
SUPPLY AIR
BRANCH DUCT
FLEXIBLE DUCT
LAY-IN CLG TILE (TYP)
CEILING
SUPPORT
TEE (TYP)
SUPPLY DIFFUSER
(SEE SCHEDULE
FOR TYPE)
COLLAR
HARD ELBOW
(AS REQ'D)
EXTRUDED ALUMINUM
STATIONARY LOUVER (COLOR TO
BE SELECTED BY ARCHITECT)
EXTERIOR WALL
AIR GAP
CONCRETE BLOCK
FACTORY BIRDSCREEN
EXTENDED SILL
SEAL WEATHER TIGHT
DOUBLE-DRAINABLE BLADE
EXTEND FULL SIZE OA PLENUM
THRU WALL.
SLOPE BOTTOM OF
PLENUM @
MIN 15° FOR DRAINAGE.
INSULATE OA PLENUM & RECTANGULAR
DUCTWORK W/ MIN. 2" BOARD INSULATION
SEE PLANS FOR DUCTWORK SIZE
LOW-PRESSURE LOSS TRANSITION
DETAIL NOTE:
SEE PLANS & SCHEDULES FOR
LOUVER DIMENSIONS &
INSTALLATION ELEVATIONS.
2-WAY CONTROL VALVE ONLY
ON INFLOOR HEAT MANIFOLD'S
INFLOOR HEAT / SNOW MELT
MANIFOLD PIPING DIAGRAM
SCALE: NTS
TYPICAL CIRCUIT
MANIFOLD
CIRCUIT SETTER,
TYP.
ADAPTER, TYP.
AIR VENT, TYP.
COPPER PIPING
UNION, TYP.
BRASS VALVED
MANIFOLD, TYP.
BALANCE VALVE
EACH CIRCUIT, TYP.
HS
HR
HS & HR MAINS
PEX TUBING,
TYP.
WIRE
TIE
TUBING SHOULD BE IN TOP 1/3 OF SLAB
WITH A 2" MIN. DEPTH OF COVERAGE
WIRE MESH
BY
OTHERS
PEX
TUBING
2" THICK
HIGH
DENSITY
INSULATION
COMPACTED
SUB-GRADE
CONCRETE
CONTRACTOR TO
COORDINATE
DEPTH OF CONCRETE JOINTS
AND SNOWMELT
TUBING
10 INFLOOR HEAT / SNOWMELT CONCRETE DETAIL
SCALE: NTS
FRAME
VANED ELBOW
LOCKING LUG
2-1/4"R
4-1/2"R
TURNING VANE
NOTES:
1. LOCKING LUGS INTEGRAL WITH VANE
2. MAXIMUM UNSUPPORTED VANE LENGTH 48"
3. FRAMES - BOLTED OR RIVITED TO ELBOW
4. VANES AND FRAMES - SAME GAUGE AS ELBOW
2 1/4" 3 1/2"
-4
F o re st H il ls
N a tu re C en te r N ew N a tu re C en te r
N
R ic h R d
A lm a
M I
S ev il le T o w n sh ip
G ra ti o t C o u n ty
A lm a M ic h ig a n
M A
T R
I X
M-802
1 OUTSIDE AIR LOUVER DETAIL
SCALE: NTS
2 SUPPLY AIR DIFFUSER DETAIL
SCALE: NTS
DUCT FITTING DETAIL - WYE WITH
TURNING VANES
SCALE: NTS
4 TYPICAL DUCT LINER DETAIL
SCALE: NTS
5 TYPICAL DUCT STRAP HANGER DETAIL
SCALE: NTS
6 RETURN AIR TRANSFER DUCT
SCALE: NTS7 RECTANGULAR TRANSITIONS, OFFSETS, AND ELBOWS
SCALE: NTS
8 TURNING VANES FOR SQUARE ELBOW DETAIL
A. THE BUILDING AUTOMATION SYSTEM (BAS) SHALL SEND THE CONTROLLER OCCUPIED
MODES. IF BAS IS NOT PRESENT, OR COMMUNICATION IS LOST WITH THE BAS THE
CONTROLLER SHALL OPERATE USING DEFAULT MODES AND SETPOINTS.
B. EQUIPMENT CONTROLLED:
B.A. BOILERS B-1, B-2 (WITH MANUFACTURER PROVIDED PUMPS).
B.B. PUMPS: P-1, P-2.
C. BOILERS TO BE EQUIPPED WITH CONTROLS THAT ALLOWS THE BOILER CONTROL
PANELS TO CONTROL SEQUENCING OF ALL BOILERS AND BOILER PUMPS IN THE
BOILER ROOM AS REQUIRED TO MAINTAIN LOOP SUPPLY WATER TEMPERATURE AT
THE OPTIMUM EFFICIENCIES BASED ON OUTDOOR AIR TEMPERATURE RESET
SCHEDULE. BOILERS SHALL ALTERNATE BEING THE LEAD/LAG BOILER. BEFORE A
BOILER STARTS THE ASSOCIATED BOILER PUMP SHALL TURN ON. IF THE BOILER
CONTROL PANEL TURNS A BOILER OFF, THE BOILER'S PUMP SHALL TURN OFF. IF
BOILER FAILS, START LAG BOILER AND ALARM BAS.
D. BAS TO SEND SIGNAL TO BOILER CONTROL PANEL WHEN HEAT IS REQUIRED BASED
ON OUTDOOR AIR TEMPERATURE.
E. HOT WATER SUPPLY LOOP TEMPERATURE SHALL BE CAPABLE OF BEING CHANGED
FROM BAS.
F. THE BAS WILL OPERATE PUMPS IN A LEAD/LAG ARRANGEMENT WITH ONE PUMP
OPERATING IN LEAD MODE AND THE OTHER PUMP IN STANDBY (LAG) MODE. THE BAS
ACTIVATES THE LEAD PUMP WHENEVER THE OUTDOOR TEMPERATURE IS BELOW 55
DEG F (ADJUSTABLE). THE BAS MONITORS CURRENT SENSING RELAYS ON THE PUMP
TO VERIFY ITS OPERATING STATUS AND ALARMS IF PUMP FAILS. STANDBY PUMP IS
ACTIVATED IF THE LEAD PUMP FAILS. PUMP OPERATION ROTATES LEAD/LAG STATUS
TO EVEN PUMP WEAR. EACH PUMP IS EQUIPPED WITH A VARIABLE FREQUENCY DRIVE
(VFD). THE BAS WILL MODULATE THE VFD ON THE LEAD PUMP AS REQUIRED TO
MAINTAIN THE SYSTEM DIFFERENTIAL PRESSURE AT THE PUMP.
G. OPERATOR STATION: BAS TO CONTROL AND/OR DISPLAY THE FOLLOWING:
1. SYSTEM GRAPHIC.
2. EACH BOILER STATUS.
3. EACH BOILER CONTROL VALVE POSITION.
4. ALARM STATUS.
5. BOILER DISCHARGE WATER TEMPERATURE FOR EACH BOILER.
6. BOILER ENTERING WATER TEMPERATURE FOR EACH BOILER.
7. HOT WATER LOOP SUPPLY WATER TEMPERATURE.
8. HOT WATER LOOP RETURN WATER TEMPERATURE.
9. EMERGENCY SHUT DOWN STATUS
10. PUMPS STATUS
11. PUMPS ALARM
12. SPEED OF EACH VFD.
13. ALARM STATUS OF EACH VFD.
14. DIFFERENTIAL PRESSURE OF SYSTEM.
15. DIFFERENTIAL PRESSURE SETPOINT OF SYSTEM.
NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND INSTALLING ALL CONTROLS
FOR A COMPLETE OPERABLE SYSTEM AND MEET THE SEQUENCE OF OPERATIONS.
2. CONTRACTOR SHALL PROVIDE ALL NECESSARY SAFETIES, INTERLOCKS, HIGH
LIMITS, LOW LIMITS, TIME DELAYS, AND CONTROL LOGIC FOR A COMPLETE AND
OPERABLE SYSTEM.
BOILER SYSTEM CONTROL SEQUENCE
A. EQUIPMENT CONTROLLED:
A.A. PUMPS: P-3, P-4.
B. THE BAS WILL OPERATE THE PUMPS IN A LEAD/LAG ARRANGEMENT WITH ONE PUMP
OPERATING IN LEAD MODE AND THE OTHER PUMP IN STANDBY (LAG) MODE. THE LEAD
PUMP SHALL RUN CONTINUOUSLY. THE BAS MONITORS CURRENT SENSING RELAYS
ON THE PUMP TO VERIFY ITS OPERATING STATUS AND ALARMS IF PUMP FAILS. THE
STANDBY PUMP IS ACTIVATED IF THE LEAD PUMP FAILS. PUMP OPERATION ROTATES
LEAD/LAG STATUS TO EVEN PUMP WEAR (THE FREQUENCY OF THE ROTATION
BETWEEN LEAD/LAG SHALL BE ADJUSTABLE). EACH PUMP IS EQUIPPED WITH A
VARIABLE FREQUENCY DRIVE (VFD). THE BAS WILL MODULATE THE VFD ON THE LEAD
PUMP AS REQUIRED TO MAINTAIN THE SYSTEM DIFFERENTIAL PRESSURE AT THE
PUMP.
C. THE SUPPLY LOOP TEMPERATURE SHALL BE SET TO MAINTAIN THE LOOP BETWEEN
70-85 DEG F (ADJUSTABLE). WHEN THE TEMPERATURE RISES ABOVE 85 DEG F (ADJ.)
CONDENSER WATER SHALL BE INJECTED INTO THE SUPPLY LOOP UNTIL THE LOOP
TEMPERATURE DROPS TO 80 DEG F (ADJ.). THE CONDENSER WATER IS INJECTED INTO
THE LOOP BY THE CONDENSER WATER PUMP AND COOLING TOWER. WHEN THE
TEMPERATURE DROPS BELOW 70 (ADJUSTABLE) DEG F HOT WATER SHALL BE
INJECTED INTO THE LOOP UNTIL THE LOOP TEMPERATURE RISES 75 DEG F (ADJ.). HOT
WATER IS INJECTED INTO THE SUPPLY LOOP BY THE BOILER LOOP CONTROL VALVE.
D. SUPPLY LOOP TEMPERATURE SHALL BE CAPABLE OF BEING CHANGED FROM BAS.
E. OPERATOR STATION: BAS TO CONTROL AND/OR DISPLAY THE FOLLOWING:
1. SYSTEM GRAPHIC.
2. ALARM STATUS.
3. LOOP SUPPLY WATER TEMPERATURE.
4. LOOP RETURN WATER TEMPERATURE.
5. LOOP SUPPLY WATER HEATING SETPOINT
6. PUMPS STATUS
7. PUMPS ALARM
8. SPEED OF EACH VFD.
9. ALARM STATUS OF EACH VFD.
10. DIFFERENTIAL PRESSURE OF SYSTEM.
11. DIFFERENTIAL PRESSURE SETPOINT OF SYSTEM.
NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND INSTALLING ALL CONTROLS
FOR A COMPLETE OPERABLE SYSTEM AND MEET THE SEQUENCE OF OPERATIONS.
2. CONTRACTOR SHALL PROVIDE ALL NECESSARY SAFETIES, INTERLOCKS, HIGH
LIMITS, LOW LIMITS, TIME DELAYS, AND CONTROL LOGIC FOR A COMPLETE AND
OPERABLE SYSTEM.
HEAT PUMP LOOP CONTROL SEQUENCE
A. THE BUILDING AUTOMATION SYSTEM (BAS) SHALL SEND THE COOLING TOWER
CONTROLLER COMMANDS. IF BAS IS NOT PRESENT, OR COMMUNICATION IS LOST
WITH THE BAS THE CONTROLLER SHALL OPERATE USING DEFAULT MODES AND
SETPOINTS.
B. EQUIPMENT CONTROLLED:
B.A. PUMP: P-5
B.B. COOLING TOWER: CT-1.
C. THE BAS WILL ACTIVATE THE COOLING TOWER AND CONDENSER WATER PUMP WHEN
THE HEAT PUMP LOOP SUPPLY WATER TEMPERATURE RISES ABOVE 85 DEG F
(ADJUSTABLE). THE COOLING TOWER SHALL BE EQUIPPED WITH CONTROLS…