26027-_Redi-Mix_Concrete_-_Attachment_A.xlsx
XLSX spreadsheet 51 KB Posted
- Attached to
- Redi-Mix Concrete (2026)- Extension
- Solicitation number
- 2026-RFB-027-PR
- Issued by
- Dane County, Mattoon Village, Wisconsin
About this file
This is a price proposal attachment for a redi-mix concrete contract extension issued by a Wisconsin county government. The solicitation, designated as 2026-RFB-027, seeks pricing for various redi-mix concrete products and services to be provided on an extension basis. The bid document requests pricing for multiple concrete mix designs, including 6.0, 7.0, 9.0, and 10.0 bag mixes, with options for fiber mesh reinforcement. Additionally, the county solicits pricing for specialized batches designed to attain 3000 PSI and 4000 PSI strength ratings at varying cure times of 6, 8, 12, and 20 hours. The proposal also includes line items for supplemental services such as heated material charges, minimum load charges for quantities less than 3 cubic yards, after-hours delivery between 7 p.m. and 1 a.m., and both chloride and non-chloride accelerator additives measured in milliliters.
Bidders must submit completed pricing for both weekday and Saturday rate schedules, with pricing inclusive of all labor, delivery costs, and related expenses necessary to fulfill the specifications and terms outlined in the bid document. The unit of measure for concrete products is cubic yards (CY), while accelerators are priced per milliliter (ML). Vendors are required to complete all cells designated in orange on the proposal form and must enter "no bid" for any line items on which they are not bidding. Additionally, bidders must provide plant location information including facility names, street addresses, phone numbers, and hours of operation for all plants that will service the contract. The completed price proposal must be submitted in Microsoft Excel format to the designated section of the bid portal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Redi-Mix_Concrete_(2026)-_Extension.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Proposal
| Price Proposal | |
| Redi-Mix Concrete (2026)- Extension | |
| 2026-RFB-027 | |
| Instructions: |
1. Pricing shall be inclusive of all labor, delivery costs and other expenses necessary to provide product in accordance with the specifications and terms and conditions of this bid document and your proposal.
2. Bidders must complete all cells in orange.
A. If not bidding on a line the vendor must enter "no bid" in the No Bid column.
3. Use the Plant Locations table to enter plant name, address, contact information, and hours of operation for all plants.
4. Upload completed Price Proposal in MS Excel format to Section 1.2.
| NO 1 AND NO 2 WASHED STONE HAS BEEN MOVED TO 2026-RFB-002 CRUSHED STONE & GRAVEL (2026) | WASHED STONE MOVED TO 2025-RFB-005 CRUSHED STONE & GRAVEL (2025) | |||
| Vendor Name: | ||||
| WEEKDAY PRICE | ||||
| Line # | Description | UOM | Unit Cost | No Bid |
| 1 | 6.0 BAG MIX | CY | $ - 0 | |
| 2 | 7.0 BAG MIX | CY | $ - 0 | |
| 3 | 7.0 BAG MIX WITH FIBER MESH | CY | $ - 0 | |
| 4 | 9.0 BAG MIX | CY | $ - 0 | |
| 5 | 9.0 BAG MIX WITH FIBER MESH | CY | $ - 0 | |
| 6 | 10.0 BAG MIX | CY | $ - 0 | |
| 7 | BATCH TO ATTAIN 3000 PSI @ 20 HOURS.* | CY | $ - 0 | |
| 8 | BATCH TO ATTAIN 3000 PSI @ 12 HOURS.* | CY | $ - 0 | |
| 9 | BATCH TO ATTAIN 3000 PSI @ 8 HOURS.* | CY | $ - 0 | |
| 10 | BATCH TO ATTAIN 3000 PSI @ 6 HOURS.* | CY | $ - 0 | |
| 11 | BATCH TO ATTAIN 4000 PSI @ 20 HOURS.* | CY | $ - 0 | |
| 12 | BATCH TO ATTAIN 4000 PSI @ 12 HOURS.* | CY | $ - 0 | |
| 13 | BATCH TO ATTAIN 4000 PSI @ 8 HOURS.* | CY | $ - 0 | |
| 14 | BATCH TO ATTAIN 4000 PSI @ 6 HOURS.* | CY | $ - 0 | |
| 15 | ADD'L CHARGE FOR HEATED MATERIAL | CY | $ - 0 | |
| 16 | MINIMUM LOAD CHARGE (LESS THAN 3 CY) | CY | $ - 0 | |
| 17 | ADD'L CHARGE FOR DELIVERY BETWEEN 7 P.M. AND 1 A.M. (FOR SPECIAL PROJECTS) | CY | $ - 0 | |
| 18 | CHLORIDE ACCELERATOR | ML | $ - 0 | |
| 19 | NON-CHLORIDE ACCELERATOR | ML | $ - 0 | |
| SATURDAY PRICE | ||||
| Line # | Description | UOM | Unit Cost | No Bid |
| 20 | 6.0 BAG MIX | CY | $ - 0 | |
| 21 | 7.0 BAG MIX | CY | $ - 0 | |
| 22 | 7.0 BAG MIX WITH FIBER MESH | CY | $ - 0 | |
| 23 | 9.0 BAG MIX | CY | $ - 0 | |
| 24 | 9.0 BAG MIX WITH FIBER MESH | CY | $ - 0 | |
| 25 | 10.0 BAG MIX | CY | $ - 0 | |
| 26 | BATCH TO ATTAIN 3000 PSI @ 20 HOURS.* | CY | $ - 0 | |
| 27 | BATCH TO ATTAIN 3000 PSI @ 12 HOURS.* | CY | $ - 0 | |
| 28 | BATCH TO ATTAIN 3000 PSI @ 8 HOURS.* | CY | $ - 0 | |
| 29 | BATCH TO ATTAIN 3000 PSI @ 6 HOURS.* | CY | $ - 0 | |
| 30 | BATCH TO ATTAIN 4000 PSI @ 20 HOURS.* | CY | $ - 0 | |
| 31 | BATCH TO ATTAIN 4000 PSI @ 12 HOURS.* | CY | $ - 0 | |
| 32 | BATCH TO ATTAIN 4000 PSI @ 8 HOURS.* | CY | $ - 0 | |
| 33 | BATCH TO ATTAIN 4000 PSI @ 6 HOURS.* | CY | $ - 0 | |
| 34 | ADD'L CHARGE FOR HEATED MATERIAL | CY | $ - 0 | |
| 35 | MINIMUM LOAD CHARGE (LESS THAN 3 CY) | CY | $ - 0 | |
| 36 | ADD'L CHARGE FOR DELIVERY BETWEEN 7 P.M. AND 1 A.M. (FOR SPECIAL PROJECTS) | CY | $ - 0 | |
| 37 | CHLORIDE ACCELERATOR | ML | $ - 0 | |
| 38 | NON-CHLORIDE ACCELERATOR | ML | $ - 0 | |
| Plant Names |
List the Plant Name(s) with street address, phone numbers and hours of operations for each plant.
Plant Name Plant Address Hours of Operation Phone number image1.tiff
File details come from the government source that posted it. Updated .